This is an Engineer's Estimate for the Holly Hill Bypass Pumps project prepared by Zev Cohen & Associates, Inc. for the City of Holly Hill in Volusia County, Florida. The project encompasses the procurement and installation of three emergency bypass pumps with associated equipment and improvements to construct operating emergency pumps for three existing sanitary pumping stations within the city. The work includes construction of concrete slabs for the bypass pumps to meet current Building Codes, installation of required Ductile Iron Pipe to plumb the bypass pumps to existing wet wells and force mains, necessary wiring connections to make the bypass systems fully functional and operate independently from existing pump station control systems, and acquisition and installation of specified Solar Panels and Controllers for each bypass pump to maintain charged starting batteries for system operation.

The Engineer's Estimate dated August 19, 2025, is submitted at the 100% design phase and breaks down project costs as follows: Site Preparation at $27,597.50, Sewage Collection System at $341,310.00, and Roadway System at $21,457.50, for a project subtotal of $390,365.00. With a 10% project contingency of $39,036.50, the project grand total is $429,401.50. The estimate was prepared by J. Dillard Engineers and includes final engineering plans and specifications for grading and utilities work associated with the lift station improvements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BY

SU

BM

IT

TA

LS

R

EV

IS

IO

N S

D

AT

E N

O

XREF'S: 24300_BASE.DWG

XREF'S: 24300 SURV.DWG

DRAFTED BY: TR

CHECKED BY: JD

DRAWING FILE: 03-05_24300 PGD

SHEET: OF

DESIGNED BY: JD

PROJECT NO: ZC 24300

NOT VALID WITHOUT SEAL

A

S S

O C

IA

T

E S

IN

C

Z E

V C

O H

E N

CI

VI

L

EN

GI

N

EE

RI

N G

LA

N

DS

CA

PE

A

RC

HI

TE

CT

U

RE

EN

VI

RO

N

M

EN

TA

L

PL

AN

N

IN

G

TR

AN

SP

O

RT

AT

IO

N

(L C

2)

(E

B

IN

TE

RC

HA

N

GE

B

LV

D.

, S

TE

. C

O

RM

O N

D

BE

AC

H, F L

W W

W .Z

EV

CO

HE

N

.C O

M

C4 6

H O

L L

Y H

IL

L

B Y

PA

SS

P U

M

PS

FI

N

A L

E N

G

IN

E E

R

IN

G P

L A

N S

G R

A D

IN

G

A N

D U

T

IL

IT

IE

S L

IF

T

S T

A T

IO

N

JOHN A. DILLARD, JR., P.E., NO. 37256

C

IT

Y O

F H

O

LL

Y H

IL

L

VO

LU

SI

A

C O

U N

TY

, F

LO

R

ID

A

DAHLIA AVENUE 40' R/W PLAT

20' WIDE ASPHALT PAVEMENT

6TH STREET

40' R/W PLAT

(FORMERLY MICHIGAN AVENUE)

24' WIDE ASPHALT PAVEMENT

0/ 3/

J D

A D

D E

N D

U M

August 19, 2025

HOLLY HILL BYPASS PUMPS

ZC 24300

Engineer's Estimate 100% Submittal

J. Dillard

Engineers l Planners l Landscape Architecture

Estimator:

Project Revision:

300 Interchange Blvd l Ormond Beach, FL 32174

386.677.2482 l Fax 386.677.2505

Project Name: HOLLY HILL BYPASS PUMPS Project Number: ZC 24300 Date: August 19, 2025 Item: Engineer's Estimate 100% Submittal

300 Interchange Blvd. Ormond Beach, FL Phone: 386-677-2482 Fax: 386-677-2505

Engineers . Planners . Landscape Architecture

Item Amount

Site Preparation 27,597.50$

Sewage Collection System 341,310.00$

Roadway System 21,457.50$

PROJECT TOTAL 390,365.00$

10% PROJECT CONTENGENCY 39,036.50$

PROJECT GRAND TOTAL 429,401.50$

Project Totals

Add, 1, Sheet C4_ 24300 Holly Hill Bypass Pumps.pdf
Estimate 8.19.2025 (provided)