Amendment 005 Repair Mech-Elec CDL 4-30-10.pdf
PDF 361 KB Posted
- Solicitation number
- AG-5114-S-10-AA10
About this file
Amendment 005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment Seven.pdf | ||
| sf30 Amend 6.pdf | ||
| Amendment Four.pdf | ||
| Amendment Three.pdf | ||
| Amendment Two.pdf | ||
| Amendment One.pdf | ||
| FINAL DRAWINGS.pdf | ||
| Return Bid Package.pdf | ||
| FINAL SPECIFICATIONS.pdf | ||
| Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
PREVIOUS EDITION UNUSABLE STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
This form was electronically produced by USDA/ARS/OCIO/ADB.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date,etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
4/30/2010
3/26/2010
J 1 3
USDA-ARS-MWA
1815 N. University Street Peoria, IL 61604
AG-5114-S-10-AA10
N/A
RECOVERY - Repair Mechanical and Electrical Systems, CDL, St. Paul, MN
Page 2 and 3 contains updates to the Reflective Ceiling Plan and revisions to plan notes.
This amendment becomes part of the contract documents.
Task Order No. AG-5114-D-09-0084 Contract No. AG-3K15-53-3K154-1500 00 20 10-1
BIDDING & CONTRACT REQUIREMENTS
Amendment No. 5
DATE: April 30, 2010
United States Department of Agriculture Agricultural Research Service
TO: PROSPECTIVE BIDDERS
SUBJECT: AMENDMENT NO. 5 TO THE BIDDING DOCUMENTS FOR:
RECOVERY – REPAIR MECHANICAL AND ELECTRICAL SYSTEMS
USDA-ARS
CEREAL DISEASE LABORATORY
ST. PAUL, MN 55108
AMENDMENT ITEMS:
Item 1:
Sheet A200 – Replace sheet A200 with the attached sheet dated 4/30/10. The updated sheet shows the ceiling and light fixtures within the scope of work only.
Item 2:
Sheet E101 – Revise the first sentence in plan note #2 to read “Existing ceiling in this corridor or room is to be removed as part of the mechanical systems upgrade portion of this project.” Add the following to plan note #2 – “See the architectural reflected ceiling plan on sheet A-001 for the extent and locations of ceiling work required.”
Item 3:
Sheet E101 – Add plan note #2 to the following rooms – Receptionist/Administration, Conference Lunch Room, Kitchen and the Large Conference Room.
File details come from the government source that posted it. Updated .