Addendum 1 PH-582-230-003. Replace Fire Panel MSP Barrack H LaPlata.pdf
PDF 172 KB Posted
- Solicitation number
- BPM032635
- Issued by
- Charles County, La Plata Town, Maryland
About this file
This document is Addendum No. 1 issued by the Maryland Department of General Services (DGS) for project PH-582-230-003, which involves the replacement of the fire alarm panel at the Maryland State Police (MSP) Barrack H in La Plata, Maryland. The addendum clarifies that a non-proprietary fire alarm system will be installed, requiring the replacement of all pull stations, strobes, smoke detectors, and related equipment, while the existing wiring will be reused. The work must be coordinated with the MSP and inspected by a third-party inspection company approved by the State Fire Marshal's Office, with all electrical permits secured by the contractor. Upon completion, the contractor must remove all excess materials and debris and repair any damages to the existing facility.
The addendum provides general requirements for the project, including the need to follow the DGS "Instructions to Bidders for Construction Projects and General Conditions of the Contract" document, adherence to normal business hours, and provisions for testing, training, and final acceptance by the State Fire Marshal. Pricing details, set-asides, funding sources, and other financial information are not included in this addendum.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
December 1, 2022
STATE OF MARYLAND
DEPARTMENT OF GENERAL SERVICES
Ellington E. Churchill, Jr.
PROJECT NO PH-582-230-003 (SBR)
DGS PROJECT NAME: REPLACE FIRE ALARM PANEL (SBR)
PROJECT LOCATION: MARYLAND STATE POLICE
MSP Barrack H LaPlata
This Addendum will clarify, add to, delete from, correct and/or change the bid documents for the project referenced above to the extent indicated. This Addendum is hereby made a part of the bid documents on which the contract will be based. By submitting a bid for this solicitation you acknowledge receipt of this addendum. All questions must be in writing and addressed to the
Procurement Officer, Christine Stenhouse.
This Addendum includes the following:
1) Pre-Bid Sign in Sheet
2) Pre-Bid Meeting minutes
REVISION: to the Project Manual
Since we are requesting that a Non-Propriety system is to be installed it has been decided to replace all the pull stations, strobes, smoke detectors, etc. to support the new Non-Propriety system in both the Barrack and the garage building. All parts and materials for Fire alarm systems-equipment, components and devices.
Please note that the wiring will remain in place and will be re-used.
VII. GENERAL REQUIREMENTS:
1. The Department of General Services “Instructions to Bidders for Construction Projects and General Conditions of the Contract between the Owner and Contractor" (Revised March 2007) is hereby made a part of this Contract.
2. All work shall be coordinated with the using agency at the work initiation meeting. Sequence of work shall be coordinated with the facility’s local DGS Field Inspector.
3. Work shall be accomplished during normal operating hours of 7:00 a.m. through 4:30 p.m., Monday through Friday, unless written permission to do otherwise is given by MSP.
4. The completed work is subject to the inspection and approval of:
The Department of General Services Construction Inspection Division.
The Agency Representative for MSP.
Final system must be accepted by the State Fire Marshal.
5. All electrical work required by the scope of this contract shall be inspected and approved by a non-governmental inspection company approved by the State Fire Marshal’s Office. All fees for said inspection shall be paid by the Contractor. The Contractor shall file for and secure all required electrical permits.
6. Upon completion of the Project, the Contractor shall remove all excess materials and debris and leave the Project site in a pre-existing condition.
7. Any damages to existing buildings, grounds, etc., caused by the Contractor shall be repaired to the satisfaction of the using agency at no additional cost to the State.
8. Testing and Training A. Testing shall be in accordance with all applicable code requirements, and respective national standards, and with the written requirements of the manufacturer(s) of the equipment.
B. Training shall include Demonstration of Operation for the MSP staff and shall be responsible for designating which staff members are to attend training, and a list of such shall be provided to the Contractor. Training shall be closely coordinated with the Center.
All other terms, conditions and specifications remain unchanged.
END OF ADDENDUM NUMBER: 1