f.6App_D_-_Reconstruction_Supplemental_Specifications.pdf
PDF 1 MB Posted
- Attached to
- Shelter Stewardship Federal contract opportunity
- Solicitation number
- AG-05G2-S-15-9000
About this file
f.6 Reconstruction Supplemental Specs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Final_Amendment_4.docx | DOCX document | |
| Amendment_3.pdf | ||
| Amendment_2.pdf | ||
| DecomissioningSpecs.pdf | ||
| VolumeSummary.pdf | ||
| Final_Amendment_1.docx | DOCX document | |
| c.Shelter_Stewardship_BiddersPacket.docx | DOCX document | |
| h.SCA_Wage_Rate_77-0209.txt | TXT text file | |
| e.App_C_-_Haul_Maintenance.pdf | ||
| d.Appendix_B_Shelter_Scaled.doc | DOC document | |
| f.2App_D_-_Decomm_Plans_2900110.pdf | ||
| f.1App_D_-_Decomm_Plans_2900105.pdf | ||
| g.2ShelterCAMpage2.pdf | ||
| b.Shelter_Stewardship_Solicitation.docx | DOCX document | |
| g.1ShelterCAMpage1.pdf | ||
| g.5ShelterCAMpage5.pdf | ||
| g.3ShelterCAMpage3.pdf | ||
| g.6ShelterCAMpage6.pdf | ||
| f.5App_D_-_Reconstruction_Plans.pdf | ||
| f.3App_D_-_Decomm_Sample_Worksheet.pdf | ||
| f.4App_D_-_Decomm_Specs.pdf | ||
| i.Construction_Wage_WA1.txt | TXT text file | |
| g.4ShelterCAMpage4.pdf | ||
| g.7ShelterCAMpage7.pdf | ||
| a.Cover_Letter_File_Code.docx | DOCX document |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD SPECIFICAIONS
FOR CONSTRUCTION OF
ROADS AND BRIDGES
ON FEDERAL HIGHWAY PROJECTS
FP-03
US CUSTOMARY UNITS
PROJECT
NAME:
SHELTER STEWARDSHIP
ROAD RECONSTRUCTION
DATE: 5/24/2015
ID LABEL 1 2 3
ROAD NO.
2900090
Reconst.
2900100
Reconst.
2900110
Reconst.
Terminus
Begin
MP 0.00 MP 0.00 MP 0.00
Terminus
End
MP 1.36 MP 0.42 MP 0.53
Construction (C)
Reconstruction (R) R R R
Title Revised
Date
1 2 3
Preface 03/15/2004
100 General Requirements
101 - Terms, Format, and Definitions
FLH FP-03 Corrections 07/25/2005
X Meaning of Terms 01/22/2009 X X X
X Meaning of Terms 01/22/2009 X X X
X Abbreviations and Symbols 06/16/2006 X X X
04 Symbols 03/29/2007 X X X
04 Definitions 11/06/2007 X X X
102 - Bid, Award, and Execution of Contract
00 Delete 102 in its entirety 02/16/2005 X X X
103 - Scope of Work
00 Intent of Contract 02/16/2005 X X X
104 - Control of Work
00 Deletions to 104 06/16/2006 X X X
03 Specifications and Drawings 02/22/2005
03 Specifications and Drawings 01/22/2009 X X X
03 Specifications and Drawings 02/22/2005
06 Use of Roads by Contractor 02/17/2005 X X X
07 Other Contracts 02/17/2005 X X X
105 - Control of Material
02 Material Sources 02/17/2005
02 Material Sources 02/17/2005
02 Material Sources 01/18/2007 X X X
02 Material Sources 02/17/2005 X X X
02 Material Sources 02/17/2005
02 Government-provided sources 03/29/2005
02 Contractor-provided material sources 03/08/2007 X X X
05 Use of Material Found in the Work 05/12/2004 X X X
106 - Acceptance of Work
01 Conformity with contract requirements 07/31/2007
01 Conformity with contract requirements 07/31/2007 X X X
07 Partial and Final Acceptance 05/11/2004 X X X
107 - Legal Relations and Responsibility To the Public
02 Protection and Restoration of Property and
Landscape
02/17/2005
05 Responsibility for Damage Claims 05/11/2004 X X X
06 Contractor Responsibility for Work 06/16/2006 X X X
08 Sanitation, Health, and Safety 05/11/2004
08 Sanitation, Health & Safety 03/29/2005 X X X
09 Legal Relationship of the Parties 06/16/2006 X X X
10 Environmental Protection 06/16/2006 X X X
11 Protection of Forests, Parks, and Public Lands 02/17/2005
108 - Prosecution and Progress
00 Delete Section 108 in entirety 02/16/2005 X X X
109 - Measurement and Payment
00 Deletions 02/17/2005 X X X
02 Measurement Terms and Definitions 06/16/2006 X X X
03 Weighing Procedures and Devices 02/17/2005
03 Weighing Procedures and Devices 03/29/2005
150 Project Requirements
151 – Mobilization
03 Payment 08/05/2005
152 - Construction Survey and Staking
00 Construction Survey and Staking 08/05/2005
153 - Contractor Quality Control
02 Contractor Quality Control Plan 02/17/2005 X X X
04 Records 10/24/2007 X X X
154 - Contractor Sampling and Testing
01 Description 05/24/2005 X X X
155 - Schedules for Construction Contracts
00 Contractor Quality Control Plan, Records 05/11/2004 X X X
156 - Public Traffic
00 Complete specification 04/17/2007 X X X
03 Accommodating Traffic During Work 02/24/2005
04 Maintaining Roadways During Work 02/24/2005
08 Traffic and Safety Supervisor 02/24/2005
157 - Soil Erosion Control
03 General 02/24/2005 X X X
170 - Develop Water Supply and Watering
00 Complete Specification 03/30/2005
171 - Weed and Disease Prevention
00 Complete Specification 03/30/2005 X X X
183 - P Line Survey
00 Complete Specification 03/30/2005
185 - Low Volume Road Design
00 Complete Specification 02/24/2005
200 Earthwork
201 - Clearing and Grubbing
00 Deletions 08/05/2009 X X X
01 Description 02/18/2005 X X X
04 Clearing 02/18/2005
04 Clearing 02/22/2005 X X X
04 Clearing 03/03/2005 X X X
06 Disposal 02/18/2005 X X X
06 Disposal 02/23/2005
06 Disposal 02/23/2005
06 Disposal 11/04/2004 X X X
06 Disposal 05/12/2004
06 Disposal 11/09/2005 X X X
203 - Removal of Structures and Obstructions
01 Description 02/25/2005 X X X
02 Material 02/18/2005
04 Removing Material 02/18/2005 X X X
05 Disposing of Material 02/24/2005
05 Disposing of Material 02/18/2005
05 Disposing of Material 02/18/2005 X X X
08 Payment 02/24/2005
204 - Excavation and Embankment
00 Complete Specification 03/26/2009 X X X
05 Conservation of Topsoil 02/18/2005
06 Roadway Excavation 03/02/2005
09 Preparing Foundation for Embankment
Construction
03/02/2005
10 Embankment Construction 03/02/2005
11 Compaction 04/11/2005
13 Sloping, Shaping, and Finishing 03/02/2005
13 Sloping, Shaping, and Finishing 03/02/2005
14 Disposal of Unsuitable or Excess Material 03/02/2005
15 Acceptance 02/07/2007
205 - Rock Blasting
02 Regulations 05/13/2004
06 Preblast condition survey and vibration monitoring and control
05/12/2004
07 Test Blasting 05/12/2004
08 Controls 05/12/2004
209 - Structure Excavation and Backfill
00 Complete Spec. 209A; Exc & Backfill for selected Minor Structures. NOT a Replacement for 209.
03/24/2008
10 Backfill 10/23/2007 X X X
11 Compacting 02/24/2005 X X X
211 – Roadway Obliteration
01 Description 03/30/2005
01 Description 03/30/2005
02 Construction Requirements 02/25/2005
212 – Linear Grading
00 Complete Specification (composite road construction)
05/19/2005
213 – Subgrade Stabilization
02 FLH FP-03 Correction metric 09/06/2005
250 Structural Embankments
251 – Riprap
03 General 06/18/2007 X X X
252 – Special Rock Embankment and Rock Buttress
02 Material – Placing Rock 05/13/2004
255 – Mechanically Stabilized Earth Walls
02 Material – Acceptance 02/25/2005
262 – Reinforced Soil Embankment
00 Complete Specification 05/14/2004
01 Table 262-1 Sampling & Testing
Requirements
05/14/2004
300 Aggregate Courses
301 – Untreated Aggregate Courses
00 Title Change 03/03/2005
01 Work 03/03/2005
02 Material 05/16/2005
03 General 09/14/2005
04 Mixing and Spreading 03/03/2005
05 Compacting 05/17/2005
06 Surface Tolerance 03/03/2005
08 Acceptance 03/03/2005
08 Acceptance 03/03/2005
08 Acceptance 03/30/2005
09 Measurement 07/07/2005
10 Payment 03/03/2005
302 - Treated Aggregate Courses
00 Deletes 302 in its entirety 02/16/2005
03 FLH FP-03 Corrections metric 08/12/2004
303 - Road Reconditioning
01 Description 03/02/2005
06 Aggregate Surface Reconditioning 05/17/2005
07 Roadway Reconditioning 03/02/2005
11 Measurement 03/29/2005
306 - Dust Palliative
03 General 03/02/2005
04 Preparation and Application 03/02/2005
06 Acceptance 03/02/2005
10 Table 306-1 Sampling & Testing 03/02/2005
320 - Stockpiled Aggregates
00 Complete Specification 03/02/2005
321 - Major Aggregate Courses
00 Complete Specification 12/19/2005
322 - Minor Aggregate Courses
00 Complete Specification 10/14/2011 X X X
400 Asphalt Pavements and Surface Treatments
401 - Superpave Hot Asphalt Concrete Pavement
01 FLH FP-03 Correction metric uscu 08/12/2004
04 FLH FP-03 Correction uscu 08/12/2004
402 - Hot Asphalt Concrete Pavement by Hveem or Marshall
Mix Design Method
03 FLH FP-03 Correction metric uscu 08/12/2004
403 - Hot Asphalt Concrete Pavement
06 Surface Preparation 05/17/2005
16 Pavement Smoothness & Testing 03/02/2005
17 Acceptance 03/02/2005
17 Acceptance 03/02/2005
404 - Minor Hot Asphalt Concrete
02 Composition of Mix (Job-Mix Formula) 03/02/2005
04 Weather Limitations 03/02/2005
06 Placing 03/02/2005
07 Compacting (a) 03/02/2005
07 Compacting (b) 03/02/2005
09 Acceptance 03/02/2005
409 - Asphalt Surface Treatment
02 Material 05/12/2004
06 Weather, date, time 05/12/2004
08 Application 06/21/2005
10 FLH FP-03 Corrections uscu 08/12/2004
11 table409-2 12/18/2004
12 FLH FP-03 Correction uscu 08/12/2004
13 Acceptance & Testing 05/13/2004
411 - Asphalt Prime Coat
06 Application 05/12/2004
414 - Asphalt Pavement Crack and Joint Sealing
02 Material 05/12/2004
05 Cleaning & Sealing 05/12/2004
430 - Asphalt Pavement Patching
00 Complete Specification 05/12/2004
550 Bridge Construction
552 - Structural Concrete
13 FLH FP-03 Correction metric uscs 08/12/2004
571 - Prefabricated Bridges
00 Complete Specification 03/15/2005
572 - Log Stringer Bridges
00 Complete Specification 05/12/2004
573 - Bridge Repair
00 Complete Specification 05/12/2004
600 Incidental Construction
601 - Minor Concrete
00 Replace Specification 05/14/2004
02 Table 601-2 Sampling & Testing 03/02/2005
602 - Culverts and Drains
03 General 09/06/2005 X X X
06 Laying Plastic Pipe 08/05/2009 X X X
603 - Structural Plate Structures
03 General 03/02/2005
04 Erecting 03/02/2005
607 - Cleaning, Reconditioning, and Repairing Existing Drainage
04 Cleaning Culverts in Place 03/02/2005 X X X
625 - Turf Establishment
03 General 02/25/2005
03 General 07/02/2007 X X X
04 Preparing Seedbed 02/25/2005
05 Watering 03/30/2005
05 Watering 03/02/2005
07 Seeding 02/25/2005
633 - Permanent Traffic Control
02 Material 03/03/2005
03 General 03/03/2005
05 Panels 03/03/2005
634 - Permanent Pavement Marking
03 General 03/03/2005
635 - Temporary Traffic Control
03 General 05/13/2004 X X X
648 - Stream Simulation
00 Complete Specification 03/15/2005
650 - Road Closure Devices
00 Complete Specification 06/28/2007
651 - Development of Pits & Quarries
00 Complete Specification 03/02/2005
700 Material
703 – Aggregate
05 Subbase, Base, & Surface Course Aggregate 08/14/2009 X X X
06 Flakiness Index and Adherent Coatings 03/02/2005
07 FLH FP-03 Correction metric uscu 03/02/2005
10 FLH FP-03 Correction 03/02/2005
704 - Soil
02 FLH FP-03 Correction Bedding Material 03/02/2005
02 FLH FP-03 Modification - Bedding Material metric uscu
03/02/2005
705 – Rock
02 Riprap Rock 08/05/2009 X X X
712 - Joint Material
01 Sealants, Fillers, Seals, and Sleeves 03/02/2005
713 - Roadside Improvement Material
05 Mulch 03/02/2005 X X X
714 - Geotextile and Geocomposite Drain Material
03 Geogrids 02/25/2005
718 - Traffic Signing and Marking Material
02 Protective Overlay Film and Edge Film 03/02/2005
05 Aluminum Panels 02/25/2008 X X X
08 FLH FP-03 Correction metric 03/27/2007
14 FLH FP-03 Correction metric uscu 03/02/2005
15 FLH FP-03 Corrections metric 03/27/2007
15 FLH FP-03 Correction metric 03/27/2007
725 - Miscellaneous Material
02 Calcium Chloride, Calcium Chloride Flakes and Magnesium Chloride
03/02/2005
Table of Contents
Table of Contents
Preface
101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
101.04 Definitions
102 - Bid, Award, and Execution of Contract
102 Bid, Award, and Execution of Contract
103 - Scope of Work
Deletions
104 - Control of Work
Deletions
104.03
104.06 Use of Roads by Contractor
104.07 Other Contracts
105 - Control of Material
105.02 Material Sources
105.02(a) Government-provided sources
105.02(a) Government Provided Sources
105.02 Material Sources
105.02(a) Contractor-provided sources
105.05 Use of Material Found in the Work
106 - Acceptance of Work
106.01 Conformity with Contract Requirements
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims
107.06 Contractor’s Responsibility for Work
107.08 Sanitation, Health, and Safety
107.09 Legal Relationship of the Parties
107.10 Environmental Protection
108 - Prosecution and Progress
108 Delete
109 - Measurement and Payment
109 Deletions
109.02 Measurement Terms and Definitions
153 - Contractor Quality Control
153.02 Contractor Quality Control Plan
153.04 Records
154 - Contractor Sampling and Testing
155 - Schedules for Construction Contracts
155 Delete
156 - Public Traffic
157 - Soil Erosion Control
157.03 General
171 - Weed and Disease Prevention
201 - Clearing and Grubbing
201.02 Material:
201.01 Description
201.04 Clearing. (c)
201.04 Clearing
201.06 Disposal
201.06 Disposal
203 - Removal of Structures and Obstructions
203.01 Description
203.04 Removing Material
203.05 Disposing of Material
204 - Excavation and Embankment
209 - Structure Excavation and Backfill
209.10 Backfill
209.11 Compacting
Table 209-1 Sampling and Testing Requirements
251 - Riprap
251.03 General
322 - Minor Aggregate Courses
602 - Culverts and Drains
602.03 General
602.06 Laying Plastic Pipe
607 - Cleaning, Reconditioning, and Repairing Existing Drainage
607.04 Cleaning Culverts in Place
625 - Turf Establishment
625.03 General
625.04 Preparing Seedbed
625.05 Watering
625.06 Fertilizing
625.07 Seeding
625.08 Mulching
625.09 Protecting and Caring for Seeded Areas
625.11 Measurement
635 - Temporary Traffic Control
635.03 General
703 – Aggregate
705 - Rock
705.02 Riprap Rock
713 - Roadside Improvement Material
713.05 Mulch
718 - Traffic Signing and Marking Material
718.05 Aluminum Panels
Preface
Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of
National Forest System Roads.
101 - Terms, Format, and Definitions
101.00_nat_us_07_25_2005
101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the FAR (Federal Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association
Mine Safety and Health Administration
National Institute of Standards and Technology
National Electrical Safety Code
West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
mp Milepost ppm Part Per Million
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
http://www.nist.gov/
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition
Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or
“design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96
Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the
Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36
CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
101.04_nat_us_11_06_2007
101.04 Definitions.
Delete the following definitions:
Contract Modification
Day
Notice to Proceed
Solicitation
102 - Bid, Award, and Execution of Contract
102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work
103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work
104.00_nat_us_06_16_2006
Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.03_nat_us_01_22_2009
104.03 Specifications and Drawings.
Delete 104.03.
104.06_nat_us_02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
104.07_nat_us_02_17_2005
Add Subsection.
104.07 Other Contracts.
Forest Service is administering and is intending to award other contracts within the area of this project or within the Haul Route area. Schedule activities to assure no delays or interference to the operations of the U.S. Forest Service contracts.
105 - Control of Material
105.02_nat_us_01_18_2007
105.02 Material Sources.
105.02(a) Government-provided sources.
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.02_nat_us_02_17_2005
105.02(a) Government Provided Sources.
There is no charge for material taken from N/A.
105.02_nat_us_03_08_2007
105.02 Material Sources.
105.02(a) Contractor-provided sources.
All material (e.g., soil, gravel, sand, borrow, aggregate, etc.) transported onto National Forest
System land or incorporated into the work will be weed-free. The Contracting Officer may request written documentation of methods used to determine the weed-free status of any and all materials furnished by the contractor. Contractor-provided expertise and methods to establish weed-free status must be appropriate for the weeds of concern in the local area. The following applies to this contract:
A Forest Service weed specialist will inspect proposed sources to determine weed-free status.
Provide the Contracting Officer written notification of proposed material sources __14__ days prior to use. Written approval of the specific source will be provided to the contractor. If weed species are present in the proposed source, appropriate mitigation measures may allow conditional use of the source as required by the Contracting Officer.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work
106.01_nat_us_07_31_2007
106.01 Conformity with Contract Requirements.
Delete Subsection 106.01 and substitute the following:
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the
Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to
106.05 inclusive. The primary method of acceptance is specified in each Section of work.
However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
(1) Sampling method;
(2) Number of samples;
(3) Sample transport;
(4) Test procedures;
(5) Testing laboratories;
(6) Reporting;
(7) Estimated time and costs; and
(8) Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program.
Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol.
If the validity of the Government test results cannot be determined, the Contractor and
Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
(1) Have the work accepted at a reduced price; or
(2) Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public
107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.08_nat_us_03_29_2005
107.08 Sanitation, Health, and Safety
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
Exact time and location of spill including a description of the area involved.
Containment procedures.
Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress
108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment
109.00_nat_us_02_17_2005
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_06_16_2006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
153 - Contractor Quality Control
153.02_nat_us_02_17_2005
153.02 Contractor Quality Control Plan.
Add the following:
Submit written proposals for approval of alternate AASHTO or State approved test methods.
Alternate methods may be allowed based on documented equivalence to the specified method.
153.04_nat_us_10_24_2007
153.04 Records.
Delete all but the first sentence
154 - Contractor Sampling and Testing
154.01_nat_us_05_24_2005
154.01 Description
Delete the last sentence of the first paragraph.
155 - Schedules for Construction Contracts
155.00_nat_us_05_11_2004
155 Delete.
Delete Section 155 in its entirety.
156 - Public Traffic
156.00_nat_us_04_17_2007
Delete Section 156 in its entirety and replace with the following:
Description
156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Construction sign panels 633
Retro-reflective sheeting 718.01
Temporary concrete barrier 618
Temporary plastic fence 710.11
Temporary traffic control devices 718.22
156.03 General. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed _N/A__ minutes at any one time followed by an open period of no less than _N/A__ minutes.
Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved. Post construction signs and traffic control devices in conformance with MUTCD. All required signs will be in place and approved prior to beginning work on project.
If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the
MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) All detours outside of clearing limits will be approved in writing by the Contracting
Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(g) Keep temporary traffic control devices clean.
(h) Remove all temporary traffic control devices upon contract completion or when approved.
(i) When required, use flaggers certified by the American Traffic Safety Services
Association, the National Safety Council, the International Municipal Signal
Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s).
Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.
Prior to closing roads during construction, give written notice to the Contracting Officer at least
10 days in advance.
Table 156-1
Temporary Road Closures
Road
Number
From
Terminus
To
Terminus
Maximum
Consecutive
Days of
Closure
Minimum
Consecutive
Days Open
2900090 0.00 1.36 Close to the
Public for the length of the sale.
Close to the
Public for the length of the sale.
2900100 0.00 0.42 Close to the
Public for the length of the sale.
Close to the
Public for the length of the sale.
2900110 0.00 0.53 Close to the
Public for the length of the sale.
Close to the
Public for the length of the sale.
156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.07 Do not measure Public Traffic for payment. Compensation is made as an indirect payment.
157 - Soil Erosion Control
157.03_nat_us_02_24_2005
157.03 General
Delete the entire subsection and replace with the following:
Prior to the start of construction, submit a written plan that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction.
Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control. An alternate erosion control plan with all necessary permits may be submitted 30 days before intended use.
Incorporate all permanent erosion control features into the project at the earliest practicable time, as outlined in the approved plan.
When erosion control measures are not functioning as intended, immediately take corrective action.
171 - Weed and Disease Prevention
171.00_nat_us_03_30_2005
171.01 This work consists of washing and treating construction equipment to remove seeds, plants, and plant fragments from the equipment before the equipment is used on National Forest
System lands.
171.02 Conform to the following Subsection:
Water 725.01
Construction Requirements
171.03 General . Notify the CO in writing at least 15 days before moving any construction equipment onto National Forest System lands. Construction equipment does not include cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas outside of National Forest System lands.
Perform all work at a location designated on the plans or other locations approved in writing.
Provide the CO with an opportunity to monitor the washing and inspection.
171.04 Equipment. Use a high pressure washing system.
For work on National Forest System lands, use a washing system that traps all wash water and either stores it for removal from National Forest System lands or recycles the water for continued use. If the equipment recycles the water, provide adequate filters for seed removal. Dispose of the filter material and removed seeds in an approved manner. Do not mix soaps, detergents, or other chemicals with the wash water.
For work at a commercial washing facility, use an approved facility.
171.05 Washing. Wash the sides, tops, and undercarriages of all construction equipment.
Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment.
171.06 Inspection. Inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris, and seeds from the construction equipment.
Rewash the construction equipment as necessary or as directed.
171.07 Acceptance. Weed prevention will be evaluated under Subsection 106.02.
Measurement
171.08 Do not measure weed prevention for payment.
Payment
171.09 Include all costs associated with the Section 171-Weed Prevention in the unit price for
Section 151-Mobilization.
201 - Clearing and Grubbing
201.00_nat_us_08_05_2009
201.02 Material:
Delete Tree wound dressing material reference.
201.03 General.
Delete the last sentence.
201.04 Clearing.
Delete the last sentence of (d).
201.01_nat_us_02_18_2005
201.01 Description
Replace with the following
This work consists of clearing and grubbing within clearing limits and other designated areas.
201.04_nat_us_02_22_2005
201.04 Clearing. (c)
Delete paragraph (c) and replace with the following:
(c) In areas outside the excavation, embankment, and slope rounding limits, cut stumps to within 12 inches or one-third of the stump diameter of the ground, whichever is higher, measured on the side adjacent to the highest ground. For timber sales, stump heights will meet the requirements of the Timber Sale contract.
Delete subsection (d) and replace with the following:
(d) Do not cut vegetation less than 3 feet tall and less than 3 inches in diameter, that is within the clearing limits but beyond the roadway and not in a decking area, and that does not interfere with sight distance along the road.
Add the following:
(e) Trim branches of remaining trees or shrubs to give a clear height of 14 feet above the roadbed unless otherwise indicated. Trim tree limbs as near flush with the trunk as practicable.
(f) Remove brush from log decks. Deck logs so that logs are piled parallel to one another; can be removed by standard log loading equipment; will not damage standing trees; will not interfere with drainage, and will not roll. Keep logs in log decks free of brush and soil.
201.04_nat_us_03_03_2005
Utilization standards for merchantable timber are listed below. Fall and buck merchantable material into lengths not to exceed __40___ feet. Pieces (logs) meet utilization standards when such pieces would have met Utilization Standards if bucking lengths were varied to include such material.
Minimum Utilization Standards
Length Diameter (Inside Bark) at Small End __40___% Net Scale in
% of Gross Scale
__12__feet _______6_____inches
201.06_nat_us_02_18_2005
201.06 Disposal.
Delete the first sentence of this subsection and substitute the following:
Dispose of merchantable timber designated for removal according to the provisions of the timber sale contract.
201.06_nat_us_11_09_2005
201.06 Disposal
Delete the first sentence of this paragraph and substitute the following:
Limb and deck logs that meet utilization standards at locations approved by the CO or otherwise designated. Deck logs according to 201.04 (f).
201.06_nat_us_11_04_2004
201.06 Disposal.
Delete the first sentence of this subsection and substitute the following:
Merchantable timber removed from Forest Service land is subject to the Forest Resources
Conservation and Shortage Relief Act of 1990 (PL 101-382; 104 Stat. 714-726; 16 USC 620 et.
seq.). Do not export timber from the United States or use in direct or indirect substitution for unprocessed timber exported from the United States, from private lands by Purchaser, or any person as defined in Section 493 (16 USC 620e) of the Act.
Unless Forest Service determines that circumstances warrant a written waiver or adjustment, (1) hammer brand all products on both ends with an assigned contract brand before removal from the project site, (2) hammer brand each product exempt from domestic processing on both ends with an exempt brand registered for use on exempt logs from National Forest, and (3) paint all domestic processing products on both ends with 2 inch circle of yellow paint according to
Interim Specification 2400-400 (available upon request). Paint or brand products before removing them from project site unless approved by the CO. Brands and yellow paint must remain on logs until they are processed.
Contractor may remanufacture logs into different log lengths as approved. Repaint or rebrand all remanufactured pieces. Pay all surveillance costs except that Forest Service may waive such payment if such costs are minor and part of normal remanufacturing operations.
203 - Removal of Structures and Obstructions
203.01_nat_us_02_25_2005
203.01 Description.
Delete and replace with the following:
This work consists of disposing of construction slash and debris, salvaging, removing, and disposing of buildings, fences, structures, pavements, culverts, utilities, curbs, sidewalks, and other obstructions.
203.04_nat_us_02_18_2005
203.04 Removing Material.
Replace the fourth and fifth paragraphs with the following:
Where part of an existing culvert is removed, remove the entire culvert upstream from the removal. The remaining downstream culvert may be left in place if no portion of the culvert is within 12 inches of the subgrade, embankment slope, or new culvert or structure; and the culvert ends are sealed with concrete.
Remove structures and obstructions in the roadbed to 12 inches below subgrade elevation.
Remove structures and obstructions outside the roadbed to 12 inches below finished ground or to the natural stream bottom.
203.05_nat_us_02_18_2005
203.05 Disposing of Material.
Add the following:
(e) Windrowing Construction Slash. Place construction slash outside the roadway in neat, compacted windrows approximately parallel to and along the toeline of embankment slopes. Do not permit the top of the windrows to extend above subgrade. Use construction equipment to matt down all material in a windrow to form a compact and uniform pile. Construct breaks of at least 15 feet at least every 200 feet in a windrow. Do not place windrows against trees. Obtain approval for pioneer roads. A pioneer road may be constructed to provide an area for placement of windrows, provided the excavated material is kept within the clearing limits and does not adversely affect the road construction.
(f) Scattering. Scatter construction slash outside the clearing limits without damaging trees.
Limb all logs. Place logs and stumps away from trees, positioned so they will not roll, and are not on top of one another. Limb and scatter other construction slash to reduce slash concentrations.
(g) Chipping or Grinding. Use an approved chipping machine to grind slash and stumps greater than 3 inches in diameter and longer than 3 feet. Deposit chips or ground woody material on embankment slopes or outside the roadway to a loose depth less than 6 inches. Minor amounts of chips or ground woody material may be permitted within the roadway if they are thoroughly mixed with soil and do not form a layer.
(h) Debris Mat. Use tree limbs, tops, cull logs, split stumps, wood chunks, and other debris to form a mat upon which construction equipment is operated. Place stumps upside down and blend stumps into the mat.
(i) Decking Firewood Material. Remove brush from decks. Limb and deck logs that do not meet Utilization Standards according to Subsection 201.04 as directed by the CO. Cut logs to lengths less than 30 feet. Ensure that logs stacks are stable and free of brush and soil.
(j) Removal to designated locations. Remove construction slash to designated locations.
(k) Piling. Pile construction slash in designated areas. Place and construct piles so that if the piles are burned, the burning will not damage remaining trees. Keep piles free of dirt from stumps. Cut unmerchantable logs into lengths of less than 20 feet.
(l) Placing Slash on Embankment Slopes. Place construction slash on completed embankment slopes to reduce soil erosion. Place construction slash as flat as practicable on the completed slope. Do not place slash closer than 2 feet below subgrade. Priority for use of available slash is for: (1) through fills; (2) insides of curves; and (3) ditch relief outlets.
(m) Hydrological Sensitive Placement. Where required use this method in combination with other designated methods to dispose of material to reduce erosion and to aid in re-vegetation:
1. Place windrow segments on contours, wrap in type I geotextile.
2. Place logs as log erosion barriers on contours. Place logs so that 80% of their length is on the ground surface.
3. Scatter slash on bare or disturbed areas within or outside the clearing limits as directed.
4. Scatter chips or ground woody material on bare or disturbed areas within or outside the clearing limits as directed.
Place stumps in swales or on sites to form planting pockets. Place windrow segments on contours, wrap in type I geotextile.
204 - Excavation and Embankment
204.00_nat_us_03_26_2009
Replace Section 204 in its entirety with the following:
204.01 This work consists of excavating material and constructing embankments. This includes furnishing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material.
204.02 Definitions.
(a) Excavation. Excavation consists of the following:
(1) Roadway excavation. All material excavated from within the right-of-way or easement areas, except subexcavation covered in (2) below and structure excavation covered in Sections 208 and 209. Roadway excavation includes all material encountered regardless of its nature or characteristics.
(2) Subexcavation. Material excavated from below subgrade elevation in cut sections or from below the original groundline in embankment sections. Subexcavation does not include the work required by Subsections 204.05, 204.06(b), and 204.06(c).
(3) Borrow excavation. Material used for embankment construction that is obtained from outside the roadway prism. Borrow excavation includes unclassified borrow, select borrow, and select topping.
(b) Embankment construction. Embankment construction consists of placing and compacting roadway or borrow excavation. This work includes:
(1) Preparing foundation for embankment;
(2) Constructing roadway embankments;
(3) Benching for side-hill embankments;
(4) Constructing dikes, ramps, mounds, and berms; and
(5) Backfilling subexcavated areas, holes, pits, and other depressions.
(c) Conserved topsoil. Excavated material conserved from the roadway excavation and embankment foundation areas that is suitable for growth of grass, cover crops, or native vegetation.
(d) Waste. Excess and unsuitable roadway excavation and subexcavation that cannot be used.
204.03 Conform to the following Subsections:
Backfill material 704.03
Select borrow 704.07
Select topping 704.08
Topping 704.05
Unclassified borrow 704.06
204.04 Preparation for Roadway Excavation and Embankment Construction. Clear the area of vegetation and obstructions according to Sections 201 and 203.
204.05 Reserved.
204.06 Roadway Excavation. Excavate as follows:
(a) General. Do not disturb material and vegetation outside the construction limits.
Incorporate only suitable material into embankments. Replace any shortage of suitable material caused by premature disposal of roadway excavation. Dispose of unsuitable or excess excavation material according to Subsection 204.14.
At the end of each day's operations, shape to drain and compact the work area to a uniform cross-section. Eliminate all ruts and low spots that could hold water.
Retrieve material deposited outside of the clearing limits as directed by the CO. Place unsuitable material in designated areas.
(b) Rock cuts. Blast rock according to Section 205. Excavate rock cuts to 6 inches below subgrade within the roadbed limits. Backfill to subgrade with topping or with other suitable material. Compact the material according to Subsection 204.11
(c) Earth cuts. Scarify earth cuts to 6 inches below subgrade within the roadbed limits.
Compact the scarified material according to Subsection 204.11.
(d) Pioneer Roads. Road pioneering, slash disposal, and grubbing of stumps may proceed concurrently with excavation. Conduct excavation and placement operations so material to be treated under Section 201 will not be incorporated into the roadway unless specified in the slash treatment method. Maintain drainage during pioneering operations.
Remove snow and ice in advance of the work and deposit beyond the roadway limits in a manner that will not waste material or generate sediment. Do not incorporate snow and ice into embankments. Place snow or ice in a manner to prevent resource damage.
204.07 Subexcavation. Excavate material to the limits designated by the CO. Take cross-sections according to Section 152. Prevent unsuitable material from becoming mixed with the backfill. Dispose of unsuitable material according to Subsection 204.14. Backfill the subexcavation with topping, or other suitable material. Compact the material according to
Subsection 204.11.
204.08 Borrow Excavation. Use all suitable roadway excavation in embankment construction.
Do not use borrow excavation when it results in excess roadway excavation. Deduct excess borrow excavation from the appropriate borrow excavation quantity.
Obtain borrow source acceptance according to Subsection 105.02. Develop and restore borrow sources according to Subsection 105.03. Do not excavate beyond the established limits. When applicable, shape the borrow source to permit accurate measurements when excavation is complete.
204.09 Preparing Foundation for Embankment Construction. Prepare foundation for embankment construction as follows:
(a) Embankment less than 4 feet high over natural ground. When designated, remove topsoil and break up the ground surface to a minimum depth of 6 inches by plowing or scarifying. Compact the ground surface according to Subsection 204.11.
(b) Embankments over an existing asphalt, concrete, or gravel road surface. Scarify gravel roads to a minimum depth of 6 inches. Scarify or pulverize asphalt and concrete roads to 6 inches below the pavement. Reduce all particles to a maximum size of 6 inches and produce a uniform material. Compact the surface according to Subsection 204.11.
(c) Embankment across ground not capable of supporting equipment. Dump successive loads of embankment material in a uniformly distributed layer to construct the lower portion of the embankment. Limit the layer thickness to the minimum depth necessary to support the equipment.
(d) Embankment on an existing slope steeper than 1V:3H. Cut horizontal benches in the existing slope to a sufficient width to accommodate placement and compaction operations and equipment. Bench the slope as the embankment is placed and compacted in layers. Begin each bench at the intersection of the original ground and the vertical cut of the previous bench.
204.10 Embankment Construction. Incorporate only suitable roadway excavation material into the embankment. When the supply of suitable roadway excavation is exhausted, furnish unclassified borrow to complete the embankment. Obtain written approval before beginning construction of embankments over 6 feet high at subgrade centerline. Construct embankments as follows:
(a) General. At the end of each day's operations, shape to drain and compact the embankment surface to a uniform cross-section. Eliminate all ruts and low spots that could hold water.
During all stages of construction, route and distribute hauling and leveling equipment over the width and length of each layer of material.
Compact embankment side slopes flatter than 1V:1.75H with a tamping type roller or by walking with a dozer. For slopes 1V:1.75H or steeper, compact the slopes as construction of the embankment progresses.
Where placing embankment on one side of abutments, wing walls, piers, or culvert headwalls, compact the material using methods that prevent excessive pressure against the structure.
Where placing embankment material on both sides of a concrete wall or box structure, conduct operations so compacted embankment material is at the same elevation on both sides of the structure.
Where structural pilings are placed in embankment locations, limit the maximum particle size to 4 inches.
(b) Embankment within the roadway prism. Place embankment material in horizontal layers not exceeding 12 inches in compacted thickness. Incorporate oversize boulders or rock fragments into the 12-inch layers by reducing them in size or placing them individually as required by (c) below. Compact each layer according to Subsection 204.11 before placing the next layer.
Material composed predominately of boulders or rock fragments too large for 12-inch layers may be placed in layers up to 24 inches thick.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .