Questions 8-10-2010.pdf
PDF 30 KB Posted
- Attached to
- Salmon Airbase
- Solicitation number
- AG-02NV-S-10-0075
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions 8-18-2010.pdf | ||
| Questions 8-17-2010.pdf | ||
| Amendment 03.doc | DOC document | |
| Amendment 02.pdf | ||
| Air Base Questions 8-4-10.pdf | ||
| Amendment 01.pdf | ||
| Salmon Airbase Getechnical Report 090222.pdf | ||
| WD ID 100015 7-16-10 Highway.pdf | ||
| Salmon Airbase Drawings.zip | ZIP file | |
| Salmon Air Base.Specs.Final.5.17.10.docx | DOCX document | |
| Solicitation.doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation AG-02NV-S-10-0075
Questions 8-10-2010
Q1. One more question that has come in from our electrical subcontractors; Drawing E5 OPS room shows (4) type “L” fixtures and (4) type “KD” fixtures which are not shown on the Fixture Schedule shown on Sheet E4 does not identify these. Would you please clarify?
A1. All type "L" fixtures should be type "M". These are the (4) called for on the schedule.
Type "KD" were originally a dimmable fixture, but were changed in the design to just type "K". This should only be (15) total type "K" fixture vs. (13) shown in the schedule.