Request_DTSB_services.xlsx
XLSX spreadsheet 562 KB Posted
- Solicitation number
- 75N99023R00029
About this file
This federal contract opportunity solicitation seeks inspection and quality assurance support services. The National Institutes of Health (NIH) Office of Research Facilities (ORF) Division of Design and Construction Management (DDCM) Design and Technical Services Branch (DTSB) requires these services to manage construction projects. As part of the U.S. Public Health Service and Department of Health and Human Services, NIH conducts biomedical research to enhance health and reduce illness burdens. DDCM oversees NIH facility design, construction, renovation and repair. DTSB provides necessary inspection and quality assurance to support DDCM construction management.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Service
| OFFICE OF RESEARCH FACILITIES | CONTACT INFORMATION |
| DIVISION OF DESIGN AND CONSTRUCTION MANAGEMENT | Vera Glazkova (backup: Samna Ali) |
| DESIGN AND TECHNICAL SERVICES BRANCH | vera.glazkova@nih.gov |
REQUEST FOR DTSB SERVICES Request Date:
edson baker: Input the Date of the request(s) mm/dd/yy Work Request #:
edson baker: Input the Project Work Request Number C#
PROJECT DATA (Fill in all blank boxes: use Pull down menus in white boxes; type in information in yellow boxes) edson baker: Fill in all boxes by using the drop boxes, where supplied, and inputing requested information in the yellow boxes
| Project Officer (type name) | ||||
| blade_runner: Type PO name | DTSB Mgr | |||
| blade_runner: Select DTSB Project Manager from drop down list | Pick from drop down list | IC/Group | ||
| edson baker: Select an Institute or a Group; if more than one IC or Group is involved select "Multiple" | Pick IC from drop down list | |||
| Project Title (Description) |
me: Input Project Title Building # - "Common Name" location me: Pick main building # from drop down list edson baker: Input the Date of the request(s)
| Pick from drop down list | |
| Project Scope (Brief Summary) |
Sean Mellott: Briefly define the scope of the project and quantify the amount of work involved Conceptual (free) Estimate or Cost of Construction me: Project Officer must provide free conceptual estimate price in box at right; provide cost of construction for services during construction blade_runner: Select DTSB Project Manager from drop down list edson baker: Input the Project Work Request Number
| $$ | Select Complexity: | ||
| me: Select Project Complexity from 1 to 5; 3 is average. For Bldg 10 CRC and for Animal buildings, use the next higher factor | 3 (average) | Complexity Factor: | |
| edson baker: Cost and Period of Performance (POP) are affected by Complexity; Cost and POP are increased or decreased by the Factor | 1.0 |
PROJECT SCHEDULE (input start and finish dates for each Phase services are selected; mm/dd/yy) edson baker: Dates must be entered into the "Start" and "Finish" columns ONLY for each Phase with requested services.
edson baker: Select an Institute or a Group; if more than one IC or Group is involved select "Multiple"
| me: Select Project Complexity from 1 to 5; 3 is average. For Bldg 10 CRC and for Animal buildings, use the next higher factor | PLANNING PHASE | DESIGN PHASE | CONSTRUCTION PHASE | POST CONSTR. PHASE | ||||||||
| start | finish | start | finish | start const. | start insp. | finish | start | finish |
REQUEST CONSULTING HOURS (select consulting type from drop down boxes, starting at top row and input number of hours) edson baker: Note: Consulting hours are used for both Design Services and for specific requested assistance
| edson baker: Cost and Period of Performance (POP) are affected by Complexity; Cost and POP are increased or decreased by the Factor | PLANNING PHASE | DESIGN PHASE | CONSTRUCTION PHASE | POST CONSTR. PHASE | |||||
| Pick from drop down list | Pick from drop down list | Pick from drop down list | Pick from drop down list | TRUE | |||||
| Pick from drop down list | Pick from drop down list | Pick from drop down list | Pick from drop down list | ||||||
| Pick from drop down list | Pick from drop down list | Pick from drop down list | Pick from drop down list | ||||||
| Pick from drop down list | Pick from drop down list | Pick from drop down list | Pick from drop down list | ||||||
| Pick from drop down list | Pick from drop down list | Pick from drop down list | Pick from drop down list |
REQUEST TECHNICAL SERVICES (select service type from drop down boxes, starting at top row) edson baker: Technical Services includes
| services like Inspection, Scheduling, Shutdowns, Punchlist, etc. | REVIEW CONSTR. WORK HRs | ||||||||||
| PLANNING PHASE | DESIGN PHASE | CONSTRUCTION PHASE | POST CONSTR. PHASE | # Days Insp./wk | # Days Constr./wk | Work Hrs | Weekend work? | ||||
| Pick from drop down list | Pick from drop down list | Pick from drop down list | Pick from drop down list | 5 | 5 | 7am-4pm | |||||
| edson baker: Select the construction work hours | FALSE | ||||||||||
| Pick from drop down list | Pick from drop down list | Pick from drop down list | Pick from drop down list | FALSE | |||||||
| Pick from drop down list | Pick from drop down list | Pick from drop down list | Pick from drop down list | FALSE | |||||||
| Pick from drop down list | Pick from drop down list | Pick from drop down list | Pick from drop down list | FALSE |
REQUEST DESIGN SERVICES (select design service in drop down boxes, starting at the top row) edson baker: This section requests Design Services of the Design Group
| edson baker: Select the construction work hours | PLANNING PHASE | DESIGN PHASE | CONSTRUCTION PHASE | POST CONSTR. PHASE | ||||
| Drop Down List | Drop Down List | Drop Down List | Drop Down List |
Drop Down List Drop Down List Drop Down List Drop Down List
Drop Down List Drop Down List Drop Down List Drop Down List
Drop Down List Drop Down List Drop Down List Drop Down List
| SPECIAL DESIGN SERVICES - QUOTATION REQUIRED | |||
| Drop Down List | Drop Down List | Drop Down List | Drop Down List |
| REQUEST ESTIMATING SERVICES | ||
| edson baker: Select the Phase(s) for the Estimating service(s) and provide the requested information | REVIEW COST OF ESTIMATE |
edson baker: Review the cost of providing an estimate with the various conditions
| cost for estimate | 1 | difficulty | Cost | TOTAL | Listed POP | |||||||||||||
| DESIGN PHASE | ||||||||||||||||||
| edson baker: Select the type of estimate from the drop down list | Date | |||||||||||||||||
| edson baker: This Start Date must be coordinated with the Estimator who may have to review existing conditions prior to starting the estimate | Special conditions? | |||||||||||||||||
| edson baker: Special conditions can include things such as Animal Facilities, CRC, Hospital, Clean Rooms, etc. Since the POP will take longer, there will be added cost | Enter Description | |||||||||||||||||
| edson baker: Describe briefly the special condition | Expedited Required? | |||||||||||||||||
| edson baker: If the estimate needs to be expedited, the POP will be reduced by this percentage, but there will be an added cost | % Deduct | |||||||||||||||||
| edson baker: The POP will be reduced by this % | POP | |||||||||||||||||
| edson baker: The POP includes some time by DTSB to review the estimate for accuracy. | Due Date | |||||||||||||||||
| edson baker: This Due Date is approximate and may be sooner or may have to be altered due to unforseen circumstances | Complexity $ | Special? | Expedite $ | TOTAL | Difficulty | special condition | expedite | POP factor | POPxdif | special | expedite | Total POP | DTSB | TOTAL | ||||
| Pick from drop down list |
edson baker: If date is RED, it is NOT a work day Special Conditions Request Expedite 0.0% $0 $0 $0 $0 1 0 0 1.00 $0 blade_runner: blade_runner:
| 0 | 0 | 0 | 0 | 0.00 | 0 | 0 | 0 | FALSE | FALSE | FALSE |
| Pick from drop down list |
edson baker: If date is RED, it is NOT a work day
| edson baker: Describe briefly the special condition | Special Conditions | Enter description | |||||||||||
| edson baker: Enter a brief description of the special condition | 0 | Request Expedite | 0.0% | $0 | $0 | $0 | $0 | 1 | 0 | 0 | 1.00 | $0 |
blade_runner: blade_runner:
| 0 | 0 | 0 | 0 | 0.00 | 0 | 0 | 0 | FALSE | FALSE | FALSE |
| Pick from drop down list |
edson baker: If date is RED, it is NOT a work day
| Special Conditions | Enter description | ||||||||||||
| edson baker: Enter a brief description of the special condition | 0 | Request Expedite | 0.0% | $0 | $0 | $0 | $0 | 1 | 0 | 0 | 1.00 | $0 |
blade_runner: blade_runner:
| 0 | 0 | 0 | 0 | 0.00 | 0 | 0 | 0 | FALSE | FALSE | FALSE | |||||||
| Pick from drop down list | Special Conditions | Enter description | |||||||||||||||
| edson baker: Enter a brief description of the special condition | 0 | Request Expedite | 0.0% | $0 | $0 | $0 | $0 | 1 | 0 | 0 | 1.00 | $0 |
blade_runner: blade_runner:
| 0 | 0 | 0 | 0 | 0.00 | 0 | 0 | 0 | FALSE | FALSE | FALSE |
| CONSTRUCTION PHASE |
edson baker: Select the type of estimate from the drop down list edson baker: Enter a brief description of the special condition edson baker: If date is RED, it is NOT a work day edson baker: Enter a brief description of the special condition Date edson baker: This Start Date must be coordinated with the Estimator who may have to review existing conditions prior to starting the estimate edson baker: If the estimate needs to be expedited, the POP will be reduced by this percentage, but there will be an added cost
| edson baker: Enter a brief description of the special condition | Special conditions? | |||
| edson baker: Special conditions can include things such as Animal Facilities, CRC, Hospital, Clean Rooms, etc. Since the POP will take longer, there will be added cost | Enter Description | |||
| edson baker: Describe briefly the special condition | Expedited Required? | |||
| edson baker: If the estimate needs to be expedited, the POP will be reduced by this percentage, but there will be an added cost | % Deduct | |||
| edson baker: The POP will be reduced by this % | POP | |||
| edson baker: The POP includes some time by DTSB to review the estimate for accuracy. | Due Date | |||
| edson baker: This Due Date is approximate and may be sooner or may have to be altered due to unforseen circumstances | Complexity $ | Special? | Expedite $ | TOTAL |
| Pick from drop down list |
edson baker: If date is RED, it is NOT a work day
| edson baker: Enter a brief description of the special condition | Special Conditions | animal facility | ||||||||||
| edson baker: Enter a brief description of the special condition | Request Expedite | 0.0% | $0 | $0 | $0 | $0 | 1 | 0 | 0 | 1.00 | $0 |
blade_runner: blade_runner:
| ERROR:#N/A | ERROR:#N/A | 0.00 | ERROR:#N/A | 0.00 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | FALSE | FALSE | FALSE |
| Pick from drop down list |
edson baker: If date is RED, it is NOT a work day edson baker: The POP will be reduced by this %
| edson baker: Describe briefly the special condition | Special Conditions | Enter description | |||||||||||
| edson baker: Enter a brief description of the special condition | 0 | Request Expedite | 0.0% | $0 | $0 | $0 | $0 | 1 | 0 | 0 | 1.00 | $0 |
blade_runner: blade_runner:
| ERROR:#N/A | ERROR:#N/A | 0.00 | ERROR:#N/A | 0.00 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | FALSE | FALSE | FALSE |
| Pick from drop down list |
edson baker: If date is RED, it is NOT a work day edson baker: The POP includes some time by DTSB to review the estimate for accuracy.
| edson baker: Enter a brief description of the special condition | Special Conditions | Enter description | |||||||||||
| edson baker: Enter a brief description of the special condition | 0 | Request Expedite | 0.0% | $0 | $0 | $0 | $0 | 1 | 0 | 0 | 1.00 | $0 |
blade_runner: blade_runner:
| ERROR:#N/A | ERROR:#N/A | 0.00 | ERROR:#N/A | 0.00 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | FALSE | FALSE | FALSE |
| Pick from drop down list |
edson baker: If date is RED, it is NOT a work day edson baker: Review the cost of providing an estimate with the various conditions edson baker: This Due Date is approximate and may be sooner or may have to be altered due to unforseen circumstances edson baker: Enter a brief description of the special condition edson baker: If the estimate needs to be expedited, the POP will be reduced by this percentage, but there will be an added cost edson baker: Enter a brief description of the special condition Special Conditions Enter description edson baker: Enter a brief description of the special condition edson baker: The POP will be reduced by this % edson baker: The POP includes some time by DTSB to review the estimate for accuracy.
edson baker: This Due Date is approximate and may be sooner or may have to be altered due to unforseen circumstances blade_runner: blade_runner:
blade_runner: blade_runner:
blade_runner: blade_runner:
blade_runner: blade_runner:
blade_runner: blade_runner:
blade_runner: blade_runner:
blade_runner: blade_runner:
0 Request Expedite 0.0% 1 0 0 1.00 blade_runner: blade_runner:
blade_runner: blade_runner:
0 0 0.00 0 0.00 0 0 0 FALSE FALSE FALSE
&11Revision Date: 10/20/18 &11Page &P &11DTSB Technical Services
(Inspections) After all Project Data and Project Schedule information entered, select the type(s) of service by "Clicking" on the "Request" buttons mailto:vera.glazkova@nih.gov Request for Estimating Provider
OFFICE OF RESEARCH FACILITIES
DIVISION OF DESIGN AND CONSTRUCTION MANAGEMENT
DESIGN AND TECHNICAL SERVICES BRANCH
REQUEST ESTIMATING SERVICES
FROM PROVIDER
Request Date: mm/dd/yy
| PART 1 - GENERAL PROJECT DESCRIPTION / DATA: | 1 | ||||||||||
| 1 | |||||||||||
| Project Title: | 0 | WR#: | C# | 1 | |||||||
| 1 | |||||||||||
| Project Officer: | 0 | DTSB Mgr: | Pick from drop down list | IC/Group: | Pick IC from drop down list | 1 | |||||
| 1 | |||||||||||
| Building # - "Common Name" location: | Pick from drop down list | 1 | |||||||||
| 1 | 1 | ||||||||||
| Project Scope (Brief Summary): | 1 | ||||||||||
| write scope | 1 | ||||||||||
| 1 | 1 | ||||||||||
| Project Cost (Conceptual): | $$ | Project Complexity: | 3 (average) | Complexity (multiplier) | 1.00 | 1 | |||||
| 1 | |||||||||||
| 1 | |||||||||||
| 1 | |||||||||||
| PART 2 - PROJECT SCHEDULE (start and finish dates for each Phase Estimating Services are provided): | 1 | ||||||||||
| DESIGN PHASE | CONSTRUCTION PHASE | 1 | |||||||||
| start | finish | start | finish | 1 | |||||||
| 1 | |||||||||||
| 1 | |||||||||||
| 1 | |||||||||||
| 1 | |||||||||||
| PART 3 - ESTIMATING SERVICES: | 1 | ||||||||||
| DESIGN PHASE | Start | Special Conditions | Expedite | POP | Due Date | COST | 0 | ||||
| NO | 0 | ||||||||||
| NO | 0 | ||||||||||
| NO | 0 | ||||||||||
| NO | 0 | 0 | |||||||||
| CONSTRUCTION PHASE | Start | Special Conditions | Expedite | POP | Due Date | COST | 0 | ||||
| NO | 0 | ||||||||||
| NO | 0 | ||||||||||
| NO | 0 | ||||||||||
| NO | 0 | 0 | |||||||||
| TOTAL Estimating Services Fees For Service = | $0 | 1 | |||||||||
| *Estimated Time to Provide Sevices = POP (normally plan on min. 1 wk to start and min. 1 wk to finish unless expedited) | 1 | ||||||||||
| 1 | |||||||||||
| 1 | |||||||||||
| 1 | |||||||||||
| PART 4 - ADDITIONAL COMMENTS / INFORMATION / CLARIFICATION: | 1 | ||||||||||
| 0 | |||||||||||
| 0 | |||||||||||
| 0 | |||||||||||
| 1 | |||||||||||
| 1 | |||||||||||
| 1 | |||||||||||
| PART 5 - AGREEMENT: | 1 | ||||||||||
| The Estimate Provider agrees to provide the Estimate(s), based on the Scope and supplied information provided above, for the price listed in "TOTAL" of Section 3 of this form. | 1 | ||||||||||
| 1 | |||||||||||
| APPROVAL BY PROVIDER (sign or initial) | Date | DTSB TECHNICAL SERVICES | Date | 1 | |||||||
| 1 |
&11Revision Date: 9/20/18 &11Page &P DTSB Technical Services
Remove Blank Lines Unhide Hidden Rows
Proposal for Estimate Services
OFFICE OF RESEARCH FACILITIES
DIVISION OF DESIGN AND CONSTRUCTION MANAGEMENT
DESIGN AND TECHNICAL SERVICES BRANCH
PROPOSAL FOR PROJECT OFFICER
FOR ESTIMATING SERVICES
| Request Date: | mm/dd/yy | 1 | |||||||||
| 1 | |||||||||||
| PART 1 - GENERAL PROJECT DESCRIPTION / DATA: | 1 | ||||||||||
| 1 | |||||||||||
| Project Title: | 0 | WR#: | C# | 1 | |||||||
| 1 | |||||||||||
| Project Officer: | 0 | DTSB Mgr: | Pick from drop down list | IC/Group: | Pick IC from drop down list | 1 | |||||
| 1 | |||||||||||
| Building # - "Common Name" location: | Pick from drop down list | 1 | |||||||||
| 1 | |||||||||||
| Project Scope (Brief Summary): | 1 | ||||||||||
| 0 | 1 | ||||||||||
| 1 | |||||||||||
| Project Cost (Conceptual): | $$ | Project Complexity: | 3 (average) | Complexity (multiplier) | 1.00 | 1 | |||||
| 1 | |||||||||||
| 1 | |||||||||||
| 1 | |||||||||||
| PART 2 - PROJECT SCHEDULE (start and finish dates for each Phase Estimating Services are provided): | 1 | ||||||||||
| DESIGN PHASE | CONSTRUCTION PHASE | 1 | |||||||||
| start | finish | start | finish | 1 | |||||||
| 1 | |||||||||||
| 1 | |||||||||||
| 1 | |||||||||||
| 1 | |||||||||||
| PART 3 - ESTIMATING SERVICES: | 1 | ||||||||||
| DESIGN PHASE | Start | Special Conditions | Expedite | POP | Due Date | COST | 0 | ||||
| NO | $0 | 0 | |||||||||
| NO | $0 | 0 | |||||||||
| NO | $0 | 0 | |||||||||
| NO | $0 | 0 | 0 | ||||||||
| CONSTRUCTION PHASE | Start | Special Conditions | Expedite | POP | Due Date | COST | 0 | ||||
| NO | $0 | 0 | |||||||||
| NO | $0 | 0 | |||||||||
| NO | $0 | 0 | |||||||||
| NO | 0 | 0 | |||||||||
| TOTAL Estimating Services Fees For Service = | $0 | 1 | |||||||||
| *Estimated Time to Provide Sevices = POP (normally plan on min. 1 wk to start and min. 1 wk to finish unless expedited) | 1 | ||||||||||
| 1 | |||||||||||
| 1 | |||||||||||
| 1 | |||||||||||
| PART 4 - ADDITIONAL COMMENTS / INFORMATION / CLARIFICATION: | 1 | ||||||||||
| 0 | |||||||||||
| 0 | |||||||||||
| 1 | |||||||||||
| 1 | |||||||||||
| 1 | |||||||||||
| PART 5 - AGREEMENT: | 1 | ||||||||||
| DTSB is a Fee For Service (FFS) entity. This document is a FFS request sent to the PO for signature, for the DTSB requested services, . The agreement requires a electronic signatures by the DTSB Chief, the PO, and the PO's supervisor/Branch Chief. The PO is requested to forward the "signed agreement" to DTSB. | 1 | ||||||||||
| 1 | |||||||||||
| For DTSB: Samna Ali, Acting Branch Chief | Date | 1 | |||||||||
| 1 | |||||||||||
| 1 | |||||||||||
| Project Officer: | 0 | Date | 1 | ||||||||
| 1 | |||||||||||
| 1 | |||||||||||
| Supervisor for PO: | Date | 1 | |||||||||
| 0 | |||||||||||
| 0 | |||||||||||
| DTSB Project Manager: | Pick from drop down list | Date | 0 |
&11Revision Date: 11/20/18 &11Page &P DTSB Technical Services
Remove Blank Lines Unhide Hidden Rows
Evaluation of Estimate
OFFICE OF RESEARCH FACILITIES
DIVISION OF DESIGN AND CONSTRUCTION MANAGEMENT
DESIGN AND TECHNICAL SERVICES BRANCH
EVALUATION OF ESTIMATE
Receive Estimate: type in date
| PART 1 - GENERAL PROJECT DESCRIPTION / DATA: | 1 | ||||||||
| 1 | |||||||||
| Project Title: | 0 | WR#: | C# | 1 | |||||
| 1 | |||||||||
| Project Officer: | 0 | DTSB Mgr: | Pick from drop down list | IC/Group: | Pick IC from drop down list | 1 | |||
| 1 | |||||||||
| Building # - "Common Name" location: | Pick from drop down list | 1 | |||||||
| 1 | 1 | ||||||||
| Project Scope (Brief Summary): | 1 | ||||||||
| 0 | 1 |
PART 2 - QUESTIONS / COMMENTS
Division Reviewer Comment / Suggestion / Question Provider Response
| PART 3 - SIGN-OFF AND ACCEPTANCE: | |
| The Estimate Provider and DTSB agree to the following: | |
| a. Confirm the type of estimate(s), accuracy and conditions, and date provided | |
| b. Accept the Final Estimate(s) submission (s) |
APPROVAL BY PROVIDER (sign or initial) Date provided DTSB TECHNICAL SERVICES Date
&11Revision Date: 3/1/18 &11Page &P DTSB Technical Services
Class of Estimate
| CLASS OF ESTIMATES: |
| Based on Information Provided |
| 100 |
| 90 |
| 80 |
| 70 |
| 60 |
| 50 |
| 40 |
| 30 |
| 20 |
| 10 |
| 0 |
| -10 |
| -20 |
| -30 |
| -40 |
| -50 |
0 10 20 30 40 50 60 70 80 90 100
| Class 4 | Class 2 | ||
| Class 3 | Class 1 |
The above information is provided for clarification of expected accuracy of estimates only and is based on information from AACE International Recommended Practice No. 56R-08, rev. Dec. 5, 2012, who provided this publication as public service. AACE International is a 501(c)(3) non-profit professional association serving the total cost management community since 1956.
DDCM/DTSB rev. 12-27-13
Class 5
MATURITY LEVEL OF PROJECT DEFINITION
DELIVERABLES (%)
RANGE IN ESTIMATE ACCURACY
FOR BUILDING AND GENERAL CONSTRUCTION
Upper Range
Lower Range
L: -20% to -30% H: +30% to +50% L: -10% to -20% H: +20% to +30% L: -5% to -15% H: +10% to +20% L: -5% to -10% H: +5% to +15% L: -3% to -5% H: +3% to +10%
CLASS KEY - INFORMATION PROVIDED TO ESTIMATOR
Class 5: 0% to 2% designed - little more than proposed building type, location, functional space building requirements (SF or m2), and number of stories are known at the time of estimate preparation.
| Class 4: | 1% to 15% designed - preliminary room layouts, new proposed site plan, existing site plan, markups |
| of existing drawings for demolition and utilities, design criteria report |
Class 3: 10% to 40% designed - defined site civil information such as site plan, existing site conditions, demolition drawings, utility plan, site electrical plans, room layouts, mechanical system layouts, plumbing layouts, and one-line electrical diagram.
| Class 2: | 30% to 70% designed - All drawings, plan views, elevation drawings and section drawings are |
| complete; except detailed design schedules, architectural details and control diagrams, which may | |
| still be in draft form. |
| Class 1: | 65% to 100% designed - All drawings, plan views, elevation drawings and section drawings are |
| complete; all detailed design schedules, architectural details, control diagrams, and specifications | |
| are complete. |
DLists
| #8 - Building | #30 - OPDIV | Project Complexity | Design Services | Technical Services planning | Technical Services design | Technical Services constr. | Technical Services post constr. | Estimate Effort | Project Criticality | Planning Drawing Info | Design Drawing Info | Construction Drawing Info | Consulting Hours | Planning Phases | Design Phases | Construction Phases | Post Construction Phases | Estimates | Construction hours | # Inspection Days | |||||||
| Pick from drop down list | Pick IC from drop down list | Pick from list | Pick from drop down list | Pick from drop down list | Pick from drop down list | Pick from drop down list | Pick from drop down list | pick from list | pick from list | Pick Dwg Info From Drop Down List | Pick Info | Pick Dwg Info From Drop Down List | Pick Info | Pick Dwg Info From Drop Down List | Pick Info | Pick from drop down list | Pick from drop down list | Pick from drop down list | Pick from drop down list | Pick from drop down list | 1 | Type 1 Cost Estimate (IGE) | Type 1 Construction IGE | Select | Select | ||
| Bethesda multiple building locations | NIH/CC | 1 (very simple) | 0.8 | Very Small (1/2 sized drawings) | Assist site eval. 4 hrs | Assist site eval. 4 hrs | Progress reports and inspection | Progress reports and inspection | 1 | 1 | As-builts (existing) | 5 | 15% SD Submittal Set | 4 | 35% DD Submittal Set | 3 | Technical & estimating | Preliminary Design | Construction Documents -50% | Construction Administration | Commissioning & Startup | 2 | Type 2 Cost Estimate (IGE) | Type 2 Construction IGE | 6am-3pm | 1 | |
| Bethesda campus site | NIH/CIT | 2 (fairly simple) | 0.9 | Small Study | Assist site eval. 8 hrs | Assist site eval. 8 hrs | Monitor schedule | Observe testing (8 hrs) | 2 | 2 | Existing condition | 5 | 35% DD Submittal Set | 3 | 50% - 65%CD Submittal Set | 2 | Architect | Schematic Design | Construction Documents -65% | Startup | 3 | Type 3 Cost Estimate (IGE) | Type 3 Construction IGE | 7am-4pm | 2 | ||
| Baltimore | NIH/CSR | 3 (average) | 1 | Small Design | Assist site eval. 16 hrs | Assist site eval. 16 hrs | Fire protection services | Observe testing (16 hrs) | 3 | 3 | Study information | 4 | 50% - 65%CD Submittal Set | 2 | 85% - 95% CD Submittal Set | 1 | Mech./Plumb. Engineer | Design Development - 35% documents | Construction Documents -95% | Project Close-out | 4 | Type 4 Cost Estimate (IGE) | Type 4 Construction IGE | 8am-5pm | 3 | ||
| Baltimore-BRC - Biomedical Research Center | NIH/FIC | 4 (more complex) | 1.2 | BOD (35% drawings) | Scheduling | Scheduling | Observe testing (8 hrs) | fire protection services | 4 | 4 | Master Plan Info. | 4 | 85% - 95% CD Submittal Set | 1 | 100% or Final CD Submittal Set | 1 | Electrical Engineer | Design Development - 50% documents | Construction Documents -100% | 5 | Type 5 Cost Estimate (IGE) | Type 5 Construction IGE | 5pm-2am | 4 | |||
| Baltimore-GRC - Gerontology Research Center | NIH/NCATS | 5 (Very complex) | 1.5 | Design-Build | AE Cost/bid/proposal evaluation | Review fire protection | Observe testing (16 hrs) | Punch List | 5 | 5 | Pre-design Basis of Design (BOD) | 4 | 100% or Final CD Submittal Set | 1 | Change Order drwg | 1 | Other Engineer | Survey | Acquistion | 1 | 15% Cost Estimate (IGE) | Type 1 Construction IGE | 6pm-3am | 5 | |||
| NIHBC 25 | NIH/NCCAM | Development | DB Cost/bid/proposal evaluation | Review AE Scheduling (10% of Sched.) | Assistance with shutdowns | Review red mark as-builts | 15% SD Submittal Set | 4 | Change Order drwg | 1 | CADD/BIM drafting | On-board Review | 2 | 35% Cost Estimate (IGE) | Type 2 Construction IGE | 7pm-4am | 6 | ||||||||||
| NIHBC 28 & 28A | NIH/NCI | Other | Review Design CO | Assistance with punchlist | Review as-built Final dwgs | 35% DD Submittal Set | 3 | Architect & drafting | 3 | 50% Cost Estimate (IGE) | Type 3 Construction IGE | 7 | |||||||||||||||
| NIHBC 29 | NIH/NCRR | Cost/bid/proposal evaluation | QA assistance | Help PO with Closeout | 50% - 65%CD Submittal Set | 2 | Mech./Plumb. Engineer & drafting | 4 | 85% Cost Estimate (IGE) | Type 4 Construction IGE | |||||||||||||||||
| NIHBC 29A | NIH/NEI | Review Construction Change Order | 85% - 95% CD Submittal Set | 1 | Electrical Engineer & drafting | 5 | 95% Cost Estimate (IGE) | Type 5 Construction IGE | |||||||||||||||||||
| Baltimore-TRIAD - TRIAD Technology Center | NIH/NHGRI | 100% or Final CD Submittal Set | 1 | Other Engineer & drafting | 5 | 100% Cost Estimate (IGE) | Type 5 Construction IGE | ||||||||||||||||||||
| Bethesda | NIH/NLM | Architect survey | |||||||||||||||||||||||||
| 06 A-B Science Complex | NIH/NHLBI | Mech./Plumb. Engineer survey | |||||||||||||||||||||||||
| Multi-Level Parking 6 | NIH/NIA | Special considerations, to include, but not limited to: | Electrical Engineer survey | ||||||||||||||||||||||||
| Multi-Level Parking 7 | NIH/NIAAA | Estmates - Design | Estmates - Construction | Estmates - Post Construction | Special | Other Engineer survey | |||||||||||||||||||||
| Multi-Level Parking 8 | NIH/NIAMS | Pick from drop down list | Pick from drop down list | Pick from drop down list | Physical Security restrictions / limitations / requirements | ||||||||||||||||||||||
| Multi-Level Parking 9 | NIH/NIBIB | 0% Submission (Class 5 estimate) | Change Order - Project $0 to $25k (Ave. size CO $5k) | Review Change Order | |||||||||||||||||||||||
| Proj. $0 to $25k (Ave.$5k) | Construction Change Order | Anti-Terrorism / Force Protection (AT / FP) restrictions / requirements | |||||||||||||||||||||||||
| Multi-Level Parking 10 | NIH/NIDA | 10% Submission (Class 4 estimate) | Change Order - Project $25k to $100k (Ave. size CO $15k) | Review Change Order | |||||||||||||||||||||||
| Proj. $25k to $100k (Ave.$15k) | Special / Interim Life Safety measures | ||||||||||||||||||||||||||
| Multi Level Parking 11 Gateway Visitor | NIH/NIAID | 15% Submission (Class 4 estimate) | Change Order - Project $100k to $500k (Ave. size CO $20k) | Review Change Order | |||||||||||||||||||||||
| Proj. $100k to $500k (Ave.$20k) | Construction Risk Assessments | ||||||||||||||||||||||||||
| 33TR (Trailer) | NIH/NICHD | 35% Submission (Class 3 estimate) | Change Order - Project $500k to $1m (Ave. size CO $30k) | Review Change Order | |||||||||||||||||||||||
| Proj. $500k to $1m (Ave.$30k) | Occupied space(s) restrictions/ limitations | ||||||||||||||||||||||||||
| Trailer T39 | NIH/NIDCD | 65% Submission (Class 2 estimate) | Change Order - Project $1m to $2m (Ave. size CO $45k) | Review Change Order | |||||||||||||||||||||||
| Proj. $1m to $2m (Ave.$45k) | Access restrictions | ||||||||||||||||||||||||||
| Trailer 40B | NIH/NIDCR | 95% Submission (Class 1 estimate) | Change Order - Project $2m to $3.5m (Ave. size CO $60k) | Review Change Order | |||||||||||||||||||||||
| Proj. $2m to $3.5m (Ave.$60k) | Off hours working requirements | ||||||||||||||||||||||||||
| Trailer 46 | NIH/NIDDK | 100% Submission (Class 1 estimate) | Change Order - Project $3.5m to $10m (Ave. size CO $100k) | Review Change Order | |||||||||||||||||||||||
| Proj. $3.5m to $10m (Ave.$100k) | Vibration / noise / access limitations | ||||||||||||||||||||||||||
| Trailer 46B | NIH/NIEHS | Cost to complete - Ave. Size of Project ($0 to $25k) | Review of Contr. pay reqts (4 hrs) | Cost to Complete Project | Hazardous Materials Abatement / Remediation | ||||||||||||||||||||||
| Trailer 46D | NIH/NINR | Cost to complete - Ave. Size of Project ($25k to $100k) | Joint Commission requirements (for hospital) | ||||||||||||||||||||||||
| Trailer 46E | NIH/NIGMS | Cost to complete - Ave. Size of Project ($100k to $500k) | Special Area restrictions, i.e. infectious or immune compromised areas within a hospital space | ||||||||||||||||||||||||
| Trailer 46F | NIH/NIMH | Cost to complete - Ave. Size of Project ($500k to $1m) | |||||||||||||||||||||||||
| Trailer 46T - Childkind | NIH/NIMHD | Cost to complete - Ave. Size of Project ($1m to $2m) | |||||||||||||||||||||||||
| Trailer 46T - Complex Pepco West Substation | NIH/NINDS | Cost to complete - Ave. Size of Project ($2m to $3.5m) | |||||||||||||||||||||||||
| Trailer 49 | NIH/OD | Cost to complete - Ave. Size of Project ($3.5m to $10m) | |||||||||||||||||||||||||
| Building 1 | NIH/OD/ORF | Cost to accelerate - Ave. Size of Project ($0 to $25k) | Cost to Accelerate or cost for Delay | ||||||||||||||||||||||||
| Building 2 | MULTIPLE | Cost to accelerate - Ave. Size of Project ($25k to $100k) | |||||||||||||||||||||||||
| Building 3 | Cost to accelerate - Ave. Size of Project ($100k to $500k) | ||||||||||||||||||||||||||
| Building 4 | Cost to accelerate - Ave. Size of Project ($500k to $1m) | ||||||||||||||||||||||||||
| Building 5 | Cost to accelerate - Ave. Size of Project ($1m to $2m) | ||||||||||||||||||||||||||
| Building 6 | Cost to accelerate - Ave. Size of Project ($2m to $3.5m) | ||||||||||||||||||||||||||
| Building 7 | Cost to accelerate - Ave. Size of Project ($3.5m to $10m) | ||||||||||||||||||||||||||
| Building 8 | Impact Factor Estimate (risk per element affecting time & $) | ||||||||||||||||||||||||||
| Building 9 | |||||||||||||||||||||||||||
| Building 10 ACRF - Ambulatory Care Research Facility | |||||||||||||||||||||||||||
| Building 10 CRC - Mark O Hatfield Clinical Research Center | |||||||||||||||||||||||||||
| Building 10 - Clinical Center | |||||||||||||||||||||||||||
| Building 11 - Central Plant | |||||||||||||||||||||||||||
| Building 12 | |||||||||||||||||||||||||||
| Building 12A | |||||||||||||||||||||||||||
| Building 12B | |||||||||||||||||||||||||||
| Building 13 - Headquarters of the Office of Research Facilities (ORF) | |||||||||||||||||||||||||||
| Building 14 | |||||||||||||||||||||||||||
| Building 14 B-H | |||||||||||||||||||||||||||
| Building 14A | |||||||||||||||||||||||||||
| Building 14B | |||||||||||||||||||||||||||
| Building 14C | |||||||||||||||||||||||||||
| Building 14D | |||||||||||||||||||||||||||
| Building 14E | |||||||||||||||||||||||||||
| Building 14F | |||||||||||||||||||||||||||
| Building 14G | |||||||||||||||||||||||||||
| Building 14H | |||||||||||||||||||||||||||
| Building 15B1-2 Quarters | |||||||||||||||||||||||||||
| Building 15 B-I Group- Quarters | |||||||||||||||||||||||||||
| Building 15B2 - Quarters | |||||||||||||||||||||||||||
| Building 15C1 - Quarters | |||||||||||||||||||||||||||
| Building 15C2 - Quarters | |||||||||||||||||||||||||||
| Building 15D1 - Quarters | |||||||||||||||||||||||||||
| Building 15D2 - Quarters | |||||||||||||||||||||||||||
| Building 15E1 - Quarters | |||||||||||||||||||||||||||
| Building 15E2 - Quarters | |||||||||||||||||||||||||||
| Building 15F1 - Quarters | |||||||||||||||||||||||||||
| Building 15F2 - Quarters | |||||||||||||||||||||||||||
| Building 15G1 - Quarters | |||||||||||||||||||||||||||
| Building 15G2 - Quarters | |||||||||||||||||||||||||||
| Building 15H - Quarters | |||||||||||||||||||||||||||
| Building 15I - Quarters | |||||||||||||||||||||||||||
| Building 15K - Wilson House | |||||||||||||||||||||||||||
| Building 16 - Lawton Chiles International House | |||||||||||||||||||||||||||
| Building 16A | |||||||||||||||||||||||||||
| Building 17 - Pepco East Substation | |||||||||||||||||||||||||||
| Building 18 | |||||||||||||||||||||||||||
| Building 18T | |||||||||||||||||||||||||||
| Building 21 | |||||||||||||||||||||||||||
| Building 21A-B | |||||||||||||||||||||||||||
| Building 22 | |||||||||||||||||||||||||||
| Building 25 | |||||||||||||||||||||||||||
| Building 26T | |||||||||||||||||||||||||||
| Building 28 | |||||||||||||||||||||||||||
| Building 28A-D | |||||||||||||||||||||||||||
| Building 29 | |||||||||||||||||||||||||||
| Building 29A | |||||||||||||||||||||||||||
| Building 29B | |||||||||||||||||||||||||||
| Building 30 | |||||||||||||||||||||||||||
| Building 31 A-C - Claude Denson Pepper Building | |||||||||||||||||||||||||||
| Building 32 | |||||||||||||||||||||||||||
| Building 32T | |||||||||||||||||||||||||||
| Building 32T2 | |||||||||||||||||||||||||||
| Building 33 - CW Bill Young Center | |||||||||||||||||||||||||||
| Building 34 - Central Plant | |||||||||||||||||||||||||||
| Building 35A - PNRC-II | |||||||||||||||||||||||||||
| Building 35 - PNRC-John Edward Porter Neuroscience Research Center | |||||||||||||||||||||||||||
| Building 37 | |||||||||||||||||||||||||||
| Building 38 - National Library of Medicine | |||||||||||||||||||||||||||
| Building 38A - Lister Hill National Center for Biomedical Communications | |||||||||||||||||||||||||||
| Building 39T - Fitness Center | |||||||||||||||||||||||||||
| Building 40 - Dale and Betty Bumpers Virology Research Center | |||||||||||||||||||||||||||
| Building 41 | |||||||||||||||||||||||||||
| Building 41A | |||||||||||||||||||||||||||
| Building 45 - William H. Natcher Building | |||||||||||||||||||||||||||
| Building 49 - Silvio O. Conte Building | |||||||||||||||||||||||||||
| Building 50 - Louis Stokes Laboratories | |||||||||||||||||||||||||||
| Building 51 - NIH Fire Station | |||||||||||||||||||||||||||
| Building 52 - Transformer Vault 52 | |||||||||||||||||||||||||||
| Building 53 - Transformer Vault 53 | |||||||||||||||||||||||||||
| Building 54 - Transformer Vault 54 | |||||||||||||||||||||||||||
| Building 57 | |||||||||||||||||||||||||||
| Building 58 - Fuel Oil Pumping Station | |||||||||||||||||||||||||||
| Building 59 - Satellite sub station for Clinical Center | |||||||||||||||||||||||||||
| Building 59A - Generator shack for Clinical center | |||||||||||||||||||||||||||
| Building 60 - Convent-Mary Woodard Lasker Center For Health Research and Education | |||||||||||||||||||||||||||
| Building 61 - Cloister - Study Recruitment Office | |||||||||||||||||||||||||||
| Building 61A - Garage | |||||||||||||||||||||||||||
| Building 62 - Childrens Inn | |||||||||||||||||||||||||||
| Building 62A - Childrens Inn Addition | |||||||||||||||||||||||||||
| Building 63 - North Electrical Substation | |||||||||||||||||||||||||||
| Building 64 - East Child Care Center | |||||||||||||||||||||||||||
| Building 65 - Edmond J Safra Family Lodge | |||||||||||||||||||||||||||
| Building 66 - Gateway Center | |||||||||||||||||||||||||||
| Building 66A - Visitor Automobile Inspection Station | |||||||||||||||||||||||||||
| Building 67 - Commercial Vehicle Inspection Facility | |||||||||||||||||||||||||||
| Building 68 - West Drive Patient Screening Facility | |||||||||||||||||||||||||||
| Building 82 - RA Bloch International Cancer Center | |||||||||||||||||||||||||||
| Leased | |||||||||||||||||||||||||||
| 10401 Fernwood Road 20817 - Fernwood - Leased | |||||||||||||||||||||||||||
| 12441 Parklawn Drive 20852 - Twinbook II - Leased | |||||||||||||||||||||||||||
| 12735 Twinbrook Parkway 20852 - Twinbook III - Leased | |||||||||||||||||||||||||||
| 16050 Industrial Dr. 20877 - Gaither Distribution Center - Leased | |||||||||||||||||||||||||||
| 2115 E. Jefferson Street 20852 - Jefferson Bldg - Leased | |||||||||||||||||||||||||||
| 301 N. Stonestreet Ave. 20854 - Stonestreet (Print/Mail Facility) - Leased | |||||||||||||||||||||||||||
| 5 Research Court 20850 - 5 Research Court Building - Leased | |||||||||||||||||||||||||||
| 5411 W Cedar Lane, 20814 - Doctors Park - Leased | |||||||||||||||||||||||||||
| 5413 W Cedar Lane, 20814 - Doctors Park - Leased | |||||||||||||||||||||||||||
| 5415 W Cedar Lane, 20814 - Doctors Park - Leased | |||||||||||||||||||||||||||
| 5625 Fisher Lane 20852 - Leased | |||||||||||||||||||||||||||
| 5635 Fisher Lane 20852 - Leased | |||||||||||||||||||||||||||
| 5640 Fisher Lane 20852 - Twinbook I - Leased | |||||||||||||||||||||||||||
| 6001 Executive Blvd. 20852 - Neuro Science Center - Leased | |||||||||||||||||||||||||||
| 6006 Executive Blvd. 20852 - Day Care Center - Leased | |||||||||||||||||||||||||||
| 6011 Executive Blvd. 20852 - Energy Building - Leased | |||||||||||||||||||||||||||
| 6100 Executive Blvd. 20852 - Executive Building - Leased | |||||||||||||||||||||||||||
| 6101 Executive Blvd. 20852 - Atrium Building - Leased | |||||||||||||||||||||||||||
| 6116 Executive Blvd. 20852 - Leased | |||||||||||||||||||||||||||
| 6120 Executive Blvd. 20852 - Executive Plaza South - Leased | |||||||||||||||||||||||||||
| 6130 Executive Blvd. 20852 -Executive Plaza North - Leased | |||||||||||||||||||||||||||
| 6610 Rockledge Dr. 20817 - Leased | |||||||||||||||||||||||||||
| 6700A Rockledge Dr. 20817 - Leased | |||||||||||||||||||||||||||
| 6700B Rockledge Dr. 20817 - Leased | |||||||||||||||||||||||||||
| 6701 Democracy Blvd. 20817 - Democracy One - Leased | |||||||||||||||||||||||||||
| 6701 Rockledge Drive 20817 - Rockledge II - Leased | |||||||||||||||||||||||||||
| 6705 Rockledge Drive 20817 - Rockledge I - Leased | |||||||||||||||||||||||||||
| 6707 Democracy Blvd. 20817 - Democracy Two -Leased | |||||||||||||||||||||||||||
| 7201 Wisconsin Ave. 20892 - Gateway Building - Leased | |||||||||||||||||||||||||||
| 8424 Helgerman Ct. 20877 - Leased | |||||||||||||||||||||||||||
| 8717 Grovemont Circle 20877 - ATC Advanced Technology Center - Leased | |||||||||||||||||||||||||||
| 9800 Medical Center Dr. 20850 | |||||||||||||||||||||||||||
| Bethesda Campus Site | |||||||||||||||||||||||||||
| Durham NC Site - Lease | |||||||||||||||||||||||||||
| Frederick | |||||||||||||||||||||||||||
| 8200 Research Plaza - NIAID/IRF | |||||||||||||||||||||||||||
| 8225 Research Plaza - Entry Control Point 7 (ECP-7) | |||||||||||||||||||||||||||
| North Carolina | |||||||||||||||||||||||||||
| Building 101-NC - David P. Rall Building | |||||||||||||||||||||||||||
| Building 102-NC - Engineering Support Building | |||||||||||||||||||||||||||
| Building 103-NC - Chemical Storage Building | |||||||||||||||||||||||||||
| Building 104-NC-Warehouse | |||||||||||||||||||||||||||
| Building 105-NC-Central Utility Plant | |||||||||||||||||||||||||||
| Building 106-NC-Incinerator Building | |||||||||||||||||||||||||||
| Building 107-NC-Electrical Distribution | |||||||||||||||||||||||||||
| Building 108-NC-Waste Handling Facility | |||||||||||||||||||||||||||
| Building 109-NC-Clinical Building | |||||||||||||||||||||||||||
| Davis-NC-Davis Park Warehouse (Leased) | |||||||||||||||||||||||||||
| Keystone-NC | |||||||||||||||||||||||||||
| Nott-NC-Nottingham Hall | |||||||||||||||||||||||||||
| Poolesville | |||||||||||||||||||||||||||
| Building 100 | |||||||||||||||||||||||||||
| Building 101A-Tunnel | |||||||||||||||||||||||||||
| Building 102 | |||||||||||||||||||||||||||
| Building 103 | |||||||||||||||||||||||||||
| Building 104 | |||||||||||||||||||||||||||
| Building 107-Waste Water Graveyard | |||||||||||||||||||||||||||
| Building 110 | |||||||||||||||||||||||||||
| Building 110A-Central Plant Addition | |||||||||||||||||||||||||||
| Building 111 | |||||||||||||||||||||||||||
| Building 112 | |||||||||||||||||||||||||||
| Building 114 - Water Tower | |||||||||||||||||||||||||||
| Building 115 - Guard House | |||||||||||||||||||||||||||
| Building 116 - Residence | |||||||||||||||||||||||||||
| Building 117 - Residence | |||||||||||||||||||||||||||
| Building 127 | |||||||||||||||||||||||||||
| Building 128 | |||||||||||||||||||||||||||
| Building 130 - Greenhouse | |||||||||||||||||||||||||||
| Building 131 | |||||||||||||||||||||||||||
| Building 132 | |||||||||||||||||||||||||||
| Building T01 | |||||||||||||||||||||||||||
| Building T02 | |||||||||||||||||||||||||||
| Building T05 | |||||||||||||||||||||||||||
| Building T06 | |||||||||||||||||||||||||||
| Building T07 | |||||||||||||||||||||||||||
| Building T08 | |||||||||||||||||||||||||||
| Building T10 | |||||||||||||||||||||||||||
| Building T12 | |||||||||||||||||||||||||||
| Building T13 | |||||||||||||||||||||||||||
| Building T14 | |||||||||||||||||||||||||||
| Building T15 | |||||||||||||||||||||||||||
| Building T16 | |||||||||||||||||||||||||||
| Building T18 | |||||||||||||||||||||||||||
| Building T18B | |||||||||||||||||||||||||||
| Building T18C | |||||||||||||||||||||||||||
| Building T19 | |||||||||||||||||||||||||||
| Poolesville Animal Center Campus Site | |||||||||||||||||||||||||||
| T112 - Trailer owned by NIACD | |||||||||||||||||||||||||||
| Trailer T21 | |||||||||||||||||||||||||||
| Trailer T22 | |||||||||||||||||||||||||||
| Trailer T24 | |||||||||||||||||||||||||||
| Trailer T130 | |||||||||||||||||||||||||||
| WH4-Well | |||||||||||||||||||||||||||
| WH5-Well | |||||||||||||||||||||||||||
| Rocky Mountain Labs | |||||||||||||||||||||||||||
| RML 01 | |||||||||||||||||||||||||||
| RML 02 | |||||||||||||||||||||||||||
| RML 03 | |||||||||||||||||||||||||||
| RML 05 | |||||||||||||||||||||||||||
| RML 06 | |||||||||||||||||||||||||||
| RML 08 | |||||||||||||||||||||||||||
| RML 09 | |||||||||||||||||||||||||||
| RML 11 | |||||||||||||||||||||||||||
| RML 12 | |||||||||||||||||||||||||||
| RML 13 | |||||||||||||||||||||||||||
| RML 13B | |||||||||||||||||||||||||||
| RML 16 | |||||||||||||||||||||||||||
| RML 17 | |||||||||||||||||||||||||||
| RML 22 | |||||||||||||||||||||||||||
| RML 25 | |||||||||||||||||||||||||||
| RML 26 | |||||||||||||||||||||||||||
| RML 27 | |||||||||||||||||||||||||||
| RML 28 | |||||||||||||||||||||||||||
| RML A | |||||||||||||||||||||||||||
| RML ARMCO-2 | |||||||||||||||||||||||||||
| Rocky Mountain Labs Campus Site | |||||||||||||||||||||||||||
| RTP | |||||||||||||||||||||||||||
| RTP 101 David P Rall Building | |||||||||||||||||||||||||||
| RTP 102 | |||||||||||||||||||||||||||
| RTP 103 | |||||||||||||||||||||||||||
| RTP 104 | |||||||||||||||||||||||||||
| RTP 105 | |||||||||||||||||||||||||||
| RTP 106 | |||||||||||||||||||||||||||
| RTP 107 | |||||||||||||||||||||||||||
| RTP 108 | |||||||||||||||||||||||||||
| RTP 109 Modular Clinic | |||||||||||||||||||||||||||
| RTP MRI | |||||||||||||||||||||||||||
| Wayne State University | |||||||||||||||||||||||||||
| FDC 244 | |||||||||||||||||||||||||||
| FDC 311 | |||||||||||||||||||||||||||
| FDC 312 | |||||||||||||||||||||||||||
| FDC 313 & 313A | |||||||||||||||||||||||||||
| FDC 314 | |||||||||||||||||||||||||||
| FDC 318 | |||||||||||||||||||||||||||
| FDC 319 | |||||||||||||||||||||||||||
| FDC 320 | |||||||||||||||||||||||||||
| FDC 321 | |||||||||||||||||||||||||||
| FDC 322 | |||||||||||||||||||||||||||
| FDC 323 | |||||||||||||||||||||||||||
| FDC 324 | |||||||||||||||||||||||||||
| FDC 325 | |||||||||||||||||||||||||||
| FDC 327 | |||||||||||||||||||||||||||
| FDC 347 | |||||||||||||||||||||||||||
| FDC 349 | |||||||||||||||||||||||||||
| FDC 350 | |||||||||||||||||||||||||||
| FDC 360 | |||||||||||||||||||||||||||
| FDC 361 | |||||||||||||||||||||||||||
| FDC 362 | |||||||||||||||||||||||||||
| FDC 363 | |||||||||||||||||||||||||||
| FDC 371 | |||||||||||||||||||||||||||
| FDC 372 | |||||||||||||||||||||||||||
| FDC 376 | |||||||||||||||||||||||||||
| FDC 378 | |||||||||||||||||||||||||||
| FDC 426 | |||||||||||||||||||||||||||
| FDC 427 | |||||||||||||||||||||||||||
| FDC 428 | |||||||||||||||||||||||||||
| FDC 429 | |||||||||||||||||||||||||||
| FDC 430 | |||||||||||||||||||||||||||
| FDC 431 | |||||||||||||||||||||||||||
| FDC 432 | |||||||||||||||||||||||||||
| FDC 433 | |||||||||||||||||||||||||||
| FDC 434 | |||||||||||||||||||||||||||
| FDC 438 | |||||||||||||||||||||||||||
| FDC 439 | |||||||||||||||||||||||||||
| FDC 440 | |||||||||||||||||||||||||||
| FDC 441 | |||||||||||||||||||||||||||
| FDC 454 | |||||||||||||||||||||||||||
| FDC 455 | |||||||||||||||||||||||||||
| FDC 456 | |||||||||||||||||||||||||||
| FDC 457 | |||||||||||||||||||||||||||
| FDC 458 | |||||||||||||||||||||||||||
| FDC 459 | |||||||||||||||||||||||||||
| FDC 469 | |||||||||||||||||||||||||||
| FDC 472 | |||||||||||||||||||||||||||
| FDC 474 | |||||||||||||||||||||||||||
| FDC 535 | |||||||||||||||||||||||||||
| FDC 536 | |||||||||||||||||||||||||||
| FDC 538 | |||||||||||||||||||||||||||
| FDC 539 | |||||||||||||||||||||||||||
| FDC 542 | |||||||||||||||||||||||||||
| FDC 549 | |||||||||||||||||||||||||||
| FDC 550 | |||||||||||||||||||||||||||
| FDC 558 | |||||||||||||||||||||||||||
| FDC 559 | |||||||||||||||||||||||||||
| FDC 560 | |||||||||||||||||||||||||||
| FDC 562 | |||||||||||||||||||||||||||
| FDC 567 | |||||||||||||||||||||||||||
| FDC 571 | |||||||||||||||||||||||||||
| FDC 576 | |||||||||||||||||||||||||||
| FDC 578 | |||||||||||||||||||||||||||
| FDC 1021 | |||||||||||||||||||||||||||
| FDC 1022 | |||||||||||||||||||||||||||
| FDC 1023 | |||||||||||||||||||||||||||
| FDC 1024 | |||||||||||||||||||||||||||
| FDC 1025 | |||||||||||||||||||||||||||
| FDC 1026 | |||||||||||||||||||||||||||
| FDC 1027 | |||||||||||||||||||||||||||
| FDC 1028 | |||||||||||||||||||||||||||
| FDC 1029 | |||||||||||||||||||||||||||
| FDC 1030 | |||||||||||||||||||||||||||
| FDC 1031 | |||||||||||||||||||||||||||
| FDC 1032 | |||||||||||||||||||||||||||
| FDC 1033 | |||||||||||||||||||||||||||
| FDC 1034 | |||||||||||||||||||||||||||
| FDC 1035 | |||||||||||||||||||||||||||
| FDC 1036 | |||||||||||||||||||||||||||
| FDC 1037 | |||||||||||||||||||||||||||
| FDC 1038 | |||||||||||||||||||||||||||
| FDC 1039 | |||||||||||||||||||||||||||
| FDC 1040 | |||||||||||||||||||||||||||
| FDC 1041 | |||||||||||||||||||||||||||
| FDC 1043 | |||||||||||||||||||||||||||
| FDC 1044 | |||||||||||||||||||||||||||
| FDC 1045 | |||||||||||||||||||||||||||
| FDC 1046 | |||||||||||||||||||||||||||
| FDC 1047 | |||||||||||||||||||||||||||
| FDC 1048 | |||||||||||||||||||||||||||
| FDC 1049 | |||||||||||||||||||||||||||
| FDC 1050 | |||||||||||||||||||||||||||
| FDC 1051 | |||||||||||||||||||||||||||
| FDC 1052 | |||||||||||||||||||||||||||
| FDC 1061 | |||||||||||||||||||||||||||
| FDC 1062 | |||||||||||||||||||||||||||
| FDC 1063 | |||||||||||||||||||||||||||
| FDC 1064 | |||||||||||||||||||||||||||
| FDC 1066 | |||||||||||||||||||||||||||
| FDC 1067 | |||||||||||||||||||||||||||
| FDC 1068 | |||||||||||||||||||||||||||
| FDC 1069 | |||||||||||||||||||||||||||
| FDC 1070 | |||||||||||||||||||||||||||
| FDC 1071 | |||||||||||||||||||||||||||
| FDC 1072 | |||||||||||||||||||||||||||
| FDC 1073 | |||||||||||||||||||||||||||
| FDC 1074 | |||||||||||||||||||||||||||
| FDC 1075 | |||||||||||||||||||||||||||
| FDC 8225 ECP-7 | |||||||||||||||||||||||||||
| FDC NIAID IRF | |||||||||||||||||||||||||||
| FDL Fairview Ctr | |||||||||||||||||||||||||||
| FDL Firstfield Rd | |||||||||||||||||||||||||||
| FDL Geoffrey Way | |||||||||||||||||||||||||||
| FDL Industry Lane | |||||||||||||||||||||||||||
| FDL MEADOWS | |||||||||||||||||||||||||||
| FDL TJ Dr | |||||||||||||||||||||||||||
| FDL-Tollhouse Ave | |||||||||||||||||||||||||||
| Fort Detrick Campus Site | |||||||||||||||||||||||||||
| IGC-TGen Headquarters | |||||||||||||||||||||||||||
| Montgomery County MD Site - Lease | |||||||||||||||||||||||||||
| NIH Biomedical Research Center | |||||||||||||||||||||||||||
| NIHOS 82 - RA Bloch International Cancer Center | |||||||||||||||||||||||||||
| Research Triangle Park Campus Site |
Estimate Pricing Schedule
| OFFICE OF RESEARCH FACILITIES | ||||||||||
| DIVISION OF DESIGN AND CONSTRUCTION MANAGEMENT | ||||||||||
| DESIGN AND TECHNICAL SERVICES BRANCH | start | |||||||||
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||
| Estimating Pricing Schedule | current date | mm/dd/yy | WR#: C101822 | 12/1/17 | 12/1/18 | 12/1/19 | 12/1/20 | 12/1/21 | ||
| Note: Fill in "Yellow" boxes only | Ag. Cost + | % of POP | ||||||||
| Multiplier for Expedited* (E%) | 15.00% | 25.00% | Escalation Multiplier for Options Periods (Y%): | 3.00% |
| Technical Service Item | A | A.1 | A.2 | A.3 | B | C | D | E | F | G | H | I | J | J.1 | K | K.1 | L | L.1 | M | M.1 |
| option yr | option yr | option yr | option yr |
Base Period Est'd QTY
| IGEs / YR | Line Item Option 1: Add'l Estimates | Line Item Option 2: Add'l Estimates | Line Item Option 3: Add'l Estimates | Period of | ||||||||||||||||||||||||||
| Performance (turn-around time in Working days) | Aggregate | |||||||||||||||||||||||||||||
| Cost | Total Service Item Cost | |||||||||||||||||||||||||||||
| (D=AxC) | Adjusted Service Item Cost Expedited* | |||||||||||||||||||||||||||||
| (E=(1+E%)xC) | Total Service Item Cost Expedited | |||||||||||||||||||||||||||||
| (F=AxE) | Line Item Option 1: Service Cost for Additional Estimating Services | Line Item Option 2: Service Cost for Additional Estimating Services | Line Item Option 3: Service Cost for Additional Estimating Services | Option Year 1 Aggregate Cost | ||||||||||||||||||||||||||
| (J=DxY%)+D) | Opt. Year 1 - esc. Option Line Item (same for all 3 Options) | |||||||||||||||||||||||||||||
| (J.1 = (G x Y%) +G | Option Year 2 Aggregate Cost | |||||||||||||||||||||||||||||
| (K=(J x Y%) + J) | Opt. Year 2 - esc. Option Line Item (same for all 3 Options) | |||||||||||||||||||||||||||||
| (K.1 = (J.1 x Y%) +J.1 | Option Year 3 Aggregate Cost | |||||||||||||||||||||||||||||
| (L=(K x Y%)+K) | Opt. Year 3 - esc. Option Line Item (same for all 3 Options) | |||||||||||||||||||||||||||||
| L.1 = (K.1 x Y%) +K.1 | Option Year 4 Aggregate Cost | |||||||||||||||||||||||||||||
| (M=(L x Y%)+L) | Opt. Year 4 - esc. Option Line Item (same for all 3 Options) | |||||||||||||||||||||||||||||
| M.1 = (L.1 x Y%) +L.1 | 12/1/17 | 12/1/18 | 12/1/19 | 12/1/20 | 12/31/99 | proposal | qty | |||||||||||||||||||||||
| DESIGN PHASE | ||||||||||||||||||||||||||||||
| IGE Project Size $25k to $100k (Ave. size $70k) | ||||||||||||||||||||||||||||||
| 35% Submission (Class 3 estimate) | 2 | 15 | $3,024 | $6,048 | $3,478 | $6,956 | $0 | $0 | $0 | $6,229 | $0 | $6,416 | $0 | $6,608 | $0 | $6,806 | $0 | $2,686 | $2,767 | $2,850 | $2,936 | $3,024 | ||||||||
| 65% Submission (Class 2 estimate) | 0 | 15 | $4,223 | $0 | $4,856 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $3,752 | $3,865 | $3,981 | $4,100 | $4,223 | ||||||||
| 95% Submission (Class 1 estimate) | 1 | 20 | $6,046 | $6,046 | $6,953 | $6,953 | $0 | $0 | $0 | $6,227 | $0 | $6,414 | $0 | $6,606 | $0 | $6,804 | $0 | $5,372 | $5,533 | $5,699 | $5,870 | $6,046 | ||||||||
| 100% Submission (Class 1 estimate) | 2 | 25 | $7,004 | $14,008 | $8,055 | $16,110 | $0 | $0 | $0 | $14,428 | $0 | $14,861 | $0 | $15,307 | $0 | $15,766 | $0 | $6,223 | $6,410 | $6,602 | $6,800 | $7,004 | ||||||||
| Sub-Total: | 5 | $26,102 | $23,342 | $30,019 | $0 | $0 | $0 | $26,884 | $0 | $27,691 | $0 | $28,521 | $0 | $29,376 | $0 | $0 | $0 | $0 | $0 | |||||||||||
| IGE Project Size $100k to $500k (Ave. $300k) | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||
| 35% Submission (Class 3 estimate) | 3 | 2 | 2 | 2 | 15 | $3,646 | $10,938 | $4,193 | $12,579 | $7,292 | $7,292 | $7,292 | $11,266 | $7,511 | $11,604 | $7,736 | $11,952 | $7,968 | $12,311 | $8,207 | $3,240 | $3,337 | $3,437 | $3,540 | $3,646 | |||||
| 65% Submission (Class 2 estimate) | 0 | 15 | $4,846 | $0 | $5,573 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $4,306 | $4,435 | $4,568 | $4,705 | $4,846 | ||||||||
| 95% Submission (Class 1 estimate) | 0 | 20 | $6,670 | $0 | $7,671 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $5,926 | $6,104 | $6,287 | $6,476 | $6,670 | ||||||||
| 100% Submission (Class 1 estimate) | 3 | 3 | 3 | 3 | 25 | $7,626 | $22,878 | $8,770 | $26,310 | $22,878 | $22,878 | $22,878 | $23,564 | $23,564 | $24,271 | $24,271 | $24,999 | $24,999 | $25,749 | $25,749 | $6,776 | $6,979 | $7,188 | $7,404 | $7,626 | |||||
| Sub-Total: | 6 | 5 | 5 | 5 | $33,816 | $26,207 | $38,889 | $30,170 | $30,170 | $30,170 | $34,830 | $31,075 | $35,875 | $32,007 | $36,951 | $32,967 | $38,060 | $33,956 | $0 | $0 | $0 | $0 | ||||||||
| IGE Project Size $500k to $1m (Ave. $800k) | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||
| 35% Submission (Class 3 estimate) | 2 | 2 | 2 | 2 | 15 | $4,269 | $8,538 | $4,909 | $9,818 | $8,538 | $8,538 | $8,538 | $8,794 | $8,794 | $9,058 | $9,058 | $9,330 | $9,330 | $9,610 | $9,610 | $3,793 | $3,907 | $4,024 | $4,145 | $4,269 | |||||
| 65% Submission (Class 2 estimate) | 1 | 15 | $6,046 | $6,046 | $6,953 | $6,953 | $0 | $0 | $0 | $6,227 | $0 | $6,414 | $0 | $6,606 | $0 | $6,804 | $0 | $5,372 | $5,533 | $5,699 | $5,870 | $6,046 | ||||||||
| 95% Submission (Class 1 estimate) | 2 | 20 | $7,291 | $14,582 | $8,385 | $16,770 | $0 | $0 | $0 | $15,019 | $0 | $15,470 | $0 | $15,934 | $0 | $16,412 | $0 | $6,479 | $6,673 | $6,873 | $7,079 | $7,291 | ||||||||
| 100% Submission (Class 1 estimate) | 2 | 3 | 3 | 3 | 25 | $8,250 | $16,500 | $9,488 | $18,976 | $24,750 | $24,750 | $24,750 | $16,995 | $25,493 | $17,505 | $26,258 | $18,030 | $27,046 | $18,571 | $27,857 | $7,330 | $7,550 | $7,777 | $8,010 | $8,250 | |||||
| Sub-Total: | 7 | 5 | 5 | 5 | $45,666 | $29,735 | $52,517 | $33,288 | $33,288 | $33,288 | $47,035 | $34,287 | $48,447 | $35,316 | $49,900 | $36,376 | $51,397 | $37,467 | $0 | $0 | $0 | $0 | ||||||||
| IGE Project Size $1m to $2m (Ave. $1.5m) | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||
| 35% Submission (Class 3 estimate) | 1 | 15 | $4,891 | $4,891 | $5,625 | $5,625 | $0 | $0 | $0 | $5,038 | $0 | $5,189 | $0 | $5,345 | $0 | $5,505 | $0 | $4,347 | $4,477 | $4,611 | $4,749 | $4,891 | ||||||||
| 65% Submission (Class 2 estimate) | 1 | 15 | $6,670 | $6,670 | $7,671 | $7,671 | $0 | $0 | $0 | $6,870 | $0 | $7,076 | $0 | $7,288 | $0 | $7,507 | $0 | $5,926 | $6,104 | $6,287 | $6,476 | $6,670 | ||||||||
| 95% Submission (Class 1 estimate) | 1 | 20 | $7,916 | $7,916 | $9,103 | $9,103 | $0 | $0 | $0 | $8,153 | $0 | $8,398 | $0 | $8,650 | $0 | $8,910 | $0 | $7,033 | $7,244 | $7,461 | $7,685 | $7,916 | ||||||||
| 100% Submission (Class 1 estimate) | 4 | 25 | $8,872 | $35,488 | $10,203 | $40,812 | $0 | $0 | $0 | $36,553 | $0 | $37,650 | $0 | $38,780 | $0 | $39,943 | $0 | $7,883 | $8,119 | $8,363 | $8,614 | $8,872 | $22,233.60 | 3 | $7,411.20 | |||||
| Sub-Total: | 7 | $54,965 | $32,602 | $63,211 | $0 | $0 | $0 | $56,614 | $0 | $58,313 | $0 | $60,063 | $0 | $61,865 | $0 | $0 | $0 | $0 | $0 | $0.00 | ||||||||||
| IGE Project Size $2m to $3.5m (Ave. $2.75m) | $0 | $0 | $0 | $0 | $0.00 | |||||||||||||||||||||||||
| 35% Submission (Class 3 estimate) | 1 | 15 | $5,515 | $5,515 | $6,342 | $6,342 | $0 | $0 | $0 | $5,680 | $0 | $5,850 | $0 | $6,026 | $0 | $6,207 | $0 | $4,900 | $5,047 | $5,198 | $5,354 | $5,515 | $0.00 | |||||||
| 65% Submission (Class 2 estimate) | 1 | 15 | $7,291 | $7,291 | $8,385 | $8,385 | $0 | $0 | $0 | $7,510 | $0 | $7,735 | $0 | $7,967 | $0 | $8,206 | $0 | $6,479 | $6,673 | $6,873 | $7,079 | $7,291 | $0.00 | |||||||
| 95% Submission (Class 1 estimate) | 1 | 20 | $8,538 | $8,538 | $9,819 | $9,819 | $0 | $0 | $0 | $8,794 | $0 | $9,058 | $0 | $9,330 | $0 | $9,610 | $0 | $7,586 | $7,814 | $8,048 | $8,289 | $8,538 | $0.00 | |||||||
| 100% Submission (Class 1 estimate) | 4 | 25 | $9,497 | $37,988 | $10,922 | $43,688 | $0 | $0 | $0 | $39,128 | $0 | $40,302 | $0 | $41,511 | $0 | $42,756 | $0 | $8,437 | $8,690 | $8,951 | $9,220 | $9,497 | $23,570.55 | 3 | $7,856.85 | |||||
| Sub-Total: | 7 | $59,332 | $35,468 | $68,234 | $0 | $0 | $0 | $61,112 | $0 | $62,945 | $0 | $64,834 | $0 | $66,779 | $0 | $0 | $0 | $0 | $0 | $0.00 | ||||||||||
| IGE Project Size $3.5m to $10m (Ave. $7m) | $0 | $0 | $0 | $0 | $0.00 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .