Salmon Airbase Specifications

View the file

Other files

File Type Posted
Questions 8-18-2010.pdf PDF
Questions 8-17-2010.pdf PDF
Amendment 03.doc DOC document
Questions 8-10-2010.pdf PDF
Amendment 02.pdf PDF
Air Base Questions 8-4-10.pdf PDF
Amendment 01.pdf PDF
Salmon Airbase Getechnical Report 090222.pdf PDF
WD ID 100015 7-16-10 Highway.pdf PDF
Salmon Airbase Drawings.zip ZIP file
Solicitation.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section C - Description/Specifications/Statement of Work

GENERAL SPECIFICATIONS

SALMON AIR B ASE

(Final Design – 5/17/2010)

SCOPE OF CONTRACT

This project consists of constructing facilities at the Lemhi County Airport in support of the Fire Aviation Program for the East Central Idaho Mountains. Facilities include a Helibase Operations Building, a Rappel Tower, a Vault Comfort Station, Helicopter pads, Fixed Wing Parking area, access roads and parking areas, security fencings, site grading, and necessary utilities for the improvements. The project also included the removal and disposal of existing structures on the site.

Base Bid: The base bid work includes the construction of the Helibase Operations Building, site work around the building (sidewalks, grading, driveways, etc.), construction of the entrance road, parking area, and service road, construction of helipads, the installation of a security fence and access gates, and installation of site utilities associated with the construction of the operations building. The work also includes the removal and disposal of existing structures and features on the site.

Bid Options:

Option A: Asphalt Pavement. Work includes paving the entrance rood and parking areas. See drawings for specific areas.

Option B: Rappel Tower. Work includes the construction of a Rappel Tower and containment area.

Option C: Site Furnishing. Work includes installing of site furniture indicated on the Schedule of Items.

Option B: Exterior Site Utilities. Work includes the installation of site utilities outside the building to include the water service and hydrants and electrical service to the helipads and fixed wing parking.

Option E: Fixed Wing Parking Area. Work includes the construction of the fixed wing parking and taxi access. Ther work includes the preparation of the subgrade, aggregate base under and around the parking and taxi area, and the asphalt surfacting.

Option F: Vault Toilet Building. Work includes the installation of a 2-unit vault toilet building including the electrical service from the operations building to the toilet.

The base project and the optional items are identified in the schedule of items. The drawings and specifications provide more definition of the work required under each work item. The Contractor must bid on the base project and all option items. The Government reserves the right to award any and all option items.

PROJECT LOCATION

The project site is located 4 miles South of Salmon, Idaho off Highway 93 on the East side of the Salmon County Airport near the intersection with Airport Road and Hot Spring Road.

SITE INFORMATION AND LIMITATIONS

The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:

Construction sites will be closed to the public during construction. The Contractor will be responsible for signing and limiting public access.

Water is available at the site for construction purposes.

Utilities are not available at the site for construction purposes. The Contractor will be responsible for coordinating the installation of temporary power for the site and the cost for the service.

The Contractor shall provide temporary toilet facilities (porta-potty) at the site during all construction work. Toilet facilities shall be provided at a rate of one stool for every 10 workers assigned or working on site with a minimum of one required.

All construction equipment shall be pressure washed before entering the Site. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brushguard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations.

TRAFFIC CONTROL AND CONSTRUCTION SIGNING

No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the CO and Local Transportation Authority. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items.

Signing and barricades shall be adequate enough to protect Forest Service employees and public.

WORK CAMPS, STAGING AND STORAGE AREAS

Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage trailers (work or housing) on site. Overnight camping on site will not be allowed.

Confine storage of materials and equipment as approved by the Contracting Officer.

Contractor shall maintain access to the facilities for Forest Service contracting personnel.

INSPECTION OF WORKSITE

The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work, and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.

START DATE

October 2010

CONTRACT TIME

180 Calendar Days

SPECIFICATIONS

The following specifications are attached. Some sections in the schedule of items refer to other sections not listed and are subsidiary to, or are included in payment for other pay items in this contract. These items are considered incidental and no additional compensation will be made.

DIVISION 1 – GENERAL REQUIREMENTS
Section C - Description/Specifications/Statement of Work
000501 – HELIBASE OPERATIONS BUILDING
000601 – RAPPEL TOWER

DIVISION 1 -GENERAL REQUIREMENTS

010250 - CONSTRUCTION STAKING
011250 - MEASUREMENT AND PAYMENT WITH ASPHALT
011900 – MOBILIZATION
013300 - SUBMITTAL PROCEDURES
014100 – QUALITY CONTROL
DIVISION 2 – EXISTING CONDITIONS
023701 - SEDIMENT AND EROSION CONTROL MEASURES
024100 - WASTE MATERIAL DISPOSAL
024102 – REMOVAL, DISPOSAL & SALVAGE OF EXISTING STRUCTURES
026460 - DUMPSTER PAD
DIVISION 3 – CONCRETE
033000 - CAST-IN-PLACE CONCRETE
033010 - HELIPADS
033020 - CONCRETE FROM PACKAGED DRY MIX FOR MINOR STRUCTURES
DIVISION 4 - MASONRY
047200 – CAST STONE VENEER
DIVISION 5 - METALS
051200 – STRUCTURAL STEEL FRAMING
055000 – METAL FABRICATIONS
055100 – METAL STAIRS, WALKWAYS, AND PLATFORMS
DIVISION 6 - WOOD AND PLASTICS
061000 - ROUGH CARPENTRY
061200 – STRUCTURAL INSULATED WOOD PANELS
061500 – WOOD DECKING

061600 - SHEATHING

061753 - SHOP-FABRICATED WOOD TRUSSES

061800 – GLUE LAMINATED WOOD CONSTRUCTION

064023 - INTERIOR ARCHITECTURAL WOODWORK

DIVISION 7 - THERMAL AND MOISTURE PROTECTION
071113 - BITUMINOUS DAMPROOFING
072100 - THERMAL INSULATION
074113 - METAL ROOF PANELS
074213 - METAL WALL PANELS
074600 – SIDING
076200 - SHEET METAL FLASHING AND TRIM
079200 - JOINT SEALANTS

DIVISION 8 - DOORS AND WINDOWS

DIVISION 8 – DOORS AND WINDOWS
081111 – STEEL DOORS AND FRAMES
081416 - FLUSH WOOD DOORS
082143 - OUT-SWINGING ENTRY DOORS
083113 - ACCESS DOORS AND FRAMES
083513 – FOLDING DOORS
083613 – SECTIONAL DOORS
084113 – ALUMINUM FRAMED ENTRANCES AND CURTAINWALL
085200 - ALUMINUM CLAD WOOD WINDOWS
087100 - DOOR HARDWARE
088000 - GLAZING
DIVISION 9 - FINISHES
092900 - GYPSUM BOARD
093000 - TILING
095110 - ACOUSTICAL PANEL CEILINGS
096511 - VINYL FLOOR TILE
096512 – SPORT FLOORING
096530 - RESILIENT WALL BASE AND ACCESSORIES
096810 - CARPET TILE
097700 - SPECIAL WALL FINISH
099120 - INTERIOR PAINTING
099300 - STAINING AND TRANSPARENT FINISHING
099600 - HIGH-PERFORMANCE COATINGS

DIVISION 10 – SPECIALTIES

101400 - SIGNAGE

101401 - SIGNS (EXTERIOR)

101415 - SITE IDENTIFICATION SIGN AND BASE

101431 – SIGNS FOR RAPPEL TOWER

101550 - TOILET COMPARTMENTS
102800 - TOILET AND BATH, ACCESSORIES
105113 – INSTALLATION OF GOVERNMENT PROVIDED METAL LOCKERS
105201 - FIRE PROTECTION SPECIALTIES
DIVISION 11 - EQUIPMENT
111320 - PROJECTION SCREENS AND PROJECTOR CEILING MOUNTS
113100 – APPLIANCES
DIVISION 12 - FURNISHINGS
122113 - HORIZONTAL LOUVER BLINDS
124813 - ENTRANCE FLOOR MATS AND FRAMES
129300 – SITE FURNISHING
DIVISION 13 - SPECIAL CONSTRUCTION
133450 - PRECAST VAULT TOILET INSTALLATION
DIVISION 14 - CONVEYING SYSTEMS
(NOT USED)

DIVISION 22 - PLUMBING

220518 - ESCUTCHEONS FOR PLUMBING PIPING
220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING & EQUIPMENT
220553 - IDENTIFICATION FOR PLUMBING PIPING & EQUIPMENT
220719 - PLUMBING PIPING INSULATION
221100 - WATER DISTRIBUTION SYSTEMS
221102 - CURB VALVES AND BOXES
221105 – WATER HYDRANT
221116 - DOMESTIC WATER PIPING
221119 - DOMESTIC WATER PIPING SPECIALTIES
221300 - ONSITE WASTEWATER TREATMENT SYSTEMS
221316 - SANITARY WASTE AND VENT PIPING
221319 - SANITARY WASTE PIPING SPECIALTIES
223400 – FUEL FIRED-DOMESTIC/WATER HEATERS
224000 - PLUMBING FIXTURES
224223 – COMMERCIAL SHOWERS, RECEPTORS, AND BASINS
224700 - DRINKING FOUNTAINS AND WATER COOLERS

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING

230593 – TESTING, ADJUSTING, & BALANCING FOR HVAC

230713 – DUCT INSULATION

230800 – COMMISSIONING OF HVAC

230900 – INSTRUMENTATON & CONTROL FOR HVAC

231126 – FACILITY LIQUEFIED-PETROLEUM GAS PIPING

233113 – METAL DUCTS

233300 – AIR DUCT ACCESSORIES

233423 – HVAC POWER VENTILATORS

233713 – DIFFUSERS, REGISTERS, & GRILLES

235400 – CONDENSING FURNACES

235513 – FUEL-FIRED DUCT HEATERS

238126 – SPLIT SYSTEM AIR CONDITIONERS

238239– UNIT HEATERS

DIVISION 26 – ELECTRICAL

260500 - COMMON WORK RESULTS FOR ELECTRICAL

260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

260533 - RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

260537 - FLEXTRAY WIRE BASKET SUPPORT SYSTEMS

260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS

260923 - LIGHTING CONTROL DEVICES

262713 - ELECTRICITY METERING

262726 - WIRING DEVICES

264313 - TRANSIENT-VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

265100 - INTERIOR LIGHTING

265600 - EXTERIOR LIGHTING

DIVISION 27 – COMMUNICATIONS

270500 – COMMON WORK RESULTS FOR COMMUNICATIONS

270700 – TELECOMMUNICATIONS WIRING SYSTEMS

DIVISION #31 - EARTHWORK

311000 - CLEARING AND GRUBBING

312000 – EARTHWORK

312100 - PROJECT SITE PREPARATION AND GRADING

312225 - EXCAVATION & EMBANKMENT

DIVISION #32 – EXTERIOR IMPROVEMENTS

321200 - HOT-MIX ASPHALT PAVING

321204 - CRUSHED AGGREGATE BASE OR SURFACE COURSE

322622 - PRECAST CONCRETE CURB

322640 - PAVEMENT MARKING

323113 – CHAIN LINK FENCE AND GATES

DIVISION #33 – UTILITIES
(Not Used)

END OF SECTION C

May 2010

AG-02NV-S-10-0075 Final (5/17/2010)

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-1

USDA FOREST SERVICE, R-4

SALMON AIR BASE

SECTION 000501 - HELIBASE OPERATIONS BUILDING

1. GENERAL

1.1 SUMMARY

A. This work includes the construction of an Office Building. The work shall also include the construction of a concrete slab for a LP Gas tank and supply line to the Office Building.

REFERENCE SPECIFICATIONS

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

2006 International Building Code 2006 International Plumbing Code 2006 International Mechanical Code 2006 International Fuel Gas Code 2006 International Energy Conservation Code 2005 National Electrical Code 2007 National Fire Protection Association Standards 13R and 13D.

2004 Americans with Disabilities Act/Architectural Barriers Act Guidelines (ADA/ABAG) (http://www.access-board.gov/adaag/html/adaag.htm)

MEASUREMENT AND PAYMENT

Helibase Operations Building - Measurement and Payment shall be Lump Sum Quantity (LSQ) as shown in the Schedule of Items for the office building constructed and completed ready for use. Measurement shall include all work items within 10 feet outside the building and covered porch perimeter (including utilities within those limits); and includes the concrete slab porch, and all concrete work within 10 feet of the face of the building walls. Measurement also includes all finish grading around the building including areas beyond 10 feet from the building.

A schedule of values for the building shall be submitted to the Contracting Officer within 14 days of award. The schedule of values shall be a breakdown of the building costs by specification items applicable to the building. The schedule of values will be the basis for progress payments on the building throughout the project.

Propane Tank, Concrete Slab and Piping - Measurement and Payment shall be Lump Sum Quantity (LSQ) as shown in the Schedule of Items for construction of a concrete slab for a LP Gas storage tank, aggregate base, riser, gas supply line to within 10 feet of the office building. The contractor shall coordinate with the gas supplier the delivery of the propane tank. The contractor is responsible for installation of the propane tank as a part of this contract and the initial filling. The propane supplier will size the tank and the line from the tank into the building. The contractor will install the line with a shut-off valve and run the line from the tank to the building.

RELATED WORK

The work shall be in accordance with the contract drawings.

The work shall be in accordance with the following specifications. The subsidiary specifications are referred to in the text by the Section designation only.

Section C - Description/Specifications/Statement of Work
000501 – HELIBASE OPERATIONS BUILDING

DIVISION 1 -GENERAL REQUIREMENTS

010250 - CONSTRUCTION STAKING
011250 - MEASUREMENT AND PAYMENT WITH ASPHALT
011900 – MOBILIZATION
013300 - SUBMITTAL PROCEDURES
014100 – QUALITY CONTROL
DIVISION 2 – EXISTING CONDITIONS
023701 - SEDIMENT AND EROSION CONTROL MEASURES
024100 - WASTE MATERIAL DISPOSAL
DIVISION 3 – CONCRETE
033000 - CAST-IN-PLACE CONCRETE
DIVISION 4 - MASONRY
047200 –CAST STONE VENEER
DIVISION 5 - METALS
055000 - METAL FABRICATIONS
DIVISION 6 - WOOD AND PLASTICS
061000 - ROUGH CARPENTRY
061200 – STRUCTURAL INSULATED WOOD PANELS
061500 – WOOD DECKING

061600 - SHEATHING

061753 - SHOP-FABRICATED WOOD TRUSSES

061800 – GLUE LAMINATED WOOD CONSTRUCTION

064023 - INTERIOR ARCHITECTURAL WOODWORK

DIVISION 7 - THERMAL AND MOISTURE PROTECTION
071113 - BITUMINOUS DAMPROOFING
072100 - THERMAL INSULATION
074113 - METAL ROOF PANELS
074213 - METAL WALL PANELS
074600 – SIDING
076200 - SHEET METAL FLASHING AND TRIM
079200 - JOINT SEALANTS

DIVISION 8 - DOORS AND WINDOWS

DIVISION 8 – DOORS AND WINDOWS

081111_ STEEL DOORS AND FRAMES

081416 - FLUSH WOOD DOORS

082143 - OUT-SWINGING ENTRY DOORS

083113 - ACCESS DOORS AND FRAMES

083513 – FOLDING DOORS

083613 – SECTIONAL DOORS

084113 – ALUMINUM FRAMED ENTRANCES AND CURTAIN WALL

085200 - ALUMINUM CLAD WOOD WINDOWS
087100 - DOOR HARDWARE
088000 - GLAZING
DIVISION 9 - FINISHES
092900 - GYPSUM BOARD
093000 –TILING
095110 - ACOUSTICAL PANEL CEILINGS
096511 – VINYL FLOOR TILE
096512 – SPORT FLOORING
096530 - RESILIENT WALL BASE AND ACCESSORIES
096810 - CARPET TILE
097700 - SPECIAL WALL FINISH
099120 - INTERIOR PAINTING
099300 - STAINING AND TRANSPARENT FINISHING
099600 - HIGH-PERFORMANCE COATINGS

DIVISION 10 – SPECIALTIES

101400 - SIGNAGE

101550 - TOILET COMPARTMENTS
102800 - TOILET AND BATH, ACCESSORIES
105113 – INSTALLATION OF GOVERNMENT PROVIDED METAL LOCKERS
105201 - FIRE PROTECTION SPECIALTIES
105113 – INSTALLATION OF GOVERNMENT PROVIDED METAL LOCKERS
DIVISION 11 - EQUIPMENT
111320 - PROJECTION SCREENS AND PROJECTOR CEILING MOUNTS
113100 – APPLIANCES
DIVISION 12 - FURNISHINGS
122113 - HORIZONTAL LOUVER BLINDS
124813 - ENTRANCE FLOOR MATS AND FRAMES

DIVISION 13 - SPECIAL CONSTRUCTION

(NOT USED)

DIVISION 14 - CONVEYING SYSTEMS
(NOT USED)
DIVISION 22 - PLUMBING
220518 - ESCUTCHEONS FOR PLUMBING PIPING
220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING & EQUIPMENT
220553 - IDENTIFICATION FOR PLUMBING PIPING & EQUIPMENT
220719 - PLUMBING PIPING INSULATION
221116 - DOMESTIC WATER PIPING
221119 - DOMESTIC WATER PIPING SPECIALTIES
221316 - SANITARY WASTE AND VENT PIPING
221319 - SANITARY WASTE PIPING SPECIALTIES
223400 – FUEL FIRED-DOMESTIC/WATER HEATERS
224000 - PLUMBING FIXTURES
224223 – COMMERCIAL SHOWERS, RECEPTORS, AND BASINS
224700 - DRINKING FOUNTAINS AND WATER COOLERS

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING

SECTION 230593 – TESTING, ADJUSTING, & BALANCING FOR HVAC

SECTION 230713 – DUCT INSULATION

SECTION 230900 – INSTRUMENTATON & CONTROL FOR HVAC

SECTION 231126 – FACILITY LIQUEFIED-PETROLEUM GAS PIPING

SECTION 233113 – METAL DUCTS

SECTION 233300 – AIR DUCT ACCESSORIES

SECTION 233423 – HVAC POWER VENTILATORS

SECTION 233713 – DIFFUSERS, REGISTERS, & GRILLES

SECTION 235400 – CONDENSING FURNACES

SECTION 235513– FUEL FIRED DUCT HEATERS

SECTION 238126 – SPLIT SYSTEM AIR CONDITIONERS

SECTION 238239– UNIT HEATERS

DIVISION 26 – ELECTRICAL

260500 - COMMON WORK RESULTS FOR ELECTRICAL

260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

260533 - RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

260537 - FLEXTRAY WIRE BASKET SUPPORT SYSTEMS

260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS

260923 - LIGHTING CONTROL DEVICES

262713 - ELECTRICITY METERING

262726 - WIRING DEVICES

264313 - TRANSIENT-VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

265100 - INTERIOR LIGHTING

265600 - EXTERIOR LIGHTING

DIVISION 27 – COMMUNICATIONS

270500 – COMMON WORK RESULTS FOR COMMUNICATIONS

270700 – TELECOMMUNICATIONS WIRING SYSTEMS

DIVISION #31 - EARTHWORK

311000 - CLEARING AND GRUBBING

312000 – EARTHWORK

312100 - PROJECT SITE PREPARATION AND GRADING

DIVISION #32 – EXTERIOR IMPROVEMENTS

321204 – CRUSHED AGGREGATE BASE OR SURFACE COURSE

DIVISION #33 – UTILITIES
(Not Used)

PART 2 - PRODUCTS - Not Applicable PART 3 - EXECUTION – Not Applicable

3.1 PROPANE TANK

A. Contractor shall coordinate LPG supply line and LPG tank installation with local LPG supplier. Verify pad size will accommodate tank to be supplied. Notify Contracting Officer of any discrepancies. Contractor shall be responsible for first LPG fill-up of tank and shall coordinate with the following supplier:

1. V-1 Propane 500 Main St.

Salmon, ID 83467 Ph: 208-756-3655

END OF SECTION 000501

MARCH 2010

HELIBASE OPERATIONS BUILDING 000501-3

USDA FOREST SERVICE, R-4

SALMON AIR BASE

SECTION 000601 - RAPPEL TOWER

1. GENERAL

DESCRIPTION

The work consists of furnishing all labor, supervision, equipment and materials for the construction of the rappeling tower. This work includes site preparation, excavation for foundations, construction of concrete footings, off-site fabrication of tower components, on site erection and assembly of tower, installation of lightning protection system, temporary facilities, shoring, sheeting, bracing, and cleanup, and construction of site containment area (concrete border & fill).

All work is to be constructed in strict accordance with the plans and specifications and subject to the terms and conditions of the contract.

Location of the Rappel Tower and Border shall be AS SHOWN ON THE DRAWINGS.

RELATED SECTIONS

Section C – Description/Specifications/Statement of Work Section 033000 – Cast-in-Place Concrete Section 051200 – Structural Steel Framing Section 055100 – Metal Stairs, Walkways, and Platforms Section 101431 – Signs for Rappel Tower Section 260526 – Grounding and Bonding for Electrical Systems Section 312000 – Earthwork Section 323113 – Chain Link Fence and Gates

PERFORMANCE REQUIREMENTS

The tower and simulator design, fabrication, and construction shall meet at a minimum the following code requirements:

All concrete work shall be performed in accordance with the latest edition of the American Concrete Institute (ACI) Manual of Concrete Practice, including “Specifications for Structural Concrete for Buildings”, ACI 301, and “Building code Requirements for Reinforced Concrete”, ACI 318.

All structural steel work shall be designed in accordance with the AISC’s Steel Construction Manual, 2005 and Seismic Provisions, 2005.

All lumber shall comply with grades and design values as given in the “National Design Specification for Wood Construction”, 2005.

The Lightning Protection System shall meet the requirements of NFPA 780.

ASCE 7-05

OSHA 1910

The contractor shall verify all dimensions shown on the drawings prior to construction, and all existing conditions at the site before proceeding.

Changes, omissions,or substitutions are not permitted without written approval from the Contracting Officer.

Temporary bolting, bracing, shoring, or pre-loading may be required during construction and is the responsibility of the contractor.

The contractor shall limit construction loads to 20 psf during construction.

RAPPEL TOWER DESIGN CRITERIA

The rappel tower has been designed to the following loads:

Roof Live Load – 32 psf (Snow) Floor Live Load – 100 psf Stair Live Load – 100 psf, 1000 lbs (moving concentrated load) Basic Wind Speed – 90 mph, exposure C Seismic Loading (per ASCE 7-05) Design Category – D Site Class – D Importance Factor – 1.0 Use Group – U

SDS – 52%, SD1 – 26.7%

SUBMITTALS

The Contractor will be required to coordinate their schedule with the Contracting Officer. The contractor will notify the Contracting Officer 10 days prior to the start of work for the major construction components of the rappel tower.

MEASUREMENT AND PAYMENT

Rappel Tower - Measurement and Payment shall be Lump Sum Quantity (LSQ) as shown in the Schedule of Items for the rappel tower constructed and completed ready for use. Measurement shall include all work items within 10 feet outside the site containment area; utilities from helibase operations building to rappel tower; and concrete border and fill material. Measurement also includes all finish grading around the rappel tower within 10 feet from the containment area.

PRODUCTS - Not Applicable

LOOSE-FILL SURFACE

Retain this article if inorganic loose-fill materials are required for Project. If more than one loose-fill system is required, repeat this article to distinguish between systems.

Aggregate Materials: Clean, washed, and free of loam, clay, organic matter, debris, and other foreign substances.

Retain one of first four subparagraphs below.

Fine Gravel: Rounded, hard, durable stone, free of sand, with particle size less than 3/8 inch (9.5 mm) in diameter; complying with ASTM C 136 for the following sieve analysis test results:

Sieve Sizes and Percent Passing through Screen: 3/8 inch (9.5 mm) passing 100 percent, No. 3-1/2 passing 93 percent, No. 4 passing 65 percent, No. 8 passing 8 percent, No. 16 passing 5 percent, and No. 30 passing 4 percent.

Usually retain one of two subparagraphs below. If retaining first, select critical height based on CPSC-published test results for critical heights. If retaining second, select actual thickness from options. If selecting more than one critical height in first subparagraph, retain first option in second subparagraph or schedule overall thicknesses and corresponding critical heights. If different dimensions are inserted below or indicated on Drawings, verify compliance with CPSC No. 325. Inserting extra material depth does not necessarily allow increasing critical heights because critical height is a tested, not a computed, value.

Uncompressed Material Depth: Not less than 12 inches (300 mm) unless otherwise indicated on the drawings.

EXECUTION

GENERAL

Excavation and Backfill shall be completed per Section 312000 “Earthwork.”

CONCRETE BORDER

Shall be constructed as detailed and shown on the drawings.

Concrete shall be installed per Section 033000 “Cast-in-place-Concrete.”

FOUNDATION

The foundation shall be specified in the drawings and specifications..

Concrete footing and slab reinforcement shall be and installed per Section 033000 “Cast-in-place-Concrete.”

STEEL

The Structural Steel shall be AS SHOWN ON THE DRAWINGS.

Steel member placement and alignment shall be AS SHOWN ON THE DRAWINGS and installed per Section 051200 “Structural Steel Framing.”

Steel Finishes per Section 051200 “Structural Steel Framing” and as indicated on the drawings. If not indicated on the drawings shall be galvanized.

STAIRWAY AND RAILING

The tower stairways, railing and hand rails shall be constructed and placed as shown on the drawings and in accordance with Section 055100 “Metal Stairs, Walkways, and platforms” and AS SHOWN ON THE DRAWINGS.

SIGNING

Construct and install signs in accordance with Section 101431.

LIGHTNING PROTECTION/GROUNDING

Per the designs in Section 260526 and as shown on the drawings.

CONCRETE BORDER

Shall be constructed as detailed and shown on the drawings.

Concrete shall be installed per Section 033000 “Cast-in-place-Concrete.”

INSTALLATION OF LOOSE-FILL MATERIAL

Retain this article if loose-fill systems are specified.

Retain first paragraph below if loose-fill containment edgings are required for Project.

Complete the construction and backfill of the concrete border and rappel tower.

Level and compact subgrade with a minimum of three passes with an approved vibratory compactor. Contracting Officer shall approve subgrade prior to placement of loose fill material.

Retain one of two options in first paragraph below if manufacturer of specified loose-fill system calculates material quantity with an allowance for excess material. If design professional's experience is sufficient to enable making an accurate estimate for required excess material, insert requirement for excess material in Part 2 and revise below.

Loose Fill: Place materials to required depths (minimum of 12 inch depth) lightly compacting the material with foot traffic Retain options in first two paragraphs below if loose-fill systems are to be compacted by mechanical means.

Grading: Uniformly grade loose fill to an even surface free from irregular surface changes as indicated.

Finish Grading: Hand rake to a smooth finished surface and to required elevations.

FINISH GRADING AND CLEANUP

Retain this article if loose-fill systems are specified.

Retain first paragraph below if loose-fill containment edgings are required for Project.

Area around concrete border shall be finish graded as shown on the drawings and raked to receive seeding.

All excess construction debris and material shall be disposed on in accordance with project specifications.

END OF SECTION

March 2010

RAPPEL TOWER 000601-1

USDA FOREST SERVICE, R-4

SALMON AIR BASE

SECTION 010250 - CONSTRUCTION STAKING

1. GENERAL

SUMMARY

This work shall consist of the construction staking of roads, parking lots, sidewalks, signs, concrete pads, culverts, buildings, and utilities in accordance with the drawings and specifications. The work includes the furnishing of all labor, equipment, instruments, materials, transportation and other incidentals necessary to complete the construction staking in accordance with these specifications and acceptable engineering practice.

QUALITY CONTROL

Construction staking shall be accomplished under the direction of a Licensed Civil Engineer or Land Surveyor closely associated and familiar with construction staking; periodic visits to the project site are required.

MEASUREMENT AND PAYMENT

Measurement shall be lump sum for surveying and staking the project through all phases of construction.

PRODUCTS

GOVERNMENT-FURNISHED SURVEY CONTROL SHEETS

The Government will provide the contractor with a set of survey control sheets showing horizontal and vertical control for site to be staked. The Government will provide the Contractor with layout information that will include the Northing, Easting, and Elevations for centerline of roads and parking areas, edge of parking areas and corners of buildings and other structures.

STAKES

Identification stakes and hubs shall be of sufficient length and width to provide and solid set in the ground and to provide space for marking above ground when applicable. Other dimensions and materials may be used, such as steel reinforcing bars, wire flagging and markers, and metal pins, if approved in writing by the Contracting Officer (CO). The top 2 inches of all slope, guard, reference, clearing, and structure stakes shall be painted or marked with plastic flagging. Colors used on stakes or for flagging shall be as follows:

Roads and parking areas-Orange
Waterlines, utilities, and culverts-Blue
Sidewalks, stairs, and concrete pads-Red
Buildings, excavation and grading-Yellow

SURVEY NOTE PAPER AND BOOKS

Paper for survey notes shall be moisture-resistant paper. Notes shall be contained in books with covers that will protect the contents and retain the pages in numerical sequence during field use. Field notebooks or note paper shall be furnished by the contractor.

EXECUTION

GENERAL

The Contractor shall be required to provide all necessary staking and control for all phases of construction. The contractor shall use the data and information shown on the project drawings to establish the location of all facilities to be constructed under this contract. The Contractor may choose any method of establishing horizontal and vertical controls provided the following minimum precision and accuracy requirements are met.

Accuracy requirements:

Minimum position close; 1/1000 Vertical closure: 0.05 ft (vertical)/station (100 feet horizontal) Cross section and slope stake precision:

Allowable deviation of cross section line projection from a true perpendicular to tangents, a true bisector of angle points, or a true radius of curves: +/-3 degrees.

Cross section topography measurements shall be taken so that variations in ground form a straight line connecting the cross section points will not exceed: 1.0 ft.

Horizontal and vertical accuracy for slope stake, slope stake references, and clearing limits. In feet or percentage of horizontal distance measured form centerline or reference stake, whichever is greater. Slope reference stakes and slope stakes: 0.15 ft or 0.6%. Clearing limits: 1.0 ft.

ESTABLISING AND REFERENCING IMPROVEMENT LOCATIONS

Roads and Parking Areas:

Slope stakes (cut and fill catch points), clearing limits, and slope stake references shall be established on both sides of the centerline at each station established. Slope stakes and slope stake references shall be located on a line at right angles to tangents and on radial lines or curves. Slope stake catch points shall be located by using the grading plans and/or profiles as shown on the drawings.

Slope stakes shall be set at 50-foot intervals, at significant breaks in the ground profile, culvert locations, and widening transition points. Slope stakes shall be set at 25 foot intervals around curves having a radius less than 100 feet.

Concrete Pads Slope stakes shall be established at the corners of concrete pads. Slope stakes shall be written to reference the finish grade of the unit or pad being staked.

Sidewalks Slope stakes (cut and fill catch points), clearing limits, and slope stake references shall be established on both sides of the centerline at each station established. Slope stakes and slope stake references shall be located on a line at right angles to tangents and on radial lines or curves. Slope stake catch points shall be located by using the grading plans and/or profiles as shown on the drawings.

Slope stakes shall be set at 10-foot intervals and at significant breaks in the ground profile or horizontal alignment.

Waterline, Sewerline, & other Utilities Waterline, Sewerline, & other Utilities shall be staked at 25-foot intervals to the minimum burial depth specified on the drawings. Waterline and sewerline elevations shall be accurately staked to provide for drainage as indicated on the drawings. Grade stakes shall be established as necessary to provide the control for the construction work.

Buildings Slope stakes and slope stake references shall be established at each corner and as necessary to provide adequate construction control.

DISCREPANCIES

The contractor shall compare the staked centerline horizontal and vertical alignment with the design data. Differences between previously recorded and observed elevations of bench marks shall be referred to the Contracting Officer. Differences in centerline profile elevations exceeding 1 foot at any two or more consecutive points shall be reported to the contracting Officer for evaluation and possible revision. Staking of these areas shall be deferred until the Contacting Officer resolves these differences.

VERTICAL CONTROL

Vertical control for construction shall be as referenced on the Drawings.

MARKING STAKES

All stakes shall be legibly marked, in the format agreed upon with the Contracting Officer, with a stake pencil that leaves an imprinted or with waterproof ink. Marking shall conform to the nomenclature below;

PIPoint of Intersection of tangents
PCPoint of curvature
POCPoint on curve
PtPoint of tangency
POTPoint on tangent
RPReference point
PP-line (preliminary location line)
LL-line (final location line)
BMBench mark
TBMTemporary bench mark
BTBegin taper (any)
ETEnd taper (any)
CCut
FFill
LCenterline
DDitch
WWidth

SURVEY NOTES

All survey data shall be neatly recorded in survey books. All survey notes shall become the property of the Forest Service. Errors shall be deleted by lining out. Date, crew names and positions, instrumentation, and weather shall be recorded in the notes at the beginning of each day’s work. The party chief shall sign or initial each page of the notes immediately after the last entry for each day’s work.

Electronically recorded survey notes shall be consecutively numbered and headed to identify the contents. The notes shall be supported and accompanied by a bound book that records the project name and for each day identifies date, crew names and positions, instrumentation, weather, type of survey, stationing of sections between which survey was performed, and survey data or sketched that cannot be electronically recorded. The party chief shall sign or initial the electronically recorded notes and Day Book immediately after the last entry for each day’s work.

END OF SECTION 010250

APRIL 2006

CONSTRUCTION STAKING 010250-2

USDA FOREST SERVICE, R-4

SALMON AIR BASE

SECTION 011250 - MEASUREMENT AND PAYMENT WITH ASPHALT

1. GENERAL

SUMMARY

Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.

When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.

DETERMINATION OF QUANTITIES

The following measurements and calculations shall be used to determine contract quantities for payment.

For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.

For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.

For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.

For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.

For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.

For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.

For bituminous material, volumes will be measured at 60F or will be corrected to the volume at 60F by using ASTM D1250 for asphalts. Emulsified asphalt will be measured at 60F, or measured by converting the gallonage at another temperature to gallonage at 60F by means of the following formula:

Gallons at 60F = Gallons at AF

1+0.00025 (AF - 60F)

* AF is the temperature of the material at the time the gallonage is measured.

For vehicular shipments, net certified scale weights or weights based on certified volumes will be used as a basis of measurement. Measurements will be adjusted when bituminous material has been lost from the vehicle or the distributor, has been wasted, or has otherwise not been incorporated into this work. Determining true weights of hauling vehicles shall be made by weighing the empty vehicles at least once a day at the times the CO directs. Each vehicle shall bear a plainly legible identification mark.

When bituminous materials are shipped, net certified weights, or volume corrected for loss of foaming, can be used for computing quantities.

Earthwork Tolerances - Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be made by the contractor as necessary to produce the designed sections and to balance earthwork. Such adjustments shall not be considered as "Changes."

UNITS OF MEASUREMENT

Payment shall be by units defined and determined according to U.S. Standard measure and by the following:

Acre: Make longitudinal and transverse measurements for area computations horizontally.

50lb Bag: Measurement will be for the actual number of 50lb bags of standard bentonite grout.

94lb Bag: Measurement will be for the actual number of 94lb bags of standard cement or grout.

Cubic Yard (CY): A measurement computed by one of the following methods:

Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.

Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.

Each (EA): One complete unit, which may consist of one or more parts.

Gallons (GAL): The quantity shall be measured by any of the following methods:

Measured volume in container.

Metered volume by approved metering system.

Commercially package volume.

Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor.

Linear Foot (LF): Measurement of work along its length from point-to-point; parallel to the base or foundation. Do not measure overlaps.

Lump Sum (LS): One complete unit.

Mile: Measured horizontally along the centerline of each roadway, approach, or ramp.

Pound (LB): For sacked or packaged material, measurement will be the net weight as packed by the manufacturer.

Square Foot (SF): Measured on a plane parallel to the surface being measured.

Square Yard (SY): Measured on a plane parallel to the surface being measured.

Ton: Measured as a short ton consisting of 2,000 pounds.

METHOD OF MEASUREMENT

One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:

ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.

DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:

As a result of changes in the work authorized by the CO.

As a result of the CO determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.

As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.

STAKED QUANTITIES (SQ) - These quantities are determined from staked measurements prior to construction.

VEHICLE QUANTITIES (VQ) - These quantities are measured or weighed in hauling vehicles.

PRICE ADJUSTMENT (for Out-of-Specification Bituminous Materials) Bituminous materials are defined as all types and grades of asphalt cement, liquid asphalt, emulsified asphalt, and dust oil.

If bituminous material fails one or more test requirements, and the Contracting Officer determines it is in the public interest to accept the material at a reduced price, the price reduction shall be based on the test results giving the largest percent price adjustment. The contractor may remove and replace the defective material or accept the adjustment.

The price reduction shall apply to all pay items affected.

Price adjustment will be based on samples taken in duplicate in accordance with AASHTO T40 under the supervision of the Contracting Officer. Samples shall be sent to an authorized laboratory. The laboratory shall test one of each duplicate sample and retain the other. When any test result is not within the specification limits, the laboratory shall immediately notify the Contractor, the supplier, and the Contracting Officer. The Contractor, after notifying the Contracting Officer, may check test the retained sample.

If the retained sample tests satisfactorily, the material will be accepted. If the retained sample also fails, the following schedule of price adjustments shall apply. The average of test values for the two samples will determine the basis for price adjustment, except when test results on the samples differ by more than the applicable AASHTO or ASTM Repeatability Unit; then, the test result numerically nearest the specification requirement will be used. (A repeatability unit is defined as D2S or D2S% limit for single operator precision described in ASTM C670.)

The schedule of price adjustments shall not apply to the following tests:

Test
AASHTO Test Method
Spot Test
T102
Particle Charge
T59
Ductility
T51

Bituminous materials failing to meet specifications for these tests shall be removed and replaced.

See Table 011250-1 for the schedule of price adjustments for bituminous materials that do not meet specifications.

Table 011250-1

Schedule of Price Adjustments for Out-of-Specification Bituminous Materials.

Application Deviation from Specification Limit Measured in Reproducibility Units*.

Less than 1
1 but less than 2
2 but less than 3
3 or more
Price reduction applicable to bituminous base course and pavement mixture or to seal coat and bituminous material paid for as a separate item.
0%
5%
25%
Remove & Replace
Price reduction applicable to bituminous material paid for as a separate item.
0%
10%
25%
Remove & Replace

* A reproducibility unit is defined as D2S or D2S% limit for multi-laboratory precision described in ASTM recommended practice C670.

The Sieve Test (AASHTO T59) results may be exempt from the Schedule of Price Adjustments provided the contractor's quality assurance program includes checking the uniformity of bituminous spread rates in increments no greater than 1 foot over the width of the spray bar and variation between increments is no greater than 5 percent.

PRODUCTS (NOT APPLICABLE)

EXECUTION (NOT APPLICABLE)

REVISION HISTORY:

PRIMARY AUTHOR: ???

5/11/2006 D. WEWER – Added 50# Bags to list of units.

END OF SECTION 011250

MAY 2006

MEASUREMENT AND PAYMENT WITH ASPHALT 011250-1

USDA FOREST SERVICE, R-4

SALMON AIR BASE

SECTION 011900 - MOBILIZATION

1. GENERAL

SUMMARY

This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.

MEASURMENT AND PAYMENT

The measurement shall be lump sum for mobilization.

Payment:

Bond premiums will be reimbursed after receipt of the evidence of payment.

50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.

Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.

Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.

Progress payments for mobilization and preparatory work shall be subject to retainage.

PRODUCTS (NOT USED)

EXECUTION (NOT USED)

END OF SECTION 011900

July 2005

MOBILIZATION 011900-1

USDA FOREST SERVICE, R-4

SALMON AIR BASE

SECTION 013300 - SUBMITTAL PROCEDURES

1. GENERAL

SUMMARY

This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.

See other specification section within this package for additional requirements on submittal.

SUBMITTAL PROCEDURES

Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.

Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

If intermediate submittal is necessary, process it in same manner as initial submittal.

Allow 14 days for processing each re-submittal.

No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.

Identification: Place a permanent label or title block on each submittal for identification.

Indicate name of firm or entity that prepared each submittal on label or title block.

Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.

Include the following information on label for processing and recording action taken:

Project name.

Date.

Name and address of Contractor.

Name of manufacturer.

Unique identifier, including revision number.

Number and title of appropriate Specification Section.

Drawing number and detail references, as appropriate.

If more than one item is shown on submittal sheet, identify item.

Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.

MEASUREMENT AND PAYMENT

No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.

PRODUCTS

ACTION SUBMITTALS – (Submittals requiring CO approval) General: Prepare and submit Action Submittals required by individual Specification Sections.

Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.

Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

Mark each copy of each submittal to show which products and options are applicable.

Include the following information, as applicable:

Manufacturer's written recommendations.

Manufacturer's product specifications.

Manufacturer's installation instructions.

Manufacturer's catalog cuts.

Wiring diagrams showing factory-installed wiring.

Compliance with recognized trade association standards.

Compliance with recognized testing agency standards.

Shop Drawings: Prepare Project-specific information, drawn accurately to scale.