0_AG-82AT-S-17-0014.pdf
PDF 809 KB Posted
- Attached to
- CCRD Clear Lake & Clear Creek Campground Construction/Re-Construction Federal contract opportunity
- Solicitation number
- AG-82AT-S-17-0014
About this file
Solicitation AG-82AT-S-17-0014
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
USDA FOREST SERVICE
ARAPAHOE-ROOSEVELT NF PAWNEE NG
2150 CENTRE AVENUE BUILDING E
FORT COLLINS CO 80526-8119
82AT
USDA Forest Service, ATTN: Klenise Wallace
Email Only: klenisewallace@fs.fed.us 2150 Centre Ave. Bldg E., Fort Collins, CO 80526
KLENISE WALLACE 970-295-6680
1x 06/30/2017
AG-82AT-S-17-0014
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
IGF::OT::IGF
Solicitation: AG-82AT-S-17-0014
Project Title: CCRD Clear Lake & Clear Creek Campground Construction/Re-Construction
Description: USDA FS will award a Firm Fixed Price Contract for work necessary to complete the reconstruction of an 11 unit campground and new construction of an 8 unit campground.
Project Location: Gunella Pass Road goes 23 miles from Georgetown CO to Grant
Colorado. Georgetown is approximately 45 miles west of Denver, Colorado. The Clear
Lake CG is located approximately 4 miles west of Georgetown, Colorado along the
Guanella Pass Road, CR381. South Clear Creek CG will be constructed about 8 miles west of Georgetown, Colorado, along the Guanella Pass Road, CR381. Clear Creek
County.
Set Aside: Women Owned Small Business (WOSB)
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 150 calendar days and complete it within ________________ ________________ calendar days after receiving
08/11/2017
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
845548
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA FOREST SERVICE
ARAPAHOE-ROOSEVELT NF PAWNEE NG
2150 CENTRE AVENUE BUILDING E
FORT COLLINS CO 80526-8119
82AT
CHRISTINA A. COOK
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 44
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
AG-82AT-S-17-0014
Project Magnitude (FAR 36.204): It is anticipated that the range price of this contract will be
(FAR 36.204):
Between $250,000 and $500,000. Contractor shall have the **bonding** capacity for the requirement prior to final selection for award. Please ensure that you have the bonding capacity for this project prior to proposal submittal.
Pre-Bid Conference/On Site Visit: See Section L
070 CCRD Clear Lake & Clear Creek Campground 1 LS
Construction/Re-Construction
See Solicitation Section B for Line Items
(Not Separately Priced)
Delivery: 150 Days After Notice to Proceed
FOB: Destination
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation No. AG-82AT-S-17-0014 Arapaho Roosevelt NF’s and Pawnee NG Page 4 of 44 CCRD Clear Lake & Clear Creek Campground Construction/Re-Construction
Continuation of SF 1442
Block 27: The full text of a clause or provision may be accessed electronically at https://www.acquisition.gov/far/html/FARTOCP52.html.
This procurement requires the use of biobased products to the extent that such products are reasonably available, meet agency or relevant industry performance standards, are reasonably priced. Where available, these products should first be acquired from among qualified products that fall under the umbrella of items designated through the Federal Biobased Products Preferred Procurement Program (FB4P).
For more information on biobased program and biobased products, refer to the links under Section C.8.1. and C.8.2.
https://www.acquisition.gov/far/html/FARTOCP52.html
Arapaho Roosevelt NF’s and Pawnee NG Page 5 of 44
This Page Intentionally Left Blank
Arapaho Roosevelt NF’s and Pawnee NG Page 6 of 44
Table of Contents
SECTION B – SCHEDULE OF ITEMS
SECTION C – DESCRIPTION/SPECIFICATIONS
SECTION D – PACKAGING AND MARKING
SECTION E – INSPECTION AND ACCEPTANCE
SECTION F – DELIVERIES OR PERFORMANCE
SECTION G – CONTRACT ADMINISTRATION DATA
SECTION H – SPECIAL CONTRACT REQUIREMENTS
SECTION I - CONTRACT CLAUSES
SECTION J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
SECTION M – EVALUATION FACTORS FOR AWARD
Arapaho Roosevelt NF’s and Pawnee NG Page 7 of 44
SECTION B – SCHEDULE OF ITEMS
BASE AWARD: AWARD TO 31 JULY 2018
South Clear Creek CG Construction
ITEM
NO. DESCRIPTION
METHOD
OF
MEASURE UOM QTY
UNIT
PRICE
TOTAL
PRICE
1 00250(01)B Construction Surveying L.S.
Lump Sum 1 $_________ $___________
2 01442(01)B Quality Control L.S.
Lump Sum 1 $_________ $___________
3 01505(01)B Mobilization L.S.
Lump Sum 1 $_________ $___________
4 01561(01)B Soil Erosion & Pollution Control L.S.
Lump Sum 1 $_________ $___________
5 02130(01)B
Clearing and Grubbing, Slash Treatment Methods for Tops and Limbs, Logs, And Stumps D.Q. Acre 1.20 $_________ $___________
6 02221(01)B Excavation, Placement Method 4 D.Q.
Cubic Yard 313 $_________ $___________
7 02221(02)B
Borrow Excavation, Placement Method 4 (Embankment) D.Q.
Cubic Yard 414 $_________ $___________
8 02221(03)B Placing GFM Barrier Rock A.Q. Each 32 $_________ $___________
9 02231(01)B
Crushed Aggregate, Grading CDOT Class 6 (3/4" Minus), Placement Method D- Road and Spurs A.Q. Ton 376 $_________ $___________
10 02231(02)B
Crusher Fines, Placement Method 2- Layer Placement - Facility & Tent Pads A.Q. Ton 216 $_________ $___________
11 02462(01)B Furnish and Install Accessible Raised Fire Ring A.Q. Each 8 $_________ $___________
12 02465(01)B
Install GFM Metal Bear Proof Box on Pedestals with Concrete Pad A.Q. Each 8 $_________ $___________
13 02472(01)B Picnic Table (Single Pad) A.Q. Each 8 $_________ $___________ 14 02514(01)B Hot Bituminous Plant Mix A.Q. Ton 18 $_________ $___________
15 02519(01)B Aggregate Trails, 3'-0" Wide, Granite Crusher Fines A.Q. Ton 59.00 $_________ $___________
16 586 linear feet trail $_________ $___________
17 02521(01)B
18-Inch Corregated Plastic Pipe with End Sections, Method C A.Q.
Linear Feet 90 $_________ $___________
18 02831(01)B Wheelstops (Precast Concrete) A.Q. Each 13 $_________ $___________ 19 02833(01)B Single Lane Closure Gate A.Q. Each 1 $_________ $___________
20 02833(02)B 30-Feet Double Lane Closure Gate A.Q. Each 1 $_________ $___________
21 02846(01)B Furnish and Install Regulatory Sign (Aluminum) A.Q. Each 8 $_________ $___________
Arapaho Roosevelt NF’s and Pawnee NG Page 8 of 44
METHOD
OF
MEASURE UOM QTY
UNIT
PRICE
TOTAL
PRICE
22 02846(02)B
Install Recreational Sign (Government Furnished Material) A.Q. Each 3 $_________ $___________
23 02933(01)B Seeding, Dry Method A.Q. Acre 0.3 $_________ $___________
24 03305(01)B Portland Cement Concrete, 4- Inch Thickness A.Q.
Cubic Yard 3 $_________ $___________
25 06131(01)B Timber Borders - Length in Place A.Q.
