Questions 8-10-2010.pdf

PDF 30 KB Posted

Attached to
Salmon Airbase
Solicitation number
AG-02NV-S-10-0075
Issued by

View the file

Other files

File Type Posted
Questions 8-18-2010.pdf PDF
Questions 8-17-2010.pdf PDF
Amendment 03.doc DOC document
Amendment 02.pdf PDF
Air Base Questions 8-4-10.pdf PDF
Amendment 01.pdf PDF
Salmon Airbase Getechnical Report 090222.pdf PDF
WD ID 100015 7-16-10 Highway.pdf PDF
Salmon Airbase Drawings.zip ZIP file
Salmon Air Base.Specs.Final.5.17.10.docx DOCX document
Solicitation.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation AG-02NV-S-10-0075

Questions 8-10-2010

Q1. One more question that has come in from our electrical subcontractors; Drawing E5 OPS room shows (4) type “L” fixtures and (4) type “KD” fixtures which are not shown on the Fixture Schedule shown on Sheet E4 does not identify these. Would you please clarify?

A1. All type "L" fixtures should be type "M". These are the (4) called for on the schedule.

Type "KD" were originally a dimmable fixture, but were changed in the design to just type "K". This should only be (15) total type "K" fixture vs. (13) shown in the schedule.