About this file

This addendum issued by the Connecticut Department of Administrative Services (DAS) Construction Services modifies the contract documents for the Troop H Maintenance Facility Repairs project located at 100R Washington Street, Hartford, Connecticut (Project BI-2B-500). The addendum, issued on June 23, 2026, provides clarifications regarding project requirements discussed during the mandatory pre-bid meeting held on June 10, 2026. The original bid due date remains July 7, 2026 at 10:00 AM EDT. The addendum includes the pre-bid meeting agenda, attendance log, and a request for information clarification regarding final photograph specifications. All prospective bidders are required to acknowledge receipt of this addendum on the Section 00 41 00 Bid Proposal Form, with failure to do so resulting in bid disqualification. The project encompasses maintenance and repair work at an operational military installation with a contract term of 243 calendar days.

The primary clarification addresses Section 01 32 33, Paragraph 2.1.D.1 photograph requirements, whereby final photographs must be provided in 10,200 x 6,600-pixel files while monthly progress photographs may be captured using standard 16-24 megapixel cameras. The addendum confirms that all questions must be submitted in writing to the consulting Architect/Engineer (Gale Associates, Inc., Marc Loranger), with copies to the DAS Project Manager (Daniel Wagoner) and Construction Manager (The Associated Construction Co., Andrew Winget). Additional project considerations discussed at the pre-bid meeting include work sequencing, project access and laydown areas, coordination around an active microwave communication dish, construction fence staging, Troop H activity restrictions, building use restrictions, State Historic Preservation Office review requirements, and truss shoring specifications.

View the file

Other files

File Type Posted
00 41 00 DAS-CS Bid Proposal Form LOCKED 20251001.docx DOCX document
Specification Vol 1 of 1.pdf PDF
00 40 16 DAS Update Stmt Reqts 20251001.docx DOCX document
00 40 15 DAS Prequal Cert Reqts 20251001.docx DOCX document
Addendum 2.pdf PDF
Drawings Voloume 1.pdf.crdownload CRDOWNLOAD file
Specification Vol 1 of 1.pdf.crdownload CRDOWNLOAD file
00 40 14 CertOfAuthority 20231001.docx DOCX document
00 11 16 DAS-CS Invitation to Bid.pdf PDF
00 45 14 GC Bidder Qual Statement 20251001.docx DOCX document
Addendum 2.pdf.crdownload CRDOWNLOAD file
Addendum 4.pdf PDF
Addendum 3.pdf PDF
00 43 16 BidBond 20240924.docx DOCX document
2615BI2B500_Aug_3_26_solicitation_doc.pdf PDF
2615BI2B500_May_28_26_solicitation_doc.pdf PDF
Drawings Voloume 1.pdf PDF
00 45 20 Named Sub Signature Page 20251001.docx DOCX document
00 41 00 DAS-CS Bid Proposal Form REVISED.docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Connecticut Department of

Administrative Services

Bid Addendum

Addendum No.: 1 Date Of Addendum: 6/23/2026

CT DAS 6030 (Rev. 08.09.2024) 6000 Bid Phase Forms

CT DAS Construction Services Office of Legal Affairs, Policy, and Procurement Troop H Maintenance Facility Repairs

100R Washington Street, Hartford CT 06106

BI – 2B – 500

Original Bid Due Date / Time: July 7, 2026 10:00 AM (EDT)

Previous Addendums: N/A

TO: Prospective Bid Proposers:

This Addendum forms part of the “Contract Documents” and modifies or clarifies the original “Contract Documents” for this Project dated 04/24/2026. Prospective Bid Proposers shall acknowledge receipt of the total number the Addenda issued for this Project on the space provided on Section 00 41 00 Bid Proposal Form.

Failure to acknowledge receipt of the total number the Addenda issued for this Project on the space provided on Section 00 41 00 Bid Proposal Form shall subject Bid Proposers to disqualification.

The following clarifications are applicable to drawings and specifications for the project referenced above.

Item 1:

Pre-Bid Meeting Agenda (Attached)

All items included on the attached agenda were reviewed with all attendees of the 6/10/26 pre-bid walk through.

Item 2:

Attached Pre-Bid walk through attendance log.

Item 3:

REQUEST FOR INFORMATION RECEIVED June 21, 2026 @ 1:38pm: “Section 01 32 33, Paragraph 2.1.D.1 calls for final photos to be provided in 10,200 x 6,600-pixel files. That is a 67MP camera. We have documented hundreds of state and municipal projects over the years and have never encountered this requirement. Is it really necessary?”

CLARIFICATION: Please note the following: The size requirement specified in Section 01 32 33, Paragraph 2.1.D.1 is for "final photographs" only. A standard 16-24 megapixel is acceptable for monthly progress photos. Refer to Section 01 32 33, Paragraph 2.1C for monthly progress photos requirements.

All questions must be emailed (not verbal or by phone) to the consulting Architect/Engineer (Gale Associates, Inc., Marc Loranger, Email: mal@gainc.com) with copies sent to the DAS/CS Project Manager (Wagoner, Daniel, Email:

Daniel.Wagoner@ct.gov) and Construction Manager (The Associated Construction Co., Andrew Winget, Email:

apw@accgc.com)

End of Addendum 1

Alison Kulas Alison Kulas, Paralegal Specialist State of Connecticut Department of Administrative Services, Construction Services Office of Legal Affairs, Policy, and Procurement 450 Columbus Boulevard, Suite 1307 Hartford, CT 06103

SECTION 00 25 13

PRE-BID MEETING AGENDA

CT DAS 5000 (Rev. 10.01.2025) PROJECT NO. BI-2B-500

Connecticut Department of Administrative Services / Construction Services

Office of Legal Affairs, Policy, and Procurement 450 Columbus Boulevard, Suite 1302, Hartford, CT 06103

1.0 Pre-Bid Meeting:

1.1 The Owner will conduct a Pre-Bid Meeting. For the Pre-Bid Meeting Date, Time, and Location see Section 00 11 16 Invitation To Bid for this Specific Bid.

1.2 Attendance:

1.2.1 General Contractor: Attendance at the Pre-Bid Meeting is MANDATORY. At the Pre-Bid Meeting, all prospective bidders shall sign his or her name on the official Pre-Bid Meeting Attendance Log (Form 6020) and list the name and address of the company he or she represents.

For MANDATORY Pre-Bid Meetings, this shall be done no later than the designated start time of the Pre-Bid Meeting. Prospective bidders are advised to register early as no attendee will be allowed to register after the advertised start time.

Bids submitted by contractors who have not properly registered and attended the MANDATORY Pre-Bid Meeting shall be rejected as non-responsive.

1.2.2 Subcontractors: Attendance at the Pre-Bid Meeting is recommended.

1.2.3 Pre-Bid Meeting

Attendance Log:

It is MANDATORY that all attendees sign the Pre-Bid Meeting Attendance Log (Form 6020).

1.3 Site/Facility Visit or Walkthrough: Please do not make any Site/Facility Visits without notifying the Project Manager prior to your visit.

1.3.1 A Site/Facility Visit or Walkthrough is scheduled for the Pre-Bid Meeting

1.3.2 A Site/Facility Visit or Walkthrough is NOT scheduled for the Pre-Bid Meeting

1.3.3 Department of Correction (DOC) Facilities: All Bidders attending a Pre-Bid Meeting at a DOC Facility shall read Section 00 73 63 Connecticut Department of Correction (DOC) Security Requirements, complete and submit the DOC “Security Background Questionnaire” as directed, and obtain approval, prior to the Pre-Bid Meeting, otherwise admission to the Pre-Bid Meeting will be denied.

To find and download a copy of the Security Background Questionnaire, go to the DOC website (https://portal.ct.gov/DOC), scroll down to “Forms” then “Security Background Questionnaire”. It is recommended that the approved form be brought as evidence of approval to attend the Pre-Bid Meeting.

1.4 Bidder Questions:

1.4.1 Submit written questions to be discussed at the Pre-Bid Meeting a minimum of two (2) Calendar Days prior to Pre-Bid Meeting date. See the Invitation to Bid for instructions on submitting questions.

IMPORTANT NOTE: In accordance with the Statutes and Regulations, no participants in any Selection, Proposal, or Bidding process, including Client Agency representative(s), shall communicate with any potential Offeror prior to, during, or upon conclusion of the entire Selection, Proposal, or Bidding procedure, with the exception of information necessary to complete the administrative steps of the Selection process.

2.0 Pre-Bid Meeting Agenda:

The Pre-Bid Meeting Agenda will include a review of topics, as applicable to the Project, which may affect proper preparation and submittal of bids, including, but not limited to, the following:

2.1 Introduction of Participants:

2.1.1 Architect/Engineer: Gale Associates, Inc.

2.1.2 CA: Associated Construction Company

2.1.3 Awarding Authority Representative: Daniel Wagoner

2.1.4 Client Agency Representative: Molly Salafia

2.2 Project Summary:

2.2.1 Summary of Work: See General Requirements Section 01 11 00

2.2.2 Temporary Facilities and Controls: See General Requirements Section 01 50 00

2.2.3 Work Sequence: See General Requirements Section 01 11 00

2.2.4 Contractor Use of Premises: See General Requirements Section 01 11 00

2.2.5 Project Schedule: See Construction Phase/Sequence requirements in Section 01 10 00

2.2.6 Contract Time: 243 days, see Section 01 10 00

2.2.7 Liquidated Damages: See General Conditions Section 00 73 13, Articles 1 and 8, and 00 41 00 Bid Proposal Form.

2.2.8 Build America, Buy America Act (BABA):

When applicable to this Project, the Bidder must comply with the requirements of the Federal Government’s “Build America, Buy America Act (BABA)”, enacted as part of the Infrastructure Investment and Jobs Act on November 15, 2021 and effective October 23, 2023. See page 1 of the Invitation to Bid or Bid Proposal Form for applicability. Additional details can be found in the following documents:

• Section 00 21 13 Instructions to Bidders (subsection 1.20 Projects With Federal Financial Assistance);

• Section 00 41 00 Bid Proposal Form (this form – Attachment 4: Build America, Buy America Act Acknowledgement);

• Section 00 72 13.1 Supplementary Conditions of the Contract for Construction for Design-Bid-Build (subsection 36.4 Build America, Buy America Act);

• Section 00 73 73 Build America, Buy America Act Requirements for Projects with Federal Financial Assistance.

2.2.9 PROJECT LABOR AGREEMENT (PLA):

When applicable to this Project, the Bidder must comply with the requirements of the Project Labor Agreement (PLA). If the Bidder does not agree to abide by the conditions of the PLA, the Bidder shall not be regarded as a responsible and qualified bidder. See page 1 of the Invitation to Bid or Bid Proposal Form for applicability.

The Apparent Low Bidder will be required to sign the PLA and “Acceptance of Agreement” prior to the Award of this Contract. Additional details and requirements can be found in the following documents:

• Section 00 21 13 Instructions to Bidders (subsection 1.21 Projects With a Project Labor Agreements);

• Section 00 73 48 Project Labor Agreement.

2.0 Pre-Bid Meeting Agenda (continued):

2.3 Communication During Bidding Period:

2.3.1 Access to Website, Forms, and CTsource:

DAS Website: https://portal.ct.gov/DAS

DAS/CS Website: https://portal.ct.gov/das/services-for-agencies-and-municipalities/state-building-construction

CTsource Homepage: https://portal.ct.gov/DAS/CTSource/ctsource

DAS/CS Online Library with Construction Services Forms: https://portal.ct.gov/DASCSLibrary

DAS/CS Bid Board and Plan Holder List: https://portal.ct.gov/DAS/Construction-Services/BidBoard

2.3.2 Bidder's Requests for Information: See General Requirements Sections 01 26 00.

All requests for information prior to the Bid Due Date shall be in writing to the awarding authority and to be given consideration shall be received at least fourteen (14) Calendar Days prior to the Bid Due Date.

2.3.3 Substitution Procedures (Prior to Bid): See General Requirements Section 01 25 00 & General Conditions Section 00 73 13, Article 15.

The awarding authority will consider Pre-Bid Equals or Substitutions Requests, if made fourteen (14) Calendar Days prior to the Bid Due Date. The information on all materials shall be consistent with the information herein. Requests must be made formally as a written question and must be accompanied by Form 7001 Equal or Substitute Product Request, available for download from the DAS/CS Online Library (https://portal.ct.gov/DASCSLibrary).

2.3.4 Substitutions following Contract Award: See General Requirements Section 01 25 00 & General Conditions Section 00 73 13, Article 15.

Subject to the Architect or Engineer's determination, if the material or equipment is Equal to the one specified or pre-qualified and the Project Manager's approval of such determination, Substitution of Material or Equipment may be allowed after the Letter of Award is issued, as specified in the Conditions Section 00 73 13, Article 15. Requests must be made formally as a written question and must be accompanied by Form 7001 Equal or Substitute Product Request, available for download from the DAS/CS Online Library (https://portal.ct.gov/DASCSLibrary).

2.3.5 Addenda Procedures: See Item No. 2.7 of this form

2.4 Procurement and Contracting Requirements:

2.4.1 Section 00 11 16 – Invitation to Bid

2.4.2 Section 00 21 13 – Instructions to Bidders

2.4.3 Section 00 41 00 – Bid Proposal Form – attachments must remain attached to the form, even if not applicable.

• ATTACHMENT 1: ALL BIDS: Campaign Contribution Certification.

• ATTACHMENT 2: IF APPLICABLE: Additional Information Questions for Bids Between

$500,000 and $1,000,000.

• ATTACHMENT 3: IF APPLICABLE: Named Subcontractor DAS Prequalification

Certificates and Update Statements for Named Subcontractors for Subcontracts exceeding $1,000,000 (and for Bidder, if Self-Performing).

• ATTACHMENT 4: IF APPLICABLE: Build America, Buy America Act Acknowledgement.

• ATTACHMENT 5: IF APPLICABLE: Named Subcontractor Signed Statement.

2.4.4 Section 00 41 10 – Bid Package Submittal Requirements

2.4.5 Section 00 43 16 – Standard Bid Bond (this form must be used and must be uploaded to CTsource prior to the date and time of the Bid Opening with the Power of Attorney from the Surety)

2.4 Procurement and Contracting Requirements (continued):

2.4.6 Section 00 45 14 - General Contractor Bidder’s Qualification Statement. Each Bidder must enter all information, sign and notarize correctly, and upload the following documents to CTsource with their bid. The bid will be rejected if the following are not attached:

• Resumes of All Supervisory Personnel.

• Letters of Reference from Architects, Engineers, or Owners.

• List of All Construction Projects Completed in the Past Five Years with required information. NOTE: Two of the construction projects completed in the past five years shall be (1) single project contracts that have reached substantial completion, not aggregate projects; (2) of commercial and/or institutional construction work (this includes compliance with general requirements); (3) within the Cost Estimate Range stated in Section 00 11 16 Invitation to Bid for this project; and (4) of the size and complexity of this Project.

Failure to identify two such projects prior to the date and time of the Bid Opening shall cause the bid to be rejected and shall not be considered a minor irregularity under C.G.S.

§ 4b-95.

• For projects greater than $5Million: (1) the Name and Resume of the Construction Scheduler and (2) a Letter of Reference for the Construction Scheduler

2.4.7 Section 00 40 14 Certificate (of Authority)

2.4.8 Bids greater than $1Million: DAS Prequalification Certificate and Update Statement for Bidder

2.4.9 Section 00 30 00 – General Statements for Available information

2.4.10 Division 50 – Project-Specific Available Information

2.4.11 Bonding (see Section 00 92 10 – Additional Forms)

2.4.12 Insurance (see Section 00 41 00 – Bid Proposal Form)

2.4.13 Notice of Award

2.5 Contract Considerations:

2.5.1 Allowances: See General Requirements Section 01 20 00

2.5.2 Base Bid Quantities and Defined Unit Prices: See General Requirements Section 01 20 00

2.5.3 Named Subcontractors: See 00 41 00 Bid Proposal Form.

2.5.4 Supplemental Bids: See General Requirements Section 01 23 13 and 00 41 00 Bid Proposal Form.

2.6 Separate Contracts:

2.6.1 Work by Owner: 3rd Party Vendor for Microwave Communication Dish work

2.6.2 Work of Other Contracts: not applicable

2.7 Post Pre-Bid Meeting Addendum:

2.7.1 No Interpretations of the meaning of the plans, specifications or other contract documents will be made orally at any time. Every bidder request for such interpretation shall be in writing to the awarding authority and to be given consideration shall be received at least fourteen (14) Calendar Days prior to the Bid Due Date. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the specifications which, if issued, will be posted on CTsource.

2.7.2 Other Bidder Questions

2.8 Other Agenda Topics and Notes:

2.8.1 Project Work Sequence (Phases).

2.8.2 Project access, parking, and laydown areas.

2.8.3 Working restrictions around the Microwave Communication Dish.

2.8.5 Coordination between the contractor and the Owner’s vendor for sequencing of the removal and installation of the Microwave Communication Dish. Including Contractor provided conduit pathway.

2.8.6 Construction fence sequencing at the adjacent lot, north side of the property.

2.8.7 Review restrictions regarding Troop H activities.

2.8.8 Review restrictions regarding building use by Owner and the Contractor access to the building interior.

2.8.9 State Historic Preservation Office reviews and approvals of Mock-ups.

2.8.10 Truss end shoring and repairs at South wall rebuild area.

3.0 Additional Information:

3.1 Recording and Distribution of Pre-Bid Meeting Minutes:

3.1.1 The Owner is responsible for conducting the Pre-Bid Meeting and will record and distribute meeting minutes to attendees and others known by the issuing office to have received a complete set of Procurement and Contracting Documents.

3.2 Pre-Bid Meeting Minutes as “Available Information”

3.2.1 Minutes of the Pre-Bid Meeting are issued as “Available Information” and do not constitute a modification to the Procurement and Contracting Documents. Modifications to the Procurement and Contracting Documents are issued by written Addendum only.

3.3 Pre-Bid Meeting Attendance Log:

3.3.1 The Pre-Bid Site Meeting Attendance Log will be provided in an addendum to the solicitation, along with the Meeting Minutes. To find the addendums for a solicitation, go to the CTsource Bid Board (https://portal.ct.gov/DAS/CTSource/BidBoard), filter by name of awarding authority under “Organization”, click on the appropriate solicitation, and click on the link(s) for the addendums. If there are no addendums, then the Pre-Bid Meeting has not yet taken place.

3.4 List of Plan Holders:

3.4.1 To find the List of Planholders for a DAS Construction Services project, go to the DAS Construction Services Bid Board (https://portal.ct.gov/DAS/Construction-Services/BidBoard) and select the “View Plan Holder List”.

3.5 Contractor and Subcontractor Prequalification:

3.5.1 CONTRACTOR PREQUALIFICATION: All Bidders submitting bids greater than one million dollars ($1,000,000) must upload a current (not expired) copy of their “DAS Prequalification Certificate” and “DAS Update Statement” for the applicable Class of Work to the solicitation on CTsource prior to the date and time of the Bid Opening. The specific, required, Class of Work for this Project can be found on page 1 of Section 00 11 16 Invitation to Bid under “Required DAS Prequalification Classification for Bidders”.

SUBCONTRACTOR PREQUALIFICATION: All subcontracts with values greater than $1,000,000 require the subcontractor to be currently prequalified by DAS, to the extent the Class of Work for the subcontractor is a DAS Prequalification Classification. Pursuant to C.G.S. §§ 4a-100 and 4b-91(j), as amended, no person whose Subcontract exceeds $1,000,000 in value may perform work as a Subcontractor on a project for the construction, reconstruction, alteration, remodeling repair or demolition of any public building or any other public work by the state or a municipality, which project is estimated to cost more than $1,000,000 and is paid for, in whole or in part, with state funds, unless, at the time of bid submission, the person is prequalified in accordance with C.G.S. §§ 4a-100 and C.G.S. §4b-91(j) as amended. “Prequalified” includes the Substantial Subcontractor's prequalification classifications, aggregate work capacity ratings and single project limits.

3.0 Additional Information (continued):

3.6 Bid Submission:

3.6.1 Find the solicitation on the CTsource Bid Board by filtering for the name of the awarding authority under “Organization”: https://portal.ct.gov/DAS/CTSource/BidBoard . To submit a bid, click “Select” and “Accept” in the Solicitation on CTsource. If you cannot click “Select” and “Accept”, then you need to first select “Add New Response” and create a Quote (which you can rename).

3.7 Bid Tab Sheet (and Bids) After The Bid Has Closed:

3.7.1 To find the Bid Tab Sheet (and other bids) after the bid has closed, go to the CTsource Bid Board (https://portal.ct.gov/DAS/CTSource/BidBoard), filter by name of awarding authority under “Organization”, click on the appropriate solicitation, and click on the “View Award Report” in the top right corner, located next to the “Print/Download solicitation summary”.

The Bid Tab Sheet will be available under “Award Documents”. Individual bid documents will be available under “Vendor Attachments”. Note: If “View Award Report” is not available, then it has not yet been published – check back later in the day.

End of Section 00 25 13 Pre-Bid Meeting Agenda

Item 1:
Item 3: