D. Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1frontmat.pdf | ||
| 700part3.pdf | ||
| 500part2.pdf | ||
| Amd2_Fr_Rd7787_towards_Rd7785.JPG | JPG image | |
| 3index.pdf | ||
| 600part2.pdf | ||
| 150.pdf | ||
| 500part1.pdf | ||
| 250.pdf | ||
| Amd2_Jct7785_towards_Rd7787.JPG | JPG image | |
| 300.pdf | ||
| 600part3.pdf | ||
| appendix.pdf | ||
| 200.pdf | ||
| 400part2.pdf | ||
| 600part1.pdf | ||
| 400part1.pdf | ||
| 100.pdf | ||
| 2backstuf.pdf | ||
| Amendement2.SF30.rtf | RTF text file | |
| 700part1.pdf | ||
| 700part2.pdf | ||
| Amendement1.SF30.rtf | RTF text file | |
| Drawings.pdf | ||
| 3.FireProtectionandSuppressionr6_fS_6300_52.rtf | RTF text file | |
| AG-0489-S-10-0085.rtf | RTF text file | |
| SpecList.doc | DOC document | |
| Attachment A Cover.doc | DOC document | |
| Attachment A Sign Details.pdf | ||
| OfferPacket.rtf | RTF text file | |
| 5.AdditionalFireSuppressionMeasure2CommunicationsR6_6300_54.doc | DOC document | |
| WageDetermination.htm | HTM file |
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
North Fork Catherine Creek Bridge #2
SECTION I
Construction Special Project Specifications
R6/SPS 100 ERRATA
LAST REVISION DATE 7/18/02
105.06 Material Sources - under (a) change the third paragraph to read: “The weight/volume relationship used for determining planned quantities of material in designated sources subject to weight measurement is SHOWN ON THE DRAWINGS.”
201.03 Utilization of Timber - under (b) (4) change second word from “of” to “as”.
201.05 Slash Treatment - Change the second paragraph to read; “ Pieces of wood less than
75mm in diameter and 1m in length may be scattered, outside the roadbed, within the clearing limits.”
203.08 Sloping, Shaping, & Finishing (d) Finishing - Change last sentence to read: “Finish roadbeds to the tolerances from table 203-1 as SHOWN ON THE DRAWINGS.”
401.04 Mixing Plant - under (b) (3) delete last sentence.
401.09 Aggregate Preparation - 2nd paragraph, 2nd sentence change "and contamination of" to ", and contamination of,".
401.17 Acceptance Sampling & Testing of Asphalt Concrete Pavement - 2nd paragraph, 3rd sentence change "0.3 m" to "300 mm".
Table 401-7 Quality Level Analysis by the Standard Deviation Method - delete first sentence of the "Note".
402.04 Mixing Plant - under (b) (2) add "Stockpile the material according to Subsection 305.03 and 305.04."
402.13 Compacting - 2nd paragraph, 3rd sentence, change "roller marks" to "roller ridges, ruts, and humps".
402.17 Acceptance Sampling & Testing of Asphalt Concrete Pavement - 2nd paragraph, 3rd sentence change "0.3 m" to "300 mm".
404.05 Acceptance Sampling & Testing - under (c) change "404.04(g)" to "404.04(h)".
414.05 Joint Cleaning & Sealing - in first paragraph, first sentence change "414.06" to "414.04".
415.02 Requirements - change "703.12" to "703.11".
Table 702-1 Application Temperatures - change "RC, MC, or SC-30" to "RC, MC, or SC-70"
703.09 Asphalt Surface Treatment Aggregate - under (f) change "FLH 508" to "FLH T 508".
703.14 Superpave Asphalt Concrete Pavement Aggregate - under (b) change "AASHOT T 104" to AASHTO T 104".
707.15 Repair of Damaged Coatings - change the ASTM reference from A849 to A760
716.05 Substitution for Solid Sawn Structural Timber & Lumber - change in second sentence to read.....Ensure that all substitutions have approximately equal dimensions and will provide equal or greater bending and shear strength per member.
101.01 R6/SPECIAL PROJECT SPECIFICATION
September 15, 2005
101.01 Terms, Organizations, & Standards
(a) Acronyms Add the following:
BMP
Best Management Practice
EPA
Environmental Protection Agency
FPL
Forest Products Laboratory
SSPC
The Society for Protective Coatings
WCLIB
West Coast Lumber Inspection Bureau
WWPA
Western Wood Products Association
USN
United States Navy
104.021 R6/SPECIAL PROJECT SPECIFICATION
August 10, 2000
104.02 Use of Roads by Contractor. Add the following:
Maintenance requirements for roads that are to be constructed or reconstructed as part of this contract apply only after the roads have been completed and accepted. For other roads, prehaul maintenance may be required before use begins. Other maintenance requirements also apply when Contractor's use of roads begins.
Maintenance required, and applicable maintenance specifications, are shown in the
Road Listing. Perform maintenance in accordance with the Standard
Maintenance Specifications as published in the Forest Service Handbook
-Transportation System Maintenance Handbook in effect on the date of advertisement.
These maintenance specifications are available from the local Forest Supervisor's office. Special Project Specifications shown in the Road Listing supersede or clarify standard maintenance specifications and are attached hereto.
ROAD LISTING:
Maintenance Requirements
| Road # |
| Termini |
| Dust Abate |
| Prehaul |
| Routine |
| Post Haul |
| Spot Rock |
| Special Project Spec |
| Use Limits |
| From |
| To |
| 7785 |
| End of county road |
| Junction w/ 7787 |
| H2O |
| 812, 891 |
| 811, 891 |
| 7787 |
| Junction w/ 7787 |
| End of Project |
| H2O |
| 812, 891 |
| 811, 891 |
| 2036 |
| HWY 203 |
| Rd 2036101 |
| H2O |
| 811, 812, 891 |
| 811, 891 |
| 2036101 |
| Rd 2036 |
| Pit |
| H2O |
| 811, 812, 891 |
| 811 |
811 = Blading
812 = Dust Abatement
891 = Water Supply and Watering
Road construction will likely be occurring on Forest Service Road 7785 simultaneously with construction of the North Fork Catherine Creek Bridg #2 project. The Contractor is required to coordinate work acitivities with the contractor for Road 7785 so there is no unreasonable interference.
USE LIMITATIONS:
If the Contractor requests use of a National Forest road or road segment not listed above, authorization to use such additional roads may include maintenance requirements and use limitations.
The Contractor has full responsibility for roads being constructed or reconstructed under this contract. This includes winterizing of disturbed areas by construction of temporary cross drains, drainage ditches, dips, berms, or other facilities necessary for control of erosion, and removal or draining of ruts, and other depressions, which would collect water and add to saturation of subgrade material.
The Contractor's maintenance responsibilities for any road will cease when contractors use is over and the final maintenance is approved by the Engineer.
In the event that another commercial user(s) use of the road at the same time as the Contractor, the Forest Service shall designate the work activity and amount of work to be performed, so as to share work, proportionate to the total uses of each.
F16/SPS 104.03F1
March 18, 2004 Measurement. Add the following:
104.03 Method. Use the method of measurement that is designated in the SCHEDULE OF ITEMS. Only those items listed in the SCHEDULE OF ITEMS will be measured.
Payment. Add the following:
104.04 Basis. The accepted quantities will be paid for at the contract unit price for each PAY ITEM DESIGNATED IN THE SCHEDULE OF ITEMS.
Add the following pay items.
Pay Item
Pay Unit
104(01) Traffic Control Lump Sum
106.03 R6/SPECIAL PROJECT SPECIFICATION
September 15, 2005
106.03 Units of Measurement
Delete this subsection and add the following:
“Forest Service Specifications for Construction of Roads and Bridges (Revised August 1996) are based on Modern Metric units of measurement. The dimensions and units of measure SHOWN ON THE DRAWINGS for this contract utilize U.S. Standard English units of measure. The SPECIAL PROJECT SPECIFICATIONS developed for this contract, utilize dual units of both Modern Metric and U.S. Standard English units of measure. Convert all measurements referenced in the August 1996 Forest Service Standard Specifications (EM-7720-100) to U.S. Standard English units of measure. Appendix A – Engineering Conversion Factors and Appendix B – SI (Modern Metric) Conversion Factors, are included on pages 612 – 614 of the Standard Specification Appendices to assist with any required conversions.
Where references are made to a Metric technical specification, such as ASTM or AASHTO, use the equivalent U.S. Standard English technical specification for purposes of material certifications.
Work required by the contract will be paid based on the PAY UNIT (U.S. Standard English measure) as DESIGNATED IN THE SCHEDULE OF ITEMS.
Under each Specification Section with PAY ITEMS of work DESIGNATED IN THE SCHDULE OF ITEMS for measurement and payment under this contract, the last subsection “Payment - Basis”, shall have the following format:
Pay Item - Numbering system and work description to remain the same.
Pay Unit - Pay unit(s) DESIGNATED IN THE SCHEDULE OF ITEM have been changed from metric to the corresponding unit of U.S. Standard English measure.
Payment will be by units defined and determined according to U.S. Standard English measure and by the following:
(a) Cubic Yard in Place. Measure solid volumes by the average end area method as follows:
(1) Measure cross sections of the original ground and use with design or staked templates, or take other comparable measurements to determine the end area. Do not measure work outside of the established lines or slopes.
(2) If any portion of the work is acceptable, but is not completed to the established lines and slopes, re-measure cross sections or comparable measurements of that portion of the work. Deduct any quantity outside the designated or staked limits. Use these measurements to calculate new end areas.
(3) Compute the quantity using the average end areas multiplied by the horizontal distance along a centerline or reference line between the end areas. Deduct any quantity outside the designed or staked limits.
Where it is impractical to measure material by the average end area method, other approved methods involving three-dimensional measurements may be used.
Measure liquid volumes in accordance with SPS Subsection 106.03(h).
(b) Cubic Yard in the Hauling Vehicle. Measure the cubic yard volume in the hauling vehicle using three-dimensional measurements at the point of delivery. Use vehicles bearing a legible identification mark with the body shaped so the actual contents may be readily and accurately determined. Before use, mutually agree in writing upon the volume of material to be hauled by each vehicle. Vehicles carrying less than the agreed volume may be rejected or accepted at the reduced volume.
Level selected loads. If leveling reveals that the vehicle was hauling less than the approved volume, reduce the quantity of all material received since the last leveled load by the same ratio as the ratio of the current leveled load volume to the agreed volume. Payment will not be made for material in excess of the agreed volume.
Material measured in the hauling vehicle may be weighed and converted to cubic yards for payment purpose if the conversion factors are mutually agreed to in writing.
Compute measurement using measurements of material in the hauling vehicles at the point of delivery. Load vehicles to at least their water-level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.
(c) Cubic Yard Mile. A combination of linear and volumetric measurement meaning the movement of a cubic yard of material one(1) mile.
(d) Hour. Measurement will be for the actual number of hours ordered and performed by the Contractor.
(e) Each. One complete unit, which may consist of one or more parts.
(f) Lump Sum. Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item.
(g) MFBM. One thousand feet board measure based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminate timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
(h) Gallon. The quantity may be measured by any of the following methods:
a. Measured volume container.
b. Metered volume. Use an approved metering system.
c. Commercially packaged volumes.
(i) Station. One hundred linear feet measured horizontally.
(j) Station Yard. A combination of linear and volumetric measurement meaning the movement of a cubic yard of material one station.
(k) Square Yard. Measure on a plane parallel to the surface being measure or horizontal.
(l) Thousand Gallons Mile. A combination of linear and volumetric measurement meaning the movement of 1,000 gallons of material one (1) mile.
(m) Ton. Short ton consisting of 2,000 pounds. Use net certified scale weights based on certified volumes.
(n) Ton Mile. A combination of linear and weight measurement meaning the movement of one (1) ton of material one (1) mile.”
201B/R6 SPECIAL PROJECT SPECIFICATION
April 10, 1997
201B.01 Work. This work consists of the cutting and disposal of vegetative growth, including trees, within established clearing limits on an existing roadway and the cutting and disposal of hazard trees adjacent to and outside of the established clearing limits.
201.02 General. Clear the area SHOWN ON THE DRAWINGS. Cut brush and trees to a maximum height of 6 inces above the ground surface, or obstructions such as rocks or stumps, except as provided in Section 201B.04.
Remove all limbs which extend over the roadway and within 14 feet above the traveled way surface, unless otherwise SHOWN ON THE DRAWINGS. When SHOWN ON THE DRAWINGS, lop limbs or otherwise cut limbs to produce a reasonably smooth vertical face, as flush with the trunk as practical. When SHOWN ON THE DRAWINGS, limb trees within the area to be cleared, in excess of 4 inches in diameter at a point 6 inches above the ground, to a height of 14 feet above the traveled way surface, instead of removing them. Treat trees damaged by cutting operations with a commercial nursery sealer.
201B.03 Removal of Hazard Trees. Cut all dead trees over 6 inches in diameter, outside of the established clearing limits, which lean toward the road, and are sufficiently tall to reach the roadbed. Cut other fire dangerous dead or unstable live trees outside of the established clearing limits which are tall enough to reach the roadbed when marked by the Contracting Officer in advance of other clearing work in the immediate vicinity. Stump heights must not exceed 1 foot, or 1/3 of the stump diameter, whichever is higher, measured on the side adjacent to the highest ground. All hazard trees designated for removal shall be felled away from the roadway and left on the ground.
201B.04 Cutting Traveled Way and Drainage Ditch Vegetation. Cut vegetation off within 4 inces of the traveled way and within 4 inches of the ditch slope surfaces.
Remove stumps resulting from cutting within the traveled way that present a pointed end to traffic. Other stumps resulting from cutting may remain in place unless otherwise SHOWN ON THE DRAWINGS. The Contractor may elect to remove stumps to facilitate operations unless otherwise SHOWN ON THE DRAWINGS. Smooth and shape the disturbed areas where stumps are removed to prevent water ponding.
201B.05 Slash Treatment Methods. Remove limbs, chunks, and debris within the roadway in excess of 1 foot in length or 3 inches in diameter, or concentrations which may plug ditches or culverts, from the traveled way, shoulders, ditches and water courses.
Dispose of slash in accordance with one or more of the following methods, as shown in the SCHEDULE OF ITEMS:
(1) Scattering. Scatter slash outside the roadway limits without damaging trees.
(2) Chipping. Process slash through a chipping machine. Deposit chips on embankment slopes, or outside the roadway, to a loose depth not exceeding 6 inches.
(3) Burying. Bury slash at the locations SHOWN ON THE DRAWINGS and DESIGNATED on the ground. Mat slash down in layers and cover with rock and soil. Slope the final surface to drain.
(4) Removal. Remove or haul slash to locations SHOWN ON THE DRAWINGS and DESIGNATED on the ground.
(5) Piling. Pile slash in areas SHOWN ON THE DRAWINGS and DESIGNATED on the ground for later burning or disposal by others. Place and construct piles so that burning will not damage remaining trees.
(6) Placing Slash on Embankment Slopes. Place slash on embankment slopes where SHOWN ON THE DRAWINGS to reduce soil erosion. Place slash as flat as practical between the toe of the embankment and a point 2 feet from the shoulder.
(7) Piling and burning. Pile and burn slash in locations SHOWN ON THE DRAWINGS and DESIGNATED on the ground. Construct piles so that burning does not damage remaining trees.
201B.06. The method of measurement. As described in Section 106, will be DESIGNATED in the SCHEDULE OF ITEMS.
Linear measurements will be measured horizontally along the road centerline.
201B.07. Basis of payment. The accepted quantities will be paid for at the contract unit price for each pay item shown in the SCHEDULE OF ITEMS.
Payment will be made under:
Pay Item Pay Unit
201B(01) Cutting and Disposal of Roadway Vegetation, Disposal Methods
.............................................Mile
201B(02)
...........................................STA.
201B(03)
..............................................L.S.
201B(04) Individual Removal of Trees; Slash Treatment Methods for Tops and Limbs , and Logs
, Utilization of Timber
.............................................STA.
201B(05) Individual Removal of Trees; Slash Treatment Methods for Tops and Limbs , and Logs
, Utilization of Timber
.............................................Mile
201.021 R6/SPECIAL PROJECT SPECIFICATION
March 26, 1998
201.02 Clearing & Grubbing. (b) Performance. Add the following:
When designated by the CO, fell and dispose of trees, which are adjacent to the clearing limits, that are scorched or damaged beyond recovery. Treat in accordance with Subsections 201.03 and 201.05.
201.05 Slash Treatment. (a) All Methods. Delete the second paragraph.
203.19 R6/SPECIAL PROJECT SPECIFICATION
September 15, 2005
203.19 Method. Add the following to the list of items included in the quantities of excavation:
(h) Channel bank material excavated to the finished ground lines AS SHOWN ON THE DRAWINGS.
F16/SPS 204.03F1
March 18, 2004
204.03 Performance. Add the following:
Contractor shall operate in a manner that will protect aquatic organisms.
Notify the CO of the intention to place a diversion and/or dewater at least 72 hours in advance.
Prepare an Erosion and Sediment Control Plan (ESCP)meeting the requirements shown in Schedule A of the NPDES general permit 1200-CA. A copy of this permit may be obtained from the CO. This plan shall also address any requirements listed in the Letters of Authorization issued by the Oregon Dept. of State lands and the Army Corp. of Engineers (also available by contacting the CO). Submit a copy of the ESCP to the CO for approval within 60 days of the pre-work meeting. Update this plan as needed.
206.04 R6/SPECIAL PROJECT SPECIFICATION
September 15, 2005
206.04 General. Add the following to the end of the second sentence of the fourth paragraph:
"... to the CO a minimum of 5 days prior to beginning excavation work."
Add the following to the end of the third sentence of the fourth paragraph:
"...to the CO a minimum of 15 days prior to installation."
206.09 Foundation Preparation.
Cast footings on foundation fill, compacted to a uniform horizontal surface at the foundation elevation SHOWN OR PROVIDED FOR ON THE DRAWINGS. Replace all material from any over excavation below the designated footing elevation with concrete, compacted gravel, or foundation fill at the direction of the CO and install it at no expense to the Government, unless, in the opinion of the CO, the over excavation was unavoidable because of the nature of the material. In lieu of on-site casting, a leveling course can be cast as detailed above prior to placement of precast footings.
When boulders or irregular, fractured, or seamed bedrock precludes excavation to the designated foundation elevation without further loosening of previously solid material, the CO may order removal of such loose material and allow payment for concrete, gravel, or foundation fill that is required to restore foundation material to the designated elevation.
206.11 Embankment.
Delete the first two sentences and replace with the following:
Construct all embankments, foundation fill, and backfill in horizontal layers adjacent to new or existing structures, or to the foundation elevation below proposed structures. Compact all embankments, foundation fill, and backfill in accordance with Subsection 203.16(b), method 4, except that mechanical tampers may be used for the required compaction.
251.03 R6/SPECIAL PROJECT SPECIFICATION
251.03 General. Add the following:
Place all riprap that is to be located beneath the superstructure prior to installing the superstructure, unless otherwise approved by the CO.
251.13 Basis. Add the following:
Payment for excavation and embankment required for placement of riprap is incidental and is included in the pay item for riprap placement.
304.081 R6/SPECIAL PROJECT SPECIFICATION
April 10, 1997
304.08. Preparation of Roadbed. Delete entire subsection and substitute the following:
Complete the roadbed in accordance with Section 249 and have it approved in writing by the Contracting Officer before placing base course.
304.09. Mixing & Placing. Delete the entire subsection and substitute the following:
Spread the aggregate uniformly as shown on the typical section.
304.10. Delete the last paragraph and substitute the following:
Finish the surface in accordance with the roadbed finishing requirements of Section 249.
304.12. Thickness & Width Requirements. Delete the entire subsection and substitute the following:
Do not vary the compacted thickness of the aggregate consistently above or below the specified thickness and do not vary from the specified thickness by more than 3 inches Unless otherwise SHOWN ON THE DRAWINGS, observe a width tolerance of (+) 1 foot.
403.11 R6/SPECIAL PROJECT SPECIFICATION
September 25, 2005
403.11 Conditioning Of Existing Surface. Add the following:
Place the asphalt concrete mixture on the new bridge over an approved emulsified asphalt tack coat meeting the material and construction requirements of Section 407.
403.16 Basis.
No separate payment will be made for the asphalt tack coat.
552.01 R6/SPECIAL PROJECT SPECIFICATION
September 15, 2005
552.01 Work.
Concrete construction tolerances, except for prestressed members, shall be as given in Table 552-8.
Add Table 552-8 as follows:
ACCEPTANCE TOLERANCES FOR BRIDGES AND SIMILAR STRUCTURES
a. Variation from the plumb or the specified batter in the lines and surfaces of columns, piers, walls and in arrises
Exposed, in 3 m (10 feet) 13 mm (1/2 inch)
Backfilled, in 3 m (10 feet) 25 mm (1 inch)
b. Variation from the level or from the grades SHOWN ON THE DRAWINGS in slabs, beams, horizontal grooves, and railing offsets
Exposed, in 3 m (10 feet)
Backfilled, in 3 m (10 feet) 25 mm (1 inch)
c. Variation in cross-sectional dimensions of columns, piers, slabs, walls, beams, and similar parts
Minus 6 mm (1/4 inch)
Plus
d. Variation in thickness of bridge slabs
3 mm (1/8 inch)
6 mm (1/4 inch)
e. Footings: Variation in dimensions in plan
50 mm (2 inches)
f. Misplacement or eccentricity
2 percent of the footing width in the direction of misplacement, but not more than 50 mm (2 inches)
g. Reduction in thickness
5 percent of specified thickness
h. Variation in the sizes and locations of slab and wall openings
In Table 552-1, change the Minimum Cement Content unit to be kilograms per cubic meter (pounds per cubic yard).
Add Class P(AE) concrete to Table 552-1 as follows:
| Class of Concrete |
| Minimum Cement |
Content
| Maximum W/C Ratio |
| Slump |
| Minimum Air Content |
| Coarse Aggregate |
| P(AE) |
| 390 (658) |
| 0.44 |
| 0 – 100 |
| 5.0 |
| No. 67 |
Add the following after footnote b. of Table 552-1.
c. Use Class P (AE) concrete in the entire depth of the top flange of all multi-beam bridge girders. In lieu of this, Class P (AE) concrete may be used for fabrication of the entire girder, and shall be used throughout in prestressed slabs. In all cases, the 28 day specified minimum concrete strength requirements shall be as for Class P concrete unless otherwise SHOWN ON THE DRAWINGS.
552.02 Requirements.
Anchor Bolts 717.01
Dowels 717.17
Delete the following:
Low Strength Grout 701.03
552.14 Handling & Placing Concrete.
Add the following at the end of the first paragraph:
Provide cleanout ports at construction joints..
552.18 Finishing Formed Concrete Surfaces.
Replace the second and third paragraphs with the following:
Finish sound formed concrete surfaces as shown below, unless another finish is SHOWN ON THE DRAWINGS or called for in the SPECIAL PROJECT SPECIFICATIONS.
(a) Class 1-- Ordinary Surface Finish.
All small holes, depressions and voids larger than 6 mm (1/4 inch) in average depth and/or diameter shall be cleaned and pointed with mortar. In lieu of the mortar and its curing specified, grout meeting the requirements of subsection 701.02 may be used, mixed, applied and cured in accordance with the manufacturer's printed instructions.
552.19 Concrete Anchorage Devices.
This subsection does not apply to anchor bolts and dowels, which are covered in subsections 564.08, 717.01, and 717.17.
552.20 Loads on New Concrete Structures.
Change the first sentence of the last paragraph to read as follows:
Erect barricades at each end of bridge spans when road approaches allow vehicles to drive directly onto the structure.
552.21 Method.
Measurement for Pay Item 552(01), Structural Concrete, class A(AE) includes all concrete in the abutments, wingwalls, and curbs, including the curbs located on the prestressed concrete members. It may also include concrete in endwalls and/or diaphragms, depending on the prestressed concrete superstructure proposed.
553.02 R6/SPECIAL PROJECT SPECIFICATION
September 15, 2005
553.02 Requirements.
Anchor Bolts 717.01(g)
Structural Steel
Welded Stud Shear Connectors 717.05
Delete the following:
Low Strength Grout 701.03
553.03 Method Approval
Delete the fourth and fifth paragraphs.
Ensure that certification for quality and quantity of offsite-produced prestressed concrete members required by subsections 160.05 (a) and (b) 161.02 (a) and (b) is accomplished by the fabricating plant preparing and submitting a Quality Control (QC) Report that accompanies the prestressed members to the job. Ensure that the report includes a certification that the quality and quantity of the furnished prestress members conforms to the drawings, specifications and requirements of the contract and bears the seal and signature of the professional engineer most directly responsible for the plant's quality control organization, whether a member of the QC organization or not.
Shop drawing items (a) through (c), (e), and (g) through (i) may be included in the fabricating plant's QC report that accompanies the members to the job site.
Add the following information to the list of items that is to be submitted with the shop drawings:
(k) Calculations to validate supporting the prestressed members while in storage or transit at locations different from those indicated on the contract drawings.
(l) Prominent notes indicating all desired changes or deviations from the contract drawings and/or specifications.
(m) Submit a load rating calculation for the superstructure.
553.04 Prestressing Steel.
Change the next to last sentence to read as follows:
Remove any strand that has more than one broken wire.
553.05 Concrete.
Change the start of the first sentence of the second paragraph to read as follows:
"Unless otherwise SHOWN ON THE DRAWINGS, ensure that threaded inserts ..."
Submit all concrete cylinder test results and temperature curing records as part of the fabricating plant's QC report, except 28 day concrete strength test results may be submitted later when prestressed girders are authorized to be shipped before that date.
553.06 Tensioning.
Provide the submittals referred to in the first paragraph as part of the fabricating plant's QC report.
In the seventh paragraph, replace the last sentence with the following:
Stress and anchor prestressing steel at the initial stress called for by the approved stressing calculations.
553.09 Erecting & Placement Of Multi-Beam Members.
Change the reference in the fourth paragraph from 20.7 kPa to 20.7 Mpa (3000 psi).
Change the patching material for smaller areas on the concrete roadway in the fifth paragraph to high-strength, non-shrink grout.
Change the seventh paragraph to read as follows:
Use high-strength non-shrink grout to set anchor bolts and dowels. Use it for structural repairs to members when approved by the CO.
Change the start of the first sentence of the ninth paragraph to read as follows:
"Strike off exposed grout surfaces flush and apply the same surface texture finish as the surrounding concrete ..."
Change the first sentence in the last paragraph to read ".....requirements of AWS D1.1-Structural Welding Code."
553.10 Painting Steel.
Replace the first sentence of the second paragraph with the following:
Use an epoxy paint or a zinc-rich paint conforming to Federal Specifications and Standards (FSS) TT-P-641 or TT-P-1046A or Military Specification MIL-P-21035.
554.02 R6/SPECIAL PROJECT SPECIFICATION
September 15, 2005
554.02 Requirements.
554.03 Order Lists.
Do not submit order lists or bending diagrams for approval..
554.08 Placing & Fastening.
Modify the first paragraph to the extent that the use of precast mortar blocks is only permitted in areas permanently hidden from view in the completed structure.
Wet down all drilled dowel holes immediately prior to grout placement; however, do not permit free-standing water in the holes during grouting operations. Place dowels accurately during grouting operations at the locations SHOWN ON THE DRAWINGS.
554.10 Method.
Measurement for Pay Item 554(01), Reinforcing steel, includes all reinforcing steel, except that placed in the prestreassed concrete members during fabrication.
556.02 R6/SPECIAL PROJECT SPECIFICATION
September 15, 2005
556.02 Requirements.
Galvanized Coating Repair 717.07
556.03 General.
Do not submit any railing shop drawings.
556.05 Steel Railing.
Add the following at the beginning of the first sentence.
"Except as provided for in the SPECIAL PROJECT SPECIFICATIONS or SHOWN ON THE DRAWINGS, ... "
In the first paragraph, change the reference from "AASHTO M 183 (ASTM A 500, grade B)" to "ASTM A 500, grade B."
In the second paragraph, change "AASHTO M 232" to "AASHTO M 232M."
The last sentence of the second paragraph is changed to read as follows:
Repair minor abrasions, cuts and all damaged coating areas with galvanized coating repair.
556.12 Basis.
Change Pay Item 556(05) to the following:
556(05) Terminal section, ET-2000 Plus, NCHRP 350, Test Level 2 Each
558.01 R6/SPECIAL PROJECT SPECIFICATION
Septemer 15, 2005
Throughout this specification, omit the words “prefabricated” and “modular” wherever they occur.
558.01 Work.
Replace this section with the following:
Design, fabricate, deliver, and install a bridge superstructure. Construct the length, width , and capacity of the structure, including the deck, diaphragms, and bracing (if needed), to the horzontal and vertical alignment SHOWN ON THE DRAWINGS. Furnish prestressed members that have ends that are vertical (plumb) once set at the grade SHOWN ON THE DRAWINGS.
When there are specific requirements for design, materials, appearance, and/or construction, they shall be SHOWN ON THE DRAWINGS or in the SPECIAL PROJECT SPECIFICATIONS.
558.03 Design Requirements.
Change the last line of the second paragraph to read, “…who is currently licensed in the State where the bridge will be located.”
Delete the first sentence of the third paragraph. Change the last sentence of this paragraph to read, “Fabricate primary components from the materials SHOWN ON THE DRAWINGS or in the SPECIAL PROJECT SPECIFICATIONS.”
Delete the fourth paragraph.
558.05 General.
Perform removal of structures and obstructions, structural excavation, backfill, and embankment work under Sections 202, 203, and 206.
Dispose of all removed, left over or excess treated timber material under Section 202.
558.07 Contractor-Furnished Bridge Superstructure.
Replace (a) and (b) with the following required submittals, as applicable:
(a) The prestresser’s QC report as outlined in 553.03.
(b) Cylinder tests showing prestressed members have achieved 28-day strength.
Delete the last two paragraphs of this section.
558.09 Method.
Delete “…and railing” from the last sentence of the second paragraph.
Add the following Pay Item:
Pay Item Pay Unit 558(03) Bridge superstructure, prestressed concrete design, fabricate, deleiver, and install Lump Sum
564.03 R6/SPECIAL PROJECT SPECIFICATION
Sptember 15, 2005
564.03 General.
In the first line, correct the spelling of the word "following."
564.04 Elastomeric Bearings.
Replace the second paragraph with the following:
Reinforce elastomeric bearings with laminates only AS SHOWN ON THE DRAWINGS.
Delete the third paragraph.
606.02 R6/SPECIAL PROJECT SPECIFICATION
September 15, 2005
606.02 Requirements.
Galvanized Coating Repair 717.07
Change the reference to "Galvanized Steel Rail" to "Steel Rail".
606.04 Rail Elements.
(a) Steel Rail.
Replace the third paragraph with the following:
Repair all scrapes, cuts and other damaged coating areas on galvanized surfaces that are through to the base metal with galvanized coating repair.
F16/SPS 633.02F1
October 30, 2009
633.02 Traffic Control Sign Details. Add the following:
American Recovery and Reinvestment Act (ARRA) Sign. Ensure that ARRA signing meets the requirements of the MUTCD and the “Project Funding Source Sign Assembly” details that are attached including sign layout and color. Comply with the requirements of the “FOR USE ON LOW SPEED ROADS OR NON-ROAD PROJECTS” sign. With respect to placement of signs, regulatory, warning, and guide signs have a higher priority than economic recovery signs. Economic recovery signs shall not be placed where they can obscure road users’ view of other traffic control devices. Economic recovery signs should be placed where they can be easily identified with the corresponding project(s). If the placement of an economic recovery sign conflicts with newly installed higher priority signs, traffic signals, temporary traffic control devices, or other priority devices, the economic recovery sign should be relocated. Due to public safety concerns, economic recovery signs should not be allowed at the following locations:
· On the front, back, adjacent to, or around any traffic control device, including traffic signs, signals, changeable message signs, traffic control device posts or structures, or bridge piers
· At key decision points where a driver’s attention is more appropriately focused on traffic control devices, roadway geometry, or traffic conditions. These locations include, but are not limited to, exit and entrance ramps, intersections controlled by traffic signals or by stop or yield signs, highway-rail grade crossings, and areas of limited sight distiance.
701.02 R6/SPECIAL PROJECT SPECIFICATION
September 15, 2005
701.02 High-Strength Non-Shrink Grout.
(g) The following is added at the start of the second sentence:
Unless using one of the products described in (h) below, submit ...
Add the following after subsection (g):
(h) Keep grout in the original manufacturer's labeled containers until used. Provide protection requirements as specified for cement in 701.01. Do not use grout after the expiration date shown on the container or 1 year from date of purchase, whichever date occurs first.
Store, mix, place and cure grout in accordance with the manufacturer's instructions; submit a copy to the CO in advance of use. Do not place grout when the air temperature is below 5° Celsius (41° Fahrenheit) or above 30° C (86° F), except as provided for Set-45 grouts below.
Five products that meet these requirements are Masterflow 928 grout manufactured by Master Builders; HornGrout manufactured by Tamms Industries.; SikaGrout 212 manufactured by Sika Corporation; Crystex grout manufactured by L&M Construction Chemicals, Inc.; and Conbextra S grout manufactured by Fosroc-Preco, Inc. Two other products that meet these requirements and which do not have to be cured, but which shall only be used in applications where their tendency to flow sideways is prevented, are Regular Set-45 and Set-45 Hot Weather Formula, both manufactured by Master Builders. Set-45 Hot Weather Formula shall be used in air temperatures of 10° - 38° C (50° - 100° F), while Regular Set-45 shall only be used in air temperatures below 10° C (50° F).
701.04 Mortar.
Replace all but the last paragraph of this subsection with the following:
Use this mortar in bridge deck and prestressed multi-beam girder keyways; and, when approved, as a structural repair mortar.
Keep mortar in the original manufacturer's labeled containers until used. Protect as specified for Portland cement in 701.01. Do not use mortar after the expiration date shown on the container or 1 year from date of purchase, whichever date occurs first.
Store, mix, place and cure in accordance with the manufacturer's instructions; submit a copy in advance of use to the CO.
Require mortar to be a chemical action concrete of the magnesium phosphate family, requiring no curing under ambient temperatures of 2° - 38° C (36° - 100° F). Require recommendation by its manufacturer specifically for use in prestressed concrete bridge member keyways that are to be part of the finished wearing and running surface of the bridge, subjected to normal roadway contaminants and conditions promoting wear of normal bridge deck concrete.
Require mortar to have the following typical properties when tested neat, without aggregate except as noted. Compressive strength (ASTM C 109 modified) of 42 Mpa (6000 psi) at 24 hours at 22° C (72° F) or above, and when used below 10° C (50° F), 35 Mpa (5000 psi). Modulus of elasticity (ASTM C 469) at 7 and 28 days of 28.8 (4177 ksi) and 31.4 Gpa (4554 ksi). Freeze-thaw durability (ASTM C 666, Procedure A Modified) of a relative dynamic modulus greater than 80 percent after 300 cycles. Scaling resistance to deicing chemicals (ASTM C 672) after 5 and 25 cycles at a rating of 0, shall show no surface scaling; after 50 cycles at a rating of 1.5 shall show only slight surface scaling. Sulfate resistance (ASTM C 1012) length change after 52 weeks shall be no greater than 0.9 percent. Coefficient of thermal expansion (CRD-C 39-81) when run with 25.4 mm x 25.4 mm x 280 mm (1 inch x 1 inch x 11 inch) bars and neat mixes without aggregate, shall be within 10 percent of 88.74 mPa per degree Celsius (7150 psi/degree Fahrenheit). Flexural strength (ASTM C 78 Modified) of 76 mm x 102 mm x 406 mm (3 inch x 4 inch x 16 inch) prisms shall be 3.8 MPa (550 psi) at 24 hours for the mortar only, and 4.6 MPa ( 670 psi) with 9.5 mm (3/8 inch) pea gravel. Require independent test results of the mortar recommended for use from 10° - 38° C (50° - 100° F), when used to fill test specimens conforming to the Government's bridge box beam test keyway, to be in the range of 204 kN/m (14 k/ft) of keyway for lateral (horizontal) shear between adjacent members, 234 kN/m (16 k/ft) of keyway for vertical shear between adjacent members, and 83 kN/m (6 k/ft) of keyway for direct tension between adjacent members. Require test results for the mortar recommended for use from 10° C (50° F) down to 2° C (36° F), to be in the range of 35 kN/m (2.4 k/ft) (horizontal shear), 82 kN/m (6 k/ft) (vertical shear), and 55 kN/m (4 k/ft) (direct tension).
Two products that meet these requirements are Master Builders' Regular Set-45 [for use below 10° C (50° F)] and Set-45 Hot Weather Formula [for use from 10° - 38° C (50° - 100° F)].
Use Set-45 Hot Weather Formula in air temperatures from 10° - 38° C (50° - 100° F). Use Regular Set-45 only in air temperatures below 10° C (50° F). When used in temperatures below 2° C (36° F), use approved weather precautions designed to prevent the mortar from freezing. Except when used in bridge deck keyways and blockouts, Regular Set-45 may be extended by the addition of 9 kg (20 pounds) of washed and clean 9.5 mm (3/8 inch) minus pea gravel per 23 kg (50 pound) bag when placed in thicknesses over 38 mm (1.5 inches), or when approved by the CO.
The following is added at the start of the last paragraph:
Unless using one of the two products described above, submit ...
704.03 R6/SPECIAL PROJECT SPECIFICATION
Sptember15, 2005
704.03 Backfill Material.
Change the sixth word to read "compactible."
705.02 R6/SPECIAL PROJECT SPECIFICATION
September 15, 2005
705.02 Riprap Rock.
Delete Table 705-1 and replace it with the following:
Table 705-1.—Gradation requirements for riprap.
| Class |
| % of Rock by Mass |
| Mass (kg) |
| Approximate Cubic Dimensionb,c (mm) |
| Weight (lbs) |
| Approximate. Cubic Dimension b,c (inches) |
| 1 |
| 20 |
| 10-15 |
| 150-200 |
| 22-33 |
| 6-8 |
| 30 |
| 5-10 |
| 125-150 |
| 11-22 |
| 5-6 |
| 40 |
| 0.5-5 |
| 50-125 |
| 1.1-11 |
| 2-5 |
| 10a |
| 0-0.5 |
| 0-50 |
| 0-1.1 |
| 0-2 |
| 2 |
| 20 |
| 25-50 |
| 200-250 |
| 55-110 |
| 8-10 |
| 30 |
| 10-25 |
| 150-200 |
| 22-55 |
| 6-8 |
| 40 |
| 1-10 |
| 75-150 |
| 2.2-22 |
| 3-6 |
| 10a |
| 0-1 |
| 0-75 |
| 0-2.2 |
| 0-3 |
| 3 |
| 20 |
| 100-150 |
| 350-400 |
| 220-330 |
| 14-16 |
| 30 |
| 50-100 |
| 250-350 |
| 110-220 |
| 10-14 |
| 40 |
| 5-50 |
| 125-250 |
| 11-110 |
| 5-10 |
| 10a |
| 0-5 |
| 0-125 |
| 0-11 |
| 0-5 |
| 4 |
| 20 |
| 250-350 |
| 450-500 |
| 550-770 |
| 18-20 |
| 30 |
| 100-250 |
| 350-450 |
| 220-770 |
| 14-18 |
| 40 |
| 10-100 |
| 150-350 |
| 22-220 |
| 6-14 |
| 10a |
| 0-10 |
| 0-150 |
| 0-22 |
| 0-6 |
| 4a |
| 20 |
| 350-615 |
| 500-600 |
| 770-1353 |
| 20-24 |
| 30 |
| 150-350 |
| 400-500 |
| 330-770 |
| 16-20 |
| 40 |
| 15-350 |
| 175-400 |
| 33-330 |
| 7-16 |
| 10a |
| 0-15 |
| 0-175 |
| 0-33 |
| 0-7 |
| 5 |
| 20 |
| 700-1000 |
| 650-700 |
| 1540-2200 |
| 26-28 |
| 30 |
| 350-700 |
| 500-650 |
| 770-1540 |
| 20-26 |
| 40 |
| 25-350 |
| 200-500 |
| 55-1100 |
| 8-20 |
| 10a |
| 0-25 |
| 0-200 |
| 0-55 |
| 0-8 |
| 6 |
| 20 |
| 850-1600 |
| 700-850 |
| 1870-3520 |
| 28-34 |
| 30 |
| 500-850 |
| 550-700 |
| 1100-1870 |
| 22-28 |
| 40 |
| 50-500 |
| 250-550 |
| 110-1100 |
| 10-22 |
| 10a |
| 0-50 |
| 0-250 |
| 0-110 |
| 0-10 |
| 7 |
| 20 |
| 2000-2700 |
| 900-1000 |
| 4400-5940 |
| 35-39 |
| 30 |
| 1000-2000 |
| 700-900 |
| 2200-4400 |
| 28-35 |
| 40 |
| 100-1000 |
| 350-700 |
| 220-2200 |
| 14-28 |
| 10a |
| 0-100 |
| 0-350 |
| 0-220 |
| 0-14 |
| 8 |
| 20 |
| 3180-4545 |
| 1065-1190 |
| 7000-10000 |
| 42-47 |
| 30 |
| 1820-3180 |
| 890-1065 |
| 4000-7000 |
| 35-42 |
| 40 |
| 180-1820 |
| 400-890 |
| 400-4000 |
| 16-35 |
| 10a |
| 0-180 |
| 0-400 |
| 0-400 |
| 0-16 |
a Furnish spalls and rock fragments graded to provide a stable, compact mass.
b The volume of a rock with these cubic dimensions will have a mass (weight) approximately equal to the specified rock mass (weight).
c Furnish stone with breadth and thickness at least one-third its length.
709.01 R6/SPECIAL PROJECT SPECIFICATION
709.01 Reinforcing Steel.
(b) Reinforcing Bars.
Change the sentence to read as follows:
Furnish deformed grade 420 bars (Grade 60) conforming to AASHTO M 31M, M 42M or M 53M unless otherwise SHOWN ON THE DRAWINGS or provided for in the SPECIAL PROJECT SPECIFICATIONS.
(f) Dowel Bars.
These dowel bars are for use in concrete pavement. See subsections 717.17 for dowel bars for concrete bridges.
709.02 Wire Rope Or Wire Cable.
Replace with the following:
Furnish wire rope or wire cable, and associated fittings, conforming to AASHTO M 30. Furnish 19mm (3/4 inch) Type II wire rope, with Class C zinc coating, unless otherwise SHOWN ON THE DRAWINGS.
709.03 Prestressing Steel.
Replace this with the following:
(a) Seven-wire uncoated strand shall conform to AASHTO M 203M, Grade 270, low relaxation strand, minimum ultimate tensile strength 1860 MPa (270 ksi), unless otherwise SHOWN ON THE DRAWINGS. It is also permitted if requested and approved as part of the prestressed beam submittals.
(b) Epoxy coated seven-wire strand shall conform to ASTM A 882M, Grade 270, low relaxation strand, minimum ultimate tensile strength 1860 MPa (270 ksi), unless otherwise SHOWN ON THE DRAWINGS.
(c) High tensile strength wire shall conform to AASHTO M 204M, Type BA or WA, Supplement I (low relaxation), unless otherwise SHOWN ON THE DRAWINGS.
(d) High strength steel bars shall conform to AASHTO M 275M, Type II, minimum ultimate tensile strength 1035 MPa (150 ksi), unless otherwise SHOWN ON THE DRAWINGS.
710.06 R6/SPECIAL PROJECT SPECIFICATION
710.06 Metal Beam Rail.
(a) Galvanized Steel Rail.
Change the title of this subsection to "(a) Steel Rail."
712.01 R6/SPECIAL PROJECT SPECIFICATION
712.01 Sealants, Fillers, Seals, & Sleeves
(b) Preformed Expansion Joint Fillers.
Modify this subsection to permit the use of more than one piece of preformed joint filler when used on an abutment, pier cap or other bent, when so approved by the CO.
Replace (d) Foam Filler, with the following:
(d) Expanded Polystyrene. Furnish an expanded polystyrene filler that meets the requirements of AASHTO M 230.
717.01 R6/SPECIAL PROJECT SPECIFICATION
September 15, 2005
717.01 Structural Steel
(e) High-Strength Bolts, Nuts, & Washers.
Change the hardened steel washer specification to AASHTO M 293M (ASTM F 436M).
717.07 Galvanized Coatings
Replace the second sentence with the following:
Furnish hot-dipped galvanized hardware and fasteners conforming to AASHTO M 232M and mechanically galvanized hardware and fasteners conforming to AASHTO M 298.
Repair damaged galvanized surfaces by power or hand tool cleaning, followed by 2 brush applications of zinc rich 2 component paint meeting FS TT-P-641, FS TT-P-1046A or MIL-P-21035. Single component brush or spray-on zinc or galvanizing compounds are not permitted. A source for TT-P-641 paint is Far West Paint Company, Tukwila, WA 206-244-8844.
717.10 Elastomeric Bearing Pads
Unless otherwise SHOWN ON THE DRAWINGS, the following applies:
(a) Furnish bearings made from Grade 3, 60-durometer elastomer containing only virgin crystallization resistant polychloroprene (neoprene).
(b) Subject bearings to Level I testing requirements. Request loading values not SHOWN ON THE DRAWINGS from the CO.
(c) Reinforce bearings when SHOWN ON THE DRAWINGS. Use only steel laminates.
(d) In addition to the test result submittals, submit manufacturer's certification that the bearings supplied conform to the requirements of the contract.
717.17 Dowels
Change this subsection to read:
Furnish dowels that conform to AASHTO M 31M (ASTM A 615M) grade 420, unless otherwise SHOWN ON THE DRAWINGS.
SECTION II
Road Maintenance Specifications
*Note: All road maintenance requirements shall be considered incidental to construction work.
811 BLADING (2/02)
811.01 Description
This work consists of surface blading the traveled way to a condition to facilitate traffic and provide proper drainage. Blading includes shaping the crown or slope of traveled way, berms, and drainage dips in accordance with this specification. Compaction is required when shown on the road listing.
811.02 Maintenance Requirements
A. Timing- Perform surface blading during the contract period as ordered by the Government. Commence surface blading within two (2) contract days after receipt of written order unless otherwise stated in the order.
B. General-
1. Blade and shape the existing traveled way and shoulders, including turnouts unless otherwise ordered, to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface, unless otherwise shown in the Road Listing, to at least 13 mm (½ inch) per .305 meter (1 foot) of width, but not more than 19 mm (¾ inch) per .305 meter (1 foot) of width. Thoroughly loosen surfacing material to no less than 50 mm (2 inches) depth or the depth of potholes or corrugations. Scarification to facilitate cutting to the full depth of potholes or corrugations may be elected, but will be considered incidental to blading. Do not scarify deep enough to cause contamination of the surfacing.
2. When Section 891 is included in the Road Listing, apply water during blading when sufficient moisture is not present to prevent segregation. Water supply, hauling, and application shall be in accordance with Section 891 and are incidental to blading unless Pay Items for Section 891 are designated in the SCHEDULE OF ITEMS.
3. Shape existing native rock or aggregate surfaced drainage dips to divert surface runoff to existing outlet devices, ditches, and discharge locations.
4. Establish a blading pattern which provides a uniform driving surface, retains the surfacing on the roadbed, and provides a thorough mixing of the materials within the completed surface width. Upon final blading, no disturbed rock shall protrude more than 50 mm (2 inches) above the adjacent surface unless otherwise provided in the contract. Remove and place outside the roadbed material not meeting this dimension so as not to obstruct drainageways or structures. This material may be scattered off the roadbed if there is free drainage.
C. Routine Blading
1. Conform to the dimensions SHOWN ON THE DRAWINGS or designated in the SPECIAL PROJECT SPECIFICATIONS upon completion of blading.
2. Shape roadbed width in excess of the dimensions shown only as needed to provide drainage away from the traveled way. Do not remove established grasses and other vegetation from the excess width except as incidental to providing drainage or unless otherwise provided in the contract.
D. Compaction- Roads requiring compaction will be included in the Road Listing. Unless Compaction Method B is designated in the SCHEDULE OF ITEMS and Road Listing, all traveled ways requiring compaction shall be compacted by Method A. Compaction shall commence immediately following blading. Compaction methods are:
Compaction Method A: By breaking track while operating equipment on the traveled way.
Compaction Method B: 7-9 (7-10 ton) metric ton pneumatic, steel, or equivalent vibratory roller, operated to cover the full width two (2) times.
E. Intrusions- Where the minimum width SHOWN ON THE DRAWINGS or included in the SPECIAL PROJECT SPECIFICATIONS is not available, the Contractor will construct berms where ordered and marked on the ground. Material to provide berms will come from sources SHOWN ON THE DRAWING or designated in the SPECIAL PROJECT SPECIFICATIONS.
F. Undercutting- Undercutting roadway back slope is not permitted.
G. Intersections
1. At intersections, blade the roadbeds of side roads which are not closed or restricted from vehicular use to ensure smooth transitions.
2. Signing, cross ditching in the road surface (traveled way), earth berms, or other devices placed to discourage or eliminate use by passenger cars, are field evidence of road closure or restriction. Roads listed for work under Sections 835 or 838 are considered restricted.
3. Side roads listed for work under this Section are not restricted.
H. Cleaning of Structures- Do not allow materials resulting from work under this Section to remain on or in structures, such as bridges, culverts, cattle guards, or drainage dips.
I. Berms- Maintain existing berms to the condition of adjacent segments when ordered by the Government.
J. Smooth blading- Smooth blading may be used as an interim measure to remove loose surfacing material from the wheel paths and store it in a recoverable windrow until blade processing, as described in this section, is feasible. Watering will not be required for smooth blading. Accomplish smooth blading without distorting the existing cross-slope or crown of the traveled way.
Move and store loose surfacing materials on the high side of super-elevated curves and sections with uniform inslope or outslope. In crowned sections, store the material on either or both sides as elected. Windrow and place stored materials to provide not less than 3.6 meters (12 feet) of smooth traveled way on one-lane segments, or 6 meters (20 feet) of smooth traveled way on two-lane segments, or segments with turnouts. Cut holes through windrows, which may collect water on the road, for drainage at least every 150 meters (500 feet).
811.03 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Measurement for…