Sewer Bypass Pumps For 3 Lift Stations - HMGP
Solicitation number
25-WW-08
Issued by
Volusia County, Florida

About this file

This document comprises Final Engineering Plans for the Holly Hill Bypass Pumps project prepared by Zev Cohen & Associates, Inc. for the City of Holly Hill, Volusia County, Florida. The project encompasses the procurement and installation of three emergency bypass pumps with associated equipment and improvements at three existing sanitary lift stations within the city. The engineering plans include detailed construction notes, grading and utilities layouts for Lift Stations #7, #14, and #16, and standard construction details specifying materials, installation requirements, and operational procedures. Key specifications require reinforced concrete wet well construction to ASTM C-76 standards at 4,000 PSI strength, ductile iron flanged joint fittings for pump suction lines, 316 stainless steel bolts and hardware, epoxy lining or alternative approved materials for lift station interiors, and three-phase electrical power with copper wiring. The plans mandate emergency electrical receptacles, high-level wet well alarms with both audible and visual indicators, linkable fused electrical disconnects, radio telemetry (RTU) units supplied by the developer, and concrete slabs meeting current applicable building codes.

Critical construction requirements include mandatory RAMNECK joint material with EZ-WRAP butyl adhesive tape for wet well section connections, sealed entry points utilizing rubber boots or city-approved infiltration-limiting methods, and comprehensive testing and inspection protocols before final acceptance. The contractor must obtain electrical permits, coordinate start-up inspections with the city's site inspector a minimum of two business days in advance, and provide three copies of lift station operating manuals to the Public Works Department prior to final acceptance. Representatives from the pumping equipment manufacturer, Data Flow Systems, and the electrical contractor must be present at pump station start-up testing and final site inspections. The developer/contractor assumes all initial electrical connection charges on the day of final acceptance, with the City's Public Works Department assuming responsibility for all future monthly electrical bills. All ground surrounding pump stations must be graded with #57 stone, and effective erosion and positive drainage control must be demonstrated before final acceptance approval.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFTED BY: TR

CHECKED BY: JD

DRAWING FILE: 01_24300 COV

SHEET: OF

DESIGNED BY: JD

PROJECT NO: ZC 24300

NOT VALID WITHOUT SEAL

A

S S

O C

IA

T

E S

IN

C

Z E

V C

O H

E N

CI

VI

L

EN

GI

N

EE

RI

N G

LA

N

DS

CA

PE

A

RC

HI

TE

CT

U

RE

EN

VI

RO

N

M

EN

TA

L

PL

AN

N

IN

G

TR

AN

SP

O

RT

AT

IO

N

(L C

2)

(E

B

IN

TE

RC

HA

N

GE

B

LV

D.

, S

TE

. C

O

RM

O N

D

BE

AC

H, F L

W W

W .Z

EV

CO

HE

N

.C O

M

C1 6

H O

L L

Y H

IL

L

B Y

PA

SS

P U

M

PS

FI

N

A L

E N

G

IN

E E

R

IN

G P

L A

N S

C O

V E

R S

H E

E T

JOHN A. DILLARD, JR., P.E., NO. 37256

C

IT

Y O

F H

O

LL

Y H

IL

L

VO

LU

SI

A

C O

U N

TY

, F

LO

R

ID

A

BY

SU

BM

IT

TA

LS

R

EV

IS

IO

N S

D

AT

E N

O

CITY OFFICIALS

CITY MANAGER JOSEPH FORTE

DISTRICT 1

DISTRICT 2

DISTRICT 3

COMMISSIONERS

MAYOR JOHN PENNY

DISTRICT 4

DEBRA SNOW

PENNY CURRIE

JEFFREY DELANOY

ROY JOHNSON

BID SET /19/20258

DRAWING FILE: 02_24300 NOT

SHEET: OF

DESIGNED BY: JD

PROJECT NO: ZC 24300

NOT VALID WITHOUT SEAL

A

S S

O C

IA

T

E S

IN

C

Z E

V C

O H

E N

CI

VI

L

EN

GI

N

EE

RI

N G

LA

N

DS

CA

PE

A

RC

HI

TE

CT

U

RE

EN

VI

RO

N

M

EN

TA

L

PL

AN

N

IN

G

TR

AN

SP

O

RT

AT

IO

N

(L C

IN

TE

RC

HA

N

GE

B

LV

D.

, S

TE

. C

O

RM

O N

D

BE

AC

H, F L

W W

W .Z

EV

CO

HE

N

.C O

M

C2 6

H O

L L

Y H

IL

L

B Y

PA

SS

P U

M

PS

FI

N

A L

E N

G

IN

E E

R

IN

G P

L A

N S

C O

N

ST

R U

C T

IO

N

N O

T E

S

JOHN A. DILLARD, JR., P.E., NO. 37256

C

IT

Y O

F H

O

LL

Y H

IL

L

VO

LU

SI

A

C O

U N

TY

, F

LO

R

ID

A

R

Know what's below.

Call before you dig.

IT

TA

LS

R

EV

IS

IO

N S

D

AT

E N

O

LS-2.1

LIFT STATION WET WELL

CONSTRUCTION NOTES

LIFT STATION WET WELL CONSTRUCTION NOTES (1 OF 2)

1. SEE CITY STANDARD DETAIL FOR EMERGENCY PUMP CONNECTION REQUIREMENTS.

2. SEE CITY STANDARD DETAIL FOR 1" HOSE BIBB AND REQUIREMENTS.

3. SEE CITY STANDARD ELECTRICAL DETAIL FOR ELECTRICAL REQUIREMENTS.

4. ALL PIPING AND FITTINGS IN WET WELLS TO BE ASSEMBLED USING 316 STAINLESS STEEL

BOLTS AND NUTS ONLY.

5. ALL PUMP SUCTION LINE FITTINGS TO BE DUCTILE IRON FLANGED JOINT,.

6. ALL SEWER LINES ENTERING AND EXITING MANHOLES SHALL BE SEALED UTILIZING RUBBER

BOOTS OR OTHER CITY APPROVED INFILTRATION LIMITING METHODS.

7. WET WELL SECTIONS SHALL BE JOINED USING "RAMNECK" JOINT MATERIAL AND SHALL BE

FREE FROM SEEPAGE PRIOR TO ACCEPTANCE. PROVIDE "EZ-WRAP" BUTYL ADHESIVE TAPE

PER MANUFACTURER'S RECOMMENDATIONS AT EACH WETWELL SECTION EXTERIOR JOINT

CIRCUMFERENCE.

8. NO SPLICES OR JUNCTION BOXES ARE ALLOWED FOR BALL FLOAT CORD INSTALLATION.

9. ALL LIFT STATIONS AND THE LAST MANHOLE COMING INTO A WETWELL SHALL BE EPOXY

LINED, AGRU SURE GRIP, OR H.D.P.E. LINED, OR OTHER MATERIAL AS APPROVED BY THE

CITY (ASTM D 3753).

10. WET WELL CONSTRUCTION SHALL BE REINFORCED CONCRETE IN ACCORDANCE WITH

A.S.T.M. C-76, 4000 PSI AT 28 DAYS. ALTERNATE CONSTRUCTION SHALL BE PRECAST

MONOLITHIC WITH BASE SLAB IN ACCORDANCE WITH A.S.T.M. C-478.

11. ELECTRICAL PERMIT TO BE OBTAINED FROM CITY (OR APPROPRIATE JURISDICTION) PRIOR

TO BEGINNING WORK ON ANY ELECTRICAL WIRING, EQUIPMENT, ETC. ALL ELECTRICAL

WIRING TO COMPLY WITH NATIONAL ELECTRICAL CODE.

12. THREE COPIES OF THE LIFT STATION OPERATING MANUAL TO BE PROVIDED TO THE PUBLIC

WORKS DEPT. PRIOR TO FINAL ACCEPTANCE OF THE LIFT STATION.

13. EMERGENCY ELECTRICAL RECEPTACLE REQUIRED TO BE INSTALLED ON ELECTRICAL

EQUIPMENT RACK, (SEE LS-10 AND LS-12).

14. EMERGENCY "HIGH LEVEL" WET WELL SOLID ALARM LIGHT AND AUDIBLE ALARM REQUIRED.

15. LINKABLE FUSED ELECTRICAL DISCONNECT REQUIRED.

16. ALL PUMP STATION WIRING SHALL BE STANDARD COPPER. THREE PHASE POWER AND

MOTORS REQUIRED.

17. RADIO TELEMETRY (RTU) TO BE PROVIDED BY DEVELOPER. CONTACT THE CITY FOR

SPECIFICATIONS OR CONTACT DIRECTLY THE CURRENT SOLE SOURCE SUPPLIER DATA

FLOW SYSTEMS.

18. DEVELOPER / CONTRACTOR TO PAY ALL INITIAL ELECTRICAL CONNECTION CHARGES, ETC.

ON THE DAY OF FINAL ACCEPTANCE BY THE CITY. ALL FUTURE MONTHLY ELECTRICAL BILLS

TO BE TAKEN OVER BY THE CITY'S PUBLIC WORKS DEPARTMENT. PLEASE CONTACT THE

PUBLIC WORKS DEPARTMENT TO TRANSFER POWER BILL OVER TO THE CITY.

19. 4" PVC CONDUIT FOR FLOAT WIRES SHALL BE INSTALLED FOR ALL OFFSET LIFT STATIONS.

20. ALL FENCING INSTALLED IN THE VICINITY OF LIFT STATIONS SHALL BE 6' HIGH CHAIN LINK

PLASTIC COATED, BLACK IN COLOR, WOODEN SHADOW BOX, OR MASONRY WALL AS

APPROVED BY THE COMMUNITY DEVELOPMENT DEPARTMENT IN COMPLIANCE WITH THE

ARCHITECTURAL AND LANDSCAPE REQUIREMENTS OF THE LDC. ANY SPECIAL FENCING

APPROVED AND INSTALLED SHALL BE MAINTAINED BY THE PRIVATE ENTITY RESPONSIBLE

ALL/ FENCING SHALL BE INSTALLED WITH A MINIMUM OF 24" CLEARANCE FROM ALL

ELECTRICAL / MECHANICAL EQUIPMENT.

02/2020

DETAIL NUMBER

DATECITY OF HOLLY HILL, FLORIDA

STANDARD CONSTRUCTION DETAILS

LS-2.2

LIFT STATION WET WELL

CONSTRUCTION NOTES

LIFT STATION WET WELL CONSTRUCTION NOTES (2 OF 2)

21. LIFT STATION START-UP INSPECTIONS SHALL BE SCHEDULED AND COORDINATED THROUGH

THE CITY'S SITE INSPECTOR (2 BUSINESS DAYS IN ADVANCE). UPON DETERMINING THAT ALL

WORK IS COMPLETE AND READY THE CITY INSPECTOR SHALL THEN NOTIFY THE CITY,

CONTRACTOR, ENGINEER OF RECORD, POWER COMPANY, DATA FLOW SYSTEMS, AND THE

PUMP SUPPLIER OF THE OFFICIAL START-UP INSPECTION DATE AND TIME. UPON

COMPLETION THE ENGINEER OF RECORD SHALL PROVIDE TO THE CITY A SUMMARY OF THE

RESULTS OF THAT TEST AND A LIST OF ALL PUNCH LIST ITEMS OUTSTANDING.

22. PUMP STATION FINAL INSPECTION AND ACCEPTANCE PROCEDURES:

· BEFORE FINAL APPROVAL OR ACCEPTANCE OF ANY PUMP STATION BY THE CITY, THERE

SHALL BE FIELD INSPECTIONS MADE BY THE CITY'S REPRESENTATIVE AND INSPECTOR.

THE FIELD INSPECTIONS SHALL SHOW THAT THE PUMP STATION IS FULLY OPERATIONAL

AND ALL NECESSARY APPURTENANCES HAVE BEEN INSTALLED AND CONSTRUCTED IN

ACCORDANCE WITH THE PLANS AND THE STANDARD CONSTRUCTION DETAILS AS

APPROVED BY THE PUBLIC WORKS DEPARTMENT PRIOR TO CONSTRUCTION.

· UPON COMPLETION AND BEFORE ACCEPTANCE OF THE PUMP STATION INSTALLATION,

THE CONTRACTOR SHALL TEST ALL THE PUMPING EQUIPMENT TO DEMONSTRATE

SATISFACTORY PERFORMANCE. IF DEFICIENCIES OCCUR, THE CONTRACTOR SHALL

CORRECT THEM ACCORDINGLY AND EQUIPMENT SHALL BE RETESTED.

· REPRESENTATIVES FROM THE PUMPING EQUIPMENT MANUFACTURER, DATA FLOW

SYSTEMS, AND THE ELECTRICAL CONTRACTOR SHALL BE PRESENT AT THE PUMP

STATION START-UP TESTING AND FOR THE FINAL SITE INSPECTION.

· ALL PUMP STATION EQUIPMENT SHALL BE TESTED AT THE START-UP. THE

MANUFACTURER/CONTRACTOR SHALL PROVIDE A FORMAL TEST PROCEDURE AND

FORMS FOR RECORDING DATA. THE TESTS SHALL BE PREFORMED BY THE CONTRACTOR

IN THE PRESENCE OF A CITY REPRESENTATIVE AND CITY INSPECTOR. THE RECORDED

FIELD DATA SHALL BE SUBMITTED TO THE PUBLIC WORKS DEPARTMENT ALONG WITH

THE PUMP STATION AS-BUILT AND PUMP STATION MAINTENANCE AND OPERATING

MANUALS.

· ALL GROUND SURROUNDING THE PUMP STATION MUST BE GRADED IN # 57 STONE FINAL

ACCEPTANCE OF THE PUMP STATION WILL NOT BE GIVEN UNTIL EFFECTIVE EROSION

AND POSITIVE DRAINAGE CONTROL HAVE BEEN PROVIDED.

· PUMP STATIONS SHALL ONLY BE CONSIDERED AS ACCEPTABLE FOR OPERATION BY THE

CITY UPON WRITTEN CONFIRMATION BY THE PUBLIC WORKS DEPARTMENT.

· IN THE EVENT THAT THE STATION OR ANY OF IT'S ASSOCIATED COMPONENTS ARE

DETERMINED TO BE DEFICIENT AT THE START UP, THEN THE CITY RESERVES THE RIGHT

TO REQUIRE A COMPLETE NEW START UP WITH ALL PARTIES PRESENT AS NOTED.

· UPON COMPLETION AND ACCEPTANCE, THE CITY SHALL NOTIFY THE ENGINEER OF

RECORD.

02/2020

DETAIL NUMBER

DATECITY OF HOLLY HILL, FLORIDA

STANDARD CONSTRUCTION DETAILS

DRAWING FILE: 03-05_24300 PGD

SHEET: OF

DESIGNED BY: JD

PROJECT NO: ZC 24300

NOT VALID WITHOUT SEAL

A

S S

O C

IA

T

E S

IN

C

Z E

V C

O H

E N

CI

VI

L

EN

GI

N

EE

RI

N G

LA

N

DS

CA

PE

A

RC

HI

TE

CT

U

RE

EN

VI

RO

N

M

EN

TA

L

PL

AN

N

IN

G

TR

AN

SP

O

RT

AT

IO

N

(L C

IN

TE

RC

HA

N

GE

B

LV

D.

, S

TE

. C

O

RM

O N

D

BE

AC

H, F L

W W

W .Z

EV

CO

HE

N

.C O

M

C3 6

H O

L L

Y H

IL

L

B Y

PA

SS

P U

M

PS

FI

N

A L

E N

G

IN

E E

R

IN

G P

L A

N S

G R

A D

IN

G

A N

D U

T

IL

IT

IE

S L

IF

T

S T

A T

IO

N

JOHN A. DILLARD, JR., P.E., NO. 37256

C

IT

Y O

F H

O

LL

Y H

IL

L

VO

LU

SI

A

C O

U N

TY

, F

LO

R

ID

IT

TA

LS

R

EV

IS

IO

N S

D

AT

E N

O

XREF'S: 24300_BASE.DWG

XREF'S: 24300 SURV.DWG

R

IV

E R

SID

E

D R

IV

E

50' R /W

PL

A

T

WALKER STREET

60' R/W PLAT

HALIFAX RIVER

IT

TA

LS

R

EV

IS

IO

N S

D

AT

E N

O

XREF'S: 24300_BASE.DWG

XREF'S: 24300 SURV.DWG

DRAFTED BY: TR

CHECKED BY: JD

DRAWING FILE: 03-05_24300 PGD

SHEET: OF

DESIGNED BY: JD

PROJECT NO: ZC 24300

NOT VALID WITHOUT SEAL

A

S S

O C

IA

T

E S

IN

C

Z E

V C

O H

E N

CI

VI

L

EN

GI

N

EE

RI

N G

LA

N

DS

CA

PE

A

RC

HI

TE

CT

U

RE

EN

VI

RO

N

M

EN

TA

L

PL

AN

N

IN

G

TR

AN

SP

O

RT

AT

IO

N

(L C

IN

TE

RC

HA

N

GE

B

LV

D.

, S

TE

. C

O

RM

O N

D

BE

AC

H, F L

W W

W .Z

EV

CO

HE

N

.C O

M

C4 6

H O

L L

Y H

IL

L

B Y

PA

SS

P U

M

PS

FI

N

A L

E N

G

IN

E E

R

IN

G P

L A

N S

G R

A D

IN

G

A N

D U

T

IL

IT

IE

S L

IF

T

S T

A T

IO

N

JOHN A. DILLARD, JR., P.E., NO. 37256

C

IT

Y O

F H

O

LL

Y H

IL

L

VO

LU

SI

A

C O

U N

TY

, F

LO

R

ID

A

DAHLIA AVENUE 40' R/W PLAT

20' WIDE ASPHALT PAVEMENT

6TH STREET

40' R/W PLAT

(FORMERLY MICHIGAN AVENUE)

24' WIDE ASPHALT PAVEMENT

DRAWING FILE: 03-05_24300 PGD

SHEET: OF

DESIGNED BY: JD

PROJECT NO: ZC 24300

NOT VALID WITHOUT SEAL

A

S S

O C

IA

T

E S

IN

C

Z E

V C

O H

E N

CI

VI

L

EN

GI

N

EE

RI

N G

LA

N

DS

CA

PE

A

RC

HI

TE

CT

U

RE

EN

VI

RO

N

M

EN

TA

L

PL

AN

N

IN

G

TR

AN

SP

O

RT

AT

IO

N

(L C

IN

TE

RC

HA

N

GE

B

LV

D.

, S

TE

. C

O

RM

O N

D

BE

AC

H, F L

W W

W .Z

EV

CO

HE

N

.C O

M

C5 6

H O

L L

Y H

IL

L

B Y

PA

SS

P U

M

PS

FI

N

A L

E N

G

IN

E E

R

IN

G P

L A

N S

G R

A D

IN

G

A N

D U

T

IL

IT

IE

S L

IF

T

S T

A T

IO

N

JOHN A. DILLARD, JR., P.E., NO. 37256

C

IT

Y O

F H

O

LL

Y H

IL

L

VO

LU

SI

A

C O

U N

TY

, F

LO

R

ID

IT

TA

LS

R

EV

IS

IO

N S

D

AT

E N

O

XREF'S: 24300_BASE.DWG

XREF'S: 24300 SURV.DWG

8th STREET

50' R/W PLAT

N A

R C

ISSU

S A

V E

N U

E 27.1' R

/W

PL

T

DRAWING FILE: 06_24300 DET

SHEET: OF

DESIGNED BY: JD

PROJECT NO: ZC 24300

NOT VALID WITHOUT SEAL

A

S S

O C

IA

T

E S

IN

C

Z E

V C

O H

E N

CI

VI

L

EN

GI

N

EE

RI

N G

LA

N

DS

CA

PE

A

RC

HI

TE

CT

U

RE

EN

VI

RO

N

M

EN

TA

L

PL

AN

N

IN

G

TR

AN

SP

O

RT

AT

IO

N

(L C

IN

TE

RC

HA

N

GE

B

LV

D.

, S

TE

. C

O

RM

O N

D

BE

AC

H, F L

W W

W .Z

EV

CO

HE

N

.C O

M

C6 6

H O

L L

Y H

IL

L

B Y

PA

SS

P U

M

PS

FI

N

A L

E N

G

IN

E E

R

IN

G P

L A

N S

C O

N

ST

R U

C T

IO

N

D E

T A

IL

S

JOHN A. DILLARD, JR., P.E., NO. 37256

C

IT

Y O

F H

O

LL

Y H

IL

L

VO

LU

SI

A

C O

U N

TY

, F

LO

R

ID

IT

TA

LS

R

EV

IS

IO

N S

D

AT

E N

O

LS-17

3' M

AX

NOTES:

1. BOLT VALVES TO TEE OR CROSS WHEREVER AND WHENEVER APPLICABLE.

2. A CONTINUOUS TRACER WIRE TO BE COLOR CODED "GREEN" FOR SEWER, LAID ON

TOP IN TRENCH .

3. GATE VALVE WEDGE SHALL BE COMPLETELY ENCAPSULATED WITH EDAM RUBBER.

4. ALL OUTSIDE HEX NUTS, BOLTS AND HARDWARE (EXCEPT MECHANICAL BOLTS

SUCH AS "T" BOLTS) SHALL BE MINIMUM 316 STAINLESS STEEL GRADE.

AIWA C509 & 515 DUCTILE IRON

BODIED EPOXY COATED RESILIENT

WEDGE GATE VALVE WITH 2"

OPERATING NUT.

MAIN RESTRAINED JOINTS

REQUIRED AT ALL VALVE

LOCATIONS

16"x16"x6" (MIN.)

PRECAST BLOCK

OR MIN. 6" THICK

#57 STONE

6" C-900 PVC

SLEEVE (USE

WITH CAST

IRON VALVE

BOX ONLY)

D

EP

TH

" M

IN

IM

U

M

WRENCH NUT OPEN

COUNTER-CLOCK

WISE

ADJUSTABLE CAST IRON

VALVE BOX COVER AND

ROUND LID

#4 RE-BAR

SET TOP OF VALVE BOX TO FINISHED

GRADE & FLUSH OF CONCRETE COLLAR.

"SEWER" ON TOP (PAINTED GREEN)

24"x24" SQUARE BY 6" THICK

CAST-IN-PLACE CONC. COLLAR

WITH # 4 RE-BAR RING AT CENTER

4' EXCESS WIRE

2" PVC W/ 2" FLAT BRASS CAP

ADJUSTABLE VALVE EXTENSION

ASSEMBLY, 2" SQ. WRENCH NUT

AND UPPER GUIDE REQUIRED FOR

MORE THAN 3 FT. DEPTH.

A CONTINUOUS No. 10

COPPERHEAD TRACER

WIRE COLOR CODED

GREEN

PRESSURE

SANITARY SEWER FORCE MAIN -

VALVE & VALVE BOX (4" - 16")

02/2020

DETAIL NUMBER

DATECITY OF HOLLY HILL, FLORIDA

STANDARD CONSTRUCTION DETAILS 02/2020

DETAIL NUMBER

DATECITY OF HOLLY HILL, FLORIDA

STANDARD CONSTRUCTION DETAILS

RD-11PAVEMENT BUTT JOINT

1-1/4"

PROPOSED SUBBASE

PROPOSED BASE

PROPOSED TYPE S-III ASPHALT

6"

6"

EXISTING SUBBASE

EXISTING BASE

EXISTING ASPHALT

SAW CUT AND TACK COAT EDGE2'-0"

BACKUP DIESEL PUMP

DIP

WET WELL SECTION

NTS

BACKUP PUMP LAYOUT

NTS

SP-50 12V PULSE TECH BATTERY SOLAR PULSE CHARGER, 50-WATT PART# 735X350

SLAB DETAIL

-9.5

Sheets and Views
C1 COVER SHEET
C2 CONSTRUCTION NOTES
C3 GRADING AND UTILITIES LIFT STATION #7
C4 GRADING AND UTILITIES LIFT STATION #14
C5 GRADING AND UTILITIES LIFT STATION #16
C6 CONSTRUCTION DETAILS