Request_DTSB_services.xlsx

XLSX spreadsheet 562 KB Posted

Attached to
INSPECTION AND QUALITY ASSURANCE SUPPORT SERVICES
Solicitation number
75N99023R00029
Issued by

About this file

This federal contract opportunity solicitation seeks inspection and quality assurance support services. The National Institutes of Health (NIH) Office of Research Facilities (ORF) Division of Design and Construction Management (DDCM) Design and Technical Services Branch (DTSB) requires these services to manage construction projects. As part of the U.S. Public Health Service and Department of Health and Human Services, NIH conducts biomedical research to enhance health and reduce illness burdens. DDCM oversees NIH facility design, construction, renovation and repair. DTSB provides necessary inspection and quality assurance to support DDCM construction management.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Service

OFFICE OF RESEARCH FACILITIESCONTACT INFORMATION
DIVISION OF DESIGN AND CONSTRUCTION MANAGEMENTVera Glazkova (backup: Samna Ali)
DESIGN AND TECHNICAL SERVICES BRANCHvera.glazkova@nih.gov

REQUEST FOR DTSB SERVICES Request Date:

edson baker: Input the Date of the request(s) mm/dd/yy Work Request #:

edson baker: Input the Project Work Request Number C#

PROJECT DATA (Fill in all blank boxes: use Pull down menus in white boxes; type in information in yellow boxes) edson baker: Fill in all boxes by using the drop boxes, where supplied, and inputing requested information in the yellow boxes

Project Officer (type name)
blade_runner: Type PO nameDTSB Mgr
blade_runner: Select DTSB Project Manager from drop down listPick from drop down listIC/Group
edson baker: Select an Institute or a Group; if more than one IC or Group is involved select "Multiple"Pick IC from drop down list
Project Title (Description)

me: Input Project Title Building # - "Common Name" location me: Pick main building # from drop down list edson baker: Input the Date of the request(s)

Pick from drop down list
Project Scope (Brief Summary)

Sean Mellott: Briefly define the scope of the project and quantify the amount of work involved Conceptual (free) Estimate or Cost of Construction me: Project Officer must provide free conceptual estimate price in box at right; provide cost of construction for services during construction blade_runner: Select DTSB Project Manager from drop down list edson baker: Input the Project Work Request Number

$$Select Complexity:
me: Select Project Complexity from 1 to 5; 3 is average. For Bldg 10 CRC and for Animal buildings, use the next higher factor3 (average)Complexity Factor:
edson baker: Cost and Period of Performance (POP) are affected by Complexity; Cost and POP are increased or decreased by the Factor1.0

PROJECT SCHEDULE (input start and finish dates for each Phase services are selected; mm/dd/yy) edson baker: Dates must be entered into the "Start" and "Finish" columns ONLY for each Phase with requested services.

edson baker: Select an Institute or a Group; if more than one IC or Group is involved select "Multiple"

me: Select Project Complexity from 1 to 5; 3 is average. For Bldg 10 CRC and for Animal buildings, use the next higher factorPLANNING PHASEDESIGN PHASECONSTRUCTION PHASEPOST CONSTR. PHASE
startfinishstartfinishstart const.start insp.finishstartfinish

REQUEST CONSULTING HOURS (select consulting type from drop down boxes, starting at top row and input number of hours) edson baker: Note: Consulting hours are used for both Design Services and for specific requested assistance

edson baker: Cost and Period of Performance (POP) are affected by Complexity; Cost and POP are increased or decreased by the FactorPLANNING PHASEDESIGN PHASECONSTRUCTION PHASEPOST CONSTR. PHASE
Pick from drop down listPick from drop down listPick from drop down listPick from drop down listTRUE
Pick from drop down listPick from drop down listPick from drop down listPick from drop down list
Pick from drop down listPick from drop down listPick from drop down listPick from drop down list
Pick from drop down listPick from drop down listPick from drop down listPick from drop down list
Pick from drop down listPick from drop down listPick from drop down listPick from drop down list

REQUEST TECHNICAL SERVICES (select service type from drop down boxes, starting at top row) edson baker: Technical Services includes

services like Inspection, Scheduling, Shutdowns, Punchlist, etc.REVIEW CONSTR. WORK HRs
PLANNING PHASEDESIGN PHASECONSTRUCTION PHASEPOST CONSTR. PHASE# Days Insp./wk# Days Constr./wkWork HrsWeekend work?
Pick from drop down listPick from drop down listPick from drop down listPick from drop down list557am-4pm
edson baker: Select the construction work hoursFALSE
Pick from drop down listPick from drop down listPick from drop down listPick from drop down listFALSE
Pick from drop down listPick from drop down listPick from drop down listPick from drop down listFALSE
Pick from drop down listPick from drop down listPick from drop down listPick from drop down listFALSE

REQUEST DESIGN SERVICES (select design service in drop down boxes, starting at the top row) edson baker: This section requests Design Services of the Design Group

edson baker: Select the construction work hoursPLANNING PHASEDESIGN PHASECONSTRUCTION PHASEPOST CONSTR. PHASE
Drop Down ListDrop Down ListDrop Down ListDrop Down List

