A1b Flr6 TYPICAL C.pdf

PDF 356 KB Posted

Attached to
P2025-1016601, Furniture Install Sit Stands, Chamblee, GA
Solicitation number
75D301-26-Q-79184
Issued by

About this file

This is a technical floor plan layout document for a cable assembly building showing two distinct configurations: an existing layout and a new layout. The document displays architectural floor plans with dimensions and equipment placement specifications for what appears to be an industrial or manufacturing facility.

The existing layout shows a 64/48 foot space with seating arrangements, storage areas, and utility placement. The new layout reconfigures the same footprint to accommodate different operational requirements, featuring repositioned equipment, workstations, and supporting infrastructure. Both layouts include detailed measurements, grid references (64/48, 64/24, 64/12 dimensions), and equipment symbols. A legend at the bottom identifies various components including new mounting points, existing lateral storage, floor treatment zones, recessed and removable base construction, and cable manager installations. The document indicates this is a space planning document (dated 4-8-2025) for facility modifications, with specific attention to cable management systems, environmental controls, and ergonomic workstation design. The plans appear to support a transition from current operations to an optimized facility configuration with enhanced cable management and equipment accessibility.

View the file

Other files

File Type Posted
B3 RFI Worksheet v3 (8.13.26).docx DOCX document
A19 SF18 RFQ 75D301-26-Q-79184 v4.pdf PDF
A1b Typical Totals.xlsx XLSX spreadsheet
B3 RFI Worksheet v2 (8.6.26).docx DOCX document
A19 SF18 RFQ 75D301-26-Q-79184 v3.pdf PDF
A19 SF18 RFQ 75D301-26-Q-79184 v2.pdf PDF
B3 RFI Worksheet (8.6.26).docx DOCX document
A1b GACH0106_Flr6_SitStand_TYPICAL C (8.6.26).pdf PDF
A1b GACH0106_0003 (8.6.26).pdf PDF
A1b GACH0106_0005 (2.05.26).pdf PDF
A1b GACH0106_Flr6_SitStand_TYPICAL B (8.6.26).pdf PDF
A1b GACH0106_Flr6_SitStand_TYPICAL A (8.6.26).pdf PDF
A1b GACH0106_Flr6_SitStand_TYPICAL D (8.6.26).pdf PDF
A1b GACH0106_Flr6_SitStand_TYPICAL E (8.6.26).pdf PDF
A1b GACH0106_0007 (8.6.26).pdf PDF
A1b GACH0106_Flr7_SitStand_TYPICAL F (8.6.26).pdf PDF
A1b GACH0106_0006 (8.6.26).pdf PDF
A1b GACH0106_0004 (8.6.26).pdf PDF
B3 RFI Worksheet.docx DOCX document
A1b Flr6 TYPICAL D.pdf PDF
A1b Flr6 TYPICAL E.pdf PDF
Artificial Intelligence Compliance and Risk Management Plan.docx DOCX document
A1b SPECIFICATIONS 2.27.24.pdf PDF
A1b ATTACHMENT B (5TH FL DRAWINGS) 2.27.24.pdf PDF
A1b Flr6 TYPICAL B.pdf PDF
A19 SF18 RFQ 75D301-26-Q-79184.pdf PDF
A1b ATTACHMENT D (4TH FL Labor Specs) 2.27.24.pdf PDF
A1b ATTACHMENT D (5TH FL Labor Specs) 2.27.24.pdf PDF
A1b Chamblee Bldg 106 SS required per floor.docx DOCX document
A1b ATTACHMENT B (4TH FL DRAWINGS) 2.27.24.pdf PDF
A1b Flr6 TYPICAL A.pdf PDF
A1b Flr7 TYPICAL F.pdf PDF
A1b Chamblee B106 SS Per Floor.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .