The file's text, extracted by GovTribe without its formatting.
NORTH FORK CATHERINE CREEK BRIDGE #2 CONSTRUCTION
List of Specifications
October 30, 2009 Section I:
FOREST SERVICE SPECIFICATIONS FOR
CONSTRUCTION OF ROADS AND BRIDGES
| Specification No. |
| Title |
| Date |
| 101 |
| Abbreviations, Acronyms, & Terms |
| 1996 |
| *101.01 |
| Terms, Organizations & Standards |
| 9/15/2005 |
| 103 |
| Intent of Contract |
| 1996 |
| 104 |
| Maintenance for Traffic |
| 1996 |
| *104.021 |
| Use of Roads by Contractor |
| 08/10/2000 |
| * 104.03F1 |
| Measurement |
| 3/18/2004 |
| 105 |
| Control of Materials |
| 1996 |
| 106 |
| Measurement and Payment |
| 1996 |
| *106.03 |
| Units of Measure |
| 9/15/2005 |
| 160 |
| Quality Control & Quantity Management |
| 1996 |
| 161 |
| Certification for Quality & Quantity |
| 1996 |
| 170 |
| Construction Staking, L-Line |
| 1996 |
| 201 |
| Clearing & Grubbing |
| 1996 |
| *201.021 |
| Clearing & Grubbing |
| 3/26/1998 |
| 203 |
| Excavation and Embankment |
| 1996 |
| * 203.19 |
| Method |
| 9/15/2005 |
| 204 |
| Soil Erosion & Water Pollution Control |
| 1996 |
| * 204.03F1 |
| Performance |
| 03/18/2004 |
| 206 |
| Structural Excavation for Major Structures |
| 1996 |
| * 206.04 |
| General |
| 9/15/2005 |
| 207 |
| Developing Water Supply and Watering |
| 1996 |
| 249 |
| Composite Road Construction |
| 1996 |
| * 251.03 |
| General |
| 9/15/2005 |
| 304 |
| Aggregate Base or Surface Course |
| 1996 |
| *304.081 |
| Preparation of Roadbed |
| 4/10/1997 |
| 403 |
| Minor Hot Asphalt Concrete Pavement |
| 1996 |
| * 403.11 |
| Conditioning of Existing Surface |
| 9/15/2005 |
| Specification No. |
| Title |
| Date |
| 552 |
| Structural Concrete |
| 1996 |
| 553 |
| Prestressed Concrete Structures |
| 1996 |
| * 553.02 |
| Requirements |
| 9/15/2005 |
| 554 |
| Reinforcing Steel |
| 1996 |
| * 554.02 |
| Requirements |
| 9/15/2005 |
| * 556.02 |
| Requirements |
| 9/1/5/2005 |
| 558 |
| Prefabricated Modular Bridge Superstructure |
| 1996 |
| * 606.02 |
| Requirements |
| 9/15/2005 |
| *633.02F1 |
| Traffic Control Sign Detail |
| 10/30/2009 |
| 701 |
| Cement, Grout, & Mortar |
| 1996 |
| * 701.02 |
| High-Strength Non-Shrink Grout |
| 9/15/2005 |
| 702 |
| Bituminous Materials |
| 1996 |
| * 704.03 |
| Backfill Material |
| 9/15/2005 |
| * 705.02 |
| Riprap Rock |
| 9/15/2005 |
| 709 |
| Reinforcing Steel & Wire Rope |
| 1996 |
| * 709.01 |
| Reinforcing Steel |
| 9/15/2005 |
| 710 |
| Fence & Guardrail |
| 1996 |
| * 710.06 |
| Metal Beam Rail |
| 9/15/2005 |
| 711 |
| Concrete Curing Materials & Admixtures |
| 1996 |
| * 712.01 |
| Sealants, Fillers, Seals, & Sleeves |
| 9/15/2005 |
| 717 |
| Structural Metal |
| 1996 |
* Special Project Specifications are attached.
Section II:
ROAD MAINTENANCE SPECIFICATIONS
| Specification No. |
| Title |
| Date |
| 812 |
| Dust Abatement |
| 02/2002 |
| 891 |
| Water Supply and Watering |
| 02/2002 |