0_SOW_845548_06232017.pdf

PDF 34 KB Posted

Attached to
CCRD Clear Lake & Clear Creek Campground Construction/Re-Construction Federal contract opportunity
Solicitation number
AG-82AT-S-17-0014
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

About this file

0. SOW

View the file

Other files for this federal contract opportunity

Other files attached to CCRD Clear Lake & Clear Creek Campground Construction/Re-Construction, newest first.
File Type Posted
Schedule_B_AG82ATS170014-SOI_Fill-In.xlsx XLSX spreadsheet
Pre-Bid_Minutes_AG82ATS170014.pdf PDF
Sects_B-M_AG82ATS170014-1,_08112017.pdf PDF
3_GENERAL_NOTES_(U)08112017.pdf PDF
AG82ATS170014,_000001.pdf PDF
32._fs_6300-11_SubcontractorApproval.doc DOC document
0_AG-82AT-S-17-0014.pdf PDF
31_SOL._TITLE_PAGE_EXAMPLE.docx DOCX document
14_EROSION-LAYOUT.pdf PDF
25_SITESIGN.pdf PDF
11_FEE_STATION.pdf PDF
12_STAIR-TRAIL.pdf PDF
19_GATES.pdf PDF
13_TEMP-EROSION.pdf PDF
7_Clear_CreekCG_Spur_Profile.pdf PDF
6_So_Clear_CreekCGmain_rd_profile_.pdf PDF
18_FIRE_BEAR_PROOF_BOX.pdf PDF
15_CULVERTS.pdf PDF
22_TOILET-DIM.pdf PDF
8_TYP_RD_SPUR.pdf PDF
17_TABLE.pdf PDF
23_KIOSKS.pdf PDF
0a_Questions_and_Answers.pdf PDF
28_WD,_CO13,_02032017,v3.pdf PDF
3_GENERAL_NOTES.pdf PDF
16_TOILETLAYOUT.pdf PDF
13_TEMP-EROSION.pdf PDF
5_SO_CLEAR_CK_SDP.pdf PDF
2_SPECIFICATIONS_02032017.pdf PDF
24_DUMPSTER_PAD.pdf PDF
9_SIDEWALKDETAILS.pdf PDF
10_SPURS_PAD.pdf PDF
4_SDP_CLEAR_LAKE_CG.pdf PDF
27_well_pump.pdf PDF
21_SIGN-INSTALLATION.pdf PDF
30_r2_fs_6300_7_Progress_Schedule.rtf RTF text file
26_wheel_block_barrier.pdf PDF
29_FS_6300-27,_Experience_Questionnaire.docx DOCX document
20_GATE_DETAILS.pdf PDF
1_Cover_Sheet,_CL.SCC.CG.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Arapaho Roosevelt National Forests and Pawnee National Grasslands

CCRD CLEAR LAKE & CLEAR CREEK CAMPGROUND CONSTRUCTION/RE-

CONSTRUCTION

19 APRIL 2017

Rev. 3

USDA Forest Service

INTRODUCTION: The USDA Forest Service has a requirement to rebuild the Clear Lake Campground to meet the accessibility guidelines, and to construct a new campground called South Clear Creek Campground.

SCOPE: The new construction will include improvements added to the access road of the campgrounds, the campground loop roads and parking spurs, re/construction of campground recreational facilities (facility pads, picnic tables, fire rings, tent pads, bear-proof storage lockers, aggregate trails) and other recreation facilities (installing two two-unit prefabricated concrete toilets, interpretive kiosks, fee station, concrete sidewalks and pads, barrier rocks, wheelstops, culverts, gates, and signage). Re-construction of campground recreational facilities includes but may not be limited to road, parking spurs, facility pads, picnic tables, fire rings, tent pads, bear-proof storage lockers, aggregate trails and installing two two-unit vault prefabricated concrete toilets, interpretive kiosks, fee station, concrete sidewalks and pads, barrier rocks, wheelstops, culverts, gates, and signage. There will also be the obliteration of several items including the existing vault toilet, storage shed, bulletin board and other campground amenities as marked on the drawings. Denuded camping and parking areas not designated as campsites or parking areas will be restored, seeded and mulched. Contractor shall provide all materials, labor, transportation, and supervision necessary to complete the reconstruction of an 11 unit campground and new construction of an 8 unit campground.

LOCATION: Guanella Pass Road goes 23 miles from Georgetown to Grant. Georgetown is approximately 45 miles west of Denver, Colorado. The Clear Lake CG is located approximately 4 miles south of Georgetown, Colorado along the Guanella Pass Road, CR381. South Clear Creek CG will be constructed about 8 miles south of Georgetown, Colorado, along the Guanella Pass Road, CR381 in Clear Creek County.

PERIOD OF PERFORMANCE: The anticipated period of performance is 150 days from the date of award (on or about 23 June 2017).

TECHNICAL REQUIREMENTS:

1. Reference attached Specifications.

DELIEVERABLES:

1. Project Schedule

2. Quality Assurance Plan

3. Safety Plan

4. Bond

5. See Attached Specifications for other deliverables (submittals).

Arapaho Roosevelt National Forests and Pawnee National Grasslands

CCRD CLEAR LAKE & CLEAR CREEK CAMPGROUND CONSTRUCTION/RE-

CONSTRUCTION

19 APRIL 2017

Rev. 3

USDA Forest Service

SPECIAL CONSIDERATIONS:

Bonding – There ☒is / ☐is not a bonding requirement for this contract. If bonding is required, bids requiring a bond, refer to FAR 28.101-2. Bids are required to have payment bonds 20% of the bid price. If awarded, the performance and payment bonds are 100% of the award amount.

This information is also in accordance with FAR 52.228-1.

Security -- Not applicable.

Government Furnished Property/Material- Except for the materials specifically stated within the awarded contract, the contractor shall be expected to provide all the tools, equipment and materials necessary to carry out this work. The government shall provide the contractor…

Contract Type: Firm Fixed Price (FFP)

PRIMARY NAICS: 237990, Other Heavy and Civil Engineering Construction

File details come from the government source that posted it. Updated .