A001.doc
DOC document 417 KB Posted
- Attached to
- Support Equipment Test & Evaluation Contractor Support Services Federal contract opportunity
- Solicitation number
- N00421-20-R-0121
About this file
This document contains a Contract Data Requirements List (CDRL) and related Data Item Description (DID) for a federal contract opportunity. The CDRL requires the submission of monthly Funds and Man-Hours Expenditure Reports detailing labor, material, travel, and other contract expenditures against baseline values and providing cost-to-completion estimates. The reports must include tabular and graphical representations of funding and work completion. The related opportunity is a solicitation for Contractor Support Services at various Navy locations to provide engineering, technical, administrative, and program management support for the Support Equipment Test & Evaluation Branch. The resulting contract will be a 5-year cost-plus-fixed-fee IDIQ awarded to one contractor through full and open competition. Eligible contractors must be registered in SAM. The incumbent is Eagle Systems, Inc. under contract N00178-14-D-7700-M801.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| P9 Wage Determination.pdf | ||
| Conformed Amendment 0001.pdf | ||
| A006.docx | DOCX document | |
| P3 PPIF.pdf | ||
| P6 Personnel Resource Matrix.xlsx | XLSX spreadsheet | |
| P7 COR Only Excel Template.xlsx | XLSX spreadsheet | |
| P6 Personnel Resource Matrix.xlsx | XLSX spreadsheet | |
| A003.doc | DOC document | |
| A002.doc | DOC document | |
| N00421-20-R-0121_RFP.docx | DOCX document | |
| J1 Org_Conflict_of_Interest.docx | DOCX document | |
| J3 CSP_SAC.docx | DOCX document | |
| P4 CPAQ.pdf | ||
| A005.doc | DOC document | |
| A004.doc | DOC document | |
| P1 Cost.xls | XLS spreadsheet | |
| P3 PPIF.pdf | ||
| J5 Data_Item_Transmittal_Acceptance_Rejection_Form.docx | DOCX document | |
| P2 Fully Burdened.xlsx | XLSX spreadsheet | |
| P8 COR and Customer Excel Template.xlsx | XLSX spreadsheet | |
| J4 DD254.pdf | ||
| A006.docx | DOCX document | |
| P5 CPAQ Instructions.docx | DOCX document |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
XXXX
B. EXHIBIT
A
C. CATEGORY
TDP
TM
OTHER XX
_________ (various, see below)
D. SYSTEM/ITEM
SE T&E Branch, AIR 4.8.6.11
E. CONTRACT/PID NO.
N00421-20-R-0121
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. 2TITLE OF DATA ITEM
Funds and Man-Hours Expenditure Report
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-FNCL-80331A
5. CONTRACT REFERENCE
SOW Para: 3.1.3.1
6. REQUIRING OFFICE
NAWCAD 4.8.6.11
7. DD 250 REQ
| 9. DIST STATEMENT REQUIRED |
| 10. Frequency |
12. DATE OF FIRST SUBMISSION
14.
DISTRIBUTION
DD
| MTHLY |
| 30 DAC |
b. COPIES
| 8. APP CODE |
| D |
| 11. As of Date |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Final
N/A
| N/A |
| 30 Days |
| Draft |
| Reg. |
| Repro. |
16. REMARKS:
This report shall be provided electronically utilizing Microsoft Excel. The contractor’s format is acceptable for this report.
| 486K00A |
| 0 |
| 1 |
| 0 |
15. TOTAL
G. PREPARED BY
NAWCAD-4.8.6.11
H. DATE
I. APPROVED BY
Patrick Weaver, AD-4.8.6.11
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete.
_1649512798.pdf
DATA ITEM DESCRIPTION
Title: Funds and Man-Hours Expenditure Report
Number: DI-FNCL-80331A Approval Date: 30 OCT 2006 AMSC Number: 7618 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A
Use/relationship:
This report provides Government visibility into contractor expenditures for labor, materials, travel and other contract charges. It tracks these expenditures against baseline values, and provides to-completion estimates.
This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
This DID is applicable to time and material, research and development and other contracts where use of Cost Performance Reporting (CPR) or Cost/Schedule Status Reporting (C/SSR) are not appropriate. It is not applicable on fixed-price contracts. It is acquired on a periodic basis.
It is not intended that all the requirements contained herein should be applied to every contract or program phase. Portions of this DID are subject to deletion tailoring depending on the management requirements of the solicitation/contract in which it is applied.
This DID is related to DI-A-5016, Project Planning/Actual Progress Chart (Other than fixed price contracts), and DI-FNCL-80003, Man-Hour Expenditure Chart.
This DID supersede DI-FNCL-80331.
Requirements:
1. Reference documents. None.
Source: http://assist.dla.mil -- Downloaded: 2020-04-27T21:08Z Check the source to verify that this is the current version before use.
engineer shop, etc), burden/overhead, material/parts, travel, subsistence, fringe, DI-FNCL-80331A
2. General. The Funds and Man-Hours Expenditure Report shall contain the following data:
a. A tabular listing of funding and man-hour expenditures inclusive of the reporting period compared to original baseline values, including to-completion estimates.
b. A graphical plot of planned versus actual funding expenditures.
c. A graphical plot of planned and actual percentage of work completed.
3. Scope. Each task, job-order, sub-task, or unit of work will be separately addressed. If schedule or milestone reporting is also a reporting requirement under the contract; the breakdown of work task elements should be consistent with the reporting.
4. Format and Content. The report shall contain the following:
4.1 Funds and man-hour expenditure summary. This chart shall contain the following data elements (See Figure 1).
4.1.1 Original negotiated contract. A summary of all cost elements associated with the original negotiated contracts. This is defined as the contractor’s original cost proposal, as negotiated and accepted by the Government. It is that cost as it appears on the original contract document. Its elements shall contain the cost estimate breakdown by category (i.e., direct labor (Sr. Engineer, Jr Engineer, draftsman, General and Administration (G&A) fee, outstanding commitments, etc), as provided in the accepted proposal. Items and amounts specified in this entry shall remain constant on successive reports during the term of the contract.
4.1.2 Latest negotiated contract changes. A summary of the latest negotiated contract changes. It shall be a recapitulation of the 4.1.1 data elements reflecting all subsequent changes resulting for contract modifications. Breakdown by category shall be as provided in 4.1.1 unless altered by a contract modification. Indicated “none” if revised proposal has no effect.
4.1.3 Reporting period expenditures. Expenditure data for the current reporting period for the work task categories used in 4.1.1 or 4.1.2 (as applicable), and covering man hours, funds, and the change (new orders minus fulfilled orders) in outstanding commitments.
4.1.4 Cumulative expenditure to date. Cumulative man hour, funds and outstanding commitments expenditure data through the current reporting period for the work task categories used in 4.1.1 and 4.1.2 (as applicable). Additionally, show the cumulative costs as a percentage of the 4.1.1 of 4.1.2 costs.
4.1.5 Estimated cost-to-complete. The estimated costs required to complete the work task from the reporting date to the date of completion. This estimate shall be defined by categories as they appear in 4.1.1 of 4.1.2. All estimates shall be justified.
4.1.6 Latest cost estimate. An estimate of the final total cost at completion of the work effort. This is derived from 4.1.4 and 4.1.5. Deviations between the original contract and/or latest negotiated contract change shall be justified/explained in footnote remarks.
4.2 Funds expenditure graph. A funds expenditure graph shall be included. The graph shall be reproducible to enable periodic changes reflecting current contract funding status to be entered. The graph shall portray, on a periodic basis, the planned versus actual total dollar expenditures and the percentage of the total contract dollars that the expenditure represent (See Figure 2).
4.3 Work completed graph. A work completed graph shall be included that reflects the percentage of work completed by the contractor through the current reporting period.
The graph shall plot actual completion versus planned completion, and shall be maintained current and be fully legible and reproducible (See Figure 3).
5. END OF DI-FNCL-80331A