Linear Feet 1280 $_________ $___________
26 10411(01)B Site Unit Markers A.Q. Each 8 $_________ $___________
27 10414(01)B Site Identification Sign, Timber Frame A.Q. Each 1 $_________ $___________
28 10415(01)B Double Panel Interpretive Kiosk A.Q. Each 1 $_________ $___________
29 10415(03)B Construct Fee Station and Install (GFM) Fee Tube A.Q. Each 1 $_________ $___________
30 10415(04)B Concrete Dumpster Pad 6'x7' & 20' Road Section A.Q. Each 1 $_________ $___________
31 10474(01)B Facility Pad (Single) A.Q. Each 8 $_________ $___________ 32 10474(03)B Tent Pad A.Q. Each 8 $_________ $___________
33 13601(01)B
Two Unit Prefabricated Concrete Toilet with Stone Wainscotting A.Q. Each 1 $_________ $___________
TOTAL $ __________
Arapaho Roosevelt NF’s and Pawnee NG Page 9 of 44
Clear Lake CG ADA Re-Construction
METHOD
OF
MEASURE UOM QTY
UNIT
PRICE
TOTAL
PRICE
1 00250(01)A Construction Surveying L.S.
Lump Sum 1 $_________ $___________
2 01442(01)A Quality Control L.S.
Lump Sum 1 $_________ $___________
3 01505(01)A Mobilization L.S.
Lump Sum 1 $_________ $___________
4 01561(01)A Soil Erosion & Pollution Control L.S.
Lump Sum 1 $_________ $___________
5 02020(01)A
Obliteration of Abandoned Site and Demolition of Storage & Toilet Buildings L.S.
Lump Sum 1 $_________ $___________
6 02130(01)A
Clearing and Grubbing, Slash Treatment Methods for Tops and Limbs, Logs , and Stumps D.Q. Acre 0.15 $_________ $___________
7 02221(01)A Excavation, Placement Method 4, Tolerance Class D D.Q.
Cubic Yard 115 $_________ $___________
8 02221(02)A
Borrow Excavation, Placement Method 4 (Embankment) D.Q.
Cubic Yard 15 $_________ $___________
9 02221(03)A
Barrier Rock, Haul & Place GFM from So. Clear Creek CG A.Q. Each 20 $_________ $___________
10 02231(01)A
Crushed Aggregate, Grading CDOT Class 6, Placement Method D (6"x12'x1000') (Entire Road Length ~1000') A.Q. Ton 528.1 $_________ $___________
11 02231(02)A
Crusher Fines, Placement Method 2- Layer Placement & 2 pass of vibratory compaction or no more displacement - for Facility & Tent Pads A.Q. Ton 307.7 $_________ $___________
12 02232(01)A Filter Fabric GeoTextile Type II - Seperation A.Q.
Linear Feet 200.0 $_________ $___________
13 02462(01)A Furnish and Install Accessible Raised Fire Ring A.Q. Each 11 $_________ $___________
14 02465(01)A
Install GFM Metal Bear Proof Box on Pedestals with Concrete Pad A.Q. Each 9 $_________ $___________
15 02465(02)A
Install GFM Metal Bear Proof Box (Double Unit) on Pedestals with Large Concrete Pad A.Q. Each 2 $_________ $___________
16 02472(01)A Picnic Table (Single Pad) A.Q. Each 9 $_________ $___________
Arapaho Roosevelt NF’s and Pawnee NG Page 10 of 44
METHOD
OF
MEASURE UOM QTY
UNIT
PRICE
TOTAL
PRICE
17 02472(02)A Picnic Table (Double Pad) A.Q. Each 2 $_________ $___________ 18 02514(01)A Hot Bituminous Plant Mix A.Q. Tons 22 $_________ $___________
19 02519(01)A Aggregate Trails, 3'-0" Wide, Granite Crusher Fines A.Q. Tons 37 $_________ $___________
20 125 + 240 linear ft trail $_________ $___________ 21 02520(01)A Timber Steps @ Site #10 A.Q. Each 6 $_________ $___________
22 02521(01)A
18-Inch Corregated Plastic Pipe with End Sections, Method C A.Q.