Drop Down List Drop Down List Drop Down List Drop Down List

Drop Down List Drop Down List Drop Down List Drop Down List

Drop Down List Drop Down List Drop Down List Drop Down List

SPECIAL DESIGN SERVICES - QUOTATION REQUIRED
Drop Down ListDrop Down ListDrop Down ListDrop Down List
REQUEST ESTIMATING SERVICES
edson baker: Select the Phase(s) for the Estimating service(s) and provide the requested informationREVIEW COST OF ESTIMATE

edson baker: Review the cost of providing an estimate with the various conditions

cost for estimate1difficultyCostTOTALListed POP
DESIGN PHASE
edson baker: Select the type of estimate from the drop down listDate
edson baker: This Start Date must be coordinated with the Estimator who may have to review existing conditions prior to starting the estimateSpecial conditions?
edson baker: Special conditions can include things such as Animal Facilities, CRC, Hospital, Clean Rooms, etc. Since the POP will take longer, there will be added costEnter Description
edson baker: Describe briefly the special conditionExpedited Required?
edson baker: If the estimate needs to be expedited, the POP will be reduced by this percentage, but there will be an added cost% Deduct
edson baker: The POP will be reduced by this %POP
edson baker: The POP includes some time by DTSB to review the estimate for accuracy.Due Date
edson baker: This Due Date is approximate and may be sooner or may have to be altered due to unforseen circumstancesComplexity $Special?Expedite $TOTALDifficultyspecial conditionexpeditePOP factorPOPxdifspecialexpediteTotal POPDTSBTOTAL
Pick from drop down list

edson baker: If date is RED, it is NOT a work day Special Conditions Request Expedite 0.0% $0 $0 $0 $0 1 0 0 1.00 $0 blade_runner: blade_runner:

00000.00000FALSEFALSEFALSE
Pick from drop down list

edson baker: If date is RED, it is NOT a work day

edson baker: Describe briefly the special conditionSpecial ConditionsEnter description
edson baker: Enter a brief description of the special condition0Request Expedite0.0%$0$0$0$01001.00$0

blade_runner: blade_runner:

00000.00000FALSEFALSEFALSE
Pick from drop down list

edson baker: If date is RED, it is NOT a work day

Special ConditionsEnter description
edson baker: Enter a brief description of the special condition0Request Expedite0.0%$0$0$0$01001.00$0

blade_runner: blade_runner:

00000.00000FALSEFALSEFALSE
Pick from drop down listSpecial ConditionsEnter description
edson baker: Enter a brief description of the special condition0Request Expedite0.0%$0$0$0$01001.00$0

blade_runner: blade_runner:

00000.00000FALSEFALSEFALSE
CONSTRUCTION PHASE

edson baker: Select the type of estimate from the drop down list edson baker: Enter a brief description of the special condition edson baker: If date is RED, it is NOT a work day edson baker: Enter a brief description of the special condition Date edson baker: This Start Date must be coordinated with the Estimator who may have to review existing conditions prior to starting the estimate edson baker: If the estimate needs to be expedited, the POP will be reduced by this percentage, but there will be an added cost

edson baker: Enter a brief description of the special conditionSpecial conditions?
edson baker: Special conditions can include things such as Animal Facilities, CRC, Hospital, Clean Rooms, etc. Since the POP will take longer, there will be added costEnter Description
edson baker: Describe briefly the special conditionExpedited Required?
edson baker: If the estimate needs to be expedited, the POP will be reduced by this percentage, but there will be an added cost% Deduct
edson baker: The POP will be reduced by this %POP
edson baker: The POP includes some time by DTSB to review the estimate for accuracy.Due Date
edson baker: This Due Date is approximate and may be sooner or may have to be altered due to unforseen circumstancesComplexity $Special?Expedite $TOTAL
Pick from drop down list

edson baker: If date is RED, it is NOT a work day

edson baker: Enter a brief description of the special conditionSpecial Conditionsanimal facility
edson baker: Enter a brief description of the special conditionRequest Expedite0.0%$0$0$0$01001.00$0

blade_runner: blade_runner:

ERROR:#N/AERROR:#N/A0.00ERROR:#N/A0.00ERROR:#N/AERROR:#N/AERROR:#N/AFALSEFALSEFALSE
Pick from drop down list

edson baker: If date is RED, it is NOT a work day edson baker: The POP will be reduced by this %

edson baker: Describe briefly the special conditionSpecial ConditionsEnter description
edson baker: Enter a brief description of the special condition0Request Expedite0.0%$0$0$0$01001.00$0

blade_runner: blade_runner:

ERROR:#N/AERROR:#N/A0.00ERROR:#N/A0.00ERROR:#N/AERROR:#N/AERROR:#N/AFALSEFALSEFALSE
Pick from drop down list

edson baker: If date is RED, it is NOT a work day edson baker: The POP includes some time by DTSB to review the estimate for accuracy.

edson baker: Enter a brief description of the special conditionSpecial ConditionsEnter description
edson baker: Enter a brief description of the special condition0Request Expedite0.0%$0$0$0$01001.00$0

blade_runner: blade_runner:

ERROR:#N/AERROR:#N/A0.00ERROR:#N/A0.00ERROR:#N/AERROR:#N/AERROR:#N/AFALSEFALSEFALSE
Pick from drop down list

edson baker: If date is RED, it is NOT a work day edson baker: Review the cost of providing an estimate with the various conditions edson baker: This Due Date is approximate and may be sooner or may have to be altered due to unforseen circumstances edson baker: Enter a brief description of the special condition edson baker: If the estimate needs to be expedited, the POP will be reduced by this percentage, but there will be an added cost edson baker: Enter a brief description of the special condition Special Conditions Enter description edson baker: Enter a brief description of the special condition edson baker: The POP will be reduced by this % edson baker: The POP includes some time by DTSB to review the estimate for accuracy.

edson baker: This Due Date is approximate and may be sooner or may have to be altered due to unforseen circumstances blade_runner: blade_runner:

blade_runner: blade_runner:

blade_runner: blade_runner:

blade_runner: blade_runner:

blade_runner: blade_runner:

blade_runner: blade_runner:

blade_runner: blade_runner:

