1. CONTRACT ID CODE
PAGE OF PAGES
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| 1 |
| 3 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| Amendment #005 |
| 9/07/12 |
| National Tower IDIQ |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
Contracting Officer
USDA Forest Service
Pan American Bldg Suite 200
| 101 B Sun Ave NE, Albuquerque, NM 87109 |
| , |
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) |
| (() |
| 9A. AMENDMENT OF SOLICITATION NO. |
FORMDROPDOWN
AG-7604-S-12-0020
9B. DATE (SEE ITEM 11)
FORMDROPDOWN
9/07/2012
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not ex-tended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (() |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MDE IN THE CON- |
TRACT ORDER NO. IN ITEM 10A.
FORMDROPDOWN
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying offices, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
FORMDROPDOWN
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return _1_ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section heading, including solicitation/contract subject matter where feasible.)
See Page 2-3
Except as provided herein, all terms and conditions of this document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
Brendell J. Gallegos, Contracting Officer
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C DATE SIGNED |
BY
(Signature of person authorized to sign)
(Signature of Contracting Officer)
AG-7604-S-12-0020
Amendment #005 Amendment #005 is issued to provide the following clarifications:
1. The solicitation changes the date of the final submission of the RFP. The new date for the submission of the RFP is hereby changed as follows; Friday, October 5, 2012 at 4:00pm Mountain Standard Time.
2. The time and date for submission of questions pertaining only to pricing information is hereby changed as follows; Friday, September 14, 2012 at 4:00pm Mountain Standard Time.
3. Page 3 and 4, B-1 Schedule of Items CLIN language has been changed from Unit Price/Total Item Amount to Estimated/NTE Ceiling. The contract type for each CLIN is changed from FIRM FIXED FEE to FIRM FIXED PRICE. CLIN 0003 Descriptive Data has been changed to reflect “SOW paragraphs 6.0 and 8.0” to SOW Paragraphs 6.0 through 8.0”.
4. Page 8-9, para 9.0 Demolition, removal of first bullet point and add last bullet point.
5. Page 9, para C-3 Government-Furnished Property. The paragraph has been modified to further clarify Government Furnished Property.
6. Page 16-19, para H- 4.0 Pricing Instruction for Task Orders has been further clarified for Task Order 0001, Sample Task Order and future Task Orders.
7. Page 24, para A. Federal Acquisition Regulation (48 CFR Chapter 1) Clauses incorporates Clause 52.204-10 Reporting Executive Compensation and first-tier Subcontract Awards (FEB 2012).
8. Page 35 the addition of Attachment 3: Pricing Tables 1, 2, 3; Attachment 4: Sample Task Order – Cougar; Attachment 5: Sample Geotechnical Investigations – Cougar; Attachment 6: Davis Bacon Wage Rates – Lincoln Cty, OR.
9. Page 39-40, Signature block added to AGAR 452.209-70 Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction and the clause at 452.209-71, Assurance Regarding Felony Conviction or Tax Delinquent Status for Corporate Applicants.
10. Page 44, L-3 under Tech Factor 1: Technical Approach added Chapter 4 Sample Task.
11. Page 45, L-4 under Volume 2: Chapter 3 – Changed to read Pricing and Labor Tables in accordance with Attachment 3 for Task Order 0001. Added Chapter 4 Pricing and Labor Tables in accordance with Attachment 3 for Sample Task Order. Renumbered Chapter 4 to Chapter 5 Contractor Teaming Agreements (if used).
12. Page 45, L-5 NOTE: revised to include Sample Task and Attachments 3-6.
13. Page 46, Factor 1 added Chapter 3 Task Order 0001 and Chapter 4 Sample Task Order.
14. Page 49, L-8 changed sentence to reflect Attachment 2 instead of Attachment 1.
15. Page 49, L-8 1. Changed the first sentence to reflect Attachment 2 instead of Attachment 1.
16. Page 51-53, added para L- 9.0 Detailed Pricing Breakout.
17. Page 55, M-6, Factor 1: Technical, added Subfactor 3: Task Order 0001 and Subfactor 4: Sample Task Order.
18. Page 55, Factor 5: Price (2) modified the last sentence.
19. Page 56, Factor 1: Technical, added Subfactor 3: Task Order 0001 and Subfactor Sample Task Order.
TASK ORDER 0001
1. Deleted 526 Spur, Highland Lookout, South Salmon Baldy Tower, High Camp Tower, and Iron Mountain Tower and replaced with Table Rock, Orleans and Babbit Peak. The total number of Geotechnical Investigations went from 7 to 5.