Linear Feet 40 $_________ $___________
23 02831(01)A Wheelstops (Precast Concrete) A.Q. Each 13 $_________ $___________
24 02833(02)A 30-Feet Double Lane Closure Gate A.Q. Each 1 $_________ $___________
25 02846(01)A Furnish and Install Regulatory Sign (Aluminum) A.Q. Each 2 $_________ $___________
26 02846(02)A
Install Recreational Sign (Government Furnished Material) A.Q. Each 7 $_________ $___________
27 02933(01)A Seeding, Dry Method (with Mulch) L.S. Acre 0.25 $_________ $___________
28 03305(01)A Portland Cement Concrete Sidewalk, 4-Inch Thickness A.Q.
Cubic Yard 2 $_________ $___________
29 06131(01)A Timber Borders Length in Place A.Q.
Linear Feet 1496 $_________ $___________
30 10411(01)A Site Unit Markers A.Q. Each 11 $_________ $___________
31 10415(02)A Triple Panel Interpretive Kiosk A.Q. Each 1 $_________ $___________
32 10415(03)A Construct Fee Station and Install (GFM) Fee Tube A.Q. Each 1 $_________ $___________
33 10415(04)A Aggregate Dumpster Pad 6'X7' A.Q. Each 1 $_________ $___________
34 10474(01)A Facility Pad (Single) A.Q. Each 9 $_________ $___________ 35 10474(02)A Facility Pad (Double) A.Q. Each 2 $_________ $___________ 36 10474(03)A Tent Pad A.Q. Each 13 $_________ $___________
37 10474(04)A Replace Hand Pump with ADA Hand Pump A.Q. Each 1 $_________ $___________
38 13601(01)A
Two Unit Prefabricated Concrete Toilet with Stone Wainscotting A.Q. Each 1 $_________ $___________
TOTAL $ __________
Arapaho Roosevelt NF’s and Pawnee NG Page 11 of 44
SECTION C – DESCRIPTION/SPECIFICATIONS
C.1 SCOPE OF CONTRACT
The USDA Forest Service has a requirement for work necessary to complete the reconstruction of an 11 unit campground and new construction of an 8 unit campground.
C.2 DESCRIPTION OF WORK
The new construction will include improvements added to the access road of the campgrounds; the campground loop roads and parking spurs; re/construction of campground recreational facilities including facility pads, picnic tables, fire rings, tent pads, bear-proof storage lockers, aggregate trails;) and re/construction of other recreation facilities including installing two two-unit prefabricated concrete toilets, interpretive kiosks, fee station, concrete sidewalks and pads, barrier rocks, wheelstops, culverts, gates, and signage.
Re-construction of campground recreational facilities includes but may not be limited to road, parking spurs, facility pads, picnic tables, fire rings, tent pads, bear-proof storage lockers, aggregate trails and installing two two-unit vault prefabricated concrete toilets, interpretive kiosks, fee station, concrete sidewalks and pads, barrier rocks, wheelstops, culverts, gates, and signage. There will also be the obliteration of several items including the existing vault toilet, storage shed, bulletin board and other campground amenities as marked on the drawings. Denoted camping and parking areas not designated as campsites or parking areas will be restored, seeded and mulched. Contractor shall provide all materials, labor, transportation, and supervision necessary to complete the reconstruction of an 11 unit campground and new construction of an 8 unit campground.
Details can be found in the project specifications and additional supporting documents listed in Section J.
C.3 LOCATION OF PROJECT
Guanella Pass Road goes 23 miles from Georgetown to Grant, Colorado. Georgetown is approximately 45 miles west of Denver, Colorado. The Clear Lake Camp Ground is located approximately 4 miles south of Georgetown, Colorado along the Guanella Pass Road, CR381. South Clear Creek Camp Ground will be constructed about 8 miles south of Georgetown, Colorado, along the Guanella Pass Road, CR381 in Clear Creek County.
C.4 PERFORMANCE OF THE WORK
All work shall be conducted in a safe and expedient manner in conformance with the specifications referenced in Section J, attachment J.3.
C.6 LIST OF REQUIRED SUBMITTALS
Below is a list of required submittals (to be provided after contract award):
1. Final Project Schedule
2. Quality Assurance/Control Plan
3. Safety Plan
4. Spill plan.
5. See Attached Specifications for other deliverables (submittals).
C.7 SAFETY
Contractors are subject to all applicable State and Federal OSHA rules and regulations. At time of award, the contractor shall submit to the COR, a safety plan that addresses the Material Safety Data Sheets (MSDS) with the intended use of each of the solutions the contractor proposes to use in the performance of work. MSDS sheets shall be supplied to the COR prior to using the items in the buildings. The Contractor shall not use any materials in which the COR determines to be unsuitable for the work, or harmful to the surfaces it is intended to be applied to. This does not relieve the Contractor of any damages resulting from the application of such materials. All containers used shall be clearly marked with manufacturer, type of chemical and intended usage. Mixing of chemicals is not allowed.
Arapaho Roosevelt NF’s and Pawnee NG Page 12 of 44
All equipment used in the process of cleaning the facilities shall be kept in safe working condition. All equipment used shall be inspected prior to each use. The Contractor shall remove damaged equipment from service until repairs are made or equipment replaced.
C.8 SUSTAINABLE PRODUCTS
The Contractor shall comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.
The Contractor shall utilize products and material made from biobased materials (e.g. biobased greases, biobased hydraulic fluids, biobased absorbents) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer.
C.8.1 In the performance of this contract, the Contractor shall make maximum use of biobased oils and lubricants that are designated by the United States Department of Agriculture unless the product cannot be acquired:
- Competitively within a time frame providing for compliance with the contract performance schedule;
- Meeting contract performance requirements; or
- At a reasonable price.
Information about this requirement and these products is available at http://sftool.gov/green-products/1/construction-materials.
C.8.2 The Federal Acquisition Regulation (FAR) requires Contractors to report the purchase of biobased products under service and construction contracts during the previous Government fiscal year (October 1 thru September 30) and to submit this report no later than:
1. October 31 of each year during contract performance; and
2. At the end of contract performance.
3. Information about this requirement is available at http://www.biopreferred.gov/FARReporting/FARReporting.xhtml
C.8.3 Sustainable products identified for this solicitation:
The following is an example list of products that may be used in this contract for operations and maintenance for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
C.8.3.1 Diesel Fuel Additives
(1) Any substance, other than one composed solely of carbon and/or hydrogen that is intentionally added to diesel fuel (including any added to a motor vehicle's fuel system) and that is not intentionally removed prior to sale or use.
(2) Neat biodiesel, also referred to as B100, when used as an additive. Diesel fuel additive does not mean neat biodiesel when used as a fuel or blended biodiesel fuel (e.g., B20). 90% - Minimum Biobased Content.
C.8.3.2 Hydraulic Fluids - Mobile Equipment
Hydraulic fluids formulated for general use in nonstationary equipment, such as tractors, end loaders, or backhoes. 44% - Minimum Biobased Content.
http://sftool.gov/green-products/1/construction-materials http://sftool.gov/green-products/1/construction-materials http://www.biopreferred.gov/FARReporting/FARReporting.xhtml
Arapaho Roosevelt NF’s and Pawnee NG Page 13 of 44
C.8.3.3 Penetrating Lubricants
Products formulated to provide light lubrication and corrosion resistance in close tolerant internal and external applications including frozen nuts and bolts, power tools, gears, valves, chains, and cables. 68% - Minimum Biobased Content.
C.8.3.4 Greases - Truck
Lubricants composed of oils thickened to a semisolid or solid consistency using soaps, polymers or other solids, or other thickeners. Lubricants that are designed for use on the fifth wheel of tractor trailer trucks onto which the semi-trailer rests and pivots. 71% - Minimum Biobased Content.
C.8.3.5 Gear Lubricants
Products, such as greases or oils, that are designed to reduce friction when applied to a toothed machine part (such as a wheel or cylinder) that meshes with another toothed part to transmit motion or to change speed or direction. 58% - Minimum Biobased Content.