0 Request Expedite 0.0% 1 0 0 1.00 blade_runner: blade_runner:

blade_runner: blade_runner:

0 0 0.00 0 0.00 0 0 0 FALSE FALSE FALSE

&11Revision Date: 10/20/18 &11Page &P &11DTSB Technical Services

(Inspections) After all Project Data and Project Schedule information entered, select the type(s) of service by "Clicking" on the "Request" buttons mailto:vera.glazkova@nih.gov Request for Estimating Provider

OFFICE OF RESEARCH FACILITIES

DIVISION OF DESIGN AND CONSTRUCTION MANAGEMENT

DESIGN AND TECHNICAL SERVICES BRANCH

REQUEST ESTIMATING SERVICES

FROM PROVIDER

Request Date: mm/dd/yy

PART 1 - GENERAL PROJECT DESCRIPTION / DATA:1
1
Project Title:0WR#:C#1
1
Project Officer:0DTSB Mgr:Pick from drop down listIC/Group:Pick IC from drop down list1
1
Building # - "Common Name" location:Pick from drop down list1
11
Project Scope (Brief Summary):1
write scope1
11
Project Cost (Conceptual):$$Project Complexity:3 (average)Complexity (multiplier)1.001
1
1
1
PART 2 - PROJECT SCHEDULE (start and finish dates for each Phase Estimating Services are provided):1
DESIGN PHASECONSTRUCTION PHASE1
startfinishstartfinish1
1
1
1
1
PART 3 - ESTIMATING SERVICES:1
DESIGN PHASEStartSpecial ConditionsExpeditePOPDue DateCOST0
NO0
NO0
NO0
NO00
CONSTRUCTION PHASEStartSpecial ConditionsExpeditePOPDue DateCOST0
NO0
NO0
NO0
NO00
TOTAL Estimating Services Fees For Service =$01
*Estimated Time to Provide Sevices = POP (normally plan on min. 1 wk to start and min. 1 wk to finish unless expedited)1
1
1
1
PART 4 - ADDITIONAL COMMENTS / INFORMATION / CLARIFICATION:1
0
0
0
1
1
1
PART 5 - AGREEMENT:1
The Estimate Provider agrees to provide the Estimate(s), based on the Scope and supplied information provided above, for the price listed in "TOTAL" of Section 3 of this form.1
1
APPROVAL BY PROVIDER (sign or initial)DateDTSB TECHNICAL SERVICESDate1
1

&11Revision Date: 9/20/18 &11Page &P DTSB Technical Services

Remove Blank Lines Unhide Hidden Rows

Proposal for Estimate Services

OFFICE OF RESEARCH FACILITIES

DIVISION OF DESIGN AND CONSTRUCTION MANAGEMENT

DESIGN AND TECHNICAL SERVICES BRANCH

PROPOSAL FOR PROJECT OFFICER

FOR ESTIMATING SERVICES

Request Date:mm/dd/yy1
1
PART 1 - GENERAL PROJECT DESCRIPTION / DATA:1
1
Project Title:0WR#:C#1
1
Project Officer:0DTSB Mgr:Pick from drop down listIC/Group:Pick IC from drop down list1
1
Building # - "Common Name" location:Pick from drop down list1
1
Project Scope (Brief Summary):1
01
1
Project Cost (Conceptual):$$Project Complexity:3 (average)Complexity (multiplier)1.001
1
1
1
PART 2 - PROJECT SCHEDULE (start and finish dates for each Phase Estimating Services are provided):1
DESIGN PHASECONSTRUCTION PHASE1
startfinishstartfinish1
1
1
1
1
PART 3 - ESTIMATING SERVICES:1
DESIGN PHASEStartSpecial ConditionsExpeditePOPDue DateCOST0
NO$00
NO$00
NO$00
NO$000
CONSTRUCTION PHASEStartSpecial ConditionsExpeditePOPDue DateCOST0
NO$00
NO$00
NO$00
NO00
TOTAL Estimating Services Fees For Service =$01
*Estimated Time to Provide Sevices = POP (normally plan on min. 1 wk to start and min. 1 wk to finish unless expedited)1
1
1
1
PART 4 - ADDITIONAL COMMENTS / INFORMATION / CLARIFICATION:1
0
0
1
1
1
PART 5 - AGREEMENT:1
DTSB is a Fee For Service (FFS) entity. This document is a FFS request sent to the PO for signature, for the DTSB requested services, . The agreement requires a electronic signatures by the DTSB Chief, the PO, and the PO's supervisor/Branch Chief. The PO is requested to forward the "signed agreement" to DTSB.1
1
For DTSB: Samna Ali, Acting Branch ChiefDate1
1
1
Project Officer:0Date1
1
1
Supervisor for PO:Date1
0
0
DTSB Project Manager:Pick from drop down listDate0

&11Revision Date: 11/20/18 &11Page &P DTSB Technical Services

Remove Blank Lines Unhide Hidden Rows

Evaluation of Estimate

OFFICE OF RESEARCH FACILITIES

DIVISION OF DESIGN AND CONSTRUCTION MANAGEMENT

DESIGN AND TECHNICAL SERVICES BRANCH

EVALUATION OF ESTIMATE

Receive Estimate: type in date

PART 1 - GENERAL PROJECT DESCRIPTION / DATA:1
1
Project Title:0WR#:C#1
1
Project Officer:0DTSB Mgr:Pick from drop down listIC/Group:Pick IC from drop down list1
1
Building # - "Common Name" location:Pick from drop down list1
11
Project Scope (Brief Summary):1
01

PART 2 - QUESTIONS / COMMENTS

Division Reviewer Comment / Suggestion / Question Provider Response

PART 3 - SIGN-OFF AND ACCEPTANCE:
The Estimate Provider and DTSB agree to the following:
a. Confirm the type of estimate(s), accuracy and conditions, and date provided
b. Accept the Final Estimate(s) submission (s)

APPROVAL BY PROVIDER (sign or initial) Date provided DTSB TECHNICAL SERVICES Date

&11Revision Date: 3/1/18 &11Page &P DTSB Technical Services

Class of Estimate

CLASS OF ESTIMATES:
Based on Information Provided
100
90
80
70
60
50
40
30
20
10
0
-10
-20
-30
-40
-50

0 10 20 30 40 50 60 70 80 90 100

Class 4Class 2
Class 3Class 1

The above information is provided for clarification of expected accuracy of estimates only and is based on information from AACE International Recommended Practice No. 56R-08, rev. Dec. 5, 2012, who provided this publication as public service. AACE International is a 501(c)(3) non-profit professional association serving the total cost management community since 1956.

DDCM/DTSB rev. 12-27-13

Class 5

MATURITY LEVEL OF PROJECT DEFINITION

DELIVERABLES (%)

RANGE IN ESTIMATE ACCURACY

FOR BUILDING AND GENERAL CONSTRUCTION

Upper Range

Lower Range

L: -20% to -30% H: +30% to +50% L: -10% to -20% H: +20% to +30% L: -5% to -15% H: +10% to +20% L: -5% to -10% H: +5% to +15% L: -3% to -5% H: +3% to +10%

CLASS KEY - INFORMATION PROVIDED TO ESTIMATOR

Class 5: 0% to 2% designed - little more than proposed building type, location, functional space building requirements (SF or m2), and number of stories are known at the time of estimate preparation.

Class 4:1% to 15% designed - preliminary room layouts, new proposed site plan, existing site plan, markups
of existing drawings for demolition and utilities, design criteria report

Class 3: 10% to 40% designed - defined site civil information such as site plan, existing site conditions, demolition drawings, utility plan, site electrical plans, room layouts, mechanical system layouts, plumbing layouts, and one-line electrical diagram.

Class 2:30% to 70% designed - All drawings, plan views, elevation drawings and section drawings are
complete; except detailed design schedules, architectural details and control diagrams, which may
still be in draft form.
Class 1:65% to 100% designed - All drawings, plan views, elevation drawings and section drawings are
complete; all detailed design schedules, architectural details, control diagrams, and specifications
are complete.

DLists

#8 - Building#30 - OPDIVProject ComplexityDesign ServicesTechnical Services planningTechnical Services designTechnical Services constr.Technical Services post constr.Estimate EffortProject CriticalityPlanning Drawing InfoDesign Drawing InfoConstruction Drawing InfoConsulting HoursPlanning PhasesDesign PhasesConstruction PhasesPost Construction PhasesEstimatesConstruction hours# Inspection Days
Pick from drop down listPick IC from drop down listPick from listPick from drop down listPick from drop down listPick from drop down listPick from drop down listPick from drop down listpick from listpick from listPick Dwg Info From Drop Down ListPick InfoPick Dwg Info From Drop Down ListPick InfoPick Dwg Info From Drop Down ListPick InfoPick from drop down listPick from drop down listPick from drop down listPick from drop down listPick from drop down list1Type 1 Cost Estimate (IGE)Type 1 Construction IGESelectSelect
Bethesda multiple building locationsNIH/CC1 (very simple)0.8Very Small (1/2 sized drawings)Assist site eval. 4 hrsAssist site eval. 4 hrsProgress reports and inspectionProgress reports and inspection11As-builts (existing)515% SD Submittal Set435% DD Submittal Set3Technical & estimatingPreliminary DesignConstruction Documents -50%Construction AdministrationCommissioning & Startup2Type 2 Cost Estimate (IGE)Type 2 Construction IGE6am-3pm1
Bethesda campus siteNIH/CIT2 (fairly simple)0.9Small StudyAssist site eval. 8 hrsAssist site eval. 8 hrsMonitor scheduleObserve testing (8 hrs)22Existing condition535% DD Submittal Set350% - 65%CD Submittal Set2ArchitectSchematic DesignConstruction Documents -65%Startup3Type 3 Cost Estimate (IGE)Type 3 Construction IGE7am-4pm2
BaltimoreNIH/CSR3 (average)1Small DesignAssist site eval. 16 hrsAssist site eval. 16 hrsFire protection servicesObserve testing (16 hrs)33Study information450% - 65%CD Submittal Set285% - 95% CD Submittal Set1Mech./Plumb. EngineerDesign Development - 35% documentsConstruction Documents -95%Project Close-out4Type 4 Cost Estimate (IGE)Type 4 Construction IGE8am-5pm3
Baltimore-BRC - Biomedical Research CenterNIH/FIC4 (more complex)1.2BOD (35% drawings)SchedulingSchedulingObserve testing (8 hrs)fire protection services44Master Plan Info.485% - 95% CD Submittal Set1100% or Final CD Submittal Set1Electrical EngineerDesign Development - 50% documentsConstruction Documents -100%5Type 5 Cost Estimate (IGE)Type 5 Construction IGE5pm-2am4
Baltimore-GRC - Gerontology Research CenterNIH/NCATS5 (Very complex)1.5Design-BuildAE Cost/bid/proposal evaluationReview fire protectionObserve testing (16 hrs)Punch List55Pre-design Basis of Design (BOD)4100% or Final CD Submittal Set1Change Order drwg1Other EngineerSurveyAcquistion115% Cost Estimate (IGE)Type 1 Construction IGE6pm-3am5
NIHBC 25NIH/NCCAMDevelopmentDB Cost/bid/proposal evaluationReview AE Scheduling (10% of Sched.)Assistance with shutdownsReview red mark as-builts15% SD Submittal Set4Change Order drwg1CADD/BIM draftingOn-board Review235% Cost Estimate (IGE)Type 2 Construction IGE7pm-4am6
NIHBC 28 & 28ANIH/NCIOtherReview Design COAssistance with punchlistReview as-built Final dwgs35% DD Submittal Set3Architect & drafting350% Cost Estimate (IGE)Type 3 Construction IGE7
NIHBC 29NIH/NCRRCost/bid/proposal evaluationQA assistanceHelp PO with Closeout50% - 65%CD Submittal Set2Mech./Plumb. Engineer & drafting485% Cost Estimate (IGE)Type 4 Construction IGE
NIHBC 29ANIH/NEIReview Construction Change Order85% - 95% CD Submittal Set1Electrical Engineer & drafting595% Cost Estimate (IGE)Type 5 Construction IGE
Baltimore-TRIAD - TRIAD Technology CenterNIH/NHGRI100% or Final CD Submittal Set1Other Engineer & drafting5100% Cost Estimate (IGE)Type 5 Construction IGE
BethesdaNIH/NLMArchitect survey
06 A-B Science ComplexNIH/NHLBIMech./Plumb. Engineer survey
Multi-Level Parking 6NIH/NIASpecial considerations, to include, but not limited to:Electrical Engineer survey
Multi-Level Parking 7NIH/NIAAAEstmates - DesignEstmates - ConstructionEstmates - Post ConstructionSpecialOther Engineer survey
Multi-Level Parking 8NIH/NIAMSPick from drop down listPick from drop down listPick from drop down listPhysical Security restrictions / limitations / requirements
Multi-Level Parking 9NIH/NIBIB0% Submission (Class 5 estimate)Change Order - Project $0 to $25k (Ave. size CO $5k)Review Change Order
Proj. $0 to $25k (Ave.$5k)Construction Change OrderAnti-Terrorism / Force Protection (AT / FP) restrictions / requirements
Multi-Level Parking 10NIH/NIDA10% Submission (Class 4 estimate)Change Order - Project $25k to $100k (Ave. size CO $15k)Review Change Order
Proj. $25k to $100k (Ave.$15k)Special / Interim Life Safety measures
Multi Level Parking 11 Gateway VisitorNIH/NIAID15% Submission (Class 4 estimate)Change Order - Project $100k to $500k (Ave. size CO $20k)Review Change Order
Proj. $100k to $500k (Ave.$20k)Construction Risk Assessments
33TR (Trailer)NIH/NICHD35% Submission (Class 3 estimate)Change Order - Project $500k to $1m (Ave. size CO $30k)Review Change Order
Proj. $500k to $1m (Ave.$30k)Occupied space(s) restrictions/ limitations
Trailer T39NIH/NIDCD65% Submission (Class 2 estimate)Change Order - Project $1m to $2m (Ave. size CO $45k)Review Change Order
Proj. $1m to $2m (Ave.$45k)Access restrictions
Trailer 40BNIH/NIDCR95% Submission (Class 1 estimate)Change Order - Project $2m to $3.5m (Ave. size CO $60k)Review Change Order
Proj. $2m to $3.5m (Ave.$60k)Off hours working requirements
Trailer 46NIH/NIDDK100% Submission (Class 1 estimate)Change Order - Project $3.5m to $10m (Ave. size CO $100k)Review Change Order
Proj. $3.5m to $10m (Ave.$100k)Vibration / noise / access limitations
Trailer 46BNIH/NIEHSCost to complete - Ave. Size of Project ($0 to $25k)Review of Contr. pay reqts (4 hrs)Cost to Complete ProjectHazardous Materials Abatement / Remediation
Trailer 46DNIH/NINRCost to complete - Ave. Size of Project ($25k to $100k)Joint Commission requirements (for hospital)
Trailer 46ENIH/NIGMSCost to complete - Ave. Size of Project ($100k to $500k)Special Area restrictions, i.e. infectious or immune compromised areas within a hospital space
Trailer 46FNIH/NIMHCost to complete - Ave. Size of Project ($500k to $1m)
Trailer 46T - ChildkindNIH/NIMHDCost to complete - Ave. Size of Project ($1m to $2m)
Trailer 46T - Complex Pepco West SubstationNIH/NINDSCost to complete - Ave. Size of Project ($2m to $3.5m)
Trailer 49NIH/ODCost to complete - Ave. Size of Project ($3.5m to $10m)
Building 1NIH/OD/ORFCost to accelerate - Ave. Size of Project ($0 to $25k)Cost to Accelerate or cost for Delay
Building 2MULTIPLECost to accelerate - Ave. Size of Project ($25k to $100k)
Building 3Cost to accelerate - Ave. Size of Project ($100k to $500k)
Building 4Cost to accelerate - Ave. Size of Project ($500k to $1m)
Building 5Cost to accelerate - Ave. Size of Project ($1m to $2m)
Building 6Cost to accelerate - Ave. Size of Project ($2m to $3.5m)
Building 7Cost to accelerate - Ave. Size of Project ($3.5m to $10m)
Building 8Impact Factor Estimate (risk per element affecting time & $)
Building 9
Building 10 ACRF - Ambulatory Care Research Facility
Building 10 CRC - Mark O Hatfield Clinical Research Center
Building 10 - Clinical Center
Building 11 - Central Plant
Building 12
Building 12A
Building 12B
Building 13 - Headquarters of the Office of Research Facilities (ORF)
Building 14
Building 14 B-H
Building 14A
Building 14B
Building 14C
Building 14D
Building 14E
Building 14F
Building 14G
Building 14H
Building 15B1-2 Quarters
Building 15 B-I Group- Quarters
Building 15B2 - Quarters
Building 15C1 - Quarters
Building 15C2 - Quarters
Building 15D1 - Quarters
Building 15D2 - Quarters
Building 15E1 - Quarters
Building 15E2 - Quarters
Building 15F1 - Quarters
Building 15F2 - Quarters
Building 15G1 - Quarters
Building 15G2 - Quarters
Building 15H - Quarters
Building 15I - Quarters
Building 15K - Wilson House
Building 16 - Lawton Chiles International House
Building 16A
Building 17 - Pepco East Substation
Building 18
Building 18T
Building 21
Building 21A-B
Building 22
Building 25
Building 26T
Building 28
Building 28A-D
Building 29
Building 29A
Building 29B
Building 30
Building 31 A-C - Claude Denson Pepper Building
Building 32
Building 32T
Building 32T2
Building 33 - CW Bill Young Center
Building 34 - Central Plant
Building 35A - PNRC-II
Building 35 - PNRC-John Edward Porter Neuroscience Research Center
Building 37
Building 38 - National Library of Medicine
Building 38A - Lister Hill National Center for Biomedical Communications
Building 39T - Fitness Center
Building 40 - Dale and Betty Bumpers Virology Research Center
Building 41
Building 41A
Building 45 - William H. Natcher Building
Building 49 - Silvio O. Conte Building
Building 50 - Louis Stokes Laboratories
Building 51 - NIH Fire Station
Building 52 - Transformer Vault 52
Building 53 - Transformer Vault 53
Building 54 - Transformer Vault 54
Building 57
Building 58 - Fuel Oil Pumping Station
Building 59 - Satellite sub station for Clinical Center
Building 59A - Generator shack for Clinical center
Building 60 - Convent-Mary Woodard Lasker Center For Health Research and Education
Building 61 - Cloister - Study Recruitment Office
Building 61A - Garage
Building 62 - Childrens Inn
Building 62A - Childrens Inn Addition
Building 63 - North Electrical Substation
Building 64 - East Child Care Center
Building 65 - Edmond J Safra Family Lodge
Building 66 - Gateway Center
Building 66A - Visitor Automobile Inspection Station
Building 67 - Commercial Vehicle Inspection Facility
Building 68 - West Drive Patient Screening Facility
Building 82 - RA Bloch International Cancer Center
Leased
10401 Fernwood Road 20817 - Fernwood - Leased
12441 Parklawn Drive 20852 - Twinbook II - Leased
12735 Twinbrook Parkway 20852 - Twinbook III - Leased
16050 Industrial Dr. 20877 - Gaither Distribution Center - Leased
2115 E. Jefferson Street 20852 - Jefferson Bldg - Leased
301 N. Stonestreet Ave. 20854 - Stonestreet (Print/Mail Facility) - Leased
5 Research Court 20850 - 5 Research Court Building - Leased
5411 W Cedar Lane, 20814 - Doctors Park - Leased
5413 W Cedar Lane, 20814 - Doctors Park - Leased
5415 W Cedar Lane, 20814 - Doctors Park - Leased
5625 Fisher Lane 20852 - Leased
5635 Fisher Lane 20852 - Leased
5640 Fisher Lane 20852 - Twinbook I - Leased
6001 Executive Blvd. 20852 - Neuro Science Center - Leased
6006 Executive Blvd. 20852 - Day Care Center - Leased
6011 Executive Blvd. 20852 - Energy Building - Leased
6100 Executive Blvd. 20852 - Executive Building - Leased
6101 Executive Blvd. 20852 - Atrium Building - Leased
6116 Executive Blvd. 20852 - Leased
6120 Executive Blvd. 20852 - Executive Plaza South - Leased
6130 Executive Blvd. 20852 -Executive Plaza North - Leased
6610 Rockledge Dr. 20817 - Leased
6700A Rockledge Dr. 20817 - Leased
6700B Rockledge Dr. 20817 - Leased
6701 Democracy Blvd. 20817 - Democracy One - Leased
6701 Rockledge Drive 20817 - Rockledge II - Leased
6705 Rockledge Drive 20817 - Rockledge I - Leased
6707 Democracy Blvd. 20817 - Democracy Two -Leased
7201 Wisconsin Ave. 20892 - Gateway Building - Leased
8424 Helgerman Ct. 20877 - Leased
8717 Grovemont Circle 20877 - ATC Advanced Technology Center - Leased
9800 Medical Center Dr. 20850
Bethesda Campus Site
Durham NC Site - Lease
Frederick
8200 Research Plaza - NIAID/IRF
8225 Research Plaza - Entry Control Point 7 (ECP-7)
North Carolina
Building 101-NC - David P. Rall Building
Building 102-NC - Engineering Support Building
Building 103-NC - Chemical Storage Building
Building 104-NC-Warehouse
Building 105-NC-Central Utility Plant
Building 106-NC-Incinerator Building
Building 107-NC-Electrical Distribution
Building 108-NC-Waste Handling Facility
Building 109-NC-Clinical Building
Davis-NC-Davis Park Warehouse (Leased)
Keystone-NC
Nott-NC-Nottingham Hall
Poolesville
Building 100
Building 101A-Tunnel
Building 102
Building 103
Building 104
Building 107-Waste Water Graveyard
Building 110
Building 110A-Central Plant Addition
Building 111
Building 112
Building 114 - Water Tower
Building 115 - Guard House
Building 116 - Residence
Building 117 - Residence
Building 127
Building 128
Building 130 - Greenhouse
Building 131
Building 132
Building T01
Building T02
Building T05
Building T06
Building T07
Building T08
Building T10
Building T12
Building T13
Building T14
Building T15
Building T16
Building T18
Building T18B
Building T18C
Building T19
Poolesville Animal Center Campus Site
T112 - Trailer owned by NIACD
Trailer T21
Trailer T22
Trailer T24
Trailer T130
WH4-Well
WH5-Well
Rocky Mountain Labs
RML 01
RML 02
RML 03
RML 05
RML 06
RML 08
RML 09
RML 11
RML 12
RML 13
RML 13B
RML 16
RML 17
RML 22
RML 25
RML 26
RML 27
RML 28
RML A
RML ARMCO-2
Rocky Mountain Labs Campus Site
RTP
RTP 101 David P Rall Building
RTP 102
RTP 103
RTP 104
RTP 105
RTP 106
RTP 107
RTP 108
RTP 109 Modular Clinic
RTP MRI
Wayne State University
FDC 244
FDC 311
FDC 312
FDC 313 & 313A
FDC 314
FDC 318
FDC 319
FDC 320
FDC 321
FDC 322
FDC 323
FDC 324
FDC 325
FDC 327
FDC 347
FDC 349
FDC 350
FDC 360
FDC 361
FDC 362
FDC 363
FDC 371
FDC 372
FDC 376
FDC 378
FDC 426
FDC 427
FDC 428
FDC 429
FDC 430
FDC 431
FDC 432
FDC 433
FDC 434
FDC 438
FDC 439
FDC 440
FDC 441
FDC 454
FDC 455
FDC 456
FDC 457
FDC 458
FDC 459
FDC 469
FDC 472
FDC 474
FDC 535
FDC 536
FDC 538
FDC 539
FDC 542
FDC 549
FDC 550
FDC 558
FDC 559
FDC 560
FDC 562
FDC 567
FDC 571
FDC 576
FDC 578
FDC 1021
FDC 1022
FDC 1023
FDC 1024
FDC 1025
FDC 1026
FDC 1027
FDC 1028
FDC 1029
FDC 1030
FDC 1031
FDC 1032
FDC 1033
FDC 1034
FDC 1035
FDC 1036
FDC 1037
FDC 1038
FDC 1039
FDC 1040
FDC 1041
FDC 1043
FDC 1044
FDC 1045
FDC 1046
FDC 1047
FDC 1048
FDC 1049
FDC 1050
FDC 1051
FDC 1052
FDC 1061
FDC 1062
FDC 1063
FDC 1064
FDC 1066
FDC 1067
FDC 1068
FDC 1069
FDC 1070
FDC 1071
FDC 1072
FDC 1073
FDC 1074
FDC 1075
FDC 8225 ECP-7
FDC NIAID IRF
FDL Fairview Ctr
FDL Firstfield Rd
FDL Geoffrey Way
FDL Industry Lane
FDL MEADOWS
FDL TJ Dr
FDL-Tollhouse Ave
Fort Detrick Campus Site
IGC-TGen Headquarters
Montgomery County MD Site - Lease
NIH Biomedical Research Center
NIHOS 82 - RA Bloch International Cancer Center
Research Triangle Park Campus Site

Estimate Pricing Schedule

OFFICE OF RESEARCH FACILITIES
DIVISION OF DESIGN AND CONSTRUCTION MANAGEMENT
DESIGN AND TECHNICAL SERVICES BRANCHstart
Base YearOption Year 1Option Year 2Option Year 3Option Year 4
Estimating Pricing Schedulecurrent datemm/dd/yyWR#: C10182212/1/1712/1/1812/1/1912/1/2012/1/21
Note: Fill in "Yellow" boxes onlyAg. Cost +% of POP
Multiplier for Expedited* (E%)15.00%25.00%Escalation Multiplier for Options Periods (Y%):3.00%
Technical Service ItemAA.1A.2A.3BCDEFGHIJJ.1KK.1LL.1MM.1
option yroption yroption yroption yr

Base Period Est'd QTY

IGEs / YRLine Item Option 1: Add'l EstimatesLine Item Option 2: Add'l EstimatesLine Item Option 3: Add'l EstimatesPeriod of
Performance (turn-around time in Working days)Aggregate
CostTotal Service Item Cost
(D=AxC)Adjusted Service Item Cost Expedited*
(E=(1+E%)xC)Total Service Item Cost Expedited
(F=AxE)Line Item Option 1: Service Cost for Additional Estimating ServicesLine Item Option 2: Service Cost for Additional Estimating ServicesLine Item Option 3: Service Cost for Additional Estimating ServicesOption Year 1 Aggregate Cost
(J=DxY%)+D)Opt. Year 1 - esc. Option Line Item (same for all 3 Options)
(J.1 = (G x Y%) +GOption Year 2 Aggregate Cost
(K=(J x Y%) + J)Opt. Year 2 - esc. Option Line Item (same for all 3 Options)
(K.1 = (J.1 x Y%) +J.1Option Year 3 Aggregate Cost
(L=(K x Y%)+K)Opt. Year 3 - esc. Option Line Item (same for all 3 Options)
L.1 = (K.1 x Y%) +K.1Option Year 4 Aggregate Cost
(M=(L x Y%)+L)Opt. Year 4 - esc. Option Line Item (same for all 3 Options)
M.1 = (L.1 x Y%) +L.112/1/1712/1/1812/1/1912/1/2012/31/99proposalqty
DESIGN PHASE
IGE Project Size $25k to $100k (Ave. size $70k)
35% Submission (Class 3 estimate)215$3,024$6,048$3,478$6,956$0$0$0$6,229$0$6,416$0$6,608$0$6,806$0$2,686$2,767$2,850$2,936$3,024
65% Submission (Class 2 estimate)015$4,223$0$4,856$0$0$0$0$0$0$0$0$0$0$0$0$3,752$3,865$3,981$4,100$4,223
95% Submission (Class 1 estimate)120$6,046$6,046$6,953$6,953$0$0$0$6,227$0$6,414$0$6,606$0$6,804$0$5,372$5,533$5,699$5,870$6,046
100% Submission (Class 1 estimate)225$7,004$14,008$8,055$16,110$0$0$0$14,428$0$14,861$0$15,307$0$15,766$0$6,223$6,410$6,602$6,800$7,004
Sub-Total:5$26,102$23,342$30,019$0$0$0$26,884$0$27,691$0$28,521$0$29,376$0$0$0$0$0
IGE Project Size $100k to $500k (Ave. $300k)$0$0$0$0
35% Submission (Class 3 estimate)322215$3,646$10,938$4,193$12,579$7,292$7,292$7,292$11,266$7,511$11,604$7,736$11,952$7,968$12,311$8,207$3,240$3,337$3,437$3,540$3,646
65% Submission (Class 2 estimate)015$4,846$0$5,573$0$0$0$0$0$0$0$0$0$0$0$0$4,306$4,435$4,568$4,705$4,846
95% Submission (Class 1 estimate)020$6,670$0$7,671$0$0$0$0$0$0$0$0$0$0$0$0$5,926$6,104$6,287$6,476$6,670
100% Submission (Class 1 estimate)333325$7,626$22,878$8,770$26,310$22,878$22,878$22,878$23,564$23,564$24,271$24,271$24,999$24,999$25,749$25,749$6,776$6,979$7,188$7,404$7,626
Sub-Total:6555$33,816$26,207$38,889$30,170$30,170$30,170$34,830$31,075$35,875$32,007$36,951$32,967$38,060$33,956$0$0$0$0
IGE Project Size $500k to $1m (Ave. $800k)$0$0$0$0
35% Submission (Class 3 estimate)222215$4,269$8,538$4,909$9,818$8,538$8,538$8,538$8,794$8,794$9,058$9,058$9,330$9,330$9,610$9,610$3,793$3,907$4,024$4,145$4,269
65% Submission (Class 2 estimate)115$6,046$6,046$6,953$6,953$0$0$0$6,227$0$6,414$0$6,606$0$6,804$0$5,372$5,533$5,699$5,870$6,046
95% Submission (Class 1 estimate)220$7,291$14,582$8,385$16,770$0$0$0$15,019$0$15,470$0$15,934$0$16,412$0$6,479$6,673$6,873$7,079$7,291
100% Submission (Class 1 estimate)233325$8,250$16,500$9,488$18,976$24,750$24,750$24,750$16,995$25,493$17,505$26,258$18,030$27,046$18,571$27,857$7,330$7,550$7,777$8,010$8,250
Sub-Total:7555$45,666$29,735$52,517$33,288$33,288$33,288$47,035$34,287$48,447$35,316$49,900$36,376$51,397$37,467$0$0$0$0
IGE Project Size $1m to $2m (Ave. $1.5m)$0$0$0$0
35% Submission (Class 3 estimate)115$4,891$4,891$5,625$5,625$0$0$0$5,038$0$5,189$0$5,345$0$5,505$0$4,347$4,477$4,611$4,749$4,891
65% Submission (Class 2 estimate)115$6,670$6,670$7,671$7,671$0$0$0$6,870$0$7,076$0$7,288$0$7,507$0$5,926$6,104$6,287$6,476$6,670
95% Submission (Class 1 estimate)120$7,916$7,916$9,103$9,103$0$0$0$8,153$0$8,398$0$8,650$0$8,910$0$7,033$7,244$7,461$7,685$7,916
100% Submission (Class 1 estimate)425$8,872$35,488$10,203$40,812$0$0$0$36,553$0$37,650$0$38,780$0$39,943$0$7,883$8,119$8,363$8,614$8,872$22,233.603$7,411.20
Sub-Total:7$54,965$32,602$63,211$0$0$0$56,614$0$58,313$0$60,063$0$61,865$0$0$0$0$0$0.00
IGE Project Size $2m to $3.5m (Ave. $2.75m)$0$0$0$0$0.00
35% Submission (Class 3 estimate)115$5,515$5,515$6,342$6,342$0$0$0$5,680$0$5,850$0$6,026$0$6,207$0$4,900$5,047$5,198$5,354$5,515$0.00
65% Submission (Class 2 estimate)115$7,291$7,291$8,385$8,385$0$0$0$7,510$0$7,735$0$7,967$0$8,206$0$6,479$6,673$6,873$7,079$7,291$0.00
95% Submission (Class 1 estimate)120$8,538$8,538$9,819$9,819$0$0$0$8,794$0$9,058$0$9,330$0$9,610$0$7,586$7,814$8,048$8,289$8,538$0.00
100% Submission (Class 1 estimate)425$9,497$37,988$10,922$43,688$0$0$0$39,128$0$40,302$0$41,511$0$42,756$0$8,437$8,690$8,951$9,220$9,497$23,570.553$7,856.85
Sub-Total:7$59,332$35,468$68,234$0$0$0$61,112$0$62,945$0$64,834$0$66,779$0$0$0$0$0$0.00
IGE Project Size $3.5m to $10m (Ave. $7m)$0$0$0$0$0.00