Davis Bacon Lemhi ID12.pdf

PDF 42 KB Posted

Attached to
USDA Forest Service National Tower IDIQ Federal contract opportunity
Solicitation number
AG-7604-S-12-0020
Issued by
Department of Agriculture Forest Service Washington Office Acquisitions

About this file

Davis Bacon Lemhi ID12

View the file

Other files for this federal contract opportunity

Other files attached to USDA Forest Service National Tower IDIQ, newest first.
File Type Posted
Rev_9-20-2012_Task_Order_00001_-_Statement_of_Work.docx DOCX document
Pricing_Tables_1_2_3.xls XLS spreadsheet
Rev_Sample_Task_Order.docx DOCX document
RFP_AG-7604-S-12-0020_National_Tower_IDIQ_v8_-_lsh.docx DOCX document
Amendment_006_SF-30.doc DOC document
RFP AG-7604-S-12-0020 National Tower IDIQ v7 - lsh.docx DOCX document
Amendment 005.doc DOC document
Pricing Tables 1 2 3.xls XLS spreadsheet
Sample Task Order.docx DOCX document
Davis Bacon - Lincoln Cty OR72.pdf PDF
Task Order 00001 - Statement of Work.docx DOCX document
Past Performance Questionnaire - Final.doc DOC document
Geotechnical Investigation - Cougar Tower - Lincoln Cty OR.PDF PDF
Revised Questions for AG-7604-S-12-0020.docx DOCX document
RFP AG-7604-S-12-0020 National Tower IDIQ v6.docx DOCX document
Davis Bacon Gogebic MI36.pdf PDF
Davis Bacon Silver Bow MT76.pdf PDF
Davis Bacon Houston TX123.pdf PDF
Questions for AG-7604-S-12-0020.docx DOCX document
Davis Bacon Idaho ID12.pdf PDF
Task Order 00001 - Statement of Work.docx DOCX document
Task Order 00001 - Statement of Work.docx DOCX document
Past Performance Questionnaire - Final.doc DOC document
RFP AG-7604-S-12-0020 National Tower IDIQ v5.docx DOCX document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: ID120012 07/20/2012 ID12

Superseded General Decision Number: ID20100012

State: Idaho

Construction Type: Heavy

Counties: Adams, Bear Lake, Benewah, Bingham, Blaine, Boise, Bonner, Bonneville, Boundary, Butte, Camas, Caribou, Cassia, Clark, Clearwater, Custer, Elmore, Franklin, Fremont, Gem, Gooding, Idaho, Jefferson, Jerome, Kootenai, Latah, Lemhi, Lewis, Lincoln, Madison, Minidoka, Nez Perce, Oneida, Owyhee, Payette, Power, Shoshone, Teton, Twin Falls, Valley and

Washington Counties in Idaho.

HEAVY CONSTRUCTION PROJECTS

Superseeds General Decision ID020030001

Modification Number Publication Date

0 01/06/2012

1 01/13/2012

2 02/03/2012

3 03/02/2012

4 04/06/2012

5 04/27/2012

6 06/22/2012

7 07/20/2012

CARP0001-010 06/01/2011

BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH

PARALLEL), KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE

COUNTIES

Rates Fringes

CARPENTER (Including Cement

Form Work).......................$ 26.06 11.84

ZONE PAY:

ZONE 1 0-40 MILES FREE

ZONE 2 41-65 MILES $2.25/PER HOUR

ZONE 3 66-100 MILES $3.25/PER HOUR

ZONE 4 OVER 100 MILES $4.75/PER HOUR

DISPATCH POINTS:

PASCO (515 N. Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee.

WENATCHEE (27 N. CHELAN) or Main Post Office of established

8/13/2012http://www.wdol.gov/wdol/scafiles/davisbacon/ID12.dvb?v=7 worksite).

COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

MOSCOW (302 N. JACKSON) or Main Post Office of established worksite).

CARP0808-004 01/01/2012

ADAMS, BEAR LAKE, BINGHAM, BOISE, BUTTE, BONNEVILLE, CAMAS,

CARIBOU, CASSIA, CLARK, CUSTER, ELMORE, FRANKLIN, FREMONT, GEM,

GOODING, IDAHO (SOUTH OF THE 46TH PARALLEL), JEFFERSON, JEROME,

LEMHI, LINCOLN, MADISON, MINIDOKA, ONEIDA, OWYHEE, PAYETTE,

POWER, TETON, TWIN FALLS, VALLEY AND WASHINGTON COUNTIES

ZONE 1

CARPENTER (Including Cement

Form Work).......................$ 25.25 12.04

ZONE 1 0-30 MILES: FREE

ZONE 2 MORE THAN 30-60 MILES: $2.00/PER HOUR

ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR

If a project is located in more than one zone the lower zone rate shall apply

ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST

OFFICES:

BOISE: 304 N. 8TH STREET

TWIN FALLS: 253 2ND AVE. WEST

POCATELLO: CLARK STREET

IDAHO FALLS: 875 NORTH CAPITAL AVE.

ELEC0073-007 08/22/2011

IDAHO (SOUTH OF THE 46TH PARALLEL) COUNTY

CABLE SPLICER....................$ 31.48 14.84

ELECTRICIAN......................$ 28.62 14.84

ELEC0073-008 08/22/2011

BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO(NORTH OF THE 46TH

Cable Splicer....................$ 31.48 14.84

ELECTRICIAN......................$ 28.62 14.84

ELEC0291-007 06/01/2010

ADAMS, BOISE, ELMORE, GEM, PAYETTE, VALLEY AND WASHINGTON

CABLE SPLICER

Adams, Valley and

Washington Counties.........$ 35.79 3%+$10.00

Boise, Elmore, Gem and

Payette Counties............$ 32.50 3%+$10.00

ELECTRICIAN

Adams, Valley and

Washington Counties.........$ 32.54 3%+$10.00

Boise, Elmore, Gem and

Payette Counties............$ 29.81 3%+$10.62

ELEC0449-001 06/01/2012

BEAR LAKE, BINGHAM, BONNEVILLE, BUTTE, CARIBOU, CLARK, CUSTER,

FRANKLIN, FREMONT, JEFFERSON, LEMHI, MADISON, ONEIDA, POWER AND

TETON COUNTIES

ELECTRICIAN

Bannock, Bingham, Bonneville, Butte, Clark, Jefferson, Fremont

Madison, Power and Teton

Counties in Idaho...........$ 26.80 11.97

ELEC0449-006 03/01/2012

BLAINE, CAMAS, CASSIA, GOODING, JEROME, LINCOLN, MINIDOKA AND

TWIN FALLS COUNTIES

ELECTRICIAN......................$ 23.00 10.67

ENGI0370-013 01/01/2012

ADAMS, BEAR LAKE, BINGHAM, BLAINE, BOISE, BONNEVILLE, BUTTE,

CARIBOU, CASSIA, CLARK, CUSTER, ELMORE, FRANKLIN, FREMONT, GEM,

GOODING, IDAHO (SOUTH OF THE 46TH PARALLEL), JEFFERSON, JEROME,

LEMHI, LINCOLN, MADISON, MINIDOKA, ONEIDA, OWYHEE, PAYETTE,

POWER, TETON, TWIN FALLS, VALLEY AND WASHINGTON COUNTIES

(Anyone working on HAZMAT jobs working with supplied air shall receive $1.00 per hour above classification)

Power equipment operator -bulldozer

Including all attachments...$ 27.14 10.00

Power equipment operator -crane

Over 50 tons................$ 26.91 10.00

Tower Crane Operator........$ 26.91 10.00

Up to and including 50 tons.$ 26.54 10.00

Power equipment operator -oiler............................$ 26.54 10.00

Power equipment operator -scraper

ALL SCRAPERS UP TO AND

INCLUDING 40 YARDS..........$ 26.54 10.00

All scrapers, pulling wagons, belly dumps and attachments, over 40 yards to and including 60 yards...$ 26.91 10.00

Elclid and similar, pulling wagons, belly dumps and attachments, over 60 yards to and including 80 yards..........$ 25.96 9.60

Euclid and similar, pulling wagons, belly dumps and attachments, over 60 yards to and including 80 yards..........$ 27.14 10.00

Euclid and similar, pulling wagons, belly dumps and attachments, over 80 yards to and including 100 yards.........$ 27.37 10.00

Euclids and similar, pulling wagons, belly dumps and attachments, over 100 yards..............$ 27.62 10.00

POCATELLO: CLARK STREET

IDAHO FALLS: 875 NORTH CAPITAL AVE.

BOOM PAY: All Cranes and Concrete Pump Boom Trucks

100 ft to 150 ft $.15 over scale

150 ft to 200 ft $.30 over scale

Over 200 ft $.45 over scale

NOTE: When the crane operator receives additional pay for long boom, the Oiler Shall also receive such additional pay. In computing the length of the boom on Tower Cranes, they shall be measured from the base of the tower to the point of the boom.

ENGI0370-014 06/01/2010

ZONE 1: (Anyone working on HAZMAT jobs working with supplied air shall receive $1.00 per hour above classification) bulldozer

(D-6 & equilvalent and over).......................$ 25.79 11.55

(To D-6 or equivalent)......$ 25.19 11.55

Power equipment operator -crane

25 TONS AND UNDER (ALL

ATTACHMENTS INCLUDING

CLAMSHELL, DRAGLINE)........$ 25.51 11.55

85 TONS AND OVER, AND ALL

CLIMBING, OVERHEAD, RAIL

AND TOWER...................$ 27.16 11.55

OVER 25 TONS UP TO AND

INCLUDING 45 TONS (ALL

ATTACHMENTS INCLUDING

CLAMSHELL, DRAGLINE)........$ 25.79 11.55

OVER 45 TONS TO BUT NOT

INCLUDING 85 TONS (ALL

ATTACHMENTS INCLUDING

CLAMSHELL, DRAGLINE)........$ 26.06 11.55

Power equipment operator -oiler............................$ 25.35 11.55

Power equipment operator -scraper

(All, Rubber-Tired).........$ 25.79 11.55

(Multiple engine with three or scrapers)..........$ 26.06 11.55

Zone Differential (Add to Zone 1 rate): Zone 2- $2.00

BASE POINTS: Spokane, Pasco, Washington; Lewiston, Idaho

Zone 1: Within 45 radius miles from the main post office

Zone 2: Outside 45 radius miles from the main post office

BOOM PAY: (All Cranes, including Tower)

180' to 250' $.50 over scale

Over 250' $.80 over scale

NOTE: In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.

IRON0014-009 01/01/2012

ADAMS (REMAINDER OF COUNTY), IDAHO (SOUTH OF THE 46TH

PARALLEL), LEMHI (NORTHWEST CORNER), VALLEY (NORTHEASTERN 1/3)

AND WASHINGTIN (NORTHWESTERN 1/2) COUNTIES

Ironworkers: Rebar, Structural, Fence Erector........$ 31.35 20.10

IRON0014-010 01/01/2012

BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO(NORTH OF THE 46TH

Structural, Fence Erector........$ 31.35 20.10

IRON0732-005 06/01/2011

ADAMS (EAST CORNER), BEAR LAKE, BINGHAM, BLAINE, BOISE, BUTTE,

BONNEVILLE, CAMAS, CARIBOU, CASSIA, CLARK, CLUSTER, ELMORE,

FRANKLIN, FREMONT, GEM, GOODING, JEFFERSON, JEROME, LINCOLM,

LEMHI (REMAINDER OF COUNTY), MADISON, MINIDOKA, ONEIDA, OWYHEE,

PAYETTE, POWER, TETON, TWIN FALLS, VALLEY (SOUTHEAST 2/3), AND

WASHINGTON (SOUTHEAST 1/2) COUNTIES

Structural, Fence Erector........$ 26.00 16.00

LABO0155-003 01/01/2012

ADAMS, BEAR LAKE, BINGHAM, BLAINE, BOISE, BONNEVILLE, BUTTE,

CAMAS, CARIBOU, CASSIA, CLARK, CUSTER, ELMORE, FRANKLIN,

FREMONT, GEM, GOODING, IDAHO (SOUTH OF THE 46TH PARALLEL),

JEFFERSON, JEROME, LEMHI, LINCOLN, MADISON, MINIDOKA, ONEIDA,

OWYHEE, PAYETTE, POWER, TETON, TWIN FALLS, VALLEY AND

WASHINGTON COUNTIES

ZONE 1 (Anyone working on HAZMAT jobs working with supplied air shall receive $1.00 per hour above classification)

Laborer: General/Cleanup.........$ 23.68 11.25

POCATELLO: CLARK STREET

IDAHO FALLS: 875 NORTH CAPITAL AVE.

* LABO0238-013 06/01/2012

Laborer: General/Cleanup.........$ 23.78 10.30

Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00

BASE POINTS: Spokane, Pasco, Lewiston

Zone 1: 0-45 radius miles from the main post office.

Zone 2: 45 radius miles and over from the main post office

SUID2003-007 09/03/2003

Cement Mason/Finisher............$ 20.22 7.98

LABORER: Tamper (Hand Held).....$ 8.00 2.84

Pipe layer.......................$ 14.26 0.00 backhoe..........................$ 18.96 4.42

Power Equipment Operator

(Gradall)........................$ 22.84 3.62

(Loader).........................$ 21.33 3.43

Excavator...................$ 20.24 0.00

TRUCK DRIVER (6 Axle Dump).......$ 24.70 3.90

Truck Driver, Dump...............$ 17.82 0.00

TRUCK DRIVER: Water Truck.......$ 20.89 4.06

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be

July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007

5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .