General Decision Number: MT120076 08/10/2012 MT76
Superseded General Decision Number: MT20100086
State: Montana
Construction Type: Heavy
Counties: Beaverhead, Broadwater, Deer Lodge, Gallatin, Granite, Jefferson, Lewis And Clark, Madison, Meagher, Powell, Silver Bow and Yellowstone National Park Counties in Montana.
HEAVY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 01/06/2012
1 01/13/2012
2 02/03/2012
3 02/10/2012
4 02/17/2012
5 03/02/2012
6 03/23/2012
7 06/01/2012
8 07/06/2012
9 08/10/2012
BRMT0001-004 06/01/2011
BEAVERHEAD, DEER LODGE, GRANITE, JEFFERON, MADISON, POWELL, AND
SILVER BOW COUNTIES
Rates Fringes
BRICKLAYER.......................$ 26.06 11.35
BRMT0005-002 06/01/2011
GALLATIN COUNTY
BRMT0006-005 06/01/2011
BROADWATER, LEWIS AND CLARK, MEAGHER, AND YELLOWSTONE NATIONAL
PARK COUNTIES
ELEC0044-003 06/01/2012
LINE CONSTRUCTION
8/13/2012http://www.wdol.gov/wdol/scafiles/davisbacon/MT76.dvb?v=9
(1) Lineman.................$ 39.45 4.75%+11.51
ELEC0233-018 06/01/2011
BEAVERHEAD, DEER LODGE, GRANITE, JEFFERSON, MADISON, POWELL,
AND SILVER BOW COUNTIES
ELECTRICIAN......................$ 26.80 11.89
* ELEC0233-020 06/01/2012
BROADWATER, LEWIS AND CLARK, AND MEAGHER COUNTIES
ELECTRICIAN......................$ 28.61 4.25%+9.70
ELEC0532-016 06/01/2012
GALLATIN COUNTY
ELECTRICIAN......................$ 27.53 10.59
ELEC0532-020 09/01/2011
YELLOWSTONE NATIONAL PARK
ELECTRICIAN......................$ 24.58 9.60
ENGI0400-009 07/29/2011
POWER EQUIPMENT OPERATOR:
(Zone 1)
(1) A-frame truck Crane, oiler (except crane).......$ 23.47 10.40
(2) Crane Oiler,Bulldozer, Roller (Dirt and Grade
Compaction).................$ 23.94 10.40
(3) Mechanic, Scraper.......$ 24.34 10.40
(4) Cranes, 25 tons - 44 tons........................$ 25.00 10.40
(5) Cranes, 45 tons to and incl. 74 tons...............$ 25.50 10.40
(6) Cranes, 75 tons to and incl. 149 tons; Cranes, Whirley (All)...............$ 26.60 10.40
(7) Cranes, 150 tons to including 250 tons (add
$1.00 for every 100 tons over
250 tons); Crane, Stiff-
Leg or
Derrick; Helicopter
Hoist; Crane, Tower (all)...$ 27.10 10.40
ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:
The zone hourly rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the nearest County Court
House of the following listed towns to the center of the job:
BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL,
MISSOULA
Zone 1: 0 to 30 miles - Base Pay
Zone 2: 30 to 60 miles - Base Pay + $3.50
Zone 3: Over 60 miles - Base Pay + $5.50
IRON0732-018 06/01/2011
IRONWORKER: Reinforcing and
Structural.......................$ 25.75 18.38
LABO1686-011 05/01/2011
LABORER
(2) Mason Tender............$ 20.75 7.59
(3) Pipelayer...............$ 20.89 7.59
ZONE DEFINITIONS FOR LABORERS
The zone hourly rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the County Courthouse of the following listed town to the center of the job:
Billings, Bozeman, Butte, Helena, Great Falls, Missoula, Kalispell
TRAVEL ZONES:
ZONE 1: 0 to 30 miles, Base Pay
ZONE 2: 30-60, add $3.05 to Base Pay
ZONE 3: Over 60 miles, add $4.85 to Base Pay
SUMT2011-051 02/08/2011
CARPENTER (Form Work Only).......$ 24.30 7.80
CARPENTER, Excludes Form Work....$ 21.13 7.00
LABORER: Common or General......$ 18.11 5.90
LABORER: Landscape and
Irrigation.......................$ 15.14 1.30
OPERATOR: Backhoe...............$ 24.16 8.05
OPERATOR: Bobcat/Skid
Steer/Skid Loader................$ 21.99 8.55
OPERATOR: Excavator.............$ 23.12 7.81
OPERATOR: Grader/Blade..........$ 24.69 8.40
OPERATOR: Loader (Front End)....$ 24.20 7.84
TRUCK DRIVER: Dump Truck........$ 18.84 5.92
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be
July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION