This Addendum No. 1 modifies a Centralized Request for Quote (CRFQ) issued by the West Virginia Department of Administration Purchasing Division for the WV Army National Guard for domestic hot water systems improvements at Camp Dawson Billeting and RTI (Residential Training Instructors) facility in Kingwood, West Virginia. The project requires labor, materials, and associated costs to install complete and operable plumbing systems including domestic hot water piping, shutoff valves, circuit solver assemblies, expansion tanks, and circulators across multiple buildings (Wings 1-8). The mandatory prebid meeting was held on July 22, 2026 at 10:00 AM EST, with vendor technical questions due by July 28, 2026 at 11:00 AM EST. The bid opening date was moved to August 11, 2026 at 1:30 PM EST. The addendum includes pre-bid meeting sign-in sheets, responses to vendor questions, and detailed plumbing and electrical drawings for the project scope.

The scope of work encompasses Type K copper piping with soldered or mechanically pressed fittings for domestic water systems, installation of HTP-JS-48-108 hot water storage tanks, Taco CAF600-125P bladder-type expansion tanks, and Taco 0013 three-speed circulators with isolation valves and check valves. All work must comply with current International Plumbing Code, International Mechanical Code, and state and local codes. The project is divided into two phases with circuit solvers being installed sequentially to maintain hot water service during construction. Contractors must coordinate final scope, dimensions, fixture placement, and routing with all trades prior to bidding and verify all field conditions and measurements. All plumbing piping must be pressure tested with water, and air testing is not permitted. The solicitation number is CRFQ ADJ2700000002, and vendors must acknowledge receipt of this addendum and submit the acknowledgment form with their bid to avoid disqualification.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date Printed: Jul 30, 2026 Page: 1 FORM ID: WV-PRC-CRFQ-002 2020/05

Department of Administration Purchasing Division 2019 Washington Street East Post Office Box 50130 Charleston, WV 25305-0130

State of West Virginia Centralized Request for Quote

Construction

Proc Folder: 2007597 Reason for Modification:

Doc Description: Construct - Camp Dawson Billeting & RTI Domestic Hot Water Addendum No. 1

Proc Type: Central Purchase Order

Date Issued Solicitation Closes Solicitation No Version

2026-07-30 2026-08-11 13:30 CRFQ 0603 ADJ2700000002 2

BID RECEIVING LOCATION

BID CLERK

DEPARTMENT OF ADMINISTRATION

PURCHASING DIVISION

2019 WASHINGTON ST E

CHARLESTON WV 25305

US

VENDOR

Vendor Customer Code:

Vendor Name :

Address :

Street :

City :

State : Country : Zip :

Principal Contact :

Vendor Contact Phone: Extension:

FOR INFORMATION CONTACT THE BUYER

David H Pauline 304-558-0067 david.h.pauline@wv.gov

Vendor Signature X FEIN# DATE

All offers subject to all terms and conditions contained in this solicitation

Date Printed: Jul 30, 2026 Page: 2 FORM ID: WV-PRC-CRFQ-002 2020/05

ADDITIONAL INFORMATION

Addendum No. 1

Provide copies of the Pre-bid meeting sign-in sheets (see attached)

Provide responses to vendor questions regarding this solicitation (see attached)

Provide drawings for clarifications and in response to vendor questions (see attached)

To move the Bid opening date to August 11, 2026 at 1:30 pm EST.

No other changes.

INVOICE TO SHIP TO

ADJUTANT GENERALS

OFFICE

CAMP DAWSON ARMY

TRAINING SITE

1707 COONSKIN DR 240 ARMY RD

CHARLESTON WV KINGWOOD WV

US US

Line Comm Ln Desc Qty Unit Issue Unit Price Total Price 1 Domestic Hot Water Systems Improvements

Comm Code Manufacturer Specification Model #

72000000

Extended Description:

To provide Labor, materials and all associated costs for a Camp Dawson Billeting and RTI Domestic Hot Water Systems Improvements per the attached specifications.

SCHEDULE OF EVENTS

Line Event Event Date 1 Mandatory Prebid Meeting At 10:00 AM EST. 2026-07-22 2 Vendor Technical Questions Due By 11:00 AM Est. 2026-07-28

SOLICITATION NUMBER: CRFQ ADJ2700000002

Addendum Number: 1

The purpose of this addendum is to modify the solicitation identified as (“ADJ2700000002”) to reflect the change(s) identified and described below.

Applicable Addendum Category:

☒ Modify bid opening date and time.

☐ Modify specifications of product or service being sought.

☒ Attachment of vendor questions and responses.

☒ Attachment of pre-bid sign-in sheet.

☐ Correction of error.

☒ Other.

Description of Modification to Solicitation:

1. Provide copies of the Pre-bid meeting sign-in sheets (see attached)

2. Provide responses to vendor questions regarding this solicitation (see attached)

3. Provide drawings for clarifications and in response to vendor questions (see attached)

4. To move the Bid opening date to August 11, 2026, at 1:30 pm EST.

No other changes.

Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.

Terms and Conditions:

1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.

2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.

DNDN

WING 1

WING 2

WING 3

WING 4

WING 5

WING 6WING 8

WING 7

"ø

D T

W

1"ø DTWR

3"ø DTW

/4

"ø D

T W

R

3" DTW UP

3" DTW UP

"ø

D T

W

1 1

P403

RTI BILLETING

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.

5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A

PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE

USED TO THE LAST FIXTURE.

7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS

(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR

ALTERATIONS AND REPAIRS.

10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY

OPERATION.

11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/

ACCESSIBLE STOPS.

12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE

STOP (MEMORY STOPS).

13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS

IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE

OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED

ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.

14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL

BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED

OR MECHANICALLY PRESSED FITTINGS.

17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR

TESTING IS NOT PERMITTED.

18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND

MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL

OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL

PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.

19. ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERVENTIONAL PLUMBING CODE, INTERNATIONAL

MECHANICAL CODE, STATE AND LOCAL CODES AND

REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.

PLUMBING NOTES

1. NEW WING ISOLATION VALVE. REFER TO P501 DETAIL 4

FOR MORE INFORMATION ON LAYOUT.

2. INSTALL NEW THERMOMETER WITH CIRCUIT SOLVER

ASSEMBLY IN THIS LOCATION. REFER TO P501

SHEET NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

P101

FIRST FLOOR

DOMESTIC PLUMBING

PLAN

17 APR 2026

TRT

BCM

25007

BIDDING

DOCUMENTS

WV ARMY NATIONAL

GUARD

WVANG - DAWSON

BILLETING AND RTI

DOMESTIC HOT

WATER REPAIRS

1" = 30'-0"

FIRST FLOOR DOMESTIC PLAN - OVERALL

N O

D

E S

C R

IP

T

IO

N

D A

T E

A

D D

E N

D U

M

/2

/2

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

WING 5

WING 6

EXTEND ALTERNATE

DFAC PIPING UP TO

SECOND FLOOR

/4

"ø D

T W

R

NEW DTWR CONNECT. VALVE OFF WHEN ALT FEED NOT IN USE

INSTALL VALVES FOR THE INTERCONNECT & EACH BRANCH

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.

5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A

PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE

USED TO THE LAST FIXTURE.

7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS

(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR

ALTERATIONS AND REPAIRS.

10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY

OPERATION.

11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/

ACCESSIBLE STOPS.

12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE

STOP (MEMORY STOPS).

13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS

IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE

OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED

ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.

14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL

BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED

OR MECHANICALLY PRESSED FITTINGS.

17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR

TESTING IS NOT PERMITTED.

18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND

MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL

OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL

PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.

19. ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERVENTIONAL PLUMBING CODE, INTERNATIONAL

MECHANICAL CODE, STATE AND LOCAL CODES AND

REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.

PLUMBING NOTES

1. REPLACE EXISTING CIRCUIT SETTER WITH A NEW

CIRCUIT SOLVER. VERIFY LOCATION IN FIELD. (TYP)

SHEET NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

P101B

FIRST FLOOR

DOMESTIC PLUMBING

PLAN

17 APR 2026

TRT

BCM

25007

BIDDING

DOCUMENTS

WV ARMY NATIONAL

GUARD

WVANG - DAWSON

BILLETING AND RTI

DOMESTIC HOT

WATER REPAIRS

1/16" = 1'-0"

FIRST FLOOR DOMESTIC PLAN - AREA B

N O

D

E S

C R

IP

T

IO

N

D A

T E

A

D D

E N

D U

M

/2

/2

DNDN

INTERCONNECT

TAP TO BILLETING

FROM RTI

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.

5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A

PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE

USED TO THE LAST FIXTURE.

7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS

(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR

ALTERATIONS AND REPAIRS.

10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY

OPERATION.

11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/

ACCESSIBLE STOPS.

12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE

STOP (MEMORY STOPS).

13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS

IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE

OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED

ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.

14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL

BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED

OR MECHANICALLY PRESSED FITTINGS.

17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR

TESTING IS NOT PERMITTED.

18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND

MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL

OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL

PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.

19. ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERVENTIONAL PLUMBING CODE, INTERNATIONAL

MECHANICAL CODE, STATE AND LOCAL CODES AND

REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.

PLUMBING NOTES

1. REPLACE EXISTING CIRCUIT SETTER WITH A NEW

CIRCUT SOLVER. VERIFY LOCATION IN FIELD. (TYP)

SHEET NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

P101C

FIRST FLOOR

DOMESTIC PLUMBING

PLAN

17 APR 2026

TRT

BCM

25007

BIDDING

DOCUMENTS

WV ARMY NATIONAL

GUARD

WVANG - DAWSON

BILLETING AND RTI

DOMESTIC HOT

WATER REPAIRS

1/16" = 1'-0"

FIRST FLOOR DOMESTIC PLAN - AREA C

N O

D

E S

C R

IP

T

IO

N

D A

T E

A

D D

E N

D U

M

/2

/2

PHASE 1. SHUT OFF WATER AND INSTALL CIRCUIT SOLVER. REFER TO

DETAIL 1 ON P501. FOR RTI, IT WILL CONSIST OF 1 CIRCUIT SOLVER PER TAP

(1 WILL COVER 6 ROOMS ACROSS 3 FLOORS). REFER TO DETAIL 1 ON P502

FOR GENERAL LAYOUT OF DHW PIPING.

PHASE 2, SHUT OFF WATER AND INSTALL CIRCUIT SOLVER. REFER TO

DETAIL 1 ON P501. FOR RTI, IT WILL CONSIST OF 1 CIRCUIT SOLVER PER

TAP (1 WILL COVER 6 ROOMS ACROSS 3 FLOORS FOR RTI). REFER TO

DETAIL 1 ON P502 FOR GENERAL LAYOUT OF DHW PIPING. (TYP)

P101D

TIE IN VALVE OFF INITIAL CUT OFF

LOCATION FOR NEW 3" DHW TAP

FOR PHASE 2

1 1

ALTERNATE FEED TO DFAC AND TO BILLETING,

SEE SHEETS P101, P101B, P101C, P102

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

2. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

3. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.

5. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

6. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A

PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE

USED TO THE LAST FIXTURE.

7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS

(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR

ALTERATIONS AND REPAIRS.

10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY

OPERATION.

11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/

ACCESSIBLE STOPS.

12. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE

STOP (MEMORY STOPS).

13. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS

IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE

OF VALVE IS REMOVED. PROVIDE 24" x 24" 1HR RATED HINGED

ACCESS PANEL AT VALVE LOCATIONS IN DRYWALL CEILINGS.

14. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

15. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL

BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

16. DOMESTIC WATER PIPING TO BE TYPE "K" COPPER w/ SOLDERED

OR MECHANICALLY PRESSED FITTINGS.

17. PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR

TESTING IS NOT PERMITTED.

18. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND

MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL

OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL

PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.

19. ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERVENTIONAL PLUMBING CODE, INTERNATIONAL

MECHANICAL CODE, STATE AND LOCAL CODES AND

REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.

PLUMBING NOTES

PIPING OCCURS IN THE CEILING ON

THE FIRST FLOOR. CIRCUIT SOLVER

TO BE CONNECTED ON 1F. SEE P502

FOR MORE INFORMATION. (TYP)

1. REPLACE EXISTING CIRCUIT SETTER WITH A NEW

CIRCUT SOLVER. VERIFY LOCATION IN FIELD. (TYP)

SHEET NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

P101D

FIRST FLOOR

DOMESTIC PLUMBING

PLAN

17 APR 2026

TRT

BCM

25007

BIDDING

DOCUMENTS

WV ARMY NATIONAL

GUARD

WVANG - DAWSON

BILLETING AND RTI

DOMESTIC HOT

WATER REPAIRS

N O

D

E S

C R

IP

T

IO

N

D A

T E

A

D D

E N

D U

M

/2

/2

1/16" = 1'-0"

FIRST FLOOR DOMESTIC PLAN - AREA D

3/8" = 1'-0"

RTI GENERAL PIPING SECTION

DEMO SECTION OF PIPE

FOR INSTALLATION OF

NEW TAP

DEMO

DEMO

DEMO

DEMO FOR INSTALLATION OF NEW SHUTOFF VALVE

DEMO

EXISTING BOILER PIPING TO REMAIN

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.

INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A

PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE

USED TO THE LAST FIXTURE.

ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS

(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR

ALTERATIONS AND REPAIRS.

ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY

OPERATION.

PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/

ACCESSIBLE STOPS.

ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE

STOP (MEMORY STOPS).

ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS

IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE

OF VALVE IS REMOVED.

ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL

BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

DOMESTIC WATER PIPING TO BE TYPE "L" COPPER w/ SOLDERED

OR MECHANICALLY PRESSED FITTINGS.

PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR

TESTING IS NOT PERMITTED.

FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND

MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL

OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL

PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.

ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERVENTIONAL PLUMBING CODE, INTERNATIONAL

MECHANICAL CODE, STATE AND LOCAL CODES AND

REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.

PLUMBING NOTES

1. SELECTIVELY DEMO TANKS AND PIPING TO REPLACE

THE TANKS WHILE KEEPING THE HW SYSTEM IN

OPERATION, COORDINATE W/ ENGINEER AND OWNER.

SHEET NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

P401

ENLARGED

PLUMBING DEMO

PLAN - OPS

17 APR 2026

TRT

BCM

21014

BIDDING

DOCUMENTS

WV ARMY NATIONAL

GUARD

WVANG - DAWSON

BILLETING AND RTI

DOMESTIC HOT

WATER REPAIRS

N O

D

ES

C

R

IP

TI

O

N D

A

TE

AD

D

EN

D U

M

/2 9/

1/2" = 1'-0"1

OPS BOILER ROOM PLUMBING DEMO PLAN - ENLARGED

NOTE: ORIGINAL DOCUMENT IN COLOR

WATTS LF709 OR EQUAL

INSTALL SHUTOFF VALVE AFTER

CHILLER LOCATION SUCH THAT

IT IS NOT OVER THE CHILLER.

4"ø DHW

4"ø DHW

EXISTING WILL NOW BECOME

WATER SOFTENER BYPASS

EXISTING DOMESTIC COLD

WATER CONTROL CORP HF-300-TWIN 4"

WATER SOFTENER OR EQUIVALENT

3" ø

SA

N

TIE IN NEW TAP TO EXISTING SANITARY LINE OVERHEAD ON 1ST FLOOR BELOW

INSTALL 4" BUTTERFLY VALVES

INSTALL 4" BUTTERFLY VALVES

4"ø DHW

4" ø

D H

W

RECONNECT TO EXISTING 4"

CONNECT TO EXISTING TAP FOR BACKUP MAKE-UP WATER CONNECTION. ALT FEED DURING CONSTRUCTION

CONNECT TO EXISTING TAP

4" ø

H H

W R

4"ø DCW

4"ø DHW

ET-1

ET-1

3/4"ø HHWR

3/4"ø HHWR

3" ø

H H

W S

3"ø HHWS

3" ø

H H

W R 3" ø D

H W

RECONNECT TO EXISTING

3"ø HHWS

3"ø HHWR

4" ø

D H

W

3/4"ø DHW

3/ 4" ø D

H W

PROVIDE BALL ISOLATION

VALVES AT ALL TANK PIPING

CONNECTIONS

3/4"ø HHWR

3/4"ø HHWR

3/4"ø HHWR

1.

2.

3.

4.

5.

INSTALL DRAIN, UNION, AND AIR VENT FOR NEW

EXPANSION TANKS.

INSTALL TACO CAF600-125P OR EQUIVALENT BLADDER

TYPE EXPANSION TANK. INSTALL PER MFR'S

REQUIREMENTS.

INSTALL HTP-JS-48-108 HOT WATER STORAGE TANK.

INSTALL PER MFR'S REQUIREMENTS.

INSTALL NEW TANKS SEQUENTIALLY TO ENSURE THE

HOT WATER REMAINS IN SERVICE, COORDINATE WITH

ENGINEER AND OWNER. INSTALL REMOTE TANK DRAIN

BALL VALVE AT BOTTOM EDGE OF TANK AND EXTEND

TO FLOOR DRAIN, MINIMIZING TRIPPING HAZARDS.

NEW EXPANSION TANK RECIRCULATION PUMP, TACO

0015E 3 SPEED CIRCULATOR. STAINLESS STEEL, 12GPM,

WITH ISOLATION VALVES AND DISCHARGE CHECK

VALVE AND UNION. PROVIDE BALL ISOLATION VALVES

AT EACH TAP AND EQUIPMENT LOCATION IN EXPANSION

TANK RECIRCULATING LOOP PIPING. MOUNT PUMP ON

WALL BRACKET 4' AFF, EXTEND LOOP PIPING DOWN AND

BACK UP VERTICALLY TO PUMP ALONG WALL.

SHEET NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF STEEL w/ SPACE FOR INSULATION IF REQUIRED.

INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A

PIPE CHASE. THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE

USED TO THE LAST FIXTURE.

ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS

(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR

ALTERATIONS AND REPAIRS.

ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY

OPERATION.

PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/

ACCESSIBLE STOPS.

ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE

STOP (MEMORY STOPS).

ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS

IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE

OF VALVE IS REMOVED.

ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL

BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

DOMESTIC WATER PIPING TO BE TYPE "L" COPPER w/ SOLDERED

OR MECHANICALLY PRESSED FITTINGS.

PRESSURE TEST ALL DOMESTIC WATER PIPING w/ WATER. AIR

TESTING IS NOT PERMITTED.

FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND

MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL

OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL

PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.

ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERVENTIONAL PLUMBING CODE, INTERNATIONAL

MECHANICAL CODE, STATE AND LOCAL CODES AND

REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.

PLUMBING NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

P402

ENLARGED

PLUMBING PLAN -

OPS

17 APR 2026

TRT

BCM

21014

BIDDING

DOCUMENTS

WV ARMY NATIONAL

GUARD

WVANG - DAWSON

BILLETING AND RTI

DOMESTIC HOT

WATER REPAIRS

N O

D

ES

C

R

IP

TI

O

N D

A

TE

AD

D

EN

D U

M

/2 9/

1/2" = 1'-0"1

OPS BOILER ROOM PLUMBING PLAN - ENLARGED

NEW ET-1 TIE IN

NOTE: ORIGINAL DOCUMENT IN COLOR

G

FC

I G

FC

I

GFCI

HOT WATER PLANT

MECHANICAL PENTHOUSE

CORR

ELEC

COMM

PANEL LB1

1.

2.

3.

4.

5.

6.

7.

WIRING AND CONDUIT SHALL BE REQUIRED FOR ALL OUTLETS

AND DEVICES. FOLLOW INDICATED CIRCUITS NUMBERS AND

PANEL DESIGNATION. OBTAIN PRIOR APPROVAL OF ENGINEER

FOR DEVIATIONS.

ALTHOUGH ALL BRANCH CIRCUIT WIRING IS NOT SHOWN, IT IS

THE INTENT OF THESE DOCUMENTS THAT A COMPLETE

BRANCH CIRCUIT WIRING SYSTEM BE INSTALLED. ALL

NEUTRALS SHALL BE FULL CAPACITY. THE USE OF SHARED OR

COMMON NEUTRALS IS PROHIBITED ON ALL ELECTRIC WIRING.

PROVIDE CONTROL AND FIRE ALARM WIRE AS NECESSARY TO

INSTALL ALL SYSTEMS DEVICES AND PANELS FOR COMPLETE

SYSTEMS. FINAL CONNECTION TO PERMANTLY MOUNTED

EQUIPMENT IS PART OF THE ELECTRICAL SCOPE OF THIS

PROJECT.

ALL INTERIOR WIRING SHALL BE THHN/THWN IN METAL

CONDUIT. MAX OF 3'-0" OF FLEXIBLE CONDUIT MAY BE USED

FOR FINAL EQUIPMENT TERMINATIONS.

VERIFY ALL FIELD CONDITIONS AND MEASUREMENTS PRIOR TO

BIDDING. COORDINATE ALL WORK WITH OTHER TRADES.

COORDINATE ALL CEILING MOUNTED DEVICES WITH ALL OTHER

TRADES PRIOR TO INSTALLATION.

PERFORM ALL WORK IN ACCORDANCE WITH 2020 NEC.

FINAL COORDINATION OF SCOPE OF WORK , DIMENSIONS,

FIXTURE PLACEMENT, ROUTINGS, ETC IS THE RESPONSIBILITY

OF THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING.

ELECTRICAL NOTES

1.

2.

INSTALL NEW GFCI RECEPTACLE. RECEPTACLE WILL

RECEIVE A HOME-RUN FEED FROM PANEL LB1 FOR

WATER SOFTNER SYSTEM. INSTALL PER

MANUFACTURER'S RECOMMENDATIONS.

POWER TO NEW TACO 0013 120V CIRCULATOR FROM

PANEL LB1, 15A BREAKER #12 CONDUCTOR, NEW 3/4

EMT CONDUIT. INSTALL FUSED DISCONNECT ON WALL

AT PUMP LOCATION, COORDINATE WITH ENGINEER.

SHEET NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E401

ENLARGED

ELECTRICAL PLAN -

OPS

17 APR 2026

TRT

BCM

21014

BIDDING

DOCUMENTS

WV ARMY NATIONAL

GUARD

WVANG - DAWSON

BILLETING AND RTI

DOMESTIC HOT

WATER REPAIRS

N O

D

ES

C

R

IP

TI

O

N D

A

TE

AD

D

EN

D U

M

/2 9/

1/8" = 1'-0"1

OPS MECHANICAL ROOM ELECTRICAL PLAN - ENLARGED

120 Braley Road, East Freetown, MA 02717 • TEL: 508-763-8071 • www.htproducts.com

HTP-CD1066-A Last Revision: 11/2014

WATER STORAGE VESSELS

JACKETED & INSULATED TANKS

• Glass Lined Steel Tank – Glass lining is applied to the interior surface of the steel providing a tough wear resistant lining which minimizes the effects of high temperature hot water.

• Designed for 180° F.

• Sturdy Steel Jacket – Heavy gauge steel jacket.

• 2” High Density Foam Insulation – Minimizes heat loss with an R value of 12.5.

•Magnesium Anode Rod – for protection and longer service life.

• Two ¾” Aquastat NPT Fittings – Located in the lower and upper part of the tank.

• All Tanks are constructed and Certified – In accordance with ASME IV, Part HLW for 125 PSI (862 kPa).

• Five Year Limited Warranty on Steel Tank – Provide warranty protection against tank failure resulting from defects in materials and workmanship.

• Ten Year Limited Warranty on Steel Tank (with double glass lining) – Provide superior warranty protection against tank failure. Double glass lining is not an inventory item, built upon request.

5-Year Limited Tank Warranties/5-Year Limited Warranty on Component Parts

For products installed in USA, Canada and Puerto Rico; some states do not allow limitations on warranties. See complete copy of the warranty included with the heater

Water Storage Vessels – Jacketed & Insulated Tanks www.htproducts.com • 272 Duchaine Blvd, New Bedford, MA • © Ariston Thermo USA LLC. 07/31/2020 • MKTLIT-109

Large Volume Commercial Storage Tanks Jacketed & Insulated Tanks

HTP MODEL ACTUAL

GALLONS

NOMINAL

GALLONS DIA. HEIGHT APPROX.

WEIGHT

HTP-JS-32-200 200 N/A 32" 77" 541 LBS.

*** NO MODIFICATIONS CAN BE MADE TO THE ABOVE LISTED TANK. IT IS AVAILABLE IN GLASS LINED ONLY.

HTP-JS-30-075 210 229 34" 83" 613 LBS.

HTP-JS-30-085 240 260 34" 93" 700 LBS.

HTP-JS-30-099 280 303 34" 107" 673 LBS.

HTP-JS-30-111 320 340 34" 119" 703 LBS.

HTP-JS-36-072 285 318 40" 80" 714 LBS.

HTP-JS-36-078 310 344 40" 86" 782 LBS.

HTP-JS-36-085 340 375 40" 93" 845 LBS.

HTP-JS-36-090 360 397 40" 98" 894 LBS.

HTP-JS-36-102 415 449 40" 110" 982 LBS.

HTP-JS-36-114 465 502 40" 122" 1106 LBS.

HTP-JS-36-126 515 555 40" 134" 1194 LBS.

HTP-JS-42-081 435 486 46" 89" 1024 LBS.

HTP-JS-42-084 453 504 46" 92" 1074 LBS.

HTP-JS-42-093 505 558 46" 101" 1168 LBS.

HTP-JS-42-105 575 630 46" 113" 1292 LBS.

HTP-JS-42-117 645 702 46" 125" 1392 LBS.

HTP-JS-42-129 720 774 46" 137" 1498 LBS.

HTP-JS-42-139 790 846 46" 147" 1587 LBS.

HTP-JS-48-073 500 572 48" 77" 1038 LBS.

HTP-JS-48-084 580 658 48" 88" 1161 LBS.

HTP-JS-48-096 675 752 48" 100" 1298 LBS.

HTP-JS-48-108 765 846 48" 112" 1433 LBS.

HTP-JS-48-120 840 940 48" 124" 1567 LBS.

HTP-JS-48-141 1040 1105 48" 145" 1805 LBS.

HTP-JS-54-113 1000 1119 58" 123" 2300 LBS.

HTP-JS-60-114 1245 1395 64" 124" 2500 LBS.

HTP-JS-60-138 1530 1689 64" 148" 2500 LBS.

* HTP Offers Epoxy Lined Tanks For The Same Price As Glass Lined Tanks.

A Manway Is Included With All Epoxy Lined Tanks – All Models are ASME Rated ***Horizontal Configurations Are Available At An Additional Cost ***For Extra Fittings, Please Refer To Pricing On The Options Page

W-H-196 Test = 7.0 - 8.0 mg/in2 The W-H-196 Test is required for water heaters sold to the U.S. Government. The test consists of exposing the enamel to a boiling (212 F) 4/10% solution of Sodium Bicarbonate for eight (8), eighteen (18) hour cycles. Maximum weight loss after eight cycles is not to exceed 15 mg/in2.

PEI T-21 Spot Acid Test = Class A PEI T-21 Spot Acid Test is used to determine enamel resistance to acids. The test area is examined for visible effects on the enamel and is graded from Class AA (no sign of etching) to Class D (etched surface).

Impact resistance = Class 4 to 5 The Impact Resistance Test is used to determine the adhesive qualities of enamel to the substrate.

The enamel is graded from Class 1 (worst) to Class 5 (best), fractured glass adhering solidly to the impact area. Class 3 is acceptable.

Hi-Pot Test Less than 20 The HYPO Test is a measurement of the continuity of the glass

All tanks are ASME Certified

Heat Exchanger Bears the ASME

“HLW” Stamp

1 2 0 B r a l e y R o a d , E a s t F r e e t o w n , M A 0 2 7 1 7 • w w w. h t p r o d u c t s . c o m • 1 1 / 2 0 1 4 © H T P www.htproducts.com • 272 Duchaine Blvd, New Bedford, MA • © Ariston Thermo USA LLC. 07/31/2020 • MKTLIT-109

Submittal

© 2025 Taco, Inc. | tacoinc.com 1160 Cranston Street, Cranston, RI | 401–942–8000

Literature No. 401-216 Effective: 11/17/25 | Supersedes: 06/13/22

CAF FLOW THROUGH

EXPANSION TANKS

Submittal

© 2025 Taco, Inc. | tacoinc.com 1160 Cranston Street, Cranston, RI | 401–942–8000

Literature No. 401-216 Effective: 11/17/25 | Supersedes: 06/13/22

CAF FLOW THROUGH

EXPANSION TANKS

PRODUCT DATA

ITEM NO. LOCATION

MODEL NO.

PRE-CHARGE* WORKING PRESSURE

QUANTITY

JOB:

ENGINEER:

REPRESENTATIVE:

CONTRACTOR:

CAF Flow Through Expansion Tanks Submittal Data

Submittal No: 401-216 | Effective: June 13, 2022 | Supersedes: NEW (Certified by NSF to NSF/ANSI 61-G for Potable Water Applications)

* Unless otherwise specified, standard pre-charge of 40 psi (276 kPa).

OPTIONAL DESIGN PRESSURES

AND TEMPERATURES

□ 150 psi @ 240°F (1034 kPa @ 116°C)

□ 175 psi @ 240°F (1207 kPa @ 116°C)

□ 250 psi @ 240°F (1724 kPa @ 116°C)

□ 300 psi @ 240°F (2069 kPa @ 116°C)

SPECIFICATIONS

• Designed and constructed per ASME Code Section VIII, Div. 1.

• Construction: Carbon Steel with exterior red oxide primer finish

• Standard Design Pressure and Temperature: 125 psi @ 240°F

(862 kPa @ 116°C) Max.

• Registered with the National Board of Pressure Vessel Manufacturers

• U-1A Data Report

• Bladder type for permanent separation of air and water.

• 2 connection design permitting flow through tank.

• Water expands into bladder, air pre-charge on shell side.

• Bladder – Heavy Duty Butyl, removable for inspection.

• System Connection Materials 304 Stainless Steel

• Suitable for Vertical Installation

• Models certified to NSF 372 are required to be installed on the cold water side of the hot water heater.

ADDITIONAL OPTIONS

□ [ A ] Anchor Clips

□ [ B ] Bulls Eye Sight Glass

H1

B

D

H2

R

CHARGING VALVE

LIFTING LUG

1/2" NPT (12.7mm)

(FACTORY USE ONLY)

ASME NAMEPLATE

OPTIONAL

SIGHT GLASS

(ADD SUFFIX 'B')

LIFTING LUG

CAF600 THRU CAF2500

OPTIONAL

ANCHOR CLIPS

(ADD SUFFIX 'A')

SYSTEM

CONNECTIONS

1/2" NPT.(12.7mm)

CAF600 THRU CAF2500

(FACTORY USE ONLY)

1/2" NPT (12.7mm) DRAIN

(CAF90 THRU CAF2500)

DO NOT PIPE THE DRAIN

COMMENTS

Taco, Inc., 1160 Cranston Street, Cranston, RI 02920 | Tel: (401) 942-8000 | Taco (Canada), Ltd., 8450 Lawson Road, Suite #3, Milton, Ontario L9T 0J8 | Tel: (905) 564-9422 Visit our website: www.TacoComfort.com | ©2022 Taco, Inc.

Model Number Tank Volume H1’ HEIGHT H2’ HEIGHT B’ DIAMETER D’ DIAMETER R’ RADIUS SHIPPING

WEIGHT **

SYSTEM

CONNECTION SIZE

Max Flow in Tank Rate

GAL. liter INCH mm INCH mm INCH mm INCH mm INCH mm LBS kg Imperial metric GPM

CAF90-125P 23 90 34 863.6 31 1/8 790.6 16 406 20 508 5.49 139 129 58.5 1 1/2” NPT 38.1mm 55

CAF140-125P 37 140 45 1143 42 1/8 1070 16 406 20 508 5.49 139 204 92.5 1 1/2” NPT 38.1mm 55

CAF215-125P 57 215 63 3/4 1619.3 60 7/8 1546.2 16 406 20 508 5.49 139 299 135.6 1 1/2” NPT 38.1mm 55

CAF300-125P 79 300 62 5/8 1590.7 59 1/8 1501.8 20 508 24 610 5.50 140 333 151.0 2” NPT 50.8mm 80

CAF450-125P 119 450 82 1/4 2089.2 78 3/4 2000.3 20 508 24 610 5.50 140 413 187.3 2” NPT 50.8mm 80

CAF500-125P 132 500 90 5/8 2301.9 87 1/8 2212.34 20 508 24 610 5.50 140 433 196.4 2” NPT 50.8mm 80

CAF600-125P 158 600 76 3/8 1940 73 1854.2 24 610 30 762 7.05 179 473 214.5 2” NPT 50.8mm 80

CAF700-125P 185 700 85 1/8 2162.2 81 5/8 2073.3 24 610 30 762 7.05 179 538 244 2” NPT 50.8mm 80

CAF800-125P 211 800 94 3/8 2397.2 90 7/8 2308.2 24 610 30 762 7.05 179 603 273.5 2” NPT 50.8mm 80

CAF900-125P 238 900 79 7/8 2028.8 75 1/4 1911.35 30 762 36 914 8.48 215 719 326 3” NPT 76.2mm 200

CAF1000-125P 264 1000 85 3/4 2178.1 82 1/8 2085.9 30 762 36 914 8.48 215 819 371.5 3” NPT 76.2mm 200

CAF1100-125P 291 1100 92 2336.8 87 3/8 2219.3 30 762 36 914 8.48 215 894 405.5 3” NPT 76.2mm 200

CAF1200-125P 317 1200 97 3/4 2482.9 93 1/8 2365.4 30 762 36 914 8.48 215 969 439.5 3” NPT 76.2mm 200

CAF1300-125P 344 1300 103 3/4 2635.3 99 1/8 2517.65 30 762 36 914 8.48 215 1009 457.8 3” NPT 76.2mm 200

CAF1400-125P 370 1400 109 3/4 2787.7 105 1/8 2670.2 30 762 36 914 8.48 215 1049 475.8 3” NPT 76.2mm 200

CAF1500-125P 396 1500 81 5/8 2073.3 76 3/8 1939.9 40 1016 48 1219 12.77 324 1251 567.4 3” NPT 76.2mm 200

CAF1600-125P 422 1600 84 3/4 2152.7 79 1/2 2019.3 40 1016 48 1219 12.77 324 1431 649 3” NPT 76.2mm 200

CAF1800-125P 475 1800 91 5/8 2327.3 86 3/8 2193.9 40 1016 48 1219 12.77 324 1567 710.8 3” NPT 76.2mm 200

CAF2000-125P 528 2000 98 5/8 2505.1 93 3/8 2371.7 40 1016 48 1219 12.77 324 1701 771.6 3” NPT 76.2mm 200

CAF2500-125P 660 2500 115 3/8 2930.5 110 1/8 2797.2 40 1016 48 1219 12.77 324 1881 853.2 3” NPT 76.2mm 200

Certified to

NSF/ANSI/CAN 61-G

Features

•3-Speed Switch
•Fine tune to system requirements
•Highest performance & starting torque in class
•Heavy-Duty construction for longer life
•Removable high-flow Integral Flow Check (IFC®)
- Prevents gravity flow
- Reduces installation costs
- Improves pump performance
•Replaceable cartridge design
•Quiet, efficient operation
•Self lubricating, no mechanical seal
•Wide range of applications
•Cast Iron or St. Steel, flanged construction

Materials of Construction

Casing:...................................Cast Iron or St. Steel
Integral Flow Check ....
(IFC®): ....................................Acetal & Stainless Steel
Stator Housing:................Aluminum
Cartridge:.............................Stainless Steel
Impeller:...............................Non-Metallic
Shaft:.......................................Ceramic
Bearings:...............................Ceramic
O-Ring & Gaskets:...........EPDM

Performance Data

00120013
Max. Flow (GPM):4232
Max. Head (FT):1433
Min. Fluid Temperature:40˚F (4˚C)
Max. Fluid Temperature:210°F (98˚C)
Max. Working Pressure:125 psi
Flanged Connection Sizes:
3/4”, 1”, 1-1/4”, 1-1/2”

Electrical Data

Pump Dimensions & Weights

Models Type Flange Code

A B C D F G Ship Wt.

in. mm in. mm in. mm in. mm in. mm in. mm lbs. Kg

0012-MSF2-IFC CI S

8-7/16 214 6-15/64 158 4-1/4 107 4-3/64 103 6-9/64 156 8-1/2 216

12 5.5

0012-MSSF2-IFC SS S 15.2 6.9

0013-MSF2-IFC CI R

7-9/16 192 6-5/32 156 3-1/2 89 4-3/64 103 6-9/64 156 6-1/2 165 11 5

0013-MSSF2-IFC SS R

Model Volts Hz Ph Amps Watts RPM

(Speed 3) HP Speed 1 Speed 2 Speed 3

0012 115 60 1 1.65 130 170 195 3250 1/8

0013 115 60 1 1.95 140 200 235 3250 1/8

Motor Type Permanent Split Capacitor Thermally Protected

Low-Lead Compliant

Certifications & Listings

FOR INDOOR

USE ONLY

Flange Orientation

Standard (S) Rotated (R)

A D

F B

C

G

Submittal Data Information

Job: Engineer: Contractor: Rep:

ITEM NO. MODEL NO.

101-166

Effective: July 19, 2021 Supersedes: June 26, 2015

0012 & 0013 3-Speed Cartridge Circulators

Dimensions and weights are approximate.

LIMITED WARRANTY STATEMENT

Taco, Inc. will repair or replace without charge (at the company’s option) any Taco product which is proven defective under normal use within three (3) years from the date code.

In order to obtain service under this warranty, it is the responsibility of the purchaser to promptly notify the local Taco stocking distributor or Taco in writing and promptly deliver the subject product or part, delivery prepaid, to the stocking distribu-tor. For assistance on warranty returns, the pur-chaser may either contact the local Taco stock-ing distributor or Taco. If the subject product or part contains no defect as covered in this war-ranty, the purchaser will be billed for parts and labor charges in effect at time of factory exami-nation and repair.

Any Taco product or part not installed or operated in conformity with Taco instructions or which has been subject to misuse, misapplication, the addi-tion of petroleum-based fluids or certain chemical additives to the systems, or other abuse, will not be covered by this warranty.

If in doubt as to whether a particular substance is suitable for use with a Taco product or part, or for any application restrictions, consult the applicable Taco instruction sheets or contact Taco at (401-942-8000).

Taco reserves the right to provide replacement products and parts which are substantially similar in design and functionally equivalent to the defective product or part. Taco reserves the right to make changes in details of design, construc-tion, or arrangement of materials of its products without notification.

TACO OFFERS THIS WARRANTY IN LIEU OF

ALL OTHER EXPRESS WARRANTIES. ANY

WARRANTY IMPLIED BY LAW INCLUDING

WARRANTIES OF MERCHANTABILITY OR

FITNESS IS IN EFFECT ONLY FOR THE DURA-

TION OF THE EXPRESS WARRANTY SET

FORTH IN THE FIRST PARAGRAPH ABOVE.

THE ABOVE WARRANTIES ARE IN LIEU OF

ALL OTHER WARRANTIES, EXPRESS OR

STATUTORY, OR ANY OTHER WARRANTY

OBLIGATION ON THE PART OF TACO.

TACO WILL NOT BE LIABLE FOR ANY SPECIAL

INCIDENTAL, INDIRECT OR CONSEQUENTIAL

DAMAGES RESULTING FROM THE USE OF

ITS PRODUCTS OR ANY INCIDENTAL COSTS

OF REMOVING OR REPLACING DEFECTIVE

PRODUCTS.

This warranty gives the purchaser specific rights, and the purchaser may have other rights which vary from state to state. Some states do not allow limitations on how long an implied warranty lasts or on the exclusion of incidental or conse-quential damages, so these limitations or exclu-sions may not apply to you.

Applications The 0012 is designed for high flow/ low head, closed loop, hydronic systems. The 0013 is designed for high flow/ high head, closed loop hydronic systems. The Stainless Steel models can be used for open systems and potable water applications.

H

EA

D (F

T)

H

EA

D (F

T)H

EA

D (M

H

EA

D (M

0012 Performance Curves 0013 Performance Curves

7.5 10.5

7.5

4.5

1.5

4.5

1.5

1.1 2.3 3.4 4.5 5.7 6.8 7.9 9.1 10.2

50 10 15 20 25 30 35 40 45

FLOW (GPM)

FLOW (m3h)

FLOW (GPM)

FLOW (m3h)

1.1 2.3 3.4 4.5 5.7 6.8 7.9

50 10 15 20 25 30 35

L M H L M

H

ADDENDUM ACKNOWLEDGEMENT FORM

SOLICITATION NO.: CRFQ ADJ2700000002

Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below.

Failure to acknowledge addenda may result in bid disqualification.

Acknowledgment: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.

Addendum Numbers Received:

(Check the box next to each addendum received)

☒ Addendum No. 1 ☐ Addendum No. 6

☐ Addendum No. 2 ☐ Addendum No. 7

☐ Addendum No. 3 ☐ Addendum No. 8

☐ Addendum No. 4 ☐ Addendum No. 9

☐ Addendum No. 5 ☐ Addendum No. 10

I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid. I further understand that that any verbal representation made or assumed to be made during any oral discussion held between Vendor’s representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.

Company

Authorized Signature

Date

NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.

1
1
2
CRFQ-ADJ27_02 Addendum No.1.pdf
Camp Dawson Billeting and RTI HW - Addendum#1 - 30Jul26
BILLETING ADDENDUM 7.28
P101 - FIRST FLOOR DOMESTIC PLUMBING PLAN
P101B - FIRST FLOOR DOMESTIC PLUMBING PLAN
P101C - FIRST FLOOR DOMESTIC PLUMBING PLAN
P101D - FIRST FLOOR DOMESTIC PLUMBING PLAN

CD Domestic Hot Water PreBid Docs

Drawings-Camp Dawson Billeting and RTI HW - Addendum#1 - 30Jul26.pdf
BILLETING ADDENDUM 7.28
P101 - FIRST FLOOR DOMESTIC PLUMBING PLAN
P101B - FIRST FLOOR DOMESTIC PLUMBING PLAN
P101C - FIRST FLOOR DOMESTIC PLUMBING PLAN
P101D - FIRST FLOOR DOMESTIC PLUMBING PLAN
Op Building_24 revision 1
JS-48-108.1
CAF_Flow_Through_ Expansion_Tanks_Submittal_401-216 replacement for cbx600
0012-0013_3-Speed_Circulators_Submittal_101-166
CD Domestic Hot Water PreBid Docs
htp js48-108

File details come from the government source that posted it. Updated .