Project 1 - Canyon Creek / Canyon Lake Trail
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment_1.pdf | ||
| short_set.pdf | ||
| Solicitation.pdf | ||
| Attachment B Drawings.pdf | ||
| Project 2 Rombo Part 2.pdf | ||
| Attachment A.pdf | ||
| Project 2 Rombo Part 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project 1 – Canyon Creek Trail
PROJECT 1 – CANYON CREEK/CANYON LAKE TRAIL
This is a real project that will be awarded under a task order simultaneously or shortly after awards are made to RFP AG-03R6-S-08-0055.
The project will also be used in the business/price evaluation as a measure of the Offeror’s price reasonableness.
ITEM DESCRIPTION METHOD
OF MEAS.
QTY PAY
UNIT
UNIT
PRICE
TOTAL
LINE PRICE
911(02) Clearing & Grubbing DQ 1,894 LF $__________ $__________
*911(10) Individual Tree Removal and Disposal AQ 1 EA $__________ $__________
912(01) Excavation DQ 1,894 CY $__________ $__________
*912(07)A Shallow Stream Ford and Gully Crossing Structure
AQ 1 EA $__________ $__________
*912(09) Ditch AQ 25 LF $__________ $__________
*915(01) Trail Restoration – Hike/Pack Trail AQ 3,517 LF $__________ $__________
*915(03) Check Dams AQ 3 EA $__________ $__________
922(0) Treated Log Waterbar, Contractor Furnished & Installed
AQ 91 EA $__________ $__________
951(01) Mobilization LSQ 1 LS $__________ $__________
952(02) Sign Installation AQ 4 EA $__________ $__________
*954(02) Obliteration – Hike/Pack AQ 1,857 LF $__________ $__________
981(02) Brush Cutting DQ 5,398 LF $__________ $__________
982(03) Logging Out DQ 38,447 LF $__________ $__________
991(03) Drainage Maintenance AQ 55 EA $__________ $__________
* Laborer AQ 8 HR $__________ $__________
* Unit Price must match RFP unless specification for this specific project is different.
Description of Work
PROJECT NAME
Canyon Lake 165 / Canyon Creek 16.3 on the Seeley Lake Ranger District, Lolo National Forest, Lewis and Clark County, Montana.
PROJECT LOCATION
The project is located approximately 20 air miles east of Seeley Lake, Montana. The project can best be accessed by either the Monture Creek or the North Fork Blackfoot River Trailhead. The Monture Creek Trailhead is located 8 1/2 miles north of Ovando, Montana, at the end of Road #89. The North Fork Blackfoot River Trailhead is located at the end of Forest Road #5550, 12 miles north from its juncture with State Hwy 200. Road #5550 leaves Hwy 200 approximately 17 miles east of Clearwater junction and is signed "North Fork Blackfoot River Trailhead".
PROJECT DESCRIPTION
The project consists of construction/reconstruction/maintenance work along 7.5 miles of trail.
Project area is thru recent burn area (summer 2007). Main hazard in this area is the possibility of falling snags from burned tree stands.
Work consists of: New trail construction including clearing, grubbing, excavation, and obliteration of abandoned trail ways. Reconstruction clearing, tread work, and grubbing.
Installation or replacement of stream fords, waterbars (treated log or rock is acceptable), ditches, check dams, and signs. Trail maintenance work includes logging out, brush cutting, drainage maintenance, and individual tree removal.
Estimated quantities are as follows:
New Construction = 1,894 LF Ditch Construction= 25 LF Reconstruction Work = 3,517 LF Waterbar = 91 EA Brush Cutting = 5,398 LF Drain Maintenance = 55 EA Logging Out = 38,477 LF Check Dams = 3 EA Sign Installation = 4 EA Tree Removal= 1 EA Obliteration = 1,857 LF Shallow Stream Crossing 1 EA
COMPLETION DATE
All work shall be completed by October 15, 2008.
SPECIFICATIONS
Standard Specifications for Construction of Trails, September 1996, is hereby incorporated into this task order. There are no special project specifications.
Note: Items 981, 982, and 991 are in the Maintenance section of the Standard Specifications.
There are no special project specifications.
DRAWINGS
Drawings provided in the contract are incorporated into this task order. There are no special drawings for this project.
CONTACT
For information regarding site or technical questions, contact Jacob Long or Jim Blackburn, Seeley Lake Ranger District at (406) 677-2233.
For contract or task order questions, contact Sue Beron, Contracting Officer at 406-329-3769.
CANYON LAKE 165 / CANYON CREEK 16-3
SEGMENT A
TRAIL LOG 11/14/2007
LEGEND
SIGN INSTALLATION – SIGN
DRAINAGE MAINTENANCE – DM
OBLITERATION – OB
DITCH CONSTRUCTION – D
WATERBAR INSTALLATION – WB
INDIVIDUAL TREE REMOVAL – TR
STA. DESCRIPTION
CONSTRUCTION
OR
RECONSTRUCTION
CLEAR TREAD
WORK
0+00 Begin Segment A Beginning of Project
New Sign Installation:
< FALLS – CANYON TR NO 16
> RIDGE TR NO 165
Sign not in inventory, will need ordered (Sec. 952)
SIGN-1
EA
0+00 Loose Rock Removal – remove all rocks larger than 2” from the trailbed to station 6+50 ~ 650 FT (Sec. 984)
0+90 Existing Waterbar – Drainage Maintenance (Sec. 991)
DM-1 EA |
2+11 Existing Waterbar – Drainage Maintenance (Sec. 991)
DM-1 EA |
2+85 Existing Waterbar – Drainage Maintenance (Sec. 991)
DM-1 EA |
3+52 Existing Waterbar – Drainage Maintenance (Sec. 991)
DM-1 EA |
4+63 Existing Waterbar – Drainage Maintenance (Sec. 991)
DM-1 EA 650 LF
5+82 Existing Waterbar – Drainage Maintenance (Sec. 991)
DM-1 EA |
6+50 New Ditch - Dig a ditch above the trail near spring (stakes should be in ground up there) to improve the flow of water away from the trail and down the natural path ~ 25ft (See Pictures) Dig at 1:1 at least 1.5 ft deep or deeper as needed to effectively drain water.
D-25 LF
CANYON LAKE “RIDGE” TR. #165
SEGMENT A
TRAIL LOG
11/14/2007
CLEAR TREAD
WORK
6+50 End Loose Rock Removal |
6+61 Existing Waterbar – Drainage Maintenance
DM-1 EA
6+83 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
7+14 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
7+61 Existing Waterbar – Drainage Maintenance (Sec. 991)
DM-1 EA
8+72 Existing Waterbar – Drainage Maintenance (Sec. 991)
DM-1 EA
9+62 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
11+42 Intermittent Stream Crossing
11+97 Existing Waterbar – Drainage Maintenance (Sec. 991)
DM-1 EA
13+87 Existing Waterbar – Drainage Maintenance (Sec. 991)
DM-1 EA
18+08 Intermittent Stream Crossing
45+26 Retread 192 FT to station 47+18 (Sec. 915) ----------
45+68 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA |
46+42 Existing Waterbar – Drainage Maintenance
DM-1 EA |
CANYON LAKE “RIDGE” TR. #165
SEGMENT A
TRAIL LOG
11/14/2007
CLEAR TREAD
WORK
46+87 Existing Waterbar – Drainage Maintenance (Sec. 991)
DM-1 EA 192 LF
47+18 End Retread |
47+18 Existing Waterbar – Drainage Maintenance (Sec. 991)
DM-1 EA
48+01 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
48+78 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
49+71 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
52+88 Retread 175 FT to station 54+63 (Sec. 915) ----------
53+30 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA |
175 LF
54+23 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA |
54+63 End Retread |
55+96 Existing Waterbar – Drainage Maintenance (Sec. 991)
DM-1 EA
77+74 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
78+85 Existing Waterbar – Drainage Maintenance
DM-1 EA
CANYON LAKE “RIDGE” TR. #165
SEGMENT A
TRAIL LOG
11/14/2007
CLEAR TREAD
WORK
82+10 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
82+79 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
83+51 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
84+14 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
84+88 Obliteration of Abandoned Trailway – Place rock and woody debris in main erosion channel to encourage use of braided trail ~ 91 FT (Sec.
