Project 2 Rombo Part 1.pdf

PDF 92 KB Posted

Attached to
TRAIL CONSTRUCTION
Solicitation number
AG-03R6-S-08-0055
Issued by

About this file

Project 2 - Rombo Trail Part 1

View the file

Other files

File Type Posted
amendment_1.pdf PDF
short_set.pdf PDF
Solicitation.pdf PDF
Project 1 Canyon Creek.pdf PDF
Attachment B Drawings.pdf PDF
Project 2 Rombo Part 2.pdf PDF
Attachment A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project 2 – Rombo Trail Part 1, Page 1 of 16

PROJECT 2 – ROMBO TRAIL

This is a real project that will be awarded under a task order simultaneously or shortly after awards are made to RFP AG-03R6-S-08-0055.

The project will also be used in the business/price evaluation as a measure of the Offerors price reasonableness.

ITEM DESCRIPTION METHOD

OF MEAS.

QTY PAY

UNIT

UNIT

PRICE

TOTAL

LINE PRICE

*912(09) Ditch AQ 300 LF $__________ $__________

*915(01) Trail Restoration – Hike/Pack Trail 18” AQ 1,350 LF $__________ $__________

922(01) Native Log Waterbar AQ 248 EA $__________ $__________

951(01) Mobilization LSQ 1 LS XXXXXXXX $__________

982(03) Logging Out DQ 29.1 MI $__________ $__________

* Laborer AQ 8 HR $__________ $__________

* Unit Price must match RFP unless specification for this specific project is different.

Part 1, Page 2 of 16

Description of Work

SCOPE OF WORK

The work to be completed under this contract will provide restoration of trails burned in the Rombo Fire of 2007 on the Sula and West Fork Ranger Districts, Bitterroot National Forest. The work includes construction of 248 waterbars and 300 feet of lead-off ditch; trail restoration on 1,350 feet of trail; and logging out 29.1 miles of existing trail (including miscellaneous rock removal and cutting leaning hazard trees). There are no “designated” trees to be felled.

PROJECT LOCATION

There are multiple access points as described below:

The east side of the project area can be accessed via two routes:

1) Follow US Hwy 93, 15 miles south of Darby, Montana. Turn onto Forest Road (FR) 9730 and FR 370 and go four (4) miles to Crazy Creek Campground and Trail 103.

2) From Crazy Creek camp, continue south along FR 370 one (1) mile to junction FR 5730. Follow FR 5730 two and ½ (2.5) miles to Section 32 and the unimproved trailhead for Trail 601.

The west side of the project area can be accessed via two routes:

1) Follow US Hwy 93, 3 miles south of Darby, Montana, to State Hwy 473. Follow State 473 south 8.6 miles to junction FR 5723, Piquett Creek. Follow FR 5723 three and ½ (3.5) miles to Trail 675.

2) To access Little Boulder Trailhead, continue on State 473 south, past West Fork Ranger Station, 13.5 miles to junction FR 1130. Follow FR 1130 one (1) mile to Trail 55. See Attached Maps (Reference 2005 Bitterroot National Forest South Half Map) and Exhibits.

PROJECT TRAIL LOCATIONS

Beginning Ending District TR # TRAIL NAME

SEC TWN RGE SEC TWN RGE

Location

SULA 103 WARM SPRINGS

CREEK

9 1S 20W 28 1S 20W FR #370 TO TR #673

SULA 601 SHOOK MOUNTAIN 34 1N 20W 29 1N 20W FR# 5730 TO TR#56

W.FORK 55 LITTLE BOULDER 25 1S 22W 16 1S 21W FR #1130 TO TR#248

W.FORK 56 WILES PEAK 23 1S 21W 32 1N 20W TR #248 TO TR #601

W.FORK 248 DROP CREEK 16 1S 21W 23 1S 21W TR #55 TO TR #56

W.FORK 675 PIQUETTE CREEK 16 1N 21W 16 1S 21W FR #5720 TO TR #55

W.FORK 676 PIQUETT DIVIDE 16 1S 21W 16 1S 21W TR #55 TO Rombo Mt.

Part 1, Page 3 of 16

COMPLETION DATE

All work shall be completed by September 15, 2008.

PRICE RANGE

$25,000 - $50,000

BONDING

Award of task order for an amount greater than $30,000 shall require an Alternative Payment Protection in accordance with FAR 52.228-13 (See Section I of parent contract).

SPECIFICATIONS

Standard Specifications for Construction of Trails, September 1996, is hereby incorporated into this task order. There are no special project specifications.

Note: Item 982 is in the Maintenance section of the Standard Specifications.

SPECIAL PROJECT SPECIFICATIONS

The following Special project Specifications (SPS) are applicable to this task order and are physically included in the package.

Page(s) SPS - 912 Excavation and Embankment 4 SPS - 915 Existing Trail Restoration 1 SPS - 922 Waterbars 2 SPS - 982 Logging Out 3

DRAWINGS

Drawings provided in the contract are incorporated into this task order. Drawings not included in Parent Contract are provided in Project 2 Part 2.

Illustration of Trail Structure Terms (Parent Contract) Clearing Limits (Parent Contract) Drawing #911 - 1 Typical Trailway Cross Sections Drawing #912 - 1 Trailbed and Slope Finish Drawing #912 - 2 (a) Existing Trail Restoration Drawing #915 - 1 Rock Waterbar (Parent Contract) Drawing #922 – 1 (a) Log or Treated Timber Waterbar (Parent Contract) Drawing #922 – 2 (a) Logging Out (Removal of Down Trees) Drawing #982 - 1 Logging Out (Leaning Trees) Drawing #982 – 2

Part 1, Page 4 of 16

Logging Out (Waterbar Cleaning) Drawing #982 - 3 Logging Out (Rolling Dip Cleaning) Drawing #982 – 4

MOTORIZED EQUIPMENT

This project is located in non-wilderness lands. Motorized hand tools may be used in prosecution of the work. Motorized trail construction equipment is not permitted. Motorized transport of equipment, camp gear, tools, etc. with ATV’s will not be permitted on trails being worked on this contract. Access to potential campsites via the “Overwhich” ATV route is acceptable when confined to ATV trails (#182, #185, #248). Motorcycle use is acceptable when it complies with all applicable restrictions as described on Bitterroot NF Visitor Maps, when its use causes no damage or conflicts with other users, and pending Contracting Officer approval.

CAMPSITES

A campsite location and management plan must be submitted and approved by the Contracting Officer, prior to occupying any camp on the National Forest Lands. The plan shall address items such as garbage, human waste, food storage in bear country, stock and weed-free feed. Leave No Trace camping techniques are required. There are limited locations suitable for campsites that have a potable water source (see vicinity map for possible back-country camp locations).

Coordinate all camp locations with COR. Sanitation facilities may need to be brought in to road-accessed campsites on this project, depending on crew size and camp location.

CONSTRUCTION MATERIALS

All stakes and flagging shall be removed from the project by the Contractor after the work is accepted. Stakes may be burned at suitable locations on the project. Flagging shall be removed from the National Forest lands.

CONTACT

For information regarding site or technical questions, contact Nick Hazelbaker, West Fork Ranger District at (406) 821-3269.

For contract or task order questions, contact Sue Beron, Contracting Officer at 406-329-3769.

CONSTRUCTION NOTES

1. Exhibit: “Reconstruction Quantities by Trail”: This exhibit shows quantities of waterbars and treads reconstruction on project trails. A field review done in the fall of 2007 was used to determine these quantities. Staking will be done in May or early June after snow melt. This spreadsheet will be used in lieu of a construction survey.

2. 922 (01) Native Log Waterbars: Waterbars will be constructed using native peeled and limbed, sound, free-of-defect onsite materials. Rock waterbars may be substituted for native log waterbars where suitable material is available. Reference SS 911-Clearing and Grubbing for

Part 1, Page 5 of 16 planning native waterbar rendering from local timber sources. Contractor is responsible to utilize as much of each felled tree as is practicable in producing waterbars. Variation in diameters of waterbars are SHOWN ON THE DRAWINGS. An allowance will be made for variation outside standard 6-8” minimum diameters to better utilize selected, felled trees; allow for natural taper; and minimize the number of felled trees. See Drawing 922-2(a).

3. 982(01) Logging Out: Warm Springs Creek Trail #103, North Terminus. Rombo Fire burned downstream of Trail Junction #103 & #205. The closest physical terminus is a trail ford on Warm Springs Creek with a footlog in place. Trail #103 logout starts at this ford and proceeds to the south trail terminus at the junction of Trails #103, #248 and #673.

Part 1, Page 6 of 16

District TR

TRAIL

NAME

Miles Reconstruction

Miles Logout

Pay Item 922 -

Waterbar

Pay Item 912 - Ditch

Pay Item 915 - Trail

Restoration

Fall 2007 Survey - Downed

Trees (Doesn't Include

Leaners)

Class Schedule Last Maintenance

Remarks

Sula 103 WARM

SPRINGS

CREEK

1.3 5.0 33 100 200 56 M 1 2007 First 5 miles only maintained in 2007, 2003 last time full length maintained

Sula 601 SHOOK

MOUNTAIN

2.5 3.3 50 0 200 89 S 3 ** No record of recent maintenance West Fork

55 LITTLE

BOULDER

2.0 4.5 10 0 150 61 S 1 2007

West Fork

56 WILES

PEAK

2.5 6.3 60 200 0 241 S 3 2004

West Fork

248 DROP

CREEK

0.5 2.0 5 0 300 10 M 1 2007

West Fork

675 PIQUETTE

CREEK

2.0 7.0 65 0 500 171 S 2 2006

West Fork

676 PIQUETT

DIVIDE

0.4 1.0 25 0 0 30 M 2 2001

Totals 11.2 29.1 248 300 1350 658

Part 1, Page 7 of 16

SPECIAL PROJECT SPECIFICATION

SECTION 912 – EXCAVATION AND EMBANKMENT

Description Delete this specification in its entirety and replace with the following:

912.01 Work. Work consists of the excavation and placement of excavated material, regardless of its nature, from within the trailway or from other sources, except for material included under other pay items AS SHOWN IN THE SCHEDULE OF ITEMS.

Includes excavation, embankment, and backfill construction required to shape and finish the trailbed, ditches, backslopes, fill slopes, drainage dips, trail passing sections, and turnouts. Also includes excavation and embankment work required to construct shallow stream fords and gully crossings, talus and rubble rock sections, and climbing turns.

Materials

912.02 Requirements. Use materials meeting the requirements of the following sections:

961 - Rock, Grid Pavement Units, and Aggregate 962 - Materials for Timber Structures 964 – Geosynthetics

Construction

912.03 Use and Disposal of Excavated Material. Conserve and use all suitable material for specified work. Conserve excess excavated rock suitable for specified project work and use in place of materials from designated sources.

Remove all duff and debris from the trailway limits and uniformly spread outside the clearing limits, not more than four (4) inches in depth (unless otherwise SHOWN ON THE DRAWINGS). Do not obstruct drainage or create piles, berms, or windrows of debris.

Place excess and unsuitable excavation beyond the downslope edge of the trailbed. Do not obstruct drainage and spread to a depth not exceeding four (4) inches. This includes any material removed in the grubbing operation and deposited in the same area.

Place rocks over four (4) inches in greatest dimensions not used in construction beyond the hinge point on the downslope side. Place rocks so that the tops are at least six (6) inches lower than the trailbed surface. Ensure that no blockage of drainage or creation of a windrow effect occurs.

Part 1, Page 8 of 16

Construction

912.04 Trailway Excavation and Embankment. Minor deviations of plus or minus 12 inches in vertical alignment and 12 inches in horizontal alignment with smooth transitions of at least 30 feet on each side of the deviation are acceptable unless otherwise

SHOWN ON THE DRAWINGS.

Construct embankments with suitable compacted material. Compact all disturbed soil within the trailbed area.

Remove any rock within or above the backslopes that is unstable. Use or dispose of rock in accordance with Subsection 912.03.

Leave the finished slope in a uniform and roughened condition.

Make necessary adjustments of horizontal or vertical alignment, within the tolerances specified in this subsection, to produce the designed trailway section and balance earthwork. Such adjustments shall not be considered as changes.

Construct a rolling dip to include an upgrade excavation of the trail subgrade; a reverse grade section with crown; and a downgrade, feathered, fill section. The transition from upgrade approach, through reverse grade and onto downgrade approach will be of sufficient length to be smooth as SHOWN ON THE DRAWINGS. See Standard Drawing 912-5, Rolling Dip.

912.05 Trailbed Finish. Fill holes with suitable material, compact, and cut high points to provide a uniform trailbed finish.

912.06 Talus or Rubble Rock Sections. Through talus or rubble rock slide areas, fill all voids with suitable material to the depth SHOWN ON THE DRAWINGS. Use cap rocks that weigh a minimum of 130 pounds and have a length of at least twice their width. At least 50 percent of all handplaced outer rocks should weigh a minimum of 130 pounds.

Construct tread by building out rather than by removing material from the inner bank.

912.07 Ditches. Construct ditches to be free of loose rocks, roots, sticks, and other obstructions. Where necessary to provide uninterrupted drainage, a leadoff ditch shall be constructed from the end of a drainage structure AS SHOWN ON THE DRAWINGS. It shall be of sufficient depth and length to insure that water flows freely from the end of the drainage structure. The ditch bottom shall have a minimum nine (9) inch width, flat and with sides finished to 4:1 slope ratio. See Standard Drawing 912-2(a), Trailbed and Slope Finish.

912.08 Geosynthetics. Where SHOWN ON THE DRAWINGS, place geosynthetics flat and parallel to centerline of the trail before placing embankment. Overlap geosythetics a minimum of 24 inches. Install anchors or fasteners as recommended by the geosynthetic manufacturer.

Part 1, Page 9 of 16

912.09 Sump Holes. AS SHOWN ON THE DRAWINGS, construct a sump hole in places where uninterrupted drainage cannot be provided at the end of a leadoff ditch. The sump hole will allow water to flow freely from the end of the ditch. Accumulated runoff water will seep into the ground and sediment will be allowed to accumulate in the sump hole. Dimensions: Two (2) feet wide x two (2) feet length x one (1) foot depth.

A sump hole will be finished with a backslope ratio equal to that required for ditch construction AS SHOWN ON THE DRAWINGS. Remove any rock on the backslope which is unstable in order to fashion a uniform slope. Remove all duff and debris from the sump hole. Place unsuitable excavation beyond the downgrade edge of the hole a distance of three (3) feet, spread to a depth not exceeding four (4) inches. Any clearing activity required for construction will not cause damage to adjacent trees. Cut limbs and branches flush with the tree trunks or stems or cut off at the ground surface. Clearing slash should not be placed in piles. Scatter all debris on the downgrade side of the hole, three (3) feet from its edge. Limb all felled trees to four (4) inch diameter.

Measurement

912.10 Method. Measure the quantities in accordance with Section 906.

Payment

912.11 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS.

Make payment under:

PAY ITEM PAY UNIT

912(01) Excavation…………………………………………LF

912(02) Excavation…………………………………………MI

912(03) Excavation…………………………………………LS

912(04) Trail Turnout……………………………………….LF

912(05) Trail Turnout……………………………………….EA

912(06) Rolling Dip…………………………………………EA

912(07) Shallow Stream Ford and Gully Crossing Structure…………………………………………...EA

Part 1, Page 10 of 16

912(08) Shallow Stream Ford and Gully Crossing Structure……………………………………………LS

912(09) Ditch………………………………………………...LF

912(10) Borrow……………………………………………...CF

912(11) Borrow……………………………………………...LS

912(12) Grade Dip…………………………………………..EA

912(13) Geosynthetics, Type _______……………………...CF

912(14) Trail Passing Section ……………………………….LF

912(15) Talus or Rubble Rock Section………………………LF

912(16) Sump Hole…………………………………………..EA

Part 1, Page 11 of 16

SPECIAL PROJECT SPECIFICATION

SECTION 915 – EXISTING TRAIL RESTORATION

Construction

915.04 Excavation and Embankment. Add the following:

Restored trail tread will meet original vertical and horizontal alignment in accordance with Subsection 912.04 unless otherwise DESIGNATED ON THE GROUND.

Part 1, Page 12 of 16

SPECIAL PROJECT SPECIFICATION

SECTION 922 – WATER BARS

Description Delete this specification in its entirety and replace with the following:

922.01 Work. This work consists of installing water bars, including excavation and backfill; selecting log and rock materials; and furnishing treated timber, belting, and other materials.

Materials

922.02 Requirements. Use materials meeting the requirements of the following sections:

961-Rock, Grid Pavement Units, and Aggregate 962-Material for Timber Structures

Use rubber belting that is single-ply, non-reinforced material 3/8” to ½” thick.

Construction

922.03 General. Install water bars of the types and at the locations SHOWN ON THE DRAWINGS or DESIGNATED ON THE GROUND.

922.04 Excavation and Embankment. Perform excavation and embankment in accordance with Section 912. Around water bars, backfill and compact suitable materials that is free of rocks larger than 3” in size. Compact material on the downgrade side of rock, log and treated timber water bars, flush with the top of water bars. Water bar drainage: Leadoff ditch construction will be done in accordance with Subsection 912.07 Ditches.

Outslope the trailbed on the upgrade side of the water bar with a slope equal to or greater than the trail grade leading into the water bar. Provide a uniform outsloped plane that forms a gutter against the water bar.

922.05 Rock Water bar. Tightly embed selected rocks into the trailbed. Place water bar rocks so that there are no dips, gaps or other breaks in the continuous top line of the water bar that would allow water to pass through.

Ideal rock size shall be 4” thickness x 12” depth x 18” length. Water bar rocks will be proportional but generally that dimension or larger. Water bar rocks will be sound and solid. Rock exposed to high-intensity fire will generally tend to crumble and will not meet specifications.

922.06 Log or Treated Water bar. Embed peeled native logs or treated timbers into the trailbed to form a water bar across the trail. Use anchor methods as SHOWN ON THE

Part 1, Page 13 of 16

DRAWINGS at log or timber ends outside the trail tread. Pre-drill pilot holes (for steel pins) through timbers prior to treatment. Anchor stakes firmly in the ground and tightly nail to the log without splitting. In the absence of a backslope, anchor the upgrade end of the log or timber water bar in the same manner as the downgrade end.

Water bars shall be placed so that they do not extend more than six (6) inches beyond the trail shoulder and/or 12” when in contact with the ground. Water bars shall be placed at an angle to the trail of 30 - 45 degrees, up to the steepness required to ensure that there is less than 6” extending, as well as providing proper drainage.

Rocks of sufficient size and weight may be substituted as an anchor method if available on site.

922.07 Rubber Belting Water bars. Tightly secure one continuous piece of rubber belting between treated timbers as SHOWN ON THE DRAWINGS.

Measurement

922.08 Method. Measure the quantities in accordance with Section 906.

Payment

922.09 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS.

Make payment under:

PAY ITEM PAY UNIT

922 (01) Native Log Water bar…………………………………………….EA

922(02) Rock Water bar…………………………………………………...EA

922(03) Treated Log Water bar……………………………………………EA

922(04) Rubber Belting Water bar………………………………………...EA

Part 1, Page 14 of 16

SPECIAL PROJECT SPECIFICATION

SECTION 982 - LOGGING OUT

Description Delete this specification in its entirety and replace with the following:

982.01 Work. This work consists of removing logs, down and leaning trees from the trail clearing limits; removing loose rock and woody debris from the trail tread; as well as cleaning existing drainage facilities including culverts, ditches, water bars and drainage dips.

Requirements

982.02 Clearing Out. If any portion of a downed tree or log lies across the trail centerline or protrudes into the trail clearing limits, the downed tree or log shall be cut off at or beyond the edge of the clearing limits. If the downed tree or log is entirely within the clearing limits, it shall be entirely removed from the clearing limits.

The portion of cut tree or log that remains on the upper side of the trail shall be either firmly anchored to prevent sliding or rolling onto the trail tread or moved across the trail to the lower side and scattered outside the clearing limits. Scatter the down trees on the lower side of the trail tread outside the clearing limits. Do not place such materials in stream channels, drainage ditches, culvert catch basins or outlets, or other locations where they would prevent the free flow of water away from the trail tread.

Remove loose roots and stumps from trees that have been uprooted within the trail clearing limits and do not require blasting.

982.03 Leaning trees (live or dead). Any leaning tree, regardless of the location of its root system, which enters the trail clearing limits shall be cut off at the ground level and shall be treated as a downed tree and handled in accordance with 982.02 above.

982.04 Rerouting. Rerouting the trail around windfalls, uprooted trees, and other obstacles will not be permitted. Ramp or reroute sections of the trail tread that have been damaged by uprooted stumps as necessary to provide short-term, safe passage on the trail. Notify COR as soon as practicable with detailed location. Payment for such work will be incidental to the specified work item and no extra payment will be made.

982.05 Wood debris. All loose wood debris including, but not limited to limbs, branches, and other tree remnants larger than 3 inches diameter and 18 inches length that have fallen on the trail tread shall be removed from the tread.

982.06 Soil and debris slides. All slides along with their location shall be brought to the attention of the COR as soon as practicable.

Part 1, Page 15 of 16

982.07 Loose rock removal. All loose rock 6 inches or greater in any dimension, except those so large as to require blasting, shall be removed from the trail tread and scattered by sidecasting to the lower side of the trail tread outside the clearing limits.

Distribute rock to ensure that no blockage of drainage or creation of a windrow occurs.

Do not dispose of waste material in water courses. Any rock too large to remove shall be reported to the COR as soon as practicable. Remove any loose rock in drainage dips or ditches that may impede water flow off the trail.

Loose rocks are rock that are not firmly embedded in the trail and can be removed by hand.

982.08 Drainage maintenance.

Turnpike maintenance. Remove debris and soil from culvert catch basins; inlet and outlet ditches; and from inside culverts to permit the unobstructed flow of water into, through, and away from the culvert. Remove debris and soil from side ditches and leadoff ditches and restore ditches to original design standard, as needed.

Waterbar maintenance. Accumulated dirt, rock, and debris shall be removed from the upgrade side of all water bars and deposited on the downgrade side of the water bar to bring the trail tread flush with the top of those water bars. Material shall be removed for a minimum of 2 feet width upgrade from the water bar. The 2 foot width shall begin at the inside edge of the trail tread and extend to the outside end of the water bar, measured on the upgrade side. Clean debris away to 1/2 the diameter measurement of the water bar structure. This excavation should be sloped gradually and meet the water bar at its centerline. Clean any leadoff ditches to their original design standard and "open to daylight" to permit water to flow freely from the trail tread.

Drainage dip maintenance. Clean deposited material and restore drainage dips to original design standard. Remove all debris from the leadoff area of dips to permit water to flow freely from the trail tread. Use suitable material obtained by cleaning dips for fill on the downgrade side, removing rock more than 3 inches at its greatest dimension. Compact all material placed in the trail tread.

Measurement

982.09 Method. Determine the quantity of logging out units by measuring the slope distance along the trail centerline or by actual count of those units designated for removal.

Part 1, Page 16 of 16

Payment

982.10 Basis. Make payment, for all units inspected and accepted, at the unit prices

SHOWN ON THE SCHEDULE OF ITEMS.

Make payment under:

PAY ITEM PAY UNIT

982(01) Logging Out……………………………………………………………MI

982(02) Logging Out Diameter…………………………………………….....EA

982(03) Logging Out………………………………………………………….....LF

982(04) Logging Out…………………………………………………………….LS

ITEM
DESCRIPTION
Payment
SECTION 922 – WATER BARS
Description Delete this specification in its entirety and replace with the following:
SECTION 982 - LOGGING OUT
Description Delete this specification in its entirety and replace with the following:
Measurement