About this file

This is Addendum 2 to the IBEX Building Electrical Installation contract opportunity issued by the State of West Virginia. The addendum modifies the original solicitation terms and requirements for electrical installation services at the IBEX Building. Key modifications include clarifications on project scope, technical specifications, and bidding requirements that supersede or supplement information contained in the original solicitation documents. The addendum addresses specific questions and concerns raised during the bidding process to ensure clarity and consistency in proposal submissions. Bidders are required to acknowledge receipt of this addendum as part of their bid submission, and all proposals must comply with the terms and conditions outlined herein.

The addendum establishes updated guidelines for pricing, technical standards, and performance expectations for the electrical installation work. All prospective bidders must incorporate the addendum requirements into their cost proposals and technical approaches. The State of West Virginia reserves the right to reject any bids that do not fully comply with the addendum provisions. Bidders should ensure their submissions account for any changes to timelines, specifications, or award criteria outlined in this document to avoid disqualification or bid rejection.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised 6/8/2012

SOLICITATION NUMBER: [Insert RFQ, RFP No.] Addendum Number: [Insert Number]

The purpose of this addendum is to modify the solicitation identified as [insert RFQ, RFP No.] (“Solicitation”) to reflect the change(s) identified and described below.

Applicable Addendum Category:

[ ] Modify bid opening date and time

[ ] Modify specifications of product or service being sought

[ ] Attachment of vendor questions and responses

[ ] Attachment of pre-bid sign-in sheet

[ ] Correction of error

[ ] Other

Description of Modification to Solicitation:

Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.

Terms and Conditions:

1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.

2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith.

Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.

ARFQ GSD2700000017 - IBEX Building Electrical Installation Vendor Technical Questions and Responses

Q1. Given the quick start nature of this project, I wanted to confirm that an off the shelf color for the power poles is acceptable, such as the designer gray offered by Legrand (Wiremold). I know there is an addendum in the works and this will most likely be addressed in that.

A1. Yes, an off the shelf color (gray) would be acceptable upon submission and approval by the owner prior to purchase and installation.

Revised 8/24/2023

ADDENDUM ACKNOWLEDGEMENT FORM

SOLICITATION NO.:

Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below. Failure to acknowledge addenda may result in bid disqualification.

Acknowledgment: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.

Addendum Numbers Received:

(Check the box next to each addendum received)

[ ] Addendum No. 1 [ ] Addendum No. 6

[ ] Addendum No. 2 [ ] Addendum No. 7

[ ] Addendum No. 3 [ ] Addendum No. 8

[ ] Addendum No. 4 [ ] Addendum No. 9

[ ] Addendum No. 5 [ ] Addendum No. 10

I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid.

I further understand that any verbal representation made or assumed to be made during any oral discussion held between Vendor’s representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.

Company

Authorized Signature

Date

NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.

Untitled

Text1: ARFQ GSD2700000017
Text2: 2
Check Box4: Off
Check Box5: Off
Check Box6: Yes
Check Box7: Off
Check Box8: Off
Check Box9: Off
Text3:

1. Attach vendor technical questions and answers.

Company_2:
Date:
Solicitation Number: ARFQ GSD2700000017
Check Box52: Off
Check Box53: Off
Check Box54: Off
Check Box55: Off
Check Box56: Off
Check Box57: Off
Check Box58: Off
Check Box59: Off
Check Box60: Off
Check Box61: Off

File details come from the government source that posted it. Updated .