g.6ShelterCAMpage6.pdf

PDF 925 KB Posted

Attached to
Shelter Stewardship Federal contract opportunity
Solicitation number
AG-05G2-S-15-9000
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

g.6 Shelter CAM Page 6

View the file

Other files for this federal contract opportunity

Other files attached to Shelter Stewardship, newest first.
File Type Posted
Final_Amendment_4.docx DOCX document
Amendment_3.pdf PDF
Amendment_2.pdf PDF
VolumeSummary.pdf PDF
Final_Amendment_1.docx DOCX document
DecomissioningSpecs.pdf PDF
f.2App_D_-_Decomm_Plans_2900110.pdf PDF
f.1App_D_-_Decomm_Plans_2900105.pdf PDF
g.2ShelterCAMpage2.pdf PDF
b.Shelter_Stewardship_Solicitation.docx DOCX document
g.1ShelterCAMpage1.pdf PDF
g.5ShelterCAMpage5.pdf PDF
i.Construction_Wage_WA1.txt TXT text file
g.4ShelterCAMpage4.pdf PDF
g.7ShelterCAMpage7.pdf PDF
a.Cover_Letter_File_Code.docx DOCX document
g.3ShelterCAMpage3.pdf PDF
f.5App_D_-_Reconstruction_Plans.pdf PDF
f.3App_D_-_Decomm_Sample_Worksheet.pdf PDF
f.4App_D_-_Decomm_Specs.pdf PDF
c.Shelter_Stewardship_BiddersPacket.docx DOCX document
h.SCA_Wage_Rate_77-0209.txt TXT text file
f.6App_D_-_Reconstruction_Supplemental_Specifications.pdf PDF
e.App_C_-_Haul_Maintenance.pdf PDF
d.Appendix_B_Shelter_Scaled.doc DOC document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2900090

2900110

OLYMPIC NATIONAL FOREST

Sheet 6 of 7SDM 6/23/15

This product is reproduced from information prepared by the USDA, Forest Service or from other suppliers. The Forest

Service cannot assure the reliability or suitability of this information for a particular purpose. The data and product accuracy may vary due to compilation from various sources, including modeling and interpretation, and may not meet National Map Accuracy Standards.

This information may be updated, corrected or otherwise modified without notification. For more information contact:

Olympic National Forest Supervisors Office at 360-956-2300.

The USDA is an equal opportunity provider and employer.

Pacific Ranger District Olympic National Forest

T.28N., R.11W., Sections 5, 7, 8 T.28N., R.12W., Sections 1, 2, 11, 12

INDUSTRIAL FIRE PRECAUTION LEVEL (IFPL),

ZONE 652NW

0 300 600150 Feet

A, R, U

A,U

A,U A, U

Contract Area Map Shelter Stewardship

DE

DE

DE

MAP STATEMENTS

CONTRACTOR IS REQUIRED TO LEAVE TOPS IN SUBDIVISION AND

THREE FACES OF EACH LOG REQUIRED TO BE LIMBED IN

THE SUBDIVISION BEFORE YARDING. K-G.7.4.1#

TREE LENGTH YARDING IS PROHIBITED. K-G.4.2#

DISTURBED LEGACY LOGS WILL BE REPLACED AND FELLED SNAGS

WILL BE LEFT AS DIRECTED BY THE FOREST SERVICE.

K-G.4.2#

SKIDROADS SHALL BE NO CLOSER THAN 110 FEET APART AND WILL

NOT EXCEED 12 FEET IN WIDTH. ALL SKIDROADS MUST BE

APPROVED IN ADVANCE OF FELLING OPERATIONS.

K-G.4.2#

SKYLINE CORRIDORS MUST BE 120 FEET APART FOR PARALLEL

AND 150 FEET APART FOR WHEELED SPOKED CORRIDORS. K-G.4.2#

ALL LANDINGS (EXCEPT ON SYSTEM ROADS), SKIDROADS, SKYLINE

CORRIDORS, AND TEMPORARY ROADS ARE SUBJECT TO

SCARIFICATION. K-G.6.0#

ALL STREAMS ADJACENT TO SUBDIVISION BOUNDARIES OR

ALONG THE HAUL ROUTE WITHIN THE CONTRACT AREA BOUNDARY

ARE SUBJECT TO STREAMCOURSE PROTECTION. H.28 (SECTION H)

MINIMUM STUMP HEIGHT IS 10 INCHES. K-C.3.5.7#

THE CONTRACT AREA IS CONSIDERED TO BE SUBJECT TO THE PLANS

AND CRITERIA FOR TEMPORARY ROAD CONSTRUCTION.

K-F.1.0.1# (OPTION 1)

AN APPROVED BRIDGE OVERLOAD PERMIT IS REQUIRED FOR ANY

VEHICLE WHICH EXCEEDS THE GROSS VEHICLE WEIGHT OF

80,000 POUNDS (ESTABLISHED BY THE FEDERAL BRIDGE

FORMULA), IF SINGLE OR TANDEM AXLE LOADS EXCEED 20,000 OR

34,000 POUNDS RESPECTIVELY, OR IF THE VEHICLE EXCEEDS THE

POSTED LOAD LIMITS OF A BRIDGE, ISSUANCE OF A USDA

FOREST SERVICE PERMIT DOES NOT AUTHORIZE THE USE OF THE

PERMIT VEHICLE ON PUBLIC HIGHWAYS OF THE STATE OR

OTHER ROADS AND VICE VERSA. H.12

ALL ROCK FOR TEMPORARY AND SPECIFIED ROAD

CONSTRUCTION/RECONSTRUCTION WILL BE FROM A COMMERCIAL

SOURCE AND CERTIFIED WEED FREE. K-F.1.0.1#, F.6

Legend Protect Improvements - Gate, Far 52.236-9 Existing Transportation System, H.12 Specified Road Reconstruction, H.12 Public Use Restricted, H.10, H.12, H.14 Unsuitable for hauling prior to completion of agreed reconstruction, H.12 Hauling Restricted, H.12 Ground Based Yarding Specified, K-G.4.2# Skyline Yarding, K-G.4.2# Decommission Road, Appendix D Contract Area Boundary, C.4 Subdivision Boundary, C.4 Subdivision, C.4

Designation by Description C.3.5, K-C.3.5.7# (Option 1) Skips C.3.5, K-C.3.5.7# (Option 1) Gaps C.3.5, K-C.3.5.7# (Option 1) Heavy Thins C.3.5, K-C.3.5.7# (Option 1)

Contour Interval 40' 200'

File details come from the government source that posted it. Updated .