954)
OB-91 LF
86+26 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
86+88 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
87+62 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
88+51 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
89+54 Existing Waterbar – Drainage Maintenance (Sec. 991)
DM-1 EA
89+56 Retread 42 FT to station 89+98 – Backfill Trenched Trailbed by pulling the trail berm and cut-slope soil material back onto the trail (See Pictures) (Sec. 915)
42 LF
89+98 End Retread |
89+98 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
CANYON LAKE “RIDGE” TR. #165
SEGMENT A
TRAIL LOG
11/14/2007
CLEAR TREAD
WORK
92+64 Individual Tree Removal – Remove “pack bump” from within clearing limits (Sec. 911)
TR-1 EA
98+53 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
100+55 Install New Waterbar (Rock or Treated Timber) Construct a long lead-off ditch to point of daylight (Sec. 922)
WB-1 EA
103+29 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
104+05 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
104+95 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
106+12 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
107+13 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
109+45 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
111+72 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
113+75 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
115+73 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
116+27 Retread 190 FT to station 118+17 (Sec. 915) ----------
117+56 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA |
190 LF
CANYON LAKE “RIDGE” TR. #165
SEGMENT A
TRAIL LOG
11/14/2007
CLEAR TREAD
WORK
118+17 End Retread |
119+82 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
124+64 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
125+70 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
126+54 Existing Waterbar – Drainage Maintenance (Sec. 991)
DM-1 EA
128+50 Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1 EA
128+85 Existing Waterbar – Drainage Maintenance (Sec. 991)
DM-1 EA
129+72 Existing Waterbar – Drainage Maintenance (Sec. 991)
DM-1 EA
130+13 Existing Waterbar – Drainage Maintenance (Sec. 991)
DM-1 EA
131+22 Existing Waterbar – Drainage Maintenance (Sec. 991)
DM-1 EA
136+57 Junction of Ridge TR NO 165 / Falls – Canyon TR NO 16 / Conger Creek TR NO 403
136+57 New Sign Installation:
^ FALLS – CANYON TR NO 16
< CANYON CR TR NO 16
> RIDGE TR NO 165
Sign not in inventory, will need ordered (Sec. 952)
CANYON LAKE “RIDGE” TR. #165
SEGMENT A
TRAIL LOG
11/14/2007
CLEAR TREAD
WORK
136+57 New Sign Installation:
^ CONGER CR TR NO 403
< RIDGE TR NO 165
> CANYON CR TR NO 16
Sign not in inventory, will need ordered (Sec. 952)
End of Segment A Equation – 136+57 Back = 0+00 Forward
CANYON LAKE 165 / CANYON CREEK 16-3
SEGMENT B
TRAIL LOG 11/15/2007
LEGEND
SIGN INSTALLATION – SIGN
DRAINAGE MAINTENANCE – DM
OBLITERATION – OB
WATERBAR INSTALLATION – WB
SHALLOW STREAM FORD – SSF
CHECK DAM – CD
STA. DESCRIPTION
CONSTRUCTION
OR
Equation – 136+57 Back = 0+00 Forward
CLEAR TREAD
WORK
0+00 Begin Segment B
Junction of Ridge TR NO 165 / Falls – Canyon TR NO 16
/ Conger Creek TR NO 403
1+21 Creek Ford – Conger Creek
CONSTRUCTION
16+65 Reroute 172 ft to station 17+92 – Build new trail away from eddy in creek – 1 ft. either side of center line (Sec. 911, 912)
16+96 Center Line
17+18 Center Line
17+52 Center Line
17+92 End Reroute – Tie new construction into existing trailbed
Obliterate existing trail approximately 100 ft – lightly block access by placing woody debris on trailbed
OB-100
LF
CLEAR TREAD
WORK
18+36 Creek Ford – Canyon Creek
CANYON CREEK TR. #16-3
SEGMENT B
TRAIL LOG
11/15/2007
RECONSTRUCTION
CLEAR TREAD
WORK
38+41 Retread 38 ft to creek – Remove roots and grub trail trench walls back to open trail
38 LF
38+79 Creek Ford – Canyon Creek End Retread
39+87 New Sign Installation:
Scapegoat Wilderness Boundary
Small Metal Sign? Or Change? (Sec. 952)
41+74 Retread next 15 ft – remove roots and slope trail banks back (Sec. 915)
15 LF
42+02 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
43+83 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
48+28 Intermittent Steam Crossing
54+32 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
55+40 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
Retread 50 ft to station 55+90 – Remove roots and slope trail banks back (Sec. 915)
55+90 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
EA
50 LF
End Retread |
CANYON CREEK TR. #16-3
SEGMENT B
TRAIL LOG
11/15/2007
RECONSTRUCTION
CLEAR TREAD
WORK
60+16 Retread / Construct 312 ft. to station 63+29 – Trail is sloughing downhill – Pull trail up hill 3 ft. along the trails current layout (Sec. 915)
312 LF
63+29 End Retread / Construction |
63+78 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
65+22 Intermittent Steam Crossing
66+42 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
66+51 Reroute / New Trail Construction 513 ft. to station 71+64 (Existing trail for 402 ft. is in swampy area – construct new trail up hill out of wet area)
Construct new trailbed 1 ft to either side of center line Full Bench Construction Waterbar Placement is not exact nor is there stakes in ground location – use judgment to place waterbars to optimize effectiveness
(Sec. 911, 912)
67+55 Center Line – Tree Removal Area
67+99 Center Line – Install New Waterbar (Rock or Treated Timber) (Sec. 922)
WB-1
68+32 Center Line
68+57 Center Line – Construct trail with a negative grade into, and a positive grade out of intermittent stream
CANYON CREEK TR. #16-3
SEGMENT B
TRAIL LOG
11/15/2007
69+08 Center Line
69+64 Center Line – Install New Waterbar (Rock or Treated Timber) (Sec. 922)
69+96 Center Line – Tree Removal Area
70+45 Center Line – Install New Waterbar (Rock or Treated Timber) (Sec. 922)
70+83 Center Line
71+19 Center Line – Install New Waterbar (Rock or Treated Timber) (Sec. 922)
71+64 End New Construction – Tie into existing trail
66+51 71+64
Obliterate existing trail by placing woody debris along trail approximately 402 ft.
OB-402
CLEAR TREAD
WORK
73+96 Retread 406 ft. to station 78+02 ----------
74+39 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
EA
406 LF
74+89 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
EA
78+02 End Retread |
78+02 Root Removal 231 ft. ----------
231 LF
80+33 End Root Removal |
CANYON CREEK TR. #16-3
SEGMENT B
TRAIL LOG
80+33 Reroute / New Construction 1090 ft. to station 91+23 (Existing trail is low across bottom of hillside – trail is eroding due to water using it as a main channel and trail is in a boggy wet area)
Construct new trailbed 1 ft to either side of center line Full Bench Construction Waterbar Placement is not exact nor is there stakes in ground location – use judgment to place waterbars to optimize effectiveness
(Sec. 911, 912)
80+84 Center Line
81+47 Center Line
81+47 Construct Shallow Stream Ford - Construct trail with a negative grade into, and a positive grade out of ford crossing (SEE
DRAWING 912-5)
SSF-20
81+91 Center Line - Install New Waterbar (Rock or Treated Timber) (Sec. 922)
82+22 Center Line
82+75 Center Line - Install New Waterbar (Rock or Treated Timber) (Sec. 922)
83+25 Center Line
83+75 Center Line
84+25 Center Line
84+47 Center Line - Install New Waterbar (Rock or Treated Timber) (Sec. 922)
84+75 Center Line
85+25 Center Line
85+75 Center Line
86+25 Center Line - Install New Waterbar (Rock or Treated Timber) (Sec. 922)
86+75 Center Line
CANYON CREEK TR. #16-3
SEGMENT B
TRAIL LOG
87+25 Center Line
87+75 Center Line
88+25 Center Line - Install New Waterbar (Rock or Treated Timber) (Sec. 922)
88+75 Center Line
89+25 Center Line
89+75 Center Line – Rocky Area – 148 ft. to station 91+23 (Heavy Excavation with rock breaking and possibility of needing some blasting - to be determined after starting the excavation)
90+25 Center Line - Install New Waterbar (Rock or Treated Timber) (Sec. 922)
90+65 Center Line
90+90 Center Line
91+23 End New Construction – Tie into existing trail
80+33 91+23
Obliterate existing trail – Do good job to help slow erosion by placing woody debris along trail – Backfill Trenches by caving in trench walls, use borrow material if needed (no borrow source is designated) - approximately 1114 ft
OB-
1114 LF
CLEAR TREAD
WORK
91+23 Retread / Root Removal 318 ft. to station 94+41 (Sec. 915, 985)
318 LF
318 LF
94+41 End Retread / Root Removal |
CANYON CREEK TR. #16-3
SEGMENT B
TRAIL LOG
11/15/2007
98+86 Retread 281 ft. to station 101+67 ----------
100+13 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
EA
281 LF
101+27 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
EA
101+67 End Retread |
103+16 Retread / Root Removal 199 ft. to station 105+15 (Sec. 915, 985)
199 LF
199 LF
105+15 End Retread / Root Removal |
107+32 Retread / Root Removal 186 ft. to station 109+18 (Sec. 915, 985)
186 LF
186 LF
109+18 End Retread / Root Removal |
109+18 Reroute / New Construction 119 ft. to station 110+37 - Construct new trailbed 1 ft to either side of center line Full Bench Construction (Sec. 911, 912)
109+55 Center Line
109+95 Center Line
110+37 End Reroute / New Construction Tie into existing trail
109+18 110+37
Obliterate existing trail by placing woody debris along trail approximately 150 ft.
OB-150
CANYON CREEK TR. #16-3
SEGMENT B
TRAIL LOG
11/15/2007
RECONSTRUCTION
CLEAR TREAD
WORK
110+37 Retread 83 ft. to next station ----------
83 LF
111+20 End Retread |
111+92 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
135+75 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
135+75 Retread as necessary / Rock and Root Removal / Drainage Maintenance - 193 ft. to station 137+68
(Area is a bad seep – trail passes through the best location, this is a rerouted trail as old trail used to pass through bellow – No possible other reroute) Spend some time here and try to clean up the bog as best you can…
*full solution is unknown and may not be possible – may just be a boggy area for 200 ft.*
- See Pictures (Sec. 915, 985, 991)
193 LF
193 LF
136+03 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
EA
137+68 End Maintenance on boggy area |
138+84 Install New Waterbar (Native Timber) to reinforce natural stream flow
Remove existing WB and Replace moving it back 1 to 2 ft.
*10+ ft. long Waterbar (Sec. 922)
CANYON CREEK TR. #16-3
SEGMENT B
TRAIL LOG
11/15/2007
RECONSTRUCTION
140+47 Lopping / Clearing 751 ft. to station 147+98 (Canyon Creek Crossing) Use Loppers to remove regen trees from within the trail clearing limits – most or all regen was burned in recent fire (Sec. 911)
143+73 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
144+70 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
EA
145+72 Existing Waterbar – Drainage Maintenance Cut out log blocking lead out ditch and improve (Sec. 991)
DM-1
EA
145+72 Retread / Rock Removal 148 ft. to station 147+20 Backfill Trenched trail by pulling the berm back onto the trail (Sec. 915, 985)
146+18 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
EA
751 LF |
146+51 Existing Waterbar – Drainage Maintenance (Sec. 991) DM-1
EA
| 148 LF
147+20 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
EA
147+20 End Retread / Rock Removal |
147+98 End Lopping / Clearing |
147+98 Creek Crossing – Canyon Creek
148+45 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
CANYON CREEK TR. #16-3
SEGMENT B
TRAIL LOG
11/15/2007
RECONSTRUCTION
149+27 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
150+73 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
150+95 Install New Waterbar (Rock or Treated Timber) Long WB > 10 ft. (Sec. 922)
151+26 Install New Waterbar (Rock or Treated Timber) Long WB > 10 ft. with long lead out ditch to carry water to daylight (Sec. 922)
151+87 Retread / Brushing
331 LF / 2,514 LF
331 LF
155+18 End Retread / Continue Brushing | |
156+02 Drainage Maintenance – drain standing water pool (Sec. 991)
DM-1
EA
157+90 Drainage Maintenance – drain standing water pool (Sec. 991)
DM-1
EA
Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
EA
Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
EA
2,514 LF
Unkn station look for stake in ground
Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
EA
166+94 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
CANYON CREEK TR. #16-3
SEGMENT B
TRAIL LOG
11/15/2007
RECONSTRUCTION
166+94 Brushing / Lopping / Clearing Use Loppers to remove regen trees from within the trail clearing limits (Sec. 911)
168+55 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
EA
170+23 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
EA
170+23 Entering Older Burn Area Continue Brushing / Lopping / Clearing
176+24 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
EA
176+78 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
EA
177+01 Shallow Stream Crossing |
177+01 End Brushing / Lopping / Clearing |
180+07 Existing Waterbar – Drainage Maintenance
DM-1
180+76 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
181+54 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
182+23 Install New Waterbar (Rock or Treated Timber) Remove existing WB and Replace (Sec. 922)
182+71 Install New Waterbar (Rock or Treated Timber) Remove existing WB and Replace (Sec. 922)
186+56 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
CANYON CREEK TR. #16-3
SEGMENT B
TRAIL LOG
11/15/2007
RECONSTRUCTION
187+06 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
189+98 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
190+91 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
198+87 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
200+38 Existing Waterbar – Drainage Maintenance (Sec. 991) DM-1
204+15 Existing Waterbar – Drainage Maintenance Reset Waterbar (Sec. 991)
DM-1
205+06 Install New Waterbar (Rock or Treated Timber) Remove existing WB and Replace (922)
207+06 Existing Waterbar – Drainage Maintenance (Sec. 991) DM-1
214+23 Existing Waterbar – Drainage Maintenance 18 Waterbars Total Top of Switchbacks – Trail is in good shape! Waterbars in good shape and working well – All Waterbars need to be cleaned (Sec. 991)
DM-18
223+94 Retread 77 ft. to next station ----------
224+71 End Retread |
TRAIL LOG
11/15/2007
RECONSTRUCTION
225+86 Shallow Stream Ford – Rock Removal / Clearing Remove obstacle rocks from trailway (Sec. 985)
256 LF
228+42 Shallow Stream Ford – Remove logs including cut log placed on northern end (not doing any good)
228+42 Retread Open and improve bank on northern end where stream splits – Improve trailbed next 50 ft. to next small stream crossing (Sec. 915)
50 LF
232+36 Shallow Stream Ford – Dry Fork of N.F. River
232+64 Check Dam / Root Removal Place THREE (ROCK) Check Dams between Dry Fork and where the beaver dam is pushing water over the bank and onto the trail
Remove Roots obstructing the trail (Sec 915-2, 985)
CD-3
EA
100 LF
236+02 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
237+24 Existing Waterbar – Drainage Maintenance (Sec. 991) DM-1
237+96 Existing Waterbar – Drainage Maintenance (Sec. 991) DM-1
239+27 Existing Waterbar – Drainage Maintenance (Sec. 991) DM-1
TRAIL LOG
11/15/2007
239+54 Retread 231 ft. to station 241+85 ----------
240+04 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
EA
231 LF
240+68 Install New Waterbar (Rock or Treated Timber) (Sec. 922) WB-1
EA
241+85 End Retread |
241+96 Existing Waterbar – Drainage Maintenance (Sec. 991) DM-1
243+25 Existing Waterbar – Drainage Maintenance (Sec. 991) DM-1
244+37 Install New Waterbar (Rock or Treated Timber) Remove existing WB and Replace (922)
245+81 Existing Waterbar – Drainage Maintenance (Sec. 991) DM-1
267+14 Junction of Trails Canyon Cr #16 – Dry Fork #31 End of Project
End of Segment B End of Canyon Lake / Canyon Creek Project
VICINITY MAP
CANYON LAKE 165 / CANYON CREEK 16-3
PROJECT MAP
CANYON LAKE 165 / CANYON CREEK 16-3
| ITEM |
| DESCRIPTION |
| CANYON LAKE 165 / CANYON CREEK 16-3 |
| TRAIL LOG |
| LEGEND |
| DESCRIPTION |
| CONSTRUCTION |
OR
| CANYON LAKE “RIDGE” TR. #165 |
| TRAIL LOG |
| CANYON LAKE “RIDGE” TR. #165 |
| TRAIL LOG |
| CANYON LAKE “RIDGE” TR. #165 |
| TRAIL LOG |
| CANYON LAKE “RIDGE” TR. #165 |
| TRAIL LOG |
| CANYON LAKE “RIDGE” TR. #165 |
| TRAIL LOG |
| CANYON LAKE “RIDGE” TR. #165 |
| TRAIL LOG |
| CANYON LAKE 165 / CANYON CREEK 16-3 |
| TRAIL LOG |
| LEGEND |
| DESCRIPTION |
| CONSTRUCTION |
OR
| CANYON CREEK TR. #16-3 |
| TRAIL LOG |
| CANYON CREEK TR. #16-3 |
| TRAIL LOG |
| CANYON CREEK TR. #16-3 |
| TRAIL LOG |
| CANYON CREEK TR. #16-3 |
| TRAIL LOG |
| CANYON CREEK TR. #16-3 |
| TRAIL LOG |
| CANYON CREEK TR. #16-3 |
| TRAIL LOG |
| CANYON CREEK TR. #16-3 |
| TRAIL LOG |
| CANYON CREEK TR. #16-3 |
| TRAIL LOG |
| CANYON CREEK TR. #16-3 |
| TRAIL LOG |
| CANYON CREEK TR. #16-3 |
| TRAIL LOG |
| CANYON CREEK TR. #16-3 |
| TRAIL LOG |
| CANYON CREEK TR. #16-3 |
| TRAIL LOG |
| CANYON CREEK TR. #16-3 |
| TRAIL LOG |
File details come from the government source that posted it. Updated .