Addendum_3_08.11.26.pdf
PDF 2 MB Posted
- Attached to
- South Campus HVAC Upgrades
- Solicitation number
- 121-071426JA
- Issued by
- Cabarrus County, North Carolina
About this file
Addendum 3 to South Campus HVAC Upgrades Project
This is an addendum to the invitation for bids (IFB) issued by Rowan-Cabarrus Community College for South Campus HVAC Upgrades, dated August 11, 2026. The addendum addresses pre-bid requests for information regarding equipment selection, clarifies that two prior addenda have been issued, and confirms that the bid form has been revised to reflect Alternates 2 and 3. Specifications Section 01 23 00 regarding alternates has been updated to include labor and material costs for an S202 boiler replacement and an additional 80-ton modular chiller section for the CH-1 chiller system. The project scope includes replacement of air handling units in buildings S201 and S202, installation of a modular three-unit 80-ton chiller system, conversion of pneumatic controls to direct digital controls, and Building Automation System software upgrades. The addendum confirms equipment selection requirements: proposed alternatives must meet specified performance minimums and not exceed maximum electrical demands. Multiple drawing sheets have been revised to reflect phased construction sequencing, temporary HVAC provisions, demolition details, emergency chiller connection points, and compressor blanket requirements for temporary packaged air handling units. The project may require overtime and weekend work coordinated with the college, with a minimum 72-hour advance notice required for any scheduled shutdowns of power, water, or HVAC systems.
The three bid alternates include: Alternate 1 for building automation system and controls integration; Alternate 2 for demolition and replacement of the existing boiler system in Building S202; and Alternate 3 for an additional 80-ton modular chiller section to Chiller CH-1. The base bid scope requires the contractor to provide temporary air handling units to maintain heating and cooling during demolition and installation of new units, construct new and temporary ductwork and piping ahead of any shutdowns to minimize downtime, and provide a temporary 40-ton chiller with emergency connection provisions for Building S203. All ductwork and piping connections must coordinate with the college to avoid operational disruptions to occupied buildings. The addendum includes updated mechanical schedules, floor plans, and installation details across multiple drawing sheets, with all revisions effective for bids due August 18, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RCCC S201 HVAC Upgrades Addendum 1.pdf | ||
| 121-071426JA.pdf | ||
| Transmittal - 00020.pdf | ||
| Addendum-4_08.17.26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 3
Date: August 11, 2026
General Comments
1. N/A
Pre-bid Request for Information
1. Are we able to use the Daikin Maverick II for the AHU's and the York YCAL0060 for the chiller?
a. The electrical demand and performance are set. Meet performance and do not exceed electrical demands. If both are met, we take no exception to the proposed options. Again, performance minimum per building and maximum electrical capacity must be met.
2. Are there any other addenda? Has the bid form been revised to reflect Alternate 2?
a. Yes, Addendum 1 and 2
b. Yes, Spec section 01 23 00 Alternate 2 and Alternate 3 have been updated
CHANGES TO THE SPECIFICATIONS
1. Section 01 23 00 - Alternates
a. Updated to include labor and material costs associated with S202 boiler and additional
80-ton modular section for chiller CH-1.
SOUTH CAMPUS HVAC UPGRADES
Rowan-Cabarrus Community College 1531 Trinity Church Road
Concord, NC 28027
SCO # 23-26928-01BIFB # 121-071426JA
CMTA 223.081
Owner: Rowan-Cabarrus Community College
Engineer: CMTA, Inc.
CHANGES TO THE DRAWINGS
1. Sheet G000 – COVER SHEET
a. Added note about installing emergency connections for chiller in S203.
2. Sheet G101 – BUILDING S201 FLOOR PLANS
a. Added notes and changed walls to be demolished during construction.
3. Sheet M002 – MECHANICAL SCHEDULES
a. Added note to Temporary Packaged AHU Schedule to provide compressor blankets.
4. Sheet M110 – S201 OVERALL PLAN
a. Added General note about phased construction that may require overtime and/or weekend work coordinated with owner.
5. Sheet M212 – S202 MECHANICAL ROOM TEMPORARY HVAC PLAN AND SECTION
a. Removed text conflicting with Scheduling Consideration general note on sheet.
6. Sheet M311 - S203 MECHANICAL ROOM FLOOR PLANS
a. Added notes showing emergency taps for possible temporary chiller during construction.
ATTACHMENTS
Spec 01 23 00 – Alternates Sheet G000 – COVER SHEET Sheet G101 – BUILDING S201 FLOOR PLANS Sheet M002 – MECHANICAL SCHEDULES Sheet M110 – S201 OVERALL PLAN Sheet M212 – S202 MECHANICAL ROOM TEMPORARY HVAC PLAN AND SECTION Sheet M311 - S203 MECHANICAL ROOM FLOOR PLANS
ZOOM LINK FOR BID OPENING
END OF ADDENDUM 3
RCCC South Campus HVAC Upgrades 223.081
SCO #23-26928-01B
Addendum 3
08.11.2026
ALTERNATES 01 23 00 - 1
SECTION 01 23 00 - ALTERNATES
PART 1 - GENERAL
1.1 SUMMARY:
A. This Section includes administrative and procedural requirements for alternates.
1.2 DEFINITIONS:
A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the Bidding Requirements that may be added to or deducted from the Base Bid amount if Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.
B. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum.
1.3 PROCEDURES:
A. Coordination: Modify or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.
B. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.
C. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the status of each alternate. Indicate if alternates have been accepted, rejected, or deferred for later consideration. Include a complete description of negotiated modifications to alternates.
D. Execute accepted alternates under the same conditions as other work of the Contract.
E. Schedule: A Schedule of Alternates is included at the end of this Section. Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate.
PART 2 - PRODUCTS (Not Used)
RCCC South Campus HVAC Upgrades 223.081
SCO #23-26928-01B
Addendum 3
08.11.2026
ALTERNATES 01 23 00 - 2
PART 3 - EXECUTION
3.1 SCHEDULE OF ALTERNATES
Alternate No. 1: Provide building automation system and integration per mechanical plans and specification section 23 09 00, 23 09 02, 23 09 03, 23 09 04 as installed/programmed by Environmental Control & Mechanical.
Dollars ($ )
Alternate No. 2: Provide labor and materials to demolish and replace the existing boiler system in Building S202 per mechanical sheet M201 and specification sections.
Dollars ($ )
Alternate No. 3: Provide labor and materials to provide an additional 80-ton (960 MBH) modular section to Chiller CH-1 scheduled on sheet M002.
Dollars ($ )
END OF SECTION 01 23 00
VICINITY MAP
DESIGN TEAM
MECHANICAL & ELECTRICAL ENGINEERS
8801 J.M. KEYNES DR.
SUITE 240
CHARLOTTE, NC 28262
704.376.7072 www.CMTA.com
S201
S201
BASE BID:
FOR AHU-1 REPLACEMENT IN BUILDINGS S201 & S202, THE INTENT IS
FOR CONTRACTOR TO PROVIDE TEMPORARY AIR HANDLING UNITS TO
HEAT/COOL BUILDINGS DURING DEMOLITION AND INSTALLATION OF
THE NEW UNITS. NEW AND TEMPORARY DUCTWORK AND PIPING SHALL
BE CONSTRUCTED AHEAD OF ANY SHUTDOWNS AND COORDINATED
WITH RCCC TO MINIMIZE DOWNTIME. UPON COMPLETION OF BOTH AIR
HANDLING UNIT REPLACEMENTS, CONTRACTOR SHALL REMOVE THOSE
UNITS. PROVIDE TEMPORARY CHILLER CONNECTIONS FOR BUILDING
S203.
FOR S203, PROVIDE A TEMPORARY 40-TON CHILLER.
UNDER MECHANICAL ALTERNATE NO. 2, BOILER B-1 IN BUILDING S202
SHALL BE REPLACED. SEE SHEET M216 FOR MORE INFORMATION.
8801 J.M. Keynes Drive, Suite 240 Charlotte, NC 28262
T: 704.376.7072
F
IL
E N A M E
P L O T
T
IM
E
PROJECT
CLIENT
CONSULANTS
REGISTRATION
ISSUE / REVISION
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
S
J
E M
A
RUCL.
31478
IR
E
SEAL
HTRO
N
ORAC
ANLI
E
EENIGN R
R
P
OISSEFO LAN
C
U se rs \D
S p ro u l\ D o cu m e n ts
\R C C C B u ild in g S
R e n o v a ti o n s_
M e ch v d a n M
C n L .r v t
/1
/2
:0 :3
P
M
G000
ROWAN-CABARRUS COMMUNITY
COLLEGE
1531 TRINITY CHURCH RD, CONCORD, NC,
28027
ROWAN-CABARRUS
COMMUNITY COLLEGE
1531 TRINITY CHURCH RD,
CONCORD, NC, 28027
8/10/2026
CMTA: 223.081.00
COVER SHEET
SCO: 23-26928-01B
SHEET INDEX
NUMBER NAME
00 - GENERAL
G000 COVER SHEET
G001 APPENDIX B - S201
G002 APPENDIX B - S202
G003 APPENDIX B - S203
G004 PARTITION DETAILS
G101 BUILDING S201 FLOOR PLANS
G102 BUILDING S202 FLOOR PLAN
G103 BUILDING S203 FLOOR PLAN
G104 BUILDING S201 PARTIAL FLOOR PLANS AND SECTIONS - DEMOLITION AND NEW WORK
01 - FIRE PROTECTION
FP001 FIRE PROTECTION NOTES, SYMBOLS, AND SCHEDULES
FP101 FIRE PROTECTION PLANS - BUILDINGS S201 AND S202
02 - MECHANICAL
M001 MECHANICAL SYMBOL LEGEND, NOTES AND DRAWING LIST
M002 MECHANICAL SCHEDULES
M003 MECHANICAL SITE PLAN
M110 S201 OVERALL PLAN
M111 S201 MECHANICAL ROOM INITIAL HVAC DEMOLITION PLAN AND SECTION
M112 S201 MECHANICAL ROOM TEMPORARY HVAC PLAN AND SECTION
M113 S201 MECHANICAL ROOM HVAC DEMOLITION PLAN AND SECTION
M114 S201 MECHANICAL ROOM AHU NEW WORK AND TEMPORARY DEMOLITION PLAN AND SECTION
M115 S201 MECHANICAL ROOM HVAC NEW WORK PLAN AND SECTION
M116 S201 MECHANICAL ROOM FINAL HVAC DEMOLITION PLAN AND SECTION
M121 S201 MECHANICAL ROOM PIPING CH-1 DEMOLITION PLAN AND SECTION
M122 S201 MECHANICAL ROOM PIPING CH-1 NEW WORK PLAN AND SECTION
M123 S201 MECHANICAL ROOM PIPING CH-2 DEMOLITION PLAN AND SECTION
M124 S201 MECHANICAL ROOM PIPING CHWP-2 & CDWP-2 NEW WORK PLAN AND SECTION
M210 S202 OVERALL PLAN
M211 S202 MECHANICAL ROOM INITIAL HVAC DEMOLITION PLAN AND SECTION
M212 S202 MECHANICAL ROOM TEMPORARY HVAC PLAN AND SECTION
M213 S202 MECHANICAL ROOM TEMPORARY HVAC DEMOLITION PLAN AND SECTION
M214 S202 MECHANICAL ROOM HVAC NEW WORK PLAN AND SECTION
M215 S202 MECHANICAL ROOM FINAL HVAC DEMOLITION PLAN AND SECTION
M216 MECHANICAL ALTERNATE NO. 2 BUILDING S202 BOILER ROOM
M310 S203 OVERALL FLOOR PLAN
M311 S203 MECHANICAL ROOM FLOOR PLANS
M401 S201 ENLARGED MECHANICAL ROOM PLAN - FINAL STATE
M402 S201 ENLARGED MECHANICAL ROOM FLOOR PLANS - FINAL STATE
M403 S201 ENLARGED FLOOR PLANS - CONTROLS REPLACEMENT
M501 CENTRAL PLANT SCHEMATIC PIPE DIAGRAMS
M502 TEMPERATURE CONTROL DIAGRAMS AND SEQUENCES
M503 TEMPERATURE CONTROL DIAGRAMS AND SEQUENCES
M504 CONDENSER WATER CONTROL DIAGRAM
M601 MECHANICAL DETAILS
M602 MECHANICAL DETAILS
03 - ELECTRICAL
E001 ELECTRICAL LEGEND, NOTES & SCHEDULES
E002 ELECTRICAL SITE PLAN
E201 S201 FIRST FLOOR POWER
E202 S202 FIRST FLOOR POWER
E203 S203 FIRST FLOOR POWER - ALTERNATE 1
E204 S201 ENLARGED MECH/ELEC ROOM - PHASE 1
E205 S202 ENLARGED MECH/ELEC ROOM - PHASE 1
E601 PANEL SCHEDULES & POWER RISER DIAGRAM
E701 ELECTRICAL DETAILS
E702 ELECTRICAL DETAILS
ROWAN-CABARRUS
COMMUNITY COLLEGE
SOUTH CAMPUS HVAC
UPGRADES
BID DOCUMENTS
7/21/2026
SCO Project Number: 23-26928-01B
# Date Description
1 10/10/2025 100% DD SET
2 12/12/2025 100% CD SET
3 03/23/2026 100% Construction Documents
4 07/21/2026 BID DOCUMENTS
6 08/10/2026 ADDENDUM 2
MECHANICAL
ROOM
INTAKE
AREAWAY
RELIEF
AREAWAY
REMOVE INNER DOORS. MODIFY
OUT DOORS WITH PANIC BARS
AND HANDLES ON THE OUTSIDE.
NO WORK IN
SHADED AREA
CORRIDOR
REMOVE EXISTING WALLS AND DOOR FOR
CONSTRUCTION. REBUILD WALLS AFTER
CONSTRUCTION. SEE DETAIL 2 ON SHEET G104.
REMOVE EXISTING WALLS FOR
CONSTRUCTION. REBUILD
WALLS AFTER CONSTRUCTION.
SEE DETAIL 9 ON SHEET G104.
PROVIDE TEMPORARY 2
HOUR CMU WALL. SEE
TYPE H ON SHEET G004.
ADD (2) LAYERS OF 5/8" GYP. BD.
TYPE "X" TO THIS SIDE OF EXISTING
1 HOUR RATED WALL. SIMILIAR TO
TYPE D ON SHEET G004.
REMOVE EXISTING CMU
WALL AS REQUIRED DURING
AHU REPLACEMENT. SEE
TYPE K ON SHEET G004.
MECHANICAL
ROOM
RELIEF
AREAWAY
INTAKE
AREAWAY
REMOVE INNER DOORS. MODIFY
OUT DOORS WITH PANIC BARS
AND HANDLES ON THE OUTSIDE.
NO WORK IN
SHADED AREA
WALL RATING LEGEND
NON-RATED PARTITION
1 HR. RATED PARTITION TO DECK
2 HR. RATED PARTITION TO DECK
8801 J.M. Keynes Drive, Suite 240 Charlotte, NC 28262
T: 704.376.7072
F
IL
E N A M E
P L O T
T
IM
E
PROJECT
CLIENT
CONSULANTS
REGISTRATION
ISSUE / REVISION
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
S
J
E M
A
RUCL.
31478
IR
E
SEAL
HTRO
N
ORAC
ANLI
E
EENIGN R
R
P
OISSEFO LAN
C
U se rs \D
S p ro u l\ D o cu m e n ts
\R C C C B u ild in g S
R e n o v a ti o n s_
M e ch v d a n M
C n L .r v t
/1
/2
:0 :4
P
M
G101
ROWAN-CABARRUS COMMUNITY
COLLEGE
1531 TRINITY CHURCH RD, CONCORD, NC,
28027
ROWAN-CABARRUS
COMMUNITY COLLEGE
1531 TRINITY CHURCH RD,
CONCORD, NC, 28027
8/10/2026
CMTA: 223.081.00
BUILDING S201 FLOOR PLANS
SCO: 23-26928-01B
0 4' 8' 16'4'
3/32" = 1'-0"G101
1 BUILDING S201 - EXISTING FLOOR PLAN
3/32" = 1'-0"G101
2 BUILDING S201 - TEMPORARY FLOOR PLAN
0 4' 8' 16'4'
# Date Description
3 03/23/2026 100% Construction Documents
4 07/21/2026 BID DOCUMENTS
N
8801 J.M. Keynes Drive, Suite 240 Charlotte, NC 28262
T: 704.376.7072
F
IL
E N A M E
P L O T
T
IM
E
PROJECT
CLIENT
CONSULANTS
REGISTRATION
KEYPLAN
ISSUE / REVISION
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
S
J
E M
A
RUCL.
31478
IR
E
SEAL
HTRO
N
ORAC
ANLI
E
EENIGN R
R
P
OISSEFO LAN
S202
C
U se rs \D
S p ro u l\ D o cu m e n ts
\R C C C B u ild in g S
R e n o v a ti o n s_
M e ch v d a n M
C n L .r v t
/1
/2
:0 :4
P
M
M002
ROWAN-CABARRUS COMMUNITY
COLLEGE
1531 TRINITY CHURCH RD, CONCORD, NC,
28027
ROWAN-CABARRUS
COMMUNITY COLLEGE
1531 TRINITY CHURCH RD,
CONCORD, NC, 28027
8/10/2026
CMTA: 223.081.00
MECHANICAL SCHEDULES
SCO: 23-26928-01B
PUMP SCHEDULE
MARK
BASIS OF DESIGN (B&G)
TYPE
UNIT
SERVED
FLOWRATE
(GPM)
FT.
HEAD
ELECTRICAL DATA RATED
SPEED
(RPM)
% EFF. REMARKS
SERIES MODEL NO. HP VOLTS PH.
CDWP-1 e-1510 4 BD END SUCTION CT-1 640 40 15.00 460 3 1800 84.90% 1, 2
CDWP-2 e-1510 4 BD END SUCTION CT-2 640 40 15.00 460 3 1800 84.90% 1, 2
CHWP-1 e-1510 3 BD END SUCTION CH-1 480 45 10.00 460 3 1800 82.00% 1, 2
CHWP-2 e-1510 4 BD END SUCTION CH-1 480 45 10.00 460 3 1800 82.00% 1, 2
CP-1 e-1510 4 BD END SUCTION HX-1 500 40 7.50 460 3 1800 71.50% 1, 2
CP-2 e-1510 4 BD END SUCTION HX-1 500 40 7.50 460 3 1800 71.50% 1, 2
REMARKS:
1. PUMP EFFICIENCIES LISTED ARE MINIMUM EFFICIENCIES ACCEPTABLE, DO NOT SUBMIT LESS EFFICIENT PUMPS.
2. ACCEPTABLE MANUFACTURERS: BELL & GOSSETT, TACO, AND PATTERSON.
3. PROVIDE VARIABLE FREQUENCY DRIVE. ELECTRICAL CONTRACTOR TO PROVIDE POWER CONNECTION.
REMARKS:
1. PROVIDE WITH FACTORY START-UP UTILIZING MANUFACTURERS STANDARD FORMS AND THE FORMS INCLUDED IN THE SPECIFICATIONS.
2. ENTIRE UNIT SHALL BE DOUBLE WALL CONSTRUCTION WITH 6” BASE RAIL.
3. SUPPLY STAINLESS STEEL IAQ CONDENSATE PAN. ENTIRE DRAIN SHALL BE PITCHED TO OUTLET. WATER CARRY OVER IS NOT ALLOWED. SELECT CHILLED WATER COILS ACCORDINGLY. PROVIDE STAINLESS STEEL INTERMEDIATE DRAIN PANS FOR STACKED CHILLED WATER COILS ALL PRE-PIPED TO MAIN DRAIN PAN.
4. CHILLED WATER COILS SHALL BE A MAXIMUM OF 8 ROWS AND 10 FPI
5. PROVIDE STAINLESS STEEL CHILLED WATER COIL CASING.
6. REFER TO DRAWINGS FOR FULL UNIT CONFIGURATION
7. PROVIDE FACTORY MOUNTED OUTSIDE, RETURN, AND RELIEF AIR DAMPERS. THE ACTUATOR SHALL BE PROVIDED AND MOUNTED BY THE TEMPERATURE CONTROLS CONTRACTOR.
8. THE TOTAL STATIC PRESSURE FOR THE FANS SHALL INCLUDE THE FOLLOWING. (A) LISTED ESP, (B) DESIGN FILTER ALLOWANCE, (C) PRESSURE DROPS THROUGH UNIT CONFIGURATION INCLUDING (COILS, DAMPERS, FILTERS, ETC.
9. PROVIDE HIGH EFFICIENCY INVERTER DUTY MOTORS.
10. UNIT DESIGN FAN HORSEPOWER, DIMENSIONS AND WEIGHT ARE LISTED IN THE SCHEDULE. IT IS THE CONTRACTOR’S AND ALTERNATE MANUFACTURER’S RESPONSIBILITY TO ENSURE THAT THE HORSEPOWER, FIT AND ALL CLEARANCES ARE MAINTAINED SHOULD EQUIPMENT OTHER THAN SPECIFIED BE FURNISHED.
11. COORDINATE SHIPPING SPLITS AS REQUIRED FOR INSTALLATION.
12. VFD’S ARE TO BE FIELD INSTALLED AND MOUNTED TO THE WALL WITH IN THE SAME MECHANICAL ROOM.
13. THE MAXIMUM MOTOR SIZE SHALL BE 10 HP. PROVIDE MULTIPLE PLENUM FANS WHERE REQUIRED TO MEET THIS REQUIREMENT. VERTICAL BACK DRAFT DAMPERS SHALL BE PROVIDED ON WHERE DUAL FANS ARE REQUIRED.
14. PROVIDE UNIT WITH PERMANENT AIR FILTER FRAMES FOR 2" THROW AWAY MERV 8 MEDIA.
15. UNIT SHALL BE PROVIDED WITH FOUR (4) COMPLETE MEDIA CHANGES.
16. PROVIDE RELIEF FAN WITH INTEGRAL PIZEO RING AND TRANSDUCER FOR AIRFLOW MEASUREMENT FOR ALL AHUS WITH RETURN/RELIEF FAN(S).
TEMPORARY PACKAGED DX AIR HANDLING UNIT SCHEDULE
MARK
BASIS OF DESIGN
SERVICE TYPE LOCATION
NOMINAL
SIZE
LxWxH (IN)
WEIGHT
(LBS)
SUPPLY AIR FAN
REMARKS
MANUF. MODEL CFM TYPE
NO. OF
FANS - RPM
DRIVE
MAX.S.P
(IN WG)
MOTOR
HP
TAHU-1A TRANE TEH600A4 TEMP AHU PACKAGED DX GRADE 232x90x77 5044 18000 FC 1 BELT 5.0 20
TAHU-1B TRANE TEH600A4 TEMP AHU PACKAGED DX GRADE 232x90x77 5044 18000 FC 1 BELT 5.0 20
TAHU-2A TRANE TEH600A4 TEMP AHU PACKAGED DX GRADE 232x90x77 5044 18000 FC 1 BELT 5.0 20
TAHU-2B TRANE TEH600A4 TEMP AHU PACKAGED DX GRADE 232x90x77 5044 18000 FC 1 BELT 5.0 20
TEMPORARY PACKAGED DX AIR HANDLING UNIT SCHEDULE - CONT.
MARK
DX COOLING COIL RETURN FAN HEATING SECTION ELECTRICAL
TOTAL CAP.
(MBH)
SENS. CAP.
(MBH)
EAT
(DB / WB)
LAT
(DB / WB)
EER CFM
ESP (IN
W.C.)
MOTOR
HP
TYPE KW VOLTS PHASE HZ MCA MOCP
TAHU-1A 540 410 78/65 55/52 10.5 14350 5.0 20 ELECTRIC 54/54, 108 TOTAL 480 3 60 186 225
TAHU-1B 540 410 78/65 55/52 10.5 14350 5.0 20 ELECTRIC 54/54, 108 TOTAL 480 3 60 186 225
TAHU-2A 540 410 78/65 55/52 10.5 14350 5.0 20 ELECTRIC 54/54, 108 TOTAL 480 3 60 186 225
TAHU-2B 540 410 78/65 55/52 10.5 14350 5.0 20 ELECTRIC 54/54, 108 TOTAL 480 3 60 186 225
REMARKS:.
1. ENTIRE UNIT SHALL BE DOUBLE WALL CONSTRUCTION.
2. PROVIDE WITH STAINLESS STEEL IAQ CONDENSATE DRAIN PAN. ENTIRE PAN SHALL BE PITCHED TO OUTLET.
3. PROVIDE WITH HIGH-EFFICIENCY MOTORS .
4. PROVIDE UNIT WITH TWO COMPRESSORS WITH COMPRESSOR BLANKETS OR MUFFLERS, AND 3 STAGES OF COOLING .
5. REFER TO SPECIFICATIONS FOR FILTER REQUIREMENTS.
6. PROVIDE DISCONNECTS FOR ALL FAN MOTORS.
7. PROVIDE WITH ECONOMIZER AND BAROMETRIC RELIEF DAMPER.
8. PROVIDE UNIT WITH INTEGRAL NON-FUSED DISCONNECT.
9. PROVIDE WITH LOW AMBIENT COOLING.
10. TIE UNITS INTO EXISTING FIRE ALARM SYSTEM.
AIR HANDLING UNIT SCHEDULE
MARK
BASIS OF DESIGN
SERVICE LOCATION
DIMENSIONS (IN)
WEIGHT
(LBS.)
SUPPLY AIR FAN RETURN AIR FAN CHILLED WATER COOLING COIL HOT WATER HEATING COIL ELECTRICAL DATA
REMARKS
MANUF. MODEL LENGTH WIDTH HEIGHT
AIRFLOW
(CFM)
E.S.P.
(IN WG)
DRIVE
TYPE
QTY
MOTOR
HP
AIRFLOW
(CFM)
E.S.P.
(IN WG)
DRIVE
TYPE
QTY.
MOTOR
HP
CAPACITY (MBH) EAT (°F) LAT (°F) CAPACITY
(MBH)
EAT
DB (°F)
LAT
DB (°F)
VOLTAGE
(V)
PHASE
(Ph)
FAN FLA (A)
TOTAL SENSIBLE DB WB DB WB SUPPLY RETURN
S201 AHU-1 TRANE CSAA066 S201
MECHANICAL
ROOM
100 141 93 16510 35,000 4.88 DIRECT 4 15 35,000 1.46 DIRECT 4 7.5 1,261.2 1,000.1 78 64 52 52 941.8 45 70 460 3 18.1 9.8
S202 AHU-1 TRANE CSAA066 S202
MECHANICAL
ROOM
100 141 93 16510 35,000 4.88 DIRCET 4 15 35,000 1.46 DIRCET 4 7.5 1,261.2 1,000.1 78 64 52 52 941.8 45 70 460 3 18.1 9.8
WATER COOLED CHILLER SCHEDULE
MARK TYPE
BASIS OF DESIGN
SERVICE
DIMENSIONS (IN)
WEIGHT
(LBS)
FLUID
TYPE
COMPRESSOR EVAPORATOR CONDENSER
NO. OF
MODULES
REFRIGERANT
CHARGE PER
MODULE
REMARKS
MANUF. MODEL # LENGTH WIDTH HEIGHT
COOLING
CAPACITY (MBH)
VOLTAGE PHASE MCA MOCP STARTER EER EWT (°F) LWT (°F) GPM
FLUID PD
(FT HD)
FOULING
FACTOR
EWT (°F) LWT (°F) GPM
FLUID PD
(FT HD)
FOULING
FACTOR
CH-1 MODULAR TRANE MWC 3x80TON CHILLED WATER 102 66 78 7800.00 lbf WATER 2,880.0 460 3 421 500 17.26 56 44 481 6.85 0.0001 80 90 702 11.30 0.00025 3 52 LBS
REMARKS:.
1. UNIT SHALL HAVE TWO COMPRESSORS (MINIMUM) PER MODULE.
2. PROVIDE FOUR-PIPE REVERSIBLE UNIT.
3. ALL SCHEDULED VALUES CORRESPOND TO THE UNIT AS A WHOLE, MADE UP OF MULTIPLE MODULES. VALVES PER MODULE ARE SPECIFICALLY NOTED.
4. REFRIGERANT SHALL BE R-454B.
5. PROVIDE COMPRESSORS WITH ACOUSTICAL WRAP.
6. OTHER ACCEPTABLE MANUFACTURERS: CLIMATE MASTER, FHP OR WATER FURNACE.
7. PROVIDE WITH SINGLE POINT POWER CONNECTION.
PLATE & FRAME HEAT EXCHANGER SCHEDULE
MARK
BASIS OF DESIGN
TYPE SERVICE
DIMENSIONS (IN) TOTAL HEAT
TRANSFER
(MBH)
EVAPORATOR SIDE COLD SIDE (CONDENSER)
REMARKS
MANUF. MODEL # LENGTH WIDTH HEIGHT GPM
MAX P.D.
(FT)
EWT
(°F)
LWT
(°F)
GPM
MAX P.D.
(FT)
EWT
(°F)
LWT
(°F)
HX-1 BELL & GOSSETT AP110 WATER CONDENSER 79 26 111 549.0 600 2.00 92 80 1,000 5.00 78 85
REMARKS:.
1. PROVIDE SINGLE PASS WITH STAINLESS STEEL PLATES AND FLANGED PIPING CONNECTIONS.
2. OTHER ACCEPTABLE MANUFACTURERS: ALFA LAVAL, ARMSTRONG & TACO.
AIR SEPARATOR SCHEDULE
MARK MANUFACTURER MODEL # SERVICE
WATER
FLOW RATE
(GPM)
WATER
PRESSURE DROP
(FT HD)
REMARKS
AS-3 BELL & GOSSETT RL-6 CH-1 1,000 13.7
EXISTING VAV TERMINAL UNIT SCHEDULE - CONTROLS REPLACEMENT
MARK BOX TYPE
INLET
SIZE
AIRFLOW (CFM) HOT WATER COIL
REMARKS
MAX. MIN. CFM GPM CAPACITY (MBH)
VAV 1A-4 COOLING ONLY 5"ø 270 40
VAV 1A-9 COOLING ONLY 5"ø 260 30
VAV 1A-13 COOLING ONLY 6"ø 330 40
VAV 3A-3 COOLING ONLY 10"ø 830 100
VAV 3A-4 COOLING ONLY 10"ø 962 120
VAV 3B-8 FAN POWERED BOX 10"ø 938 120 700 1 15.2 1/4 HP - 277V
VAV 3B-10 FAN POWERED BOX 12"ø 1,558 190 1,170 1.5 24.6 1/2 HP - 277V
VAV 3B-16 FAN POWERED BOX 6"ø 352 40 260 0.5 5.9 1/6 HP - 277V
VAV 3A-18 COOLING ONLY 6"ø 300 60
VAV 3B-21 FAN POWERED BOX 6"ø 376 50 280 0.5 7.1 1/6 HP - 277V
VAV 3B-22 FAN POWERED BOX 12"ø 1,368 170 1,030 1.5 22.2 1/2 HP - 277V
VAV 3C-24 COOLING ONLY 4"ø 130 65
VAV 3B-26 FAN POWERED BOX 10"ø 1,028 130 770 1 17.5 1/4 HP - 277V
REFRIGERANT CALCULATIONS
R454B
EFFECTIVE
VOLUME
(V )
REFRIGERANT
CONCENTRATION
LIMIT
(RCL)
OCCUPANCY
ADJUSTMENT
FACTOR
(F )
EFFECTIVE
DISPERSAL
VOLUME CHARGE
(EDVC)
REFRIGERANT
eff
29,520 CF 3.1 LBS/1000 CF 1.0 91.5 LBS
RCL OF R454B = 3.1 LBS/1,000 CF
F BUSINESS OCCUPANCY: 1.0
EDVC = Veff x RCL x Focc
EDVC = 29,517 CF x 3.1 LBS/1,000 SF x 1.0
91.5 LBS of Refrigerant
52 LBS < 91.5 LBS
occ
LOCATION
180 MECH
REMARKS:
1. SEE UNIT LOCATIONS ON SHEET M403.
MAXIMUM
CHARGE OF
SINGLE
CIRCUIT
52 LBS
occ
OUTSIDE AIR TABLE FOR AHUS
AHU-1 S201
NON-ECONOMIZER
MAXIMUM CFM
NOTESUNIT
11,500 SEE M502 CONTROLS
MINIMUM
OUTSIDE
AIR CFM
6,300
AHU-1 S202 9,5004,500 SEE M502 CONTROLS
TEMPORARY CHILLER SCHEDULE
MARK TYPE SERVICE
COMPRESSOR
EVAPOR
ATOR
REMARKS
COOLING
CAPACITY (TONS)
VOLTAGE PHASE GPM
TCH-3 AIR-COOLED BUILDING S203 40.0 208 3 80
REMARKS:.
1. PROVIDE WITH 150kVA- 208V/480V STEP-UP TRANSFORMER CAM CONNECTIONS, (2)
4"x100FT HOSE BOX, 2/0 x 100FT CABLE BOX, 2/0 x 50FT CABLE BOX, AND INTEGRAL PUMP.
# Date Description
1 10/10/2025 100% DD SET
2 12/12/2025 100% CD SET
3 03/23/2026 100% Construction Documents
4 07/21/2026 BID DOCUMENTS
WALL RATING LEGEND
NON-RATED PARTITION
1 HR. RATED PARTITION TO DECK
2 HR. RATED PARTITION TO DECK
M111
M112
M113
M114
M115
M116
M121
M122
M123
M124
8801 J.M. Keynes Drive, Suite 240 Charlotte, NC 28262
T: 704.376.7072
N
F
IL
E N A M E
P L O T
T
IM
E
PROJECT
CLIENT
CONSULANTS
REGISTRATION
KEYPLAN
ISSUE / REVISION
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
S
J
E M
A
RUCL.
31478
IR
E
SEAL
HTRO
N
ORAC
ANLI
E
EENIGN R
R
P
OISSEFO LAN
S201
C
U se rs \D
S p ro u l\ D o cu m e n ts
\R C C C B u ild in g S
R e n o v a ti o n s_
M e ch v d a n M
C n L .r v t
/1
/2
:0 :4
P
M
M110
ROWAN-CABARRUS COMMUNITY
COLLEGE
1531 TRINITY CHURCH RD, CONCORD, NC,
28027
ROWAN-CABARRUS
COMMUNITY COLLEGE
1531 TRINITY CHURCH RD,
CONCORD, NC, 28027
8/10/2026
CMTA: 223.081.00
S201 OVERALL PLAN
SCO: 23-26928-01B
02' 2' 4' 8'
3/16" = 1'-0"M110
1 S201 OVERALL PLAN
# Date Description
1 10/10/2025 100% DD SET
2 12/12/2025 100% CD SET
3 03/23/2026 100% Construction Documents
4 07/21/2026 BID DOCUMENTS
6 08/10/2026 ADDENDUM 2
THIS IS A PHASED PROJECT TO BE PERFORMED IN OCCUPIED BUILDINGS AND MAY
REQUIRE OVERTIME AND WEEKEND WORK TO ACCELERATE COMPLETION WHILE
MINIMIZING DISRUPTION TO ONGOING OPERATIONS AND BUILDING OCCUPANTS. A
MINIMUM 72-HOUR ADVANCE NOTICE WITH APPROVAL IS REQUIRED FOR WEEKEND
OR OVERTIME SHIFTS. ANY PLANNED POWER, WATER, OR HVAC SHUTDOWNS
SHALL BE COORDINATED WITH THE OWNER AND SCHEDULED DURING APPROVED
NIGHT OR WEEKEND WINDOWS TO AVOID IMPACTS TO BUILDING OCCUPANTS.
GENERAL NOTE:
S
S
S
D
E
M212
54x28 RA(EX)54x28 RA
(EX)FD
(EX)FD
(EX)12x6 EA
(EX) AHU-1
(E X
H
W R
(E X
H
W
S (EX)AC-1
(EX)WH-1
(EX) UH-1
(EX) UH-2
(EX)54x28 RA (EX)54x28 RA
(EX)FD (EX)FD
(EX)48x24 MPSA
(EX)64x18 MPSA
(EX)48x24 MPSA
(EX)FD
(E X
)4 x M
P S
A
(EX)FD
(EX)FD
(E X
)4 x R
A
(EX) 4" CHWR (EX) 4" CHWS
(EX) HWR
(E X
H
W R
120x40 RA
54x28 RA
42x42 RA
"ø
R A
24"ø RA(4)
140x34 MPSA
20"ø MPSA
(4)
20"ø MPSA
"ø
R A
20"ø MPSA
202 LEVEL 1
0' - 0"
202 LEVEL 2
16' - 0"
28x54 RA
28x54 RA 42x42 RA
(EX)28x54 RA
(EX)FD
(EX)28x54 RA
(EX)48x24 MPSA (EX)18x64 MPSA
(EX)6x12 EA (EX)F-4
(4)
(EX)28x54 RA
(EX)FD
(EX)FD
(EX) AHU-1
1/2" HWR
(EX) UH-1
x M
P S
A
20"ø
24"ø RA
24"ø RA
20"ø MPSA
20"ø MPSA
20"ø MPSA
20"ø MPSA
WALL RATING LEGEND
NON-RATED PARTITION
1 HR. RATED PARTITION TO DECK
2 HR. RATED PARTITION TO DECK
N
8801 J.M. Keynes Drive, Suite 240 Charlotte, NC 28262
T: 704.376.7072
F
IL
E N A M E
P L O T
T
IM
E
PROJECT
CLIENT
CONSULANTS
REGISTRATION
KEYPLAN
ISSUE / REVISION
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
S
J
E M
A
RUCL.
31478
IR
E
SEAL
HTRO
N
ORAC
ANLI
E
EENIGN R
R
P
OISSEFO LAN
S202
C
U se rs \D
S p ro u l\ D o cu m e n ts
\R C C C B u ild in g S
R e n o v a ti o n s_
M e ch v d a n M
C n L .r v t
/1
/2
:0 :4
P
M
M212
ROWAN-CABARRUS COMMUNITY
COLLEGE
1531 TRINITY CHURCH RD, CONCORD, NC,
28027
ROWAN-CABARRUS
COMMUNITY COLLEGE
1531 TRINITY CHURCH RD,
CONCORD, NC, 28027
8/10/2026
CMTA: 223.081.00
S202 MECHANICAL ROOM
TEMPORARY HVAC PLAN AND
SECTION
SCO: 23-26928-01B
3/8" = 1'-0"M212
1 S202 MECHANICAL ROOM TEMPORARY HVAC PLAN
01' 1' 2' 4'
3/8" = 1'-0"M212
2 S202 MECHANICAL ROOM TEMPORARY HVAC SECTION
01' 1' 2' 4'
MECHANICAL KEYNOTES
46 CONNECT TEMPORARY 20" DIAMETER MPSA DUCTWORK TO EXISTING 64x18 MPSA AND 48x24 MPSA VIA TEMPORARY 140x34 MPSA PLENUM AND MPSA CONNECTION DUCTWORK
AS SHOWN.
47 CONNECT TEMPORARY 24" DIAMETER RA DUCTWORK TO EXISTING 54x28 RA AND 48x28 RA VIA TEMPORARY 120x40 RA PLENUM AND RA CONNECTION DUCTWORK AS SHOWN.
48 RE-INSTALL EXISTING DUCT MOUNTED SMOKE DETECTOR IN NEW RETURN DUCT AND TIE
IN TO FIRE ALARM SYSTEM.
THE INTENT IS TO PROVIDE HEATING/COOLING TO BUILDING S202 USING
TEMPORARY AHUs AND DUCTWORK IN ORDER TO REMOVE THE OLD UNIT
SECTIONS AND INSTALL THE NEW SECTIONS. CONTRUCT AND INSTALL AS MUCH
DUCTWORK AND PIPING PRIOR TO SHUTDOWNS OF UNIT TO MINIMIZE DOWNTIME.
COORDINATE SHUTDOWNS OF UNIT WITH THE RCCC REPRESENTATIVE.
INSTALL TEMPORARY UNITS AND ROUTE AS MUCH TEMPORARY DUCTWORK TO
EXISTING AREAWAY AND INSIDE MECHANICAL ROOM TO AHU-1 CONNECTION
POINTS AS POSSIBLE. PREPARE TEMPORARY ACOUSTICAL PLENUM CONNECTIONS
TO EXISTING BUILDING SUPPLY AND RETURN DUCTWORK.
REMOVE EXISTING RELIEF/EXHAUST LOUVER AND SET ASIDE. DEMOLISH EXISTING
SUPPLY AND RETURN AIR CONNECTIONS TO BUILDING DUCTWORK. REMOVE AS
MUCH OF SUPPLY AND RETURN AIR PLNEUMS ON AHU-1 AS REQUIRED FOR
CONNECTION OF TEMPORARY DUCTWORK.
INSTALL TEMPORARY SUPPLY AND RETURN PLENUMS ON EXISTING BUILDING
SUPPLY AND RETURN DUCTWORK AND CONNECT TEMPORARY DUCTS. START AND
BALANCE TEMPORARY UNIT TO SERVE ENTIRE BUILDING.
REMOVE EXISTING OUTSIDE AIR LOUVER AND OUTSIDE AIR PLENUM AS REQUIRED
AND SET ASIDE LOUVER. DEMOLISH REMAINING AHU-1 SECTIONS AND ASSOCIATED
DUCTWORK, PIPING, AND ELECTRICAL CONNECTIONS.
INSTALL NEW AHU-1 SECTIONS, CONTROLS, AND ALL ASSOCIATED DUCTWORK AND
PIPING AS POSSIBLE. PREPARE CONNECTIONS TO EXISTING BUILDING DUCTWORK
AND PIPING.
DEMOLISH TEMPORARY CONNECTIONS, CONNECT AHU-1 TO EXISTING DUCTWORK
AND START NEW AHU-1 TO SERVE THE BUILDING.
REMOVE ALL REMAINING TEMPORARY DUCTWORK AND UNIT..
REINSTALL LOUVERS AND ASSOCIATED PLENUMS, REBUILD AND PATCH EXISTING
WALLS AS REQUIRED, AND FINALIZE BALANCING OF NEW AHU-1.
SCHEDULING CONSIDERATIONS:
# Date Description
1 10/10/2025 100% DD SET
2 12/12/2025 100% CD SET
3 03/23/2026 100% Construction Documents
4 07/21/2026 BID DOCUMENTS
(EX) AHU-1
1. PROVIDE WET TAP FOR EMERGENCY
CONNECTION TO TEMPORARY 2-1/2" CHWS/R
PIPING FROM TEMPORARY CHILLER, TCH-3.
SEAL OPENING WITH NON-SHRINK GROUT
AND PROVIDE BRUSHED STAINLESS STEEL
WALL FLANGE AROUND EACH PIPE.
THE INTENT IS TO QUICKLY PROVIDE COOLING
TO BUILDING S203 IF CHILLERS GO DOWN
DURING CONSTRUCTION.
2 1/2" CHWR 2 1/2" CHWS
BLIND FLANGE
(EX) AHU-1
WALL RATING LEGEND
NON-RATED PARTITION
1 HR. RATED PARTITION TO DECK
2 HR. RATED PARTITION TO DECK
N
8801 J.M. Keynes Drive, Suite 240 Charlotte, NC 28262
T: 704.376.7072
F
IL
E N A M E
P L O T
T
IM
E
PROJECT
CLIENT
CONSULANTS
REGISTRATION
KEYPLAN
ISSUE / REVISION
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
S
J
E M
A
RUCL.
31478
IR
E
SEAL
HTRO
N
ORAC
ANLI
E
EENIGN R
R
P
OISSEFO LAN
S203
C
U se rs \D
S p ro u l\ D o cu m e n ts
\R C C C B u ild in g S
R e n o v a ti o n s_
M e ch v d a n M
C n L .r v t
/1
/2
:0 :4
P
M
M311
ROWAN-CABARRUS COMMUNITY
COLLEGE
1531 TRINITY CHURCH RD, CONCORD, NC,
28027
ROWAN-CABARRUS
COMMUNITY COLLEGE
1531 TRINITY CHURCH RD,
CONCORD, NC, 28027
8/10/2026
CMTA: 223.081.00
S203 MECHANICAL ROOM FLOOR
PLANS
SCO: 23-26928-01B
1/4" = 1'-0"M311
1 S203 MECHANICAL ROOM TEMPORARY NEW WORK PLAN
1/4" = 1'-0"M311
2 S203 MECHANICAL ROOM TEMPORARY DEMOLITION PLAN
2' 0 2' 4' 8'
2' 0 2' 4' 8'
# Date Description
1 10/10/2025 100% DD SET
2 12/12/2025 100% CD SET
3 03/23/2026 100% Construction Documents
4 07/21/2026 BID DOCUMENTS
| Addendum 2 cover |
| 01 23 00 - Alternates |
| G000 - COVER SHEET |
| G101 - BUILDING S201 FLOOR PLANS |
| M002 - MECHANICAL SCHEDULES |
| M110 - S201 OVERALL PLAN |
| M212 - S202 MECHANICAL ROOM TEMPORARY HVAC PLAN AND SECTION |
| M311 - S203 MECHANICAL ROOM FLOOR PLANS |
File details come from the government source that posted it. Updated .