C.8.3.6 Fuel Conditioners
Products formulated to improve the performance and efficiency of engines by providing benefits such as removing accumulated deposits, increasing lubricity, removing moisture, increasing the cetane number, and/or preventing microbial growths within the fuel system. 64% - Minimum Biobased Content.
C.8.3.7 Erosion Control
Woven or non-woven fiber materials manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose earth surfaces, which may be combined with seed and/or fertilizer to promote growth. 77% - Minimum Biobased Content.
C.8 CONTRACT TIME
The contract time will be 150 days after the notice to proceed date.
452.211-72 Statement of Work/Specifications. (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
Arapaho Roosevelt NF’s and Pawnee NG Page 14 of 44
SECTION D – PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
Arapaho Roosevelt NF’s and Pawnee NG Page 15 of 44
SECTION E – INSPECTION AND ACCEPTANCE
52.246-12 Inspection of Construction. (AUG 1996)
(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not --
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes re-inspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may --
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
(End of Clause)
52.246-13 Inspection – Dismantling, Demolition or Removal of Improvements (AUG 1996)
452.246-70 Inspection and Acceptance (FEB 1988)
(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.
(b) Inspection and acceptance will be performed at the project location specified under C.3.
(End of clause)
Arapaho Roosevelt NF’s and Pawnee NG Page 16 of 44
SECTION F – DELIVERIES OR PERFORMANCE
52.211-10 Commencement, Prosecution and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days of award and complete within 150 days after the NTP as provided for on the SF 1442, block 11.
(b) Prosecute the work diligently, and (c) complete the entire work ready for use not later than 31 July 2018. The time stated for completion shall include final cleanup of the premises.
(End of clause)
Alternate I (Apr 1984). If the completion date is expressed as a specific calendar date, computed on the basis of the contractor receiving the notice to proceed by a certain day, add the following paragraph to the basic clause:
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 28 August 2017. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
52.242-14 Suspension of Work. (APR 1984) 52.242-15 Stop-Work Order. (AUG 1989)
452.211-75 Effective Period of the Contract. (FEB 1988) The effective period of this contract is 150 business days after the notice to proceed date.
Arapaho Roosevelt NF’s and Pawnee NG Page 17 of 44
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 INVOICES & PAYMENTS
All invoices are to be submitted via the electronic Invoice Processing Platform (IPP) System.
The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in previous communications from USDA and Treasury.
This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm Ensure your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. Offeror must have an established account prior to commencement of work.
Invoice Processing Platform (IPP) does not allow for the contractor to change the description of the line items being invoiced against and therefore an itemized invoice must be uploaded as an attachment(s).
Itemized invoice shall include at a minimum:
Contractor Name and Address Contract, Task Order or Purchase Order numbers Invoice Number Description of Services or work completed.
Date of services or completion.
G.2 FOREST SERVICE REPRESENTATIVES:
Klenise Wallace shall serve as the Contracts Specialist administering this contract and is the contact on all things concerning this contract. The Contracts Specialist can be reached at klenisewallace@fs.fed.us or 970-295-6680. The signing Contracting Officer (CO) will be appointed and his/her contact information will be provided upon award of the contract.
The Contracting Officer has full warrant authority over all contract issues.
A Contracting Officer Representative (COR) will be appointed for this contract upon award. The COR delegated authority, responsibilities and contact information will be defined on a delegation letter issued after contract award.
G.3 CONTRACT ADMINISTRATION DATA
Contract Award. A written award or acceptance of offer mailed or otherwise furnished to the Contractor shall result in a binding contract without further action by either party.
Notice to Proceed. The Contractor shall commence work upon receipt of a properly executed Notice to Proceed.
Changes. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract the said authority remains solely with the Contracting Officer. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.
Unauthorized Instructions from Government or Other Personnel. The Contractor shall not accept instructions issued by any person employed by the U.S. Government or otherwise other than the Contracting Officer, or the authorized representative of the Contracting Officer acting within the limits of his/her authority.
Designation of Contracting Officer’s Representative (COR). Designation will be made upon contract issuance of task order(s) and a copy of the designation letters will be furnished to the Contractor. Limits of authority are described in each designation letter.
https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm https://www.ipp.gov/vendors/enrollment-vendors.htm mailto:klenisewallace@fs.fed.us
Arapaho Roosevelt NF’s and Pawnee NG Page 18 of 44
Designation of Authorized Representative of the Contractor. The Contractor shall assign a member or employee who will act as Project Manager during the course of this contract or during the course of this project. The official shall be responsible for affording liaison between the contract forces and the contracting offices. This designation shall be in writing and a copy furnished to the Contracting Officer.
Arapaho Roosevelt NF’s and Pawnee NG Page 19 of 44
SECTION H – SPECIAL CONTRACT REQUIREMENTS
452.237-74 Key Personnel. (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel: Contractor Representative, Project Manager, Project Forman/Woman, and Inspector.
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer.
Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions.
The contract will be modified to reflect any approved changes of key personnel.
H.1. PERSONAL PROTECTIVE EQUIPMENT
The contractor shall train workers in the safe operation and use of equipment that the worker may use before the worker begins using such equipment.
Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered which may cause injury or impairment in the function of any part of the body. Defective or damaged personal protective equipment shall not be used.
The contractor shall provide chain saw chaps to each employee who operates a chain saw, at no cost to the employee. These chaps must be approved by an Underwriters Laboratory or meet Forest Service specification 6170-47. The chaps shall cover the full length of the thigh and shall extend to the top of the boot on each leg.
The contractor shall assure that each employee wears foot protection that provides adequate traction and ankle support.
Employees operating chain saws shall wear foot protection that is constructed with cut-resistant material which will protect the employee against contact with a running chain saw.
In any area where the worker is exposed to the potential for flying or falling objects, the contractor shall provide a hard hat, at no cost to the employee, and the contractor shall assure that the employee wears the hard hat. The hard hat must meet the minimum requirements of American National Standards Institute (ANSI) standard Z89.1-1997.
The contractor shall provide, at no cost to the employee, eye protection where there is potential for eye injury due to flying objects. This eye protection must meet the minimum requirements of ANSI standard Z87.1-2003.
The contractor shall provide, at no cost to the employee, hearing protection where there is a potential for hearing loss due to high intensity noise for example, chain saw operation.
H.2 PREWORK CONFERENCE
After issuance of contract award and prior to commencement of work, the Contractor shall attend a meeting to discuss the contract terms, work performance requirements, and safety. Also at this meeting such items as work progress schedule, quality control, worksite plan, and fire prevention plans shall be finalized in writing.
H. 3 FIRE PREVENTION AND CONTROL
See Section J Attachments. The Fire Control plan can be found within the specifications attachment.
Arapaho Roosevelt NF’s and Pawnee NG Page 20 of 44
H.4. PORTABLE TOILETS FOR CONSTRUCTION CREW. The contractor shall provide necessary portable facilities for construction crew employees as use of the government facilities is not permitted for this contract. The contractor shall ensure that maintenance and service of the portable facilities is in accordance with OSHA requirements and that the number of employees to number of facilities ratio is adhered to. Contract shall include costs for portable toilet rental and maintenance is included in overall cost to perform under this project.
H.5 AGAR ADVISORY NUMBER 96
Contractor Performance Information and Contractor Performance Assessment Reporting System (CPARS) Contractor Performance Information and Contractor Performance Assessment Reporting System (CPARS) will be used by the Forest Service for evaluating contractor performance. CPARS is the single USDA-wide system used to collect, maintain, and disseminate contractor performance evaluations to the Past Performance Information Retrieval System (PPIRS). Past performance reporting is required by FAR 42.1502 and 42.1503. The contractor will be notified by email to review evaluation information submitted by the Agency. The contractor will have 60 days to submit comments, rebutting statements, or additional information to the Assessing Official before any evaluation is considered final.
52.236-13 Accident Prevention. (NOV 1991)
(a) The Contractor shall provide and maintain work environments and procedures which will—
(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to
Contractor operations and activities;
(2) Avoid interruptions of Government operations and delays in project completion dates; and
(3) Control costs in the performance of this contract.
(b) For these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall—
(1) Provide appropriate safety barricades, signs, and signal lights;
(2) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part 1910; and
(3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.
(c) If this contract is for construction or dismantling, demolition or removal of improvements with any Department of
Defense agency or component, the Contractor shall comply with all pertinent provisions of the latest version of U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation.
(d) Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action.
This notice, when delivered to the Contractor or the Contractor’s representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.
(e) The Contractor shall insert this clause, including this paragraph (e), with appropriate changes in the designation of the parties, in subcontracts.
(End of clause)
Alternate I (Nov 1991). If the contract will involve (a) work of a long duration or hazardous nature, or (b) performance on a Government facility that on the advice of technical representatives involves hazardous materials or operations that
Arapaho Roosevelt NF’s and Pawnee NG Page 21 of 44 might endanger the safety of the public and/or Government personnel or property, add the following paragraph (f) to the basic clause:
(f) Before commencing the work, the Contractor shall—
(1) Submit a written proposed plan for implementing this clause. The plan shall include an analysis of the significant hazards to life, limb, and property inherent in contract work performance and a plan for controlling these hazards; and
(2) Meet with representatives of the Contracting Officer to discuss and develop a mutual understanding relative to administration of the overall safety program.
452.215-73 Postaward Conference. (NOV 1996) A post award conference with the successful offeror is required. Contracting Officer Representative (COR) will contact you on time and place of post award conference.
Arapaho Roosevelt NF’s and Pawnee NG Page 22 of 44
SECTION I - CONTRACT CLAUSES
52.202-1 Definitions. (NOV 2013) 52.203-3 Gratuities. (APR 1984) 52.203-5 Covenant Against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government. (SEP 2006) 52.203-7 Anti-Kickback Procedures (MAY 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (OCT 2010) 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights (Apr 2014) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2016) 52.204-13 System for Award Management Maintenance (OCT 2016) 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015) 52.211-18 Variation in Estimated Quantity. (APR 1984) 52.215-8 Order of Precedence - Uniform Contract Format. (OCT 1997) 52.219-28 Post-Award Small Business Program Representation. (JUL 2013) 52.219-30 Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible
Under the Women-Owned Small Business Program.
52.222-3 Convict Labor. (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards - Overtime Compensation. (MAY 2014) 52.222-6 Construction Wage Rate Requirements (May 2014) 52.222-7 Withholding of Funds. (MAY 2014) 52.222-8 Payrolls and Basic Records. (MAY 2014) 52.222-9 Apprentices and Trainees. (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements. (FEB 1988) 52.222-11 Subcontracts (Labor Standards). (MAY 2014) 52.222-12 Contract Termination - Debarment. (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards. (FEB 1988) 52.222-15 Certification of Eligibility. (MAY 2014) 52.222-21 Prohibition of Segregated Facilities. (APR 2015) 52.222-26 Equal Opportunity (APR 2015) 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) 52.222-35 Equal Opportunity for Veterans. (OCT 2015) 52.222-36 Equal Opportunity for Workers with Disabilities. (JUL 2014) 52.222-37 Employment Reports on Veterans. (FEB 2016) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) 52.222-50 Combating Trafficking in Persons (MAR 2015) 52.222-54 Employment Eligibility Verification. (OCT 2015) 52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2015) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(SEP 2013)
52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011) 52.223-6 Drug-Free Workplace. (MAY 2001) 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items. (May 2008) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts.
(May 2008) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. (AUG 2011)
Arapaho Roosevelt NF’s and Pawnee NG Page 23 of 44
Arapaho Roosevelt NF’s and Pawnee NG Page 24 of 44
52.225-9 Buy American–Construction Materials (MAY 2014)
a) Definitions. As used in this clause--
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: None
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
Arapaho Roosevelt NF’s and Pawnee NG Page 25 of 44
(i) The cost of domestic construction material would be unreasonable.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .