This document provides details for a federal solicitation seeking janitorial services. The solicitation number is W912P921R0013 and is being issued by the Department of the Army Corps of Engineers Engineering District St Louis. The selected contractor will be responsible for cleaning, servicing and maintaining sanitary conditions and adjusting courtesy boat docks at Clarence Cannon Dam and Mark Twain Lake. The contractor must furnish all labor, equipment, materials and supplies to perform this work in accordance with the provided work schedule, specifications and drawings. Any questions regarding this solicitation must be submitted electronically to the specified Contract Specialist by 11:00 AM CST on February 4, 2021. The response due date and award date are not provided in this document.

View the file

Other files

File Type Posted
Updated Pricing Schedule.xlsx XLSX spreadsheet
Janitorial Questions and Answers.pdf PDF
A02. Appendix F.pdf PDF
A02. Appendix C.pdf PDF
Pricing Schedule.xlsx XLSX spreadsheet
A22. PO Solicitation W912P921R0013.pdf PDF
A02. Appendix G.pdf PDF
A02. Appendix B.pdf PDF
A02. Appendix E.pdf PDF
A02. Appendix H.pdf PDF
Opening and Closing Dates 2021.pdf PDF
A02. Appendix A .pdf PDF
A02. Appendix I.pdf PDF
A02. Appendix J.pdf PDF
A02. Appendix D.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers

St. Louis District

Janitorial Services Contract

Mark Twain Lake Project Office 20642 Highway J Monroe City, MO, 63456

COMBINED SYNOPSIS &

SOLICITATION W912P921R0013

This is a 100% Small Business Set-Aside combined synopsis/solicitation for commercial items prepared in accordance with the format Federal Acquisition Regulation (FAR) Part 12.603, Streamlined solicitation for commercial items, and FAR Part 13, Simplified Acquisition Procedures. This announcement constitutes the only solicitation. Offers are being requested and a written solicitation will not be issued.

This Request for Proposal is numbered W912P9-21-R-0013. The North American Industry Classification System (NAICS) code for this acquisition is 561720 with a size standard of $19.5M dollars. Please identify your business size in your response based upon this standard.

This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2021-02, dated 11-23-2020.

In accordance with the FAR Subpart 13.106-1(a)(2) offerors are notified that the award will be made to the offer that provides the lowest evaluated price whose service meets the requirements as listed in the performance work statement.

The government intends to award a contract without discussions with respective offerors. The government, however, reserves the right to conduct discussions if deemed in its best interest. Therefore, the offeror’s initial offer should contain the offeror’s best terms from a price and technical standpoint. The Government reserves the right to conduct discussions if later the Contracting Officer determines to be necessary. The Government may reject any and all offers if such is in the public interest; accept other than the lowest offer;

and waive informalities and minor irregularities in received offers.

Description: The contractor’s work shall consist of furnishing all labor, equipment, materials and supplies necessary to clean, service and maintain sanitary conditions and adjust courtesy boat docks at Clarence Cannon Dam and Mark Twain Lake in accordance with the work schedule, specifications and drawings contained herein.

Please provide a completed copy of the provision at 52.212-3, Offeror Representations and Certifications – Commercial Items with your offer.

Site Visit: Scheduled for Monday, February 1st, 2021 at 10:00 (CST). Contractors shall wear a personal face mask/covering and other appropriate protective gear when within six (6) feet of any other individual if recommended by the Centers for Disease Control and Prevention (CDC). Please refer to CDC link:https://www.cdc.gov/coronavirus/2019-ncov/prevent-getting-sick/prevention.html.

The site visit location is as follows:

Mark Twain Lake Project Office 20642 Highway J Monroe City, MO, 63456

Additional Instruction is located in the addendum to 52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014) on pages 38-40.

Please submit any questions concerning this solicitation by 11:00 AM (CST) on Thursday, February 4th, 2021. Questions can be provided electronically to Contract Specialist (Allen Holmes), Allen.L.Holmes@usace.army.mil.

Please submit all proposals electronically to Contract Specialist, Allen Holmes, at the above email address by 11:00 AM (CST) on Friday, February 12th, 2021.

Please fill out information below:

Contractor's Name:

Cage Code:

Dun's Number:

Contractor Signature;

CLIN Structure

CLIN DESCRIPTION QUANTITY/ UNIT UNIT COST TOTAL COST

0001 Project Office 1/JOB 0002 Recreational Area 1/JOB 0003 MW. Boudreaux Memorial 1/JOB 0004 Optional CLIN 1/JOB

Section SF 1449 - CONTINUATION SHEET

PERFORMANCE WORK STATEMENT

JANITORIAL SERVICES

PERFORMANCE WORK STATEMENT

FOR

CLARENCE CANNON DAM

AND

MARK TWAIN LAKE

AT

MARK TWAIN LAKE, MISSOURI

Table of Contents

1.0. Description of Services

1.1. Service Project Office

1.2. Service Recreation Areas

1.3. M.W. Boudreaux Memorial Visitor Center

2.0. Service Delivery Summary

2.1. Quality Control Plan

2.2. Quality Assurance

2.3. Performance Assessment

3.0. Government-Furnished Equipment, Materials, and Supplies

3.1. General

3.2. Utilities

3.3. Push Bars

3.4. Keys

3.5. Vault Chemical Treatment

4.0. Contractor-Furnished Equipment, Materials, and Supplies

4.1. General

4.2. Property Storage

4.3. Vehicles

4.4. Carpet Runners

4.5. Supply 55 Gallon Barrels (Refuse Containers)

4.6. Trash Bags

4.7. Communications

4.8. Signs

4.9 Sustainability

5.0. General Information

5.1. Scope of Work

5.2. Safety

5.3. Accident Prevention Plan

5.4. Activity Hazard Analysis

5.5. Emergency Medical Treatment

5.6. Reports

5.7. Meetings

5.8. Location and Contract Limits

5.9. Access

5.10. Unusual Conditions

5.11. Security

5.12. Service Schedule

5.13. Personnel Requirements

5.14. Environmental Protection

5.15. Permits and Responsibilities

5.16. ERGO Data

5.17. Identification Signs

5.18. Payment

5.19. Changes to Service Frequency and/or Quantity

5.20. Master Work Plan

5.21. Monthly Work Plan…………………………………………………………………………………………………………….

5.22. Contract Duration

5.23. Post Award Conference

5.24. Omissions

6.0. Appendices

Appendix A – Definitions and Acronyms Appendix B – Approximate Square Footage of Buildings Appendix C – Contract Area Maps Appendix D – Facility Inventory Appendix E – Schedule of Services Appendix F – Vehicle Signs Appendix G – Accident Prevention Program Appendix H – Master Work Plan Appendix I – Example Push Bar Bumper Appendix J – Signs

1.0. Description of Services. The contractor’s work shall consist of furnishing all labor, equipment, materials and supplies necessary to clean, service and maintain sanitary conditions and adjust courtesy boat docks at Clarence Cannon Dam and Mark Twain Lake in accordance with the work schedule, specifications and drawings contained herein. The contractor’s performance will be based on the Contracting Officer’s (KO), Contracting Officer’s Representative (COR), and Quality Assurance Personnel (QA) evaluations and the results required by the Service Delivery Summary (SDS). The evaluation of results will be based on COR based on COR performance assessment, tenant satisfaction, and customer complaints. Final results of the evaluations will be the determining factor for the success or failure of this contract. See Appendix D & E for the number and types of facilities and schedule of services for each area. Approximate square footage for buildings is shown in Appendix B.

1.1. Service Project Office. The Contractor shall clean, service and maintain sanitary conditions at the Project Office between the hours of 0700 and 1600, See Appendix E, Schedule of Services.

1.1.1. Service Floors. The Contractor shall maintain sanitary conditions and clean all floors and baseboards.

General floor coverings are identified in Appendix C. The Government reserves the right to change any or all floor coverings. The Contractor shall be responsible for servicing floors that have been changed.

1.1.1.1. Carpet, Tile, and Concrete Floors. The Contractor shall clean all floors and baseboards, laminate and rubber tile floors, carpet runners, carpeted or concrete floors. The cleaning process and products are required to meet the floor material manufacturer’s recommendations. General floor coverings are identified in Appendix C. All light office furniture, waste receptacles, chairs, carpet protectors and rugs shall be picked up and/or moved to permit cleaning underneath and around the item. All items shall be replaced to the original position when cleaning of the area is complete.

1.1.1.1.1. Mopping. If the Contractor chooses to mop a floor in order to clean and maintain sanitary conditions, the Contractor shall dry mop the floor prior to wet mopping. When wet mopping a floor the Contractor shall replace mop water in accordance with the cleaning solution manufacturer’s recommendation.

1.1.1.2. Shampoo Carpets. The Contractor shall clean and shampoo all carpets and carpet runners using equipment and cleaning supplies in accordance with the shampoo manufacturer's recommendations. The Contractor shall insure that all work associated with the cleaning and shampooing of carpets, removal and replacement of furniture and office equipment, is completed in the entire building between 5 p.m. Friday and 6 a.m. on Monday as shown in Appendix E.

The Contractor shall notify the Contracting Officer a minimum of 2 weeks prior to commencing a shampooing service in order to avoid scheduling conflicts.

1.1.2. Office Furniture/Fixtures. The Contractor shall clean equipment and furniture, chairs, coat racks, tables, water fountains, front door glass, podiums, interior and exterior of light fixture covers, window shades and venetian blinds, heating and air conditioning grates, ceiling fans, and the conference room table.

1.1.3. Waste Receptacles. The Contractor shall empty and clean all waste receptacles. The Contractor shall provide and install properly fitted plastic liners for each waste receptacle. Stainless steel waste receptacles shall be polished each service. The Contractor shall place all collected refuse in trash dumpsters located outside of buildings.

1.1.4. Restrooms. The Contractor shall clean four (4) restrooms in the Project Office.

1.1.4.1. Sinks, Toilets, and Urinals. The Contractor shall clean all sinks, toilets, urinals, partitions, walls, and amenities of each restroom. The restrooms shall have a pleasing odor once cleaned. An approved deodorant shall be provided by the Contractor to maintain a pleasing odor in each restroom. The Contractor shall provide a 3-day supply of liquid hand soap at all restroom sinks throughout the Project Office and pumice-based bar soap in the restrooms adjacent to the lunchroom as noted in Appendix C-3. The Contractor shall provide and install hand towels appropriate for each dispenser and toilet paper for each toilet. The Contractor shall provide a toilet paper supply of a minimum of one full and one half-full rolls in each toilet stall, with a surplus supply available to the Government of a minimum of two full toilet paper rolls per toilet stall. Toilet paper shall be a minimum of 2-ply.

One deodorant urinal screen, which emits a pleasing odor, shall be maintained in each urinal at all times.

1.1.5. Kitchen and Lunchroom. The Kitchen/Lunchroom shall be cleaned. The contractor shall clean the exterior of the refrigerators, microwaves, stove, coffee maker, sink, countertops, and tables. The contractor shall clean the interior of the microwaves, stove, toaster, and coffee maker. The contractor shall provide a paper hand towel supply of a minimum of one and a half-full rolls of hand towels in the kitchen/lunchroom.

1.1.6. Walls, Doors, and Windows. The contractor shall clean and maintain sanitary conditions on all interior walls, doors, and windows of the project office. The contractor shall also clean and maintain sanitary conditions for exterior windows of the front project office as indicated in Appendix C-3.

1.1.7. Project Office Exterior. The contractor shall remove all spider webs from the exterior of the front project office as indicated in Appendix C-3.

1.2. Service Recreation Areas. The Contractor shall clean, service and maintain sanitary conditions and adjust boat docks in recreation areas in accordance with specifications, drawings, and schedules contained herein.

1.2.1. General. The Contractor shall clean all public facilities even when occupied by visitors. The Contractor shall either (1) ask permission to clean, or (2) return later that same day to perform cleaning services. The Contractor shall display a contractor-furnished sign indicating facilities are closed for cleaning. See Appendix J.

The Contractor shall furnish the COR a list of all occupied campsites where permission was not obtained to perform litter and grill cleaning services. NOTE: All comfort stations, shower buildings, bathhouse, and picnic shelters must be cleaned in accordance with Appendix E.

1.2.2. Comfort Stations, Shower Buildings, and Spalding Bathhouse. The Contractor shall clean the building interior and exterior of comfort stations, shower buildings, and the bathhouse foyers/ building entrances. The facility shall have a pleasing odor once cleaned. Non-abrasive commercial cleaner(s) shall be used on all stainless steel and porcelain fixtures, windows and mirrors. A disinfectant solution shall be used each time the facilities are cleaned. Special effort must be made to keep electric hand dryers, electrical switches and outlets, and toilet paper dry. Floors, walls, and fixtures shall be thoroughly rinsed to remove excess cleaning solutions. The contractor shall remove any excess water from facility floors prior to leaving the building.

1.2.2.1. Refuse Receptacles. The Contractor shall empty and clean all refuse receptacles each time a facility is cleaned and a new plastic bag (minimum of 2 mil thick) shall be supplied and placed in the container. Refuse bags (containing trash) shall be tied closed and deposited in the nearest trash dumpster.

1.2.2.2. Toilet Paper. The Contractor shall supply and properly mount toilet paper on all spindles or bars in each facility. Toilet paper shall be a minimum of one thousand (500) sheets per roll. A minimum of two and a half full rolls are required for each spindle or bar. The Contractor shall provide extra toilet paper in the event a dispenser should become empty of toilet paper during non-duty hours. A minimum of 10 additional rolls of toilet paper shall be supplied and stored in the pipe chase of each facility. Care shall be exercised during cleaning operations to protect toilet paper from becoming wet. Toilet paper stored in the pipe chase must be stored in a manner that prevents it from becoming wet and from being destroyed by pests. If toilet paper becomes wet or is otherwise destroyed it shall be replaced with a new roll. This refers to toilet paper stored in the pipe chase as well as the toilet paper on the spindles in each stall.

1.2.2.3. Urinals. The Contractor shall clean all urinals, and supply one deodorant urinal screen, which emits a pleasing odor, and shall be maintained in each urinal at all times. NOTE: There are several types of urinals which may require different deodorant urinal screens.

1.2.2.4. Pipe Chase. The Contractor shall clean the pipe chase of all comfort stations, shower buildings and the bathhouse once per month during the first scheduled service unless the first service falls the Saturday or Sunday of Memorial Day, Fourth of July, or Labor Day weekend. In this case the pipe chase will be cleaned during the first service following the holiday weekend.

1.2.2.5. Walkways. The Contractor shall clean, remove debris, and litter from all paved entrance landings and sidewalks each time facilities are serviced.

1.2.2.6. Repairs. If toilets or urinals are not functioning properly, the Contractor shall attempt to correct the problem through the implementation of accepted plumbing practices. Physical removal of obstructions and, if necessary, the use of plungers, sewer rods and tapes furnished by the Contractor shall be used to clean the line;

however, at no time shall chemical drain cleaners be used. If problems cannot be corrected, the Contractor shall lock the affected side of the building and notify the Project Office as soon as possible, but no later than fifteen minutes after locking the door. The Contractor shall attach an “Out of Order” sign, see Appendix J, to the locked door.

1.2.2.7. Lights. The Contractor shall test all lights each time the facilities are cleaned by turning on the photocell override switches. The Contractor shall supply and replace all burned out bulbs and lamps on the day they are discovered. The inside of the light covers shall be cleaned on the first Friday of each month or more often if required. Replacement bulbs and lamps shall be LED’s of equal wattage and quality as those being replaced. The light cover shall be properly removed and reattached, taking care that the light cover and fixture are not damaged, and the switches turned back to photocell operation.

1.2.3. Vault Toilets. The Contractor shall clean and maintain sanitary conditions in the building interior and exterior of vault toilets. The Contractor shall clean and maintain sanitary conditions in the interior and exterior of all toilet fixtures. The service shall range from the uppermost surface of the fixture to where it is attached to the floor on both the interior and exterior. Toilet paper shall be supplied as cited in Paragraph 1.2.2.2 (Toilet Paper).

Lights shall be tested and replaced as cited in Paragraph 1.2.2.7 (Lights).

1.2.3.1. Chemical Treatment. The Contractor shall treat all sewage vaults in vault toilets with a commercial biochemical cleaner deodorizer provided by the Government. The vault toilet shall be treated at least weekly, or as necessary, to remove or mask all objectionable odors. The required monthly work plan shall address the application of chemical to vaults.

1.2.4. Picnic Shelters. The Contractor shall maintain sanitary conditions and clean the entire structure, ceiling, recesses, eaves (excluding the roof), floor, adjacent paved walkways, picnic tables, fireplaces and braziers.

Braziers located on the perimeter shall be cleaned in accordance with Paragraph 1.2.6 (Grills and Braziers). Picnic tables shall be positioned in straight evenly spaced rows. Picnic tables that have been removed from the shelter shall be returned to the shelter and positioned accordingly. The Contractor shall test the lights and notify the Government of any lights burned out or not working.

1.2.5. Trailer Dump Stations. The Contractor shall maintain sanitary conditions and clean all fixtures and exposed concrete surfaces within a 15-foot radius. Odors shall be controlled by using approved chemicals in order to provide effective control.

1.2.6. Grills and Braziers. The Contractor shall clean and remove all materials from the interior and surface of the grills and from the area immediately adjacent to the grills. Grill tops shall be left open after cleaning. Refuse and materials collected from the grills shall be deposited on the day of collection in the trash dumpster units located within the contract area. The Contractor shall thoroughly extinguish all hot coals and other burning material with water prior to dumping the material in the refuse dumpsters.

1.2.7. Fountains and Hydrants. The Contractor shall clean all fountains and hydrants. If drains become blocked and cannot be cleared by removal of debris from the bowl or drain grate or if the water flow is impaired, the Contractor shall notify the COR. The bowl and bubbler of all drinking fountains shall be disinfected and polished by the Contractor with disinfectants and metal polish.

1.2.8. Litter Pickup/Removal. The Contractor shall pickup and remove all litter and other trash from and along roadways, campsites, playgrounds, trails, parking lots, beaches to the water's edge, and around all public facilities and equipment within the boundaries for litter collection as shown in Appendix C.

1.2.8.1. Disposal. The Contractor shall deposit all litter collected in the dumpsters located within each recreation area on the day of collection.

1.2.9. Fire Rings. The Contractor shall remove all fire rings constructed by the public, which shall include extinguishing any burning material and stacking any wood and properly disposing of all debris. Any rocks that have been assembled for fire rings shall be scattered away from the campsite outside the mowing limits. If the campsite is occupied, the contractor shall politely ask the campers for permission prior to extinguishing a fire or removing materials. If the camper does not grant permission the contractor shall contact a gate attendant or Park Ranger.

1.2.10. Adjust Boat Docks. The Contractor shall adjust boat docks in accordance with daily lake elevation forecasts provided by the Government at the Mark Twain Lake Project Office. Boat Docks are located at the public launching ramps in the Ray Behrens, John F. Spalding, Indian Creek, Robert Allen, South Fork, Stoutsville Recreation Areas, and Hunter/Fisherman Access Area No. 15 (Shell Branch) as specified herein and in accordance with the schedule of services, Appendix E.

1.2.10.1. Description. The boat docks are a galvanized steel frame approximately 3'6" by 48' with steel runners, which rest on the surface of the concrete ramp. The docks are designed to slide up and down the ramp by using a vehicle or tractor of appropriate size and power. Two pairs of push poles which fit into the upper end of the dock to allow for dock adjustments will be furnished by the Government prior to beginning work. Tow chain, cable or other material necessary to pull the docks up the ramp shall be furnished by the Contractor.

1.2.10.2. Positioning. Prior to each scheduled service, the Contractor shall contact the Government to receive up-to-date statistics regarding lake elevation and forecasted elevation changes for safe dock positioning. Safe operating ranges are identified with reflective orange tape at 12 and 20 inches below the expanded metal surface.

Prior to adjustments being made, the ramps attachments must be flipped onto the dock. After correct adjustments are made, ramps must be placed in the downward position. The boat docks shall be oriented, so they are positioned parallel with the ramp and so the outside edge of the dock is 10" to 30" from the edge of the concrete ramp. Dock adjustments shall not be made while persons are on or in a "close” vicinity to the docks or when boats are tied up to the dock. The Contractor may courteously request persons to leave the immediate area while dock adjustments are made, but the public is under no obligation to comply. The Contractor must return at other times during the specified duty hours to make adjustments on occupied docks. The dock at the Ray Behrens and Hunter/Fisherman Access No. 15 boat ramp shall be aligned in the center of and parallel with the ramp. All other docks shall be positioned as previously described.

1.2.11. 55-Gallon Barrels (Refuse Containers). The Contractor shall clean and maintain sanitary conditions of 55-gallon barrels, holders and lids as specified in Appendices C and D, and at frequencies specified in Appendix E.

The Contractor shall supply and maintain barrels as specified in Paragraph 4.5. Supply 55 Gallon Barrels (Refuse Containers). All refuse shall be removed, and a new trash bag installed as specified in Paragraph 4.6. (Trash Bags) during each service. A 10 foot’ radius around each barrel shall be cleaned and litter removed during each service.

1.2.11.1. 55-Gallon Barrel Movement. The Contractor shall insure that refuse containers remain in their proper locations. In the event they are moved, the Contractor shall return them to their proper locations at each regularly scheduled service. The Contractor shall also collect and properly dispose of all refuse spilled on both land and water due to movement of the containers. The Contractor shall place containers in the holders so the lids can be closed and fit flush over the containers. The Contracting Officer may change the location of refuse containers and/or holders within the recreation areas, but the number of containers will remain as specified in Appendix D.

1.2.11.2. 55-Gallon Barrel Movement (Flooding). Refuse containers located within the flood pool elevations of Mark Twain Lake shall be moved by the Contractor to safe locations whenever lake levels rise to the point of jeopardizing inundation of the refuse containers. The Contractor shall return the refuse containers to their designated locations as soon as water levels drop to safe levels. The Government will notify the contractor when lake levels are to the point of jeopardizing inundation of the refuse containers and when water levels drop to safe levels. The COR reserves the right to move containers in emergency situations.

1.2.13. Fish Cleaning Stations. The Contractor shall remove all fish parts and clean all fish cleaning stations.

Items to be cleaned shall include the entire fish cleaning station, light fixtures, working surfaces, base slabs, drain gates and screens, uprights, recesses and eaves. Fish cleaning station lights shall be tested and replaced as cited in Paragraph 1.2.2.7 (Lights).

1.2.12. Unusual Conditions. Occasionally, emergencies and maintenance problems arise that require the immediate closure of a facility. The Contractor shall be verbally notified as soon as possible, and with written notification issued within five working days.

1.3. M.W. Boudreaux Memorial Visitor Center. The Contractor shall clean the M.W. Boudreaux Visitor Center and Campus. All work shall be completed before 9 a.m. on each service day.

1.3.1. Floors. The Contractor shall maintain sanitary conditions and clean all floors. Floor cleaning shall include the floor surface extending up to and the tops of all baseboards. The cleaning process and products are required to meet the floor material manufacturer’s recommendations. General floor coverings are identified in Appendix C.

The Government reserves the right to change any or all floor coverings. The Contractor shall be responsible for servicing floors that have been changed.

1.3.1.1. Tile, Wood, and Concrete Floors. The Contractor shall clean all floors, wood and tile floors, carpet runners, floor mats, and carpeted or concrete floors in areas identified in Appendix C. Floors shall be cleaned following manufacturers’ recommendations. All light office furniture, waste receptacles, chairs, carpet protectors and rugs shall be picked up and/or moved to permit cleaning underneath and around the item. All items shall be replaced to the original position when cleaning of the area is complete.

1.3.1.2. Sealing Tile Floors. The Contractor shall seal tile floors in accordance with manufacturer's procedure using an approved sealant meeting manufacturer’s recommendation.

1.3.2. Community Room Tables and Chairs. The Contractor shall clean the Community Room’s tables and chairs, metal and fabric parts when specified in Appendix E. These tables and chairs shall be place on racks in the Storage area.

1.3.3. Walls and Doors (Lower Level). The Contractor shall clean and polish all walls and both sides of all doors using products meeting manufacturer’s recommendation. Walls shall include but not be limited to painted concrete block, ceramic tile, vinyl panel, wooden panel, stainless steel, and metal panel, papered walls. Doors include all metal, wood, wood/glass and metal/glass doors, and door facings. (Lower Level -from the ground to the bottom of the ledge of upper lobby windows)

1.3.4. Walls, Doors, and Windows (Upper Level). The contractor shall clean and polish all interior and exterior materials from the window ledge to the ceiling, walls, doors, lights, windows, window ledges, copper leaf sculpture, vents, grates, speakers, fireplace, displays, and fans. Polish shall meet manufacturers’ recommendation. For this service, the contractor shall be given seventy-two (72) hours to commence work. This service will require the Contractor to perform service on items within an area with a high vaulted ceiling that cannot be accessed by ladder alone.

1.3.5. Windows and Glass Doors (Lower Level). The Contractor shall clean all interior and exterior windows and window ledges located between the floor and the upper ledge of the bottom windows and door windows, using products meeting manufacturer’s recommendation. The Contractor shall use an approved non-abrasive cleaner and soft, clean cloth for servicing all windows. Window screens shall be removed and cleaned during this service.

1.3.6. Visitor Center Campus Furniture/Fixtures. The Contractor shall clean equipment and furniture, water fountains, benches, window shades and venetian blinds, heating and air conditioning grates, ceiling fans, and all furniture within the executive room. Wood tables, chairs, and benches shall be treated with an approved surface wax once per week as noted in the Contractor’s Work Plan. This service does not include the sales area of the bookstore.

1.3.7. Displays. The Contractor shall clean all displays; map displays, informational signs, brochure dispensers, artifacts, murals, kiosks, bulletin boards, Vietnam Memorial plaques, and components of displays to include painted wooden walls and ceilings, laminated walls, brass stanchions, glass and Plexiglas. The Contractor shall not clean monitors and touch screen displays. All materials used to clean displays must meet manufacture’s recommendations. Extreme caution shall be used when cleaning the displays to avoid damage or disturbing the display.

1.3.8. Waste Receptacles. The Contractor shall empty and clean all waste receptacles in the visitor center and throughout the campus, see Appendix C for general location of the seven exterior receptacles. The Contractor shall provide and install properly fitted plastic liners for each waste receptacle. Receptacles shall be cleaned during each service. The Contractor shall place all collected refuse in the designated dumpster.

1.3.9. Sidewalks and Building Exterior. The Contractor shall clean the exterior areas by removing all materials;

cobwebs, leaves, bird droppings, litter, and woody debris, on the following, walkways, sidewalks, overlooks, decks, Vietnam Memorial, dumpster pad, scenic overlook, outdoor classroom, picnic tables, bridges, guard rails, trails, and other areas as identified in Appendix C. The removed materials may not be directed into the Dry Riverbed Landscape or other landscape features or areas. The material shall be placed in the dumpster.

1.3.10. Restrooms. The Contractor shall clean the two (2) restrooms in the Visitor Center. The Contractor shall clean all sinks, counter tops, toilets, urinals, partitions, child changing stations, walls, and amenities of each restroom with an approved cleaner. The restrooms shall have a pleasing odor once cleaned. The Contractor shall provide an approved, antibacterial soap for the lavatory mounted soap dispensers. The Contractor shall provide a toilet paper supply of a minimum of one full and one half-full roll in each toilet stall, with a surplus supply available to the Government of a minimum of two full toilet paper rolls per toilet stall. One deodorant urinal screen, which emits a pleasing odor, shall be maintained in each urinal at all times. All waste receptacles located in the restrooms shall be serviced in accordance with the Waste Receptacles 1.3.8.

1.3.11. Lights (Lower). The Contractor shall inspect and test all interior and exterior lights. The Contractor shall furnish and replace all burned out bulbs and lamps during this service. (Hard wired “puck lights” are excluded) The inside of the light covers shall be cleaned on the first Sunday of each month and more often if required.

Replacement bulbs and lamps shall be bright white color spectrum and of equal wattage and quality as those being replaced and shall be approved by the government. The light cover shall be properly removed and reattached, taking care that the light cover and fixture are not damaged, and the switches turned back to normal operations.

(Lower Level -from the ground to the bottom of the ledge of upper lobby windows).

1.3.12. Lights (Upper). The Contractor shall inspect and test all interior and exterior lights. The Contractor shall furnish and replace all burned out bulbs and lamps during this service. (Hard wired “puck lights” are excluded) The interior and exterior of the light covers shall be cleaned. Replacement bulbs and lamps shall be bright white color spectrum and of equal wattage and quality as those being replaced and shall be approved by the government.

The light cover shall be properly removed and reattached, taking care that the light cover and fixture are not damaged, and the switches turned back to normal operations. (Upper Level -above the bottom of the ledge of upper lobby windows).

1.3.13. Fire Pits and Fireplace. The Contractor shall clean and remove all materials from the interior and surface of the fire pit located by the outdoor classroom and on the observation deck of the Visitor Center. These materials shall be placed in a plastic bag and placed in the dumpster. The Contractor shall extinguish with water all hot coals and other burning material prior to dumping the material in the refuse dumpsters.

1.3.14. Litter Pickup/Removal. The Contractor shall pickup and remove all native vegetation, litter and trash in the designated area. These designated areas include but are not limited to, roadways, sidewalks, playgrounds, decks, overlooks, trails, parking lots, picnic area (normal leaf accumulation excluded), Dry River Bed feature, landscape areas, outdoor classroom, Vietnam Memorial, and around all public facilities and equipment within the boundaries for litter collection as listed in Appendix C. The Contractor shall deposit all litter collected in the dumpster.

1.3.15. Kitchen and Lunchroom. The Kitchen/Lunchroom shall be cleaned. The contractor shall clean the exterior of the refrigerators, microwaves, stove, coffee maker, sink, countertops, and tables. The contractor shall clean the interior of the microwaves, stove, toaster, and coffee maker. The contractor shall provide a hand towel supply of a minimum of one and a half-full rolls of hand towels in the kitchen/lunchroom

1.4. COVID-19 VIRUS REQUIREMENTS AND PROCEDURES. Contractors shall wear a personal face mask/covering and other appropriate protective gear when within six (6) feet of any other individual if recommended by the Centers for Disease Control and Prevention (CDC). Additionally, the Contractor shall follow CDC recommendations and guidance located at https://www.cdc.gov/coronavirus/ for cleaning procedures, methods, and shall utilize cleaning products as recommended within the guidance. The Contractor shall be responsible for any change of personal protective equipment (PPE) requirements and/or procedures and will notify the Government of any changes in PPE.

2.0. Service Delivery Summary.

2.0.1. Service Delivery Summary (SDS). The contract service requirements are summarized in performance objectives that relate directly to requirements. The maximum number of defective items in a lot that can be considered unsatisfactory is called the performance threshold. The performance threshold for each service to be performed can be found in the chart below. When the number of defects for a specified service (or lot) is below the performance threshold, the work will be considered satisfactory. Each service that is performed will be determined acceptable or deficient according to the requirements of this contract. The SDS and the contractor’s Quality Control Plan provide information on contract requirements, the expected level of contractor performance and the expected method of government validation and confirmation of services provided

Performance Objective

Performance Threshold

Method of Assessment

Remedy

See Description of

Work 1.0 Through 1.4.

No more than zero (0) defects per month

Periodic Validations

1. Re-Performance

2. Deficiency

3. Cure Notice

4. Contract Termination

Administer quality control program including subcontractor management in accordance with

SDS

The contractor is in compliance with the QCP 95% of the time

Periodic Validations

1. Deficiency

2. Cure Notice

3. Contract Termination

2.1. Quality Control Plan. The Contractor shall submit their Quality Control Plan within 15 working days of contract award. The Plan shall identify personnel, procedures, instructions, records and forms to be used. The Plan shall include a description of the quality control organization, name, duties, responsibilities and authorities of each person assigned a quality control function and a copy of the letter to the quality control manager signed by an authorized official of the firm which describes the responsibilities and delegates the authorities of the quality control manager. The Contractor shall provide and maintain an inspection system acceptable to the Government, covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

2.2. Quality Assurance. The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government will perform inspections and tests in a manner that will not unduly delay the work. The government will inspect and evaluate the contractor’s performance to ensure services are received in accordance with the requirements set forth in this contract. The Quality Assurance Representative, QAR, will inspect by validating actual work performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in this contract.

2.3. Performance Assessment.

2.3.1. Periodic Validations. This method requires the COR to employ a “spot check” style of evaluation. Periodic validations will be conducted on a scheduled basis (daily, weekly, monthly, quarterly, semi-annual or annually) and may be adjusted, based on quality trends. The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work

2.3.2 Re-performance. If any of the services do not conform to contract requirements or do not meet the performance threshold, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount and within the daily confines of the area time restrictions.

2.3.3 Deficiency. If the identified services are not re-performed to a satisfactory standard as identified in the Description of Services, or the services were not performed in the first place, or the service is found to not meet the performance threshold multiple times, then the Contractor may be issued a deficiency. A deficiency may –

(1) Required the Contractor to take necessary action to ensure the future performance conforms to contract requirements; and

(2) Reduce the contract price to reflect the reduced value of the services performed; and

(3) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the

Government that are directly related to the performance of such service.

2.3.4. Cure Notice. If the deficient services are not corrected, then the Contractor may be issued a Cure Notice outlining the deficiencies. The Cure Notice may also request corrective actions to be proposed and be enacted by the Contractor. The Contractor shall have ten, 10, days to provide response to the Government.

2.3.5 Contract Termination. The Government may choose to terminate the contract for any deficiency identified on the Cure Notice that is not corrected within the ten, 10, days.

3.0. Government-Furnished Equipment, Materials, and Supplies.

3.1. General. The Government will supply to the Contractor, for use only in connection with this contract, the following described equipment and materials in amounts, and at times necessary for the use by the Contractor to provide the necessary work described herein. The Contractor shall receive Government-furnished materials at the Mark Twain Lake Project Office. The Contractor shall evidence receipt of such materials by signing ENG Form 4900, Property Control Receipt. All unused materials shall be returned to the Government as soon as practicable after completion of necessary work.

3.2. Utilities. The Government will supply all water and electricity required in the performance of this contract.

Water and electricity can be obtained by the Contractor from sources within work areas or from other approved sources.

3.3. Push Bars. The Government will furnish two sets of push bars to be used for boat dock adjustments. NOTE:

Push bar bumpers will NOT be furnished by the Government. Examples of a push bar bumper are shown in Appendix I.

3.4. Keys. The Government will furnish the necessary keys for access to recreation areas and facilities. The Contractor shall evidence receipt of such materials by signing the project’s key control sheet. The Government will furnish one key to the front door of the Project Office. NOTE: DUPLICATION OF GOVERNMENT- FURNISHED KEYS IS NOT PERMITTED. The Contractor shall immediately report the loss of keys to the Contracting Officer. In the event that a Government-furnished key is lost, the Contractor is responsible for reimbursement of all costs incurred by the Government for replacement of entire lock systems throughout the lake project, which are affected by the lost key. Contractor costs shall include, but not be limited to, Government labor, replacement lock costs, replacement key costs, tumbler reworking and all contracted labor costs required to replace lock systems. All lock systems required to be replaced will be equal quality to lock systems presently in place. The Government will determine the specific replacement lock system.

3.5. Vault Chemical Treatment. The Government will supply a biochemical cleaner deodorizer to be applied at a rate indicated by the Contracting Officer.

4.0. Contractor-Furnished Equipment, Materials, and Supplies.

4.1 General. All Contractor-furnished equipment and materials used in the performance of this contract shall be of suitable size, type and quality for the intended use. Contractor-furnished equipment shall be inspected daily by the Contractor and maintained in a safe and good working condition. The Contracting Officer reserves the right to inspect any and all equipment, materials, and supplies prior to award of this contract and during the course of this contract. All materials used in the performance of this contract will become the property of the Government.

4.2. Property Storage. The Contractor will not be allowed to store any equipment on Government property unless approved in advance by the Contracting Officer. If approval is given for property storage, the Government assumes no responsibility for the safety or security of property left on Government property. Limited storage of equipment will be allowed in the Mark Twain Lake Project Office and M.W. Boudreaux Visitors Center only and shall be marked property of the Contractor. The Contracting Officer will designate specific locations. A small limited supply of cleaning materials may be left in the approved storage areas and must be marked property of the contractor. Property shall be removed from the work site as soon as possible after the completion of the work described herein.

4.3. Vehicles. The Contractor shall provide all vehicles necessary to perform all services under this contract. The Contractor shall keep all vehicles clean and in safe operating condition. Vehicles shall be clearly marked, on both sides of the vehicle, with an identification sign showing, in 2" or larger letters, the Contractor's name, type of business and address as set forth in Appendix F. The contractor shall also provide a push bar bumper that is capable of safely pushing boat docks as shown in Appendix I.

4.4. Carpet Runners. The Contractor shall supply a minimum of nine (9) brand new non-slip carpet runners approximately 4' X 3' in size and shall be placed at the Project Office. The COR will designate color and exact location of each runner. Runners shall be cleaned each time floors are serviced.

4.5. Supply 55-Gallon Barrels (Refuse Containers). The Contractor shall supply all refuse containers (barrels) required for servicing. Barrels shall be empty metal 55-gallon barrels that fit Government Furnished holders with lids in recreation areas. The Contractor shall paint all barrels with Contractor-furnished paint. The paint shall be tan in color, enamel, and shall be approved by the Contracting Officer prior to painting. Barrels shall not be dented or damaged. Barrels shall have a solid bottom. If barrels become damaged, dented, rusted or are found missing, the Contractor shall replace the barrels with new painted 55-gallon barrels. Barrels shall be free of any sharp edges. At any time that barrels become faded, scratched, or marked-up, the Contractor shall repaint barrels using Contractor-furnished tan enamel paint.

4.6. Trash Bags. The contractor shall furnish trash bags at least 2 mil thick and have a proper size to fit the refuse containers.

4.6. Communications. The Contractor shall provide crew leaders with a reliable and functioning communication system with numbers furnished to the Government. The system provided shall insure communications between the Government and the Contractor crew leader(s) during all hours of scheduled work.

4.7. Signs. The contractor shall provide four (4) “Building Closed for Cleaning” signs to indicate a facility is closed for service, two (2) “Out of Order” signs to indicate a facility/utility is non-operational, and two (2) “Floor Slippery When Wet” signs to indicate a floor that is slippery and/or wet. The signs shall have 2” or larger letters.

Examples of these signs are in shown in Appendix J.

4.7.1. Uniform Logos. The contractor shall have their business logo or “Janitorial Staff” in a location that is clearly visible on the front and back of employees work uniforms. The contractor is required to wear this uniform anytime services are conducted within recreation and day use facilities.

4.8. Sustainability. In accordance with (IAW) the U.S. Army Corps of Engineer (USACE) Acquisition Instruction (UAI), USACE shall advance sustainable acquisition and the Army Green Procurement Guide by ensuring that all applicable new contract actions include relevant, federally mandated, sustainability requirements.

4.8.1. EPA Designated. Under the Comprehensive Procurement Guidelines (CPG) program the EPA designates products that are, or can be made with recovered materials, and recommends practices for buying these products.

Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. The contractor is encouraged to visit http://www.epa.gov/epawaste /conserve/tools/cpg/products for a complete list of designated products and the associated recommended content levels. Offerors must be able to demonstrate that each offered product meets minimum content levels upon request.

4.8.2. Safer Choice. The contractor shall provide Safer Choice labeled product under this contract, as applicable.

The contractor is encouraged to visit http://www2.epa.gov/saferchouice/products for updated lists of qualifying products.

4.8.3. Water Sense. The contractor shall provide Water Sense labeled products under this contract, as applicable.

The contractor is encouraged to visit http://www.epa.gov/watersense for complete product specifications as updated lists of qualifying products.

4.8.4. Bio-Based. The United States Department of Agriculture (USDA) designates certain bio-based products for federal procurement and specified minimum bio-based content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred’s minimum bio-based content level.

Visit the BioPreferred website (https://www.biopreferred.gov/BioPreferred/) for the complete list of designated products and the associate minimum bio-based content level requirements.

4.8.5. Energy Star. As required in clause 52.223-15 Energy Efficiency in Energy-consuming Products, the contractor shall only provide products that earn the ENERGY STAR label and meet ENERGY STAR specifications for energy efficiency. The contractor is encouraged to visit http://www.energy star.gov for complete product specifications.

4.8.6. FEMP. As required in clause 52.223-15 Energy Efficiency in Energy-consuming Products, the contractor shall only provide products that meet Federal Management Program (FEMP) purchasing specifications for energy efficiency under this contract, ass applicable. Covered product categories and the applicable energy efficiency requirements can be found at http://energy.gov?eere?femp/covered-products-categories.

5.0. General Information.

5.1. Scope of Work. The contractor’s work shall consist of furnishing all labor, equipment, materials and supplies necessary to clean, service and maintain sanitary conditions and adjust courtesy boat docks at Clarence Cannon Dam and Mark Twain Lake in accordance with the work schedule, specifications and drawings contained herein. The contractor’s performance will be based on the Contracting Officer’s (KO), Contracting Officer’s Representative (COR), and Quality Assurance Personnel (QA) evaluations and the results required by the Service Delivery Summary (SDS). The evaluation of results will be based on COR based on COR performance assessment, tenant satisfaction, and customer complaints. Final results of the evaluations will be the determining factor for the success or failure of this contract. See Appendix D & E for the number and types of facilities and schedule of services for each area.

Approximate square footage for buildings is shown in Appendix B.

5.2. Safety. This paragraph applies to contracts and purchase orders that require the Contractor to comply with EM 385-1-1 (e.g., contracts that include the Accident Prevention clause at FAR 52.235-13 and/or other safety provisions). EM 385-1-1 and its changes are available at http://publications.usace.army.mil/publications/eng-manuals/ (at the HQ homepage, select Safety and Occupational Health). The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .