Section J, Attachment J.5, General Notes (Updated)

View the file

Other files for this federal contract opportunity

Other files attached to CCRD Clear Lake & Clear Creek Campground Construction/Re-Construction, newest first.
File Type Posted
Pre-Bid_Minutes_AG82ATS170014.pdf PDF
Sects_B-M_AG82ATS170014-1,_08112017.pdf PDF
Schedule_B_AG82ATS170014-SOI_Fill-In.xlsx XLSX spreadsheet
AG82ATS170014,_000001.pdf PDF
32._fs_6300-11_SubcontractorApproval.doc DOC document
0_AG-82AT-S-17-0014.pdf PDF
31_SOL._TITLE_PAGE_EXAMPLE.docx DOCX document
0_SOW_845548_06232017.pdf PDF
14_EROSION-LAYOUT.pdf PDF
25_SITESIGN.pdf PDF
11_FEE_STATION.pdf PDF
12_STAIR-TRAIL.pdf PDF
19_GATES.pdf PDF
17_TABLE.pdf PDF
23_KIOSKS.pdf PDF
0a_Questions_and_Answers.pdf PDF
28_WD,_CO13,_02032017,v3.pdf PDF
3_GENERAL_NOTES.pdf PDF
16_TOILETLAYOUT.pdf PDF
13_TEMP-EROSION.pdf PDF
5_SO_CLEAR_CK_SDP.pdf PDF
2_SPECIFICATIONS_02032017.pdf PDF
24_DUMPSTER_PAD.pdf PDF
9_SIDEWALKDETAILS.pdf PDF
13_TEMP-EROSION.pdf PDF
7_Clear_CreekCG_Spur_Profile.pdf PDF
6_So_Clear_CreekCGmain_rd_profile_.pdf PDF
18_FIRE_BEAR_PROOF_BOX.pdf PDF
15_CULVERTS.pdf PDF
22_TOILET-DIM.pdf PDF
8_TYP_RD_SPUR.pdf PDF
10_SPURS_PAD.pdf PDF
4_SDP_CLEAR_LAKE_CG.pdf PDF
27_well_pump.pdf PDF
21_SIGN-INSTALLATION.pdf PDF
30_r2_fs_6300_7_Progress_Schedule.rtf RTF text file
26_wheel_block_barrier.pdf PDF
29_FS_6300-27,_Experience_Questionnaire.docx DOCX document
20_GATE_DETAILS.pdf PDF
1_Cover_Sheet,_CL.SCC.CG.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. RESERVED (ORIGINAL CONTENT REMOVED) 11. ALL SLOPES SHALL BE CONSTRUCTED AS SUCH AS BUILDINGS, PROPERTY MARKERS, SPECIFIED ON THE PLANS OR STAKED IN THE 19. DITCH LOCATIONS WILL BE STAKED IN THE FIELD FENCES, PIPELINES, TREES, SHRUBBERY, AND FIELD. BY THE FOREST SERVICE. LOCATIONS MAY LAWNS DURING THE PROGRESS OF WORK; AND

CHANGE PER THE FOREST SERVICE REQUEST. RESTORE THE SITE AS NEARLY AS POSSIBLE TO

2. THE CONTRACTOR SHALL BE SOLELY AND 12. CONTRACTOR SHALL PROVIDE AN EROSION ITS ORIGINAL CONDITION, INCLUDING THE

COMPLETELY RESPONSIBLE FOR THE CONDITIONS CONTROL PLAN PRIOR TO THE COMMENCEMENT OF 20. STOCKPILE LOCATIONS WILL BE STAKED IN THE REPLACEMENT AT THE CONTRACTOR'S EXPENSE AT AND ADJACENT TO THE JOB SITE. THIS WORK FOR APPROVAL BY THE CONTRACTING FIELD BY THE FOREST SERVICE. ALL STOCKPILES OF ANY FACILITY OR LANDSCAPING WHICH HAS INCLUDES THE SAFETY OF ALL PERSONS WITHIN OFFICER. SHALL BE APPROVED BY THE CONTRACTING BEEN DAMAGED BEYOND RESTORATION.

THE CONSTRUCTION LIMITS AT ALL TIMES AND IS OFFICER PRIOR TO PLACEMENT OF ANY MATERIAL.

NOT LIMITED TO NORMAL WORKING HOURS. 13. 30 DAYS PRIOR TO INTENDED USE, THE 28. THE CONTRACTOR MAY UTILIZE THE EXISTING

CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL NATIVE STONE MATERIAL WITHIN THE

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PLAN FOR APPROVAL BY THE CONTRACTING 21. GENERAL SITE CONDITIONS VARIES, THE PROJECT CONSTRUCTION LIMITS. THIS MATERIAL MAYBE

ALL UTILITY LOCATES AT LEAST 48 HOURS PRIOR OFFICER (SPEC 156). THE PROPOSED PLAN SHALL IS LOCATED AT APPROXIMATELY 10,300 FEET IN UTILIZED FOR BARRIER ROCKS IF THEY MEET THE TO COMMENCEMENT OF CONSTRUCTION. ADDRESS ALL ANTICIPATED PHASES OF ELEVATION SO THE CONSTRUCTION SEASON IS SPECIFICATION REQUIREMENTS.

CONSTRUCTION. LIMITED DUE TO EARLY SPRING/FALL SNOWFALLS

4. CONSTRUCTION SIGNING SHALL CONFORM TO THE AND COLD WEATHER. 29. ALL MERCHANABLE TIMBER WILL BE STOCK-PILED

MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES 14. IF THE CONTRACTOR PLANS TO DEVIATE FROM ON LOCATION AT A SITE APPROVED BY THE C.O.

(MUTCD) LATEST VERSION. ALL TRAFFIC CONTROL THE TRAFFIC CONTROL PLAN, A SPECIFIC 22. THE CONTRACTOR SHALL DISPOSE OF ALL SIGNS SHALL BE FURNISHED AND MAINTAINED AT ALTERNATIVE MUST BE SUBMITTED FOR APPROVAL UNSUITABLE EXCAVATION MATERIAL AND 30. THE GOVERNMENT WILL PROVIDE THE CONTRACTOR THE CONTRACTOR'S EXPENSE. BY THE CONTRACTING OFFICER. CONSTRUCTION DEBRIS TO AN APPROVED WITH THE FOLLOWING: SEED

SANITARY LANDFILL OFF NATIONAL FOREST LANDS. BEAR LOCKERS

5. STORAGE OF ALL CONSTRUCTION EQUIPMENT ON 15. THERE ARE NO DESIGNATED BORROW SOURCES SIGN PANELS (NOT POSTS OR HARDWARE)

GOVERNMENT LANDS WILL BE AT THE FOR THIS PROJECT. GRAVEL AND BORROW NEEDED 23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SITE UNIT MARKER PANELS CONTRACTOR'S RISK AND AT A LOCATION FOR THIS CONTRACT SHALL BE OBTAINED FROM THE PROTECTION OF ALL EQUIPMENT AND APPROVED BY THE CONTRACTING OFFICER. COMMERCIAL SOURCES. THE CONTRACTOR IS SUPPLIES INTENDED FOR USE IN THIS PROJECT.

RESPONSIBLE TO ASCERTAIN THAT THE MATERIAL THE CONTRACTOR SHALL PAY ALL COSTS 31. NO TRAILS WILL HAVE TIMBER BORDERS.

6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INCORPORATED IN THIS PROJECT MEET THE RELATED TO SUCH PROTECTION.

VERIFY THE EXISTING CONDITIONS, ELEVATIONS, REQUIREMENTS OF THE SPECIFICATIONS FOR 32. EXISTING INFORMATION SHOWN ON DRAWINGS HAS

CONTOURS AND SLOPES AS STATED WITHIN THE GRADATION, SOUNDNESS, QUALITY, ETC. 24. LOCATIONS OF ALL FACILITIES AND CONSTRUCTED BEEN TAKEN FROM LIMITED FIELD OBSERVATIONS.

FEATURES WILL BE STAKED IN THE FIELD PRIOR FIELD VERIFY EXISTING CONDITIONS PRIOR TO

PLANS. IT BECOMES THE CONTRACTOR'S LIABILITY

TO CONSTRUCTION. LOCATIONS MAY VARY FROM BEGINNING WORK.

IF DISCREPANCIES ARE NOT ADDRESSED WITH THE

THOSE SHOWN ON THE PLANS.CONTRACTING OFFICER PRIOR TO THE

COMMENCEMENT OF WORK.

25. ALL DEVELOPED LAND IS MANAGED BY THE USDA

7. ALL QUANTITIES FOR SOIL AND AGGREGATE ARE FOREST SERVICE, PERMITS WILL BE REQUIRED TO

GIVEN AS FINAL COMPACTED IN PLACE. CAMP AT PROJECT LOCATION. PERMITS MAY BE

OBTAINED AT THE CLEAR CREEK RANGER

8. ANY SETTLEMENT OR SOIL ACCUMULATION DISTRICT, 101 HWY 103, IDAHO SPRINGS, CO.

OUTSIDE THE CONSTRUCTION LIMITS DUE TO

GRADING OR EROSION SHALL BE REPAIRED BY

THE CONTRACTOR IMMEDIATELY.

16. GOVERNMENT FURNISHED SEED SHALL BE APPLIED

AT THE RATE OF 18 KG PLS/HECTACRE (40 LBS

PLS/ACRE).

17. DISPOSAL OF EXCESS MATERIAL SHALL BE IN

ACCORDANCE WITH SPEC 203.

18. GRADING IS BASED ON BEST AVAILABLE

INFORMATION AND TYPICAL SECTIONS. MINOR 26. CONTRACT TIME = 150 CALENDAR DAYS.

ADJUSTMENTS MAY BE NECESSARY TO BRING

PLANS INTO CONFORMANCE WITH APPROVED FINAL 27. EXCEPT AS OTHERWISE PROVIDED HEREIN, THE

PLANS. CONTRACTOR SHALL PROTECT ALL STRUCTURES,

U.S. DEPARTMENT OF AGRICULTURE

,J' Forest '<:I Sheet Hie: Sub Sheet: Project No:

Design: ARNF DESIGN TEAM

FOREST SERVICE

R-2

ROCKY MOUNTAIN REGION

I\RAPAHO & ROOSEVELT NATIONAL FOREST Drawn: ARNF DESIGN TEAM GENERAL NOTES Checked: G2 Sheet

Date: 09/11/2016

CLEAR LAKE & SOUTH CLEAR CREEK CG 2 OF 27 CLEAR CREEK RANGER DISTRICT A