e. Appendix C
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Final_Amendment_4.docx | DOCX document | |
| Amendment_3.pdf | ||
| Amendment_2.pdf | ||
| VolumeSummary.pdf | ||
| Final_Amendment_1.docx | DOCX document | |
| DecomissioningSpecs.pdf | ||
| f.2App_D_-_Decomm_Plans_2900110.pdf | ||
| f.1App_D_-_Decomm_Plans_2900105.pdf | ||
| g.2ShelterCAMpage2.pdf | ||
| b.Shelter_Stewardship_Solicitation.docx | DOCX document | |
| g.1ShelterCAMpage1.pdf | ||
| g.5ShelterCAMpage5.pdf | ||
| g.3ShelterCAMpage3.pdf | ||
| g.6ShelterCAMpage6.pdf | ||
| f.5App_D_-_Reconstruction_Plans.pdf | ||
| f.3App_D_-_Decomm_Sample_Worksheet.pdf | ||
| f.4App_D_-_Decomm_Specs.pdf | ||
| i.Construction_Wage_WA1.txt | TXT text file | |
| g.4ShelterCAMpage4.pdf | ||
| g.7ShelterCAMpage7.pdf | ||
| a.Cover_Letter_File_Code.docx | DOCX document | |
| c.Shelter_Stewardship_BiddersPacket.docx | DOCX document | |
| h.SCA_Wage_Rate_77-0209.txt | TXT text file | |
| f.6App_D_-_Reconstruction_Supplemental_Specifications.pdf | ||
| d.Appendix_B_Shelter_Scaled.doc | DOC document |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Name: Shelter Stewardship Page 1 of 28
K-F.3.1# ROAD MAINTENANCE REQUIREMENTS. (7/01) hall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
Contract Road Maintenance Requirements Summary
Road Termini
Miles Applicable Prehaul Road Maintenance Specifications
From To T-811 T-813 T-831 T-832 T-834 T-838 T-842 T-851
2900 0 11.1 11.1 C C C C C
2900* 6.4 9.5 3.1 C C
2900 11.1 13.7 2.6 C C C C C C C C
C = Contractor Performance Item, D = Deposit to Forest Service, D3 = Deposit to Third Party
Miles Applicable During Haul Road Maintenance Specifications
From To T-803 T-811 T-813 T-831 T-832 T-834 T-838 T-842 T-851
2900 0.00 11.1 10.0 C C C C C C
2900* 6.4 9.5 3.1 C C
2900 11.1 13.7 2.6 C C C C C C C C C
2900110 0 0.53 0.53 C C C C C C C C C
2900090 0 1.36 1.36 C C C C C C C C C
2900100 0 0.42 0.42 C C C C C C C C C
C = Contractor Performance Item, D = Deposit to Forest Service, D3 = Deposit to Third Party
Miles Applicable Post Haul Road Maintenance Specifications
From To T-811 T-813 T-831 T-834 T-835
2900 0.00 11.1 11.1
2900* 6.4 9.5 3.1 C C
2900 11.1 13.7 2.6 C C C C
2900110 0 0.53 0.53 C C C C C
2900090 0 1.36 1.36 C C C C C
2900100 0 0.42 0.42 C C C C C
C = Contractor Performance Item, D = Deposit to Forest Service, D3 = Deposit to Third Party, *Detail information in table
Contract Name: Shelter Stewardship Page 2 of 28
ROAD MAINTENANCE REQUIREMENTS SPECIFICATION TABLE PURSUANT TO
K-F.3.1# - ROAD MAINTENANCE REQUIREMENTS (07/2001)
1 2 3 4 5 6 7 8
Special Post
Road No. Project Travel Way Brush Wet Haul and Specifi- X And Weather Haul Snow
Termini cation Width Slope Comp Log Out Surfacing Removal Block Treat
MP 0.00 to
11.1
EX
Brush Left
& Right
Log Out
Aggregate Base, Grading A
WW
Aggregate Base, Grading A
Additional Erosion Control
Measures
JU C
2900*
MP 6.4 to
9.5
4 Gravel
Patches
MP 6.4,
7.2, 9.1, 9.4
EX
Aggregate Base, Grading A
4 gravel patches
Roller Compaction
“B”
WW
Aggregate Base, Grading A
JU C
MP 11.1 to
13.7
EX
Brush Left
& Right
Log Out
Aggregate Base, Grading A
WW
Aggregate Base, Grading A
Additional Erosion Control
Measures
JU C
2900110
MP 0.00 to
0.53
EX
Brush Left
& Right
Log Out
Aggregate Base, Grading A
WW
Aggregate Base, Grading A
Additional Erosion Control
Measures
JU C C
2900090
MP 0.00 to
1.36
EX
Brush Left
& Right
Log Out
Aggregate Base, Grading A
WW
Aggregate Base, Grading A
Additional Erosion Control
Measures
JU C C
2900100
MP 0.00 to
0.42
EX
Brush Left
& Right
Log Out
Aggregate Base, Grading A
WW
Aggregate Base, Grading A
Additional Erosion Control
Measures
JU C C
Contract Name: Shelter Stewardship Page 3 of 28
ROAD MAINTENANCE REQUIREMENTS SPECIFICATION CODES TABLE
PURSUANT TO
Column No. Heading Entry Explanation
Any Blank Except as otherwise described, no entry indicates
Contractor is not authorized or required to perform the work item(s).
Any RC This work requirement applies only when haul of sale related construction materials occurs.
2 Special Project
Specification
4 Graveled
Patches
There are 4 graveled patches to be maintained Pre, During and post haul, work may be conducted with dozer
(or Grader) to shape for drainage and rolled for compaction with spot surfacing
3 Travel Way EX Contractor shall maintain the traveled way to the width existing upon entry, or at the completion of Specified
Road work.
Numbers Contractor shall maintain the traveled way to the standard width indicated by the entry, plus curve widening, in accordance with Section T-811. If required, the road template shall be shaped to this width and to the designated cross slope before haul and during recurring maintenance.
IS, C, OS,
F, or AI
Cross slopes are designated as:
IS (Inslope), C (Crown), OS (Outslope), F (Flat), AI
(As Is).
A or B If compaction is required.
4 Brush and Log
Out
Brush Left
& Right
Using mechanical brushing equipment Contractor shall remove brush from the right (R) side and left (L) side of road in accordance with the Brushing Detail.
As Staked Limits of brushing are as staked or marked in the field.
OPT Contractor may use hand or mechanical means of brushing.
H Only hand brushing may be used.
Contract Name: Shelter Stewardship Page 4 of 28
ROAD MAINTENANCE REQUIREMENTS SPECIFICATION CODES TABLE
PURSUANT TO
Column No. Heading Entry Explanation
5 Surfacing Aggregate
Grading
D
Contractor shall place surfacing on roads listed according to the grading indicated.
Contractor is to make deposits for listed road maintenance, including surface rock replacement.
6 Wet Weather
Haul
WW Wet Weather Haul Agreement applies to all activities.
Additional Erosion control features shall be in place prior to haul between November 1 st and May 31 st . Features include but are not limited to: straw wattles, weed free straw bales, silt fencing, & check dams. Contractor shall place surfacing on roads listed according to the grading indicated.
7 Snow Removal TS Snowplowing authorized for Contractor's Operations without recreation access being provided per Section T-
803 requirements.
JU Snowplowing authorized, but must provide for recreation joint use per Section T-803 requirements.
Blank Snowplowing is not authorized. Forest Service may authorize plowing by permit when not in conflict with other uses.
8 Post Haul C
D
C denotes that work is Contractor's Responsibility to perform.
D denotes that work is USFS Responsibility to perform.
Contract Name: Shelter Stewardship Page 5 of 28
T-803 - SNOW REMOVAL (05/07)
803.01 Description
This Section provides for removal of snow from roads to facilitate logging operations and safe use.
803.02 Maintenance Requirements
(1) Erect signs required by the Sign Plan in the SUPPLEMENTAL SPECIFICATIONS.
(2) Perform work in a manner to preserve and protect roads and appurtenances, and prevent erosion damage to roads, streams, and other Forest values.
(3) Do not undercut banks. Do not blade gravel or other surfacing material off the road.
(4) Keep roadbed drainage ditches, drain dips, and culverts functional when needed during operations and upon completion of operations.
(5) Control snow removal to identify the usable traveled way having roadbed support.
Reshape over-width plowing as necessary to define the usable width.
(6) Space, construct, and maintain drainage holes in the dike of snow or berm caused by snow removal operations. Place drain holes to obtain surface drainage without discharging on erodible fills.
(7) Close roads to wheeled vehicles at times and in the manner specified in C(T)5.12 or the Road Rules document.
(8) Upon seasonal completion of Contractor's Operations, effectively block the road by a snow barricade, unless otherwise approved by the Contracting Officer.
(9) Remove snow for either public access or project use as established in the
SUPPLEMENTAL SPECIFICATIONS and meet the following requirements:
Contract Name: Shelter Stewardship Page 6 of 28
T-811 BLADING (10/07)
811.01 Description
This work consists of surface blading the traveled way to a condition that facilitates traffic and provides proper drainage. Blading includes shaping the crown or slope of travel way, berms, and drainage dips in accordance with this specification.
Compaction is required when shown on the ROAD LISTING.
811.02 Maintenance Requirements
A. Timing - Perform surface blading during the contract period as often as needed to provide conditions stated for the maintenance level of the road.
B. General
1. Blade and shape the existing traveled way and shoulders, including turnouts
, to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface, unless otherwise shown in the ROAD LISTING, to at least ½ inch per 1 foot of width, but not more than ¾ inch per 1 foot of width. Thoroughly loosen surfacing material to no less than 2 inches depth or the depth of potholes or corrugations.
Scarification to facilitate cutting to the full depth of potholes or corrugations may be elected, but will be considered incidental to blading. Do not scarify to a depth that will cause contamination of the surfacing.
2. Apply water during blading when sufficient moisture is not present to prevent segregation. Supply, haul, and apply water in accordance with Section
T-891.
3. Shape existing native rock or aggregate surfaced drainage dips to divert surface runoff to existing outlet devices, ditches, or discharge locations.
4. Establish a blading pattern which provides a uniform driving surface, retains the surfacing on the roadbed, and provides a thorough mixing of the materials within the completed surface width. Upon final blading, no disturbed rock shall protrude more than 2 inches above the adjacent surface unless otherwise provided in the contract. Remove and place outside the roadbed, material not meeting this dimension so as not to obstruct drainage ways or structures. This material may be scattered off the roadbed if there is free drainage.
Contract Name: Shelter Stewardship Page 7 of 28
5. Where DESIGNATED ON THE GROUND, included in the ROAD
LISTING, SHOWN ON THE DRAWINGS or as ordered by the Contracting
Officer invasive species of concern prevention practices shall be followed as listed below.
Invasive Species of Concern Prevention Practices
To be filled in by local FS invasive plant specialist, if applicable.
C. Routine Blading
1. Conform to the dimensions SHOWN ON THE DRAWINGS or designated in the SUPPLEMENTAL SPECIFICATIONS upon completion of blading.
2. Shape roadbed width in excess of the dimensions shown only as needed to provide drainage away from the traveled way. Do not remove established grasses and other vegetation from the excess width except as incidental to providing drainage or unless otherwise provided in the contract.
D. Compaction
Roads requiring compaction will be included in the ROAD LISTING. Unless
Compaction Method B is designated in the ROAD LISTING, all traveled ways requiring compaction may be compacted by Method A. Compaction shall commence immediately following blading.
Compaction methods are:
Compaction Method A: Breaking track while operating equipment on the traveled way.
Compaction Method B: 7-10 ton pneumatic, steel, or equivalent vibratory roller, operated to cover the full width two (2) times.
E. Undercutting - Undercutting roadway back slope is not permitted.
Contract Name: Shelter Stewardship Page 8 of 28
F. Intersections
1. At intersections, blade the roadbeds of side roads which are not closed or restricted from vehicular use to ensure smooth transitions.
2. Signing, cross ditching in the road surface (traveled way), earth berms, or other devices placed to discourage or eliminate use by passenger cars, are field evidence of road closure or restriction. Roads listed for work under Sections T-835, T-836, T-838, or T-839 are considered restricted.
3. Side roads listed for work under this Section are not restricted.
G. Cleaning of Structures - Do not allow materials resulting from work under this
Section to remain on or in structures, such as bridges, culverts, cattle guards, or drainage dips.
H. Berms - Maintain existing berms to the condition of adjacent segments. Do not create new berms.
I. Smooth Blading - Smooth blading may be used as an interim measure to remove loose surfacing material from the wheel paths, and store removed materials in a recoverable windrow, until blade processing as described in this section is feasible.
Watering will not be required for smooth blading. Accomplish smooth blading without distorting the existing cross-slope or crown of the traveled way.
Move and store loose surfacing materials on the high side of super-elevated curves and sections with uniform inslope or outslope. In crowned sections, store the material on either or both sides as elected. Windrow and place stored materials to provide not less than 12 feet of smooth traveled way on one-lane segments, or 20 feet of smooth traveled way on two-lane segments, or segments with turnouts. Cut holes through windrows, which may collect water on the road, for drainage at least every 500 feet.
Contract Name: Shelter Stewardship Page 9 of 28
T-813 SURFACING (10/07)
813.01 Description
This work consists of placing surface aggregate as DESIGNATED ON THE GROUND, or as ordered by the Contracting Officer. It includes preparing the area, furnishing, hauling, and placing all necessary materials and other work necessary to blend with the adjacent road cross section.
813.02 Materials
A. Materials will be Government-furnished when stated in the supplemental specifications.
B. Materials furnished by the Contractor shall conform to the gradation and quality requirements of Section 703 of the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects
FP-03 U.S. Customary Units" and FS supplements to the FP-03.
C. All materials transported onto National Forest System land shall be free of invasive species of concern. Written documentation of methods used to determine the invasive species of concern free status of any and all materials furnished by the Contractor shall be submitted to the
Contracting Officer before transport of any materials onto National
Forest System land.
The Contracting Officer shall have 5 days, excluding weekends and
Federal holidays, to review the methods and inspect the materials after the required written documentation is provided by the Contractor. After satisfactory review and inspection or after such 5 day period, the
Contractor may transport the material onto National Forest System land.
Material or methods appropriate for establishing invasive species of concern free status for the particular invasive species of concern are listed below.
Invasive Species of Concern and Acceptable Methods specific to this project:
Invasive Species of Concern Acceptable Methods
To be filled in by the local FS invasive plant specialist
To be filled in by the local FS invasive plant specialist
Contract Name: Shelter Stewardship Page 10 of 28
813.03 Maintenance Requirements
A. Thoroughly loosen the area to be surfaced to a minimum depth of 1 inch prior to placement of aggregate.
B. Mixing and Placing
When scheduled coincidentally with work under Section T-811, and included in the SUPPLEMENTAL SPECIFICATIONS, mix surfacing and existing aggregate with water until a uniform mixture is obtained prior to final shaping and compaction.
Otherwise, spread the material on the prepared area in layers no more than 4 inches in depth. When more than one (1) layer is required, shape and compact each layer before the succeeding layer is placed. Upon completion, the surfacing shall reasonably conform to the adjacent cross section and provide smooth transitions in the road profile.
C. Compaction Methods
Compaction Method A: Breaking track while operating equipment on the traveled way.
Compaction Method B: 7-10 ton pneumatic, steel, or equivalent vibratory roller, operated to cover the full width two (2) times.
Either Method A or B may be used unless Method B is designated in the
ROAD LISTING.
Contract Name: Shelter Stewardship Page 11 of 28
T-831 DITCH MAINTENANCE (10/07)
831.01 Description
This Section provides for routine maintenance of various types of ditches to provide a waterway which is unobstructed, as shown on the ROAD LISTING or DESIGNATED ON
THE GROUND.
831.02 Maintenance Requirements
A. Maintain ditches by removing rock, soil, wood, and other materials. Maintained ditches shall function to meet the intent of the original design.
B. Undercutting backslopes during removal operations is not permitted.
C. Suitable material up to 4 inches in greatest dimension removed from the ditches may be blended into existing native road surface and shoulder or placed in designated berm.
D. Do not blend material from ditch cleaning operations into aggregate surfaced roads.
Do not blade material across aggregate or bituminous surfaced roads, unless approved in writing by the Contracting Officer.
E. Haul material in excess of 831.02 D or subject to 831.02 E to a designated waste area under Section T-832. Remove excess materials temporarily stored on the ditch slope or edge of the shoulder daily.
F. Remove limbs and wood chunks in excess of 12 inches in length or 3 inches in diameter from ditches and place outside the roadway.
G. Clean paved surfaces of all materials resulting from ditch maintenance work.
H. Shape lead-off ditches to drain away from the traveled way.
I. Where DESIGNATED ON THE GROUND, included in the ROAD LISTING, SHOWN ON THE DRAWINGS or as ordered by the Contracting Officer invasive species of concern prevention practices shall be followed as listed below.
Contract Name: Shelter Stewardship Page 12 of 28
T-832 REMOVE AND END HAUL MATERIALS (05/07)
832.01 Description
Work consists of loading, hauling, and placing of slide, slough, or excess materials such as rock, soil, vegetation, and other materials to designated disposal sites.
832.02 Maintenance Requirements
A. Remove, end haul, and dispose of excess materials generated by work under other
Sections of this contract.
B. Remove the slide and slough materials in the area extending approximately 6 feet vertically above the road surface and not more than 3 feet down slope from the roadbed.
Dispose of material at designated sites as SHOWN ON THE DRAWINGS, identified in
SUPPLEMENTAL SPECIFICATIONS, or as ordered by the Contracting Officer.
Reshape the slope which generated the slide material as nearly as practical to its original condition by equipment operating from road surface. Reshaping of roadside ditches in slide area shall be in accordance with Section T-831.
C. When approved by the Contracting Officer, fill slumps by compacting selected materials into roadway depressions. Compaction is by Method 2.
D. Place all materials in disposal sites as specified in the SUPPLEMENTAL
SPECIFICATIONS, as SHOWN ON THE DRAWINGS, or as ordered by the
Contracting Officer.
1. Method 1 - Side Casting and End Dumping. Material may be placed by side casting and end dumping. Where materials include large rocks, provide a solid fill by working smaller pieces and fines into voids. Shape the finished surfaces to drain.
2. Method 2 Layer Placement - Step or roughen surfaces on which materials are to be placed prior to placing any material. Place materials in approximately horizontal layers no more than 12 inches thick. Compact each layer by operating hauling and spreading equipment over the full width of each layer.
E. Repair any damage to existing aggregate or pavement surfaces.
Contract Name: Shelter Stewardship Page 13 of 28
T-834 DRAINAGE STRUCTURE MAINTENANCE (10/07)
834.01 Description
This work consists of cleaning and reconditioning culverts and other drainage structures.
834.02 Maintenance Requirements
A. Clean drainage structures, inlet structures, culverts, catch basins, and outlet channels specified in the SUPPLEMENTAL SPECIFICATIONS. Clean catch basins by removing the material within the area SHOWN ON THE DRAWINGS.
B. Clean the transition from the ditch line to the catch basin a distance of 10 feet from the catch basin. Clean outlet channels and lead-off ditches a distance of 6 feet. Remove and place debris and vegetation so as to not enter the channel or ditch, or obstruct traffic. Haul debris and vegetation to a designated disposal area in accordance with
Section T-832.
C. Hydraulic flushing of drainage structures is not allowed unless provided for in the
SUPPLEMENTAL SPECIFICATIONS.
D. Cleaning and reconditioning are limited to the first 3 feet of inlet and outlet, determined along the top of the structure. Recondition culvert inlet and outlet by field methods such as jacking out or cutting away damaged metal which obstructs flow.
Treat cut edges with a zinc rich coating, in accordance with AASHTO M 36M and
ASTM A 849.
E. Where DESIGNATED ON THE GROUND, included in the ROAD LISTING, SHOWN ON THE DRAWINGS or as ordered by the Contracting Officer invasive species of concern prevention practices shall be followed as listed below.
Contract Name: Shelter Stewardship Page 14 of 28
T-835 ROADWAY DRAINAGE MAINTENANCE (05/07)
835.01 Description
This work consists of providing post haul drainage on roads.
835.02 Maintenance Requirements
A. Drainage
1. Upon completion of work, shape the roadway to provide for the removal of surface water. The roadway need not be passable to vehicles. Repair and reinstall water bars, barriers or berms existing prior to the Contractor's operation. Areas where water is ponded by existing centerline profile sags in through cuts may be left untreated.
2. Continuous blade shaping of the roadbed is not required under this specification.
3. Work to be done at staked locations shall be as indicated on the stake and/or stated in SUPPLEMENTAL SPECIFICATIONS:
4. Any of the following methods are acceptable for use at eroded or rutted locations:
Method A: Outsloping the roadbed at not less than ½ inch per yard of width.
Method B: Insloping the roadbed at not less than ½ inch per yard of width.
Method C: Water bar roadbed at locations staked on the ground and construct as SHOWN ON THE DRAWINGS or as included in
SUPPLEMENTAL SPECIFICATIONS.
5. Drainage structures located in through fills and natural watercourses shall be fully functional without obstructions, including inlet and outlet channel within 20 feet of the structure.
Contract Name: Shelter Stewardship Page 15 of 28
6. Either clean culverts and other fabricated structures to provide drainage from road ditches and make the ditch functional or provide water bar(s) across the roadbed. Removed structures shall become Contractor's property to be removed from National Forest System land. Remove and replace any
Contractor-installed temporary drainage structures with a water bar.
B. Slides, Slumps and Slough
1. Slides and slough may be left in place, provided they do not potentially impound water or divert water from watercourses. As necessary, reshape the various surfaces to provide drainage.
2. Provide drainage to effectively decrease or eliminate the entry of surface water into slides, slumps, and roadbed surface cracks. Place berms, waterbars or ditches as needed to intercept and remove runoff water from the roadbed.
Surface seal cracks by covering over with native soil materials to prevent additional water entry and compact with equipment tires.
C. Entrance Devices
Upon completion of work, replace entrance devices to effectively eliminate access by motorized vehicles having four (4) wheels and a width in excess of 50 inches.
D. Seeding
Seed and fertilize all disturbed areas in accordance with requirements set forth in
Section T-841.
Contract Name: Shelter Stewardship Page 16 of 28
T-838 MAINTENANCE FOR HIGH CLEARANCE VEHICLE USE (05/07)
838.01 Description
This work consists of making limited use roads passable for project use by Contractor and providing drainage from the traveled way and roadbed.
838.02 Maintenance Requirements
A. Traveled Way
Contractor may smooth or fill existing cross ditches and water bars and as approved by the Contracting Officer modify existing road junctions to enable vehicle access.
The Contractor may perform the following work prior to beginning haul and resumption of haul after an extended stoppage:
1. Remove brush, fallen trees, rocks, and other debris from traveled way, including turnouts, turnarounds, and other locations that interfere with needed maintenance as follows:
a. No object extending over 4 inches above the road surface shall remain within the 12 feet usable traveled way. Center the usable width on the roadbed or position away from the fill slope.
b. Cut and remove standing or down trees, logs, brush, and limbs from within the area described in 1(a). Remove encroaching limbs to a height of 14 feet above the traveled way surface. Scatter material not meeting utilization standards outside and below the roadbed on the fill side. Limb and remove timber that meets utilization standards or deck at locations approved by the Contracting Officer.
c. Place all removed materials away from drainages.
d. During use, maintain drainage structures including dips, ditches and culverts in a usable condition.
2. Clean and recondition drainage facilities in accordance with Section T-831 and T-834.
B. Slough and Slides
1. Slough and slides may be left in place, provided surface drainage is provided and at least 12 feet of width is available for vehicle passage.
Contract Name: Shelter Stewardship Page 17 of 28
2. Contractor may reposition or ramp over slides and slough when the traveled way width is less than 12 feet providing the material is capable of supporting vehicles. Limit out slope to no more than six percent.
Contract Name: Shelter Stewardship Page 18 of 28
3. Reposition slough or slide materials, which are not capable of supporting a vehicle, on the roadbed to provide the 12 feet width. When directed by the
Contracting Officer, slough or slide material will be removed under Section
T-832.
C. Slumps and Washouts
1. Drain the roadbed immediately upgrade of slumps and longitudinal cracks to prevent water from entering slump area.
2. Slumps and longitudinal cracks at the edge of the roadbed shall not be considered a part of the usable width. Usable width may be reduced to 10 feet in the area of the slump.
3. Unless the Contracting Officer approves material being placed on slumps, ramp the slumps on both ends into undisturbed roadbed to provide at least 10 feet usable width. Use removed materials to guide vehicles to the ramp location or to aid in draining the area.
4. Washouts may be filled with suitable material.
D. Post haul
At the end of hauling or prior to entering into seasonal shutdowns or a period of extended inactivity:
1. Shape the traveled way and disturbed roadbed to provide functional drainage.
2. Reinstall removed cross ditches and water bars and provide any additional drainage structures necessary to offset changes caused through use and maintenance.
3. Leave roads useable for high clearance vehicles. Remove or reshape
Contractor modifications at road junctions to leave the entrance as it was before use, or as agreed at the time of improvement.
Contract Name: Shelter Stewardship Page 19 of 28
T-839 MAINTENANCE FOR PROJECT USE (05/07)
839.01 Description
Work consists of providing minimum access required for Contractor's Operations and associated Forest Service contract administration and preventing unacceptable resource or road damage.
839.02 Maintenance Requirements
A. Contractor is authorized to perform the following maintenance to provide vehicle passage and drainage:
1. Removing log, earth, and rock barriers and/or improving existing road junctions to enable vehicle access as mutually agreed.
2. Smoothing or filling existing cross ditches and water bars.
3. Installing Contractor-furnished culverts or other temporary drainage structures for shallow stream crossings as approved by the Contracting
Officer.
4. Removing brush, fallen trees, rocks, and other materials from the traveled way and other locations that interfere with needed maintenance:
a. Place all removed materials away from drainages.
b. Limb and remove timber which meets utilization standards or deck at locations approved by the Contracting Officer. Scatter other woodymaterials, including limbs, off of and below the roadbed without creating concentrations.
5. Clean and recondition drainage structures in accordance with Section T-831 and Section T-834.
6. Reposition or ramp over slough and slides to provide adequate width of traveled way material.
7. Provide traveled way drainage above slumps and seal cracks in slump area. Ramp the slumps on both ends into undisturbed roadbed to provide usable width unless otherwise ordered by the Contracting Officer.
Contract Name: Shelter Stewardship Page 20 of 28
B. During use, the traveled way shall not channel water along the road. Prior to seasonal periods of anticipated rains and runoff, perform the following work:
1. Shape the traveled way and roadbed to drain.
Contract Name: Shelter Stewardship Page 21 of 28
2. Reinstall removed cross ditches and water bars and provide any additional drainage structures necessary to offset changes through use and maintenance.
3. Perform work outlined in 839.02 A (5), (6), and (7).
4. During periods of non use, replace original barrier or provide and maintain standard MUTCD, Type 3, barricades unless alternate type barriers are approved by the Contracting Officer.
839.03 Post Haul Requirements
A. Upon completion of project use perform such work as needed to reasonably conform to the character of the existing road prior to Contractor's maintenance for project use, unless otherwise provided in the SUPPLEMENTAL
SPECIFICATIONS or the Road Listing. Work shall be in addition to requirements of 839.02 B and in accordance with 839.03 B and C.
B. Roads designated in the Road Listing to be blocked shall conform to the requirements of Section T-835. Unless otherwise approved by the Contracting
Officer, remove Contractor-installed temporary structures from National Forest
System land. Associated commercially-obtained materials shall remain the property of the Contractor.
C. Remove or reshape Contractor improvements at road junctions, as approved by the
Contracting Officer at the time of improvement.
Contract Name: Shelter Stewardship Page 22 of 28
Contract Name: Shelter Stewardship Page 23 of 28
Contract Name: Shelter Stewardship Page 24 of 28
T-842 CUTTING ROADWAY VEGETATION (10/07)
842.01 Description
This work consists of cutting all vegetative growth, including trees and other vegetation less than 4 inches in diameter measured 6 inches above the ground, on roadway surfaces and roadsides.
842.02 Maintenance Requirements
A. General
1. Cut brush, trees, and other vegetation within each area treated to a maximum height of 6 inches above the ground surface or obstruction such as rocks or existing stumps. When work is performed under this Section, remove all limbs which extend into the treated area, or over the roadbed, to a height of
14 feet above the traveled way surface elevation.
2. Items to remain will be DESIGNATED ON THE GROUND.
3. Work may be performed either by hand or mechanically unless specifically shown in the Road Listing. Self-propelled equipment is not allowed on cut and fill slopes or in ditches.
4. Correct damage to trunks of standing trees caused by Contractor's operation either by treatment with a commercial nursery sealer or by removing the tree as directed by the Contracting Officer.
5. Limb trees within the cutting limits which are over 4 inches -measured at 6 inches above the ground in lieu of cutting.
6. When trees are limbed, cut limbs within 4 inches of the trunk.
B. Cutting Side Vegetation
1. Show the width of vegetation to be removed in the Road Listing.
2. Unless otherwise included in the SUPPLEMENTAL SPECIFICATIONS or DESIGNATED ON THE GROUND:
a. Commence work at the edge of the traveled way and proceed away from the road centerline.
Contract Name: Shelter Stewardship Page 25 of 28
b. Roads without a defined traveled way: The starting point for cutting will be marked on the ground or defined in the SUPPLEMENTAL
SPECIFICATIONS.
Contract Name: Shelter Stewardship Page 26 of 28
3. The points for establishing cutting limits are as follows:
a. Fill and daylighted (wide roadbed) section cutting commences at the edge of the traveled way and proceeds away from the road center line.
b. Drainage ditched section cutting commences at the bottom of the existing ditch and proceeds away from the road center line. Cutting on ditch foreslopes is not required.
c. Unditched cut section cutting commences at the intersection of the cutbank and the roadbed and proceeds away from center line.
4. Provide transitions between differing increments of cutting width.
Accomplish transitions in a taper length of not less than 50 feet nor more than
70 feet.
C. Debris
1. Materials resulting from the cutting operation in excess of 12 inches in length or 3 inches in diameter is not allowed to remain on roadway slopes within the treated area, in ditches, or within water courses.
2. Remove limbs and chunks in excess of 3 inches in any dimension from the traveled way and shoulders.
3. Materials may be scattered down slope from the roadbed, outside of the work area and drainages unless otherwise listed in D. Invasive Species of
Concern.
D. Invasive Species of Concern
Where DESIGNATED ON THE GROUND, included in the ROAD LISTING, SHOWN ON THE DRAWINGS or as ordered by the Contracting Officer invasive species of concern prevention practices shall be followed as listed below.
Contract Name: Shelter Stewardship Page 27 of 28
Contract Name: Shelter Stewardship Page 28 of 28
T-851 LOGGING OUT (5/07)
851.01 Description
This work consists of removal of fallen trees and snags which encroach into the roadway or the 3 feet of roadside abutting the roadway on the cut side.
851.02 Maintenance Requirements
A. Limb and remove timber which meets Utilization Standards, or deck at locations designated by the Contracting Officer.
B. Limb other material cut into lengths for handling. Deck outside ditches and drainages, off the traveled way and turnouts or at staked locations. The clearing width is to the edge of the roadway for public use roads, except limited use roads. The clearing width for limited use roads is shown in the specifications.
C. Notwithstanding B(T)2.3, blowdown timber outside Sale Area required to be removed, which meets Utilization Standards in A(T)2, when designated by the
Contracting Officer is Included Timber subject to requirements of B(T)2.2.
D. Do not leave woody debris and slash in excess of 12 inches in length or 3 inches in diameter, or concentrations which may plug ditches or culverts, in ditches, drainage channels, or on backslopes, traveled way, shoulders, or turnouts.
6’
MIN