Amendment 005.doc

DOC document 61 KB Posted

Attached to
USDA Forest Service National Tower IDIQ Federal contract opportunity
Solicitation number
AG-7604-S-12-0020
Issued by
Department of Agriculture Forest Service Washington Office Acquisitions

About this file

Amendment 005

View the file

Other files for this federal contract opportunity

Other files attached to USDA Forest Service National Tower IDIQ, newest first.
File Type Posted
Rev_9-20-2012_Task_Order_00001_-_Statement_of_Work.docx DOCX document
Pricing_Tables_1_2_3.xls XLS spreadsheet
Rev_Sample_Task_Order.docx DOCX document
RFP_AG-7604-S-12-0020_National_Tower_IDIQ_v8_-_lsh.docx DOCX document
Amendment_006_SF-30.doc DOC document
RFP AG-7604-S-12-0020 National Tower IDIQ v7 - lsh.docx DOCX document
Sample Task Order.docx DOCX document
Pricing Tables 1 2 3.xls XLS spreadsheet
Davis Bacon - Lincoln Cty OR72.pdf PDF
Task Order 00001 - Statement of Work.docx DOCX document
Past Performance Questionnaire - Final.doc DOC document
Geotechnical Investigation - Cougar Tower - Lincoln Cty OR.PDF PDF
Revised Questions for AG-7604-S-12-0020.docx DOCX document
RFP AG-7604-S-12-0020 National Tower IDIQ v6.docx DOCX document
Davis Bacon Gogebic MI36.pdf PDF
Davis Bacon Silver Bow MT76.pdf PDF
Davis Bacon Houston TX123.pdf PDF
Questions for AG-7604-S-12-0020.docx DOCX document
Davis Bacon Idaho ID12.pdf PDF
Davis Bacon Lemhi ID12.pdf PDF
Task Order 00001 - Statement of Work.docx DOCX document
Task Order 00001 - Statement of Work.docx DOCX document
Past Performance Questionnaire - Final.doc DOC document
RFP AG-7604-S-12-0020 National Tower IDIQ v5.docx DOCX document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE

PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1
3
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
Amendment #005
9/07/12
National Tower IDIQ
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE

Contracting Officer

USDA Forest Service

Pan American Bldg Suite 200

101 B Sun Ave NE, Albuquerque, NM 87109
,
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
(()
9A. AMENDMENT OF SOLICITATION NO.

FORMDROPDOWN

AG-7604-S-12-0020

9B. DATE (SEE ITEM 11)

FORMDROPDOWN

9/07/2012

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FORMCHECKBOX

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not ex-tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(()
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MDE IN THE CON-

TRACT ORDER NO. IN ITEM 10A.

FORMDROPDOWN

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying offices, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

FORMDROPDOWN

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return _1_ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section heading, including solicitation/contract subject matter where feasible.)

See Page 2-3

Except as provided herein, all terms and conditions of this document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Brendell J. Gallegos, Contracting Officer

15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C DATE SIGNED

BY

(Signature of person authorized to sign)

(Signature of Contracting Officer)

AG-7604-S-12-0020

Amendment #005 Amendment #005 is issued to provide the following clarifications:

1. The solicitation changes the date of the final submission of the RFP. The new date for the submission of the RFP is hereby changed as follows; Friday, October 5, 2012 at 4:00pm Mountain Standard Time.

2. The time and date for submission of questions pertaining only to pricing information is hereby changed as follows; Friday, September 14, 2012 at 4:00pm Mountain Standard Time.

3. Page 3 and 4, B-1 Schedule of Items CLIN language has been changed from Unit Price/Total Item Amount to Estimated/NTE Ceiling. The contract type for each CLIN is changed from FIRM FIXED FEE to FIRM FIXED PRICE. CLIN 0003 Descriptive Data has been changed to reflect “SOW paragraphs 6.0 and 8.0” to SOW Paragraphs 6.0 through 8.0”.

4. Page 8-9, para 9.0 Demolition, removal of first bullet point and add last bullet point.

5. Page 9, para C-3 Government-Furnished Property. The paragraph has been modified to further clarify Government Furnished Property.

6. Page 16-19, para H- 4.0 Pricing Instruction for Task Orders has been further clarified for Task Order 0001, Sample Task Order and future Task Orders.

7. Page 24, para A. Federal Acquisition Regulation (48 CFR Chapter 1) Clauses incorporates Clause 52.204-10 Reporting Executive Compensation and first-tier Subcontract Awards (FEB 2012).

8. Page 35 the addition of Attachment 3: Pricing Tables 1, 2, 3; Attachment 4: Sample Task Order – Cougar; Attachment 5: Sample Geotechnical Investigations – Cougar; Attachment 6: Davis Bacon Wage Rates – Lincoln Cty, OR.

9. Page 39-40, Signature block added to AGAR 452.209-70 Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction and the clause at 452.209-71, Assurance Regarding Felony Conviction or Tax Delinquent Status for Corporate Applicants.

10. Page 44, L-3 under Tech Factor 1: Technical Approach added Chapter 4 Sample Task.

11. Page 45, L-4 under Volume 2: Chapter 3 – Changed to read Pricing and Labor Tables in accordance with Attachment 3 for Task Order 0001. Added Chapter 4 Pricing and Labor Tables in accordance with Attachment 3 for Sample Task Order. Renumbered Chapter 4 to Chapter 5 Contractor Teaming Agreements (if used).

12. Page 45, L-5 NOTE: revised to include Sample Task and Attachments 3-6.

13. Page 46, Factor 1 added Chapter 3 Task Order 0001 and Chapter 4 Sample Task Order.

14. Page 49, L-8 changed sentence to reflect Attachment 2 instead of Attachment 1.

15. Page 49, L-8 1. Changed the first sentence to reflect Attachment 2 instead of Attachment 1.

16. Page 51-53, added para L- 9.0 Detailed Pricing Breakout.

17. Page 55, M-6, Factor 1: Technical, added Subfactor 3: Task Order 0001 and Subfactor 4: Sample Task Order.

18. Page 55, Factor 5: Price (2) modified the last sentence.

19. Page 56, Factor 1: Technical, added Subfactor 3: Task Order 0001 and Subfactor Sample Task Order.

TASK ORDER 0001

1. Deleted 526 Spur, Highland Lookout, South Salmon Baldy Tower, High Camp Tower, and Iron Mountain Tower and replaced with Table Rock, Orleans and Babbit Peak. The total number of Geotechnical Investigations went from 7 to 5.

In lieu of STANDARD FORM 30 In lieu of STANDARD FORM 30 BACK

File details come from the government source that posted it. Updated .