Amendment A00004 75H701-23-R-00033 2023.06.09.pdf
PDF 3 MB Posted
- Solicitation number
- 75H701-23-R-00033
About this file
This solicitation notice seeks proposals for a construction project to replace two steam boilers and convert steam systems at the Whiteriver Indian Hospital in Whiteriver, Arizona. The project scope includes furnishing all labor, materials, equipment, permits, insurance and services to replace existing steam boilers with condensing boilers and convert supported steam systems. The period of performance is 180 calendar days from notice to proceed. The construction magnitude is estimated between $500,000 to $1,000,000. A site visit will be detailed in the solicitation. The Indian Health Service intends to award a single firm fixed price contract through a request for proposal evaluated with lowest price technically acceptable criteria. The solicitation documents will be available only through electronic download from the specified website.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A00004
N/A
KELLY J. BRITTON
PH21WR01H8, Boiler Replacement & Steam System Conversion
Amendment A00004 is to incorporate Pre-Proposal Inquiries 8-17, , replace clause 52.244-6, add clause 52.204-27, update list of attachments in Section J, add Attachment J01d - WR Pipe Insulation Limited Asbestos, replace Attachment J02 Attachment J02 - Wage Determination: General Decision Number AZ20230027.
SEE CONTINUATION PAGES
Indian Health Service Division of Engineering Services (DES) - Seattle 701 5th Ave, Suite 1600 Seattle, WA 98104
75H701-23-R-00033
PH21WR01H8
1 27
06/09/2023
05/03/2023
Amendment of Solicitation Amendment A00004 under Solicitation 75H701-23-R-00033 Project PH21WR01H8, Boiler Replacement & Steam System Conversion
SUMMARY OF CHANGES
1. The purpose of Amendment A00003 is to incorporate the following changes:
a. Pre-Proposal Inquiries #8-17, dated June 9, 2023, 5 pages.
b. Section I:
i. Update Section I.1 by removing FAR 52.244-6 Subcontracts For Commercial Products And Commercial Services (MAR 2023) and replacing it with the attached updated clause FAR 52.244-6 Subcontracts For Commercial Products And Commercial Services (Jun 2023).
ii. Section I, Clauses Incorporated In Full Text, add FAR Clause FAR 52.204-27 Prohibition On A Bytedance Covered Application (Jun 2023) in full text.
iii. Clause Incorporated in Full Text:
I.8. FAR 52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023)
(a) Definitions. As used in this clause— Covered application means the social networking service TikTok or any successor application or service developed or provided by ByteDance Limited or an entity owned by ByteDance Limited.
Information technology, as defined in 40 U.S.C. 11101(6)—
(1) Means any equipment or interconnected system or subsystem of equipment, used in the automatic acquisition, storage, analysis, evaluation, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information by the executive agency, if the equipment is used by the executive agency directly or is used by a contractor under a contract with the executive agency that requires the use—
(i) Of that equipment; or
(ii) Of that equipment to a significant extent in the performance of a service or the furnishing of a product;
(2) Includes computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources; but
(3) Does not include any equipment acquired by a Federal contractor incidental to a Federal contract.
(b) Prohibition. Section 102 of Division R of the Consolidated Appropriations Act, 2023 (Pub. L. 117- 328), the No TikTok on Government Devices Act, and its implementing guidance under Office of Management and Budget (OMB) Memorandum M-23-13, dated February 27, 2023, “No TikTok on Government Devices” Implementation Guidance, collectively prohibit the presence or use of a covered application on executive agency information technology, including certain equipment used by Federal contractors. The Contractor is prohibited from having or using a covered application on any information technology owned or managed by the Government, or on any information technology used or provided by the Contractor under this contract, including equipment provided by the Contractor’s employees;
however, this prohibition does not apply if the Contracting Officer provides written notification to the Contractor that an exception has been granted in accordance with OMB Memorandum M-23-13.
(c) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts, including subcontracts for the acquisition of commercial products or commercial services.
(End of clause)
Project PH21WR01H8, Boiler Replacement & Steam System Conversion
c. Section J:
i. Add Attachment J01d - WR Pipe Insulation Limited Asbestos, dated May 28, 2023, 13 pages.
ii. Replace Attachment J02 - Wage Determination: General Decision Number AZ20230027, Mod 1, dated February 3, 2023 with Attachment J02 - Wage Determination: General Decision Number AZ20230027, Mod 2, dated June 9, 2023.
d. Revise Section J – List of Attachments to read as follows:
SECTION J – LIST OF ATTACHMENTS
Attachment # and Document Title Date # of Pages
J01a - Specifications - Boiler Replacement 11/03/2022 491 J01b - Drawings - Boiler Replacement 11/03/2022 14 J01c - Site Maps N/A 2 J01d - WR Pipe Insulation Limited Asbestos 05/28/2023 13 J02 - Wage Determination: General Decision Number AZ20230027, Mod 2 06/09/2023 6 J03 - Self Performed Calculation Sheet N/A 4 J04 - 2023 Exemption Letter for a Qualifying Hospital 01/05/2023 4 J04a - Arizona Form 5000HC – Transaction Privilege Tax Healthcare
Exemption Certificate Nov 2020 2
J05 - Company Specialized Experience Form N/A 2 J06 - Past Performance Questionnaire N/A 5
2. All other terms and conditions of this solicitation remain unchanged.
END OF SUMMARY OF CHANGES
Project PH21WR01H8, WR Boiler Replacement
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H701-23-R-00033
PROJECT: WR Boiler Replacement LOCATION: Whiteriver, AZ
PROJECT NO: PH21WR01H8
DOCUMENT
OWNER: Kelly Britton PHONE: 602-364-5081 DOCUMENTS:
DATE: 6/9/2023 DEPARTMENT: IHS/PAO/DFE
Item No.
Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response
Amendment A00004 dated 06/09/2023
8.
This project includes providing a new fuel oil day tank. I am assuming that the initial fill will come from the bulk tank located outside and that we won’t need to provide the additional 100-gallons of fuel oil to fill the day tank. Is that correct?
Melton Correct. The fuel oil for the new fuel oil day tank will be provided from the existing bulk fuel oil tanks.
9. Ambulance Area
I just want to make sure that the drive located outside of the boiler room can be shut down for extended periods of time while we move equipment in and out?
Melton The ambulance bay drive located outside of the boiler room can be shut down during boiler change outs and will be coordinated during construction.
10. Ambulance Area
The Emergency Room traffic may be impacted for a period of 2 days for the removal and replacement of equipment. Please confirm this is acceptable
Melton Blocking of the ambulance traffic is required to change out the boilers. Ambulance will be re-routed during this timeframe.
11. Asbestos Has the hospital had any asbestos testing done on the insulation within the scope of work? And if so, was any identified?
Melton
A limited asbestos survey was recently performed and found no asbestos containing materials.
See attached Attachment J01d WR Pipe Insulation Limited Asbestos, dated May 28, 2023, 13 pages
12. Asbestos Will IHS be providing the asbestos abatement directly, or will it be under the contractors scope of work? Melton See Question #11 above.
13. Asbestos
There appears to be asbestos on the project that will need to be remediated for the work to be completed. Will this be handled by the hospital directly or should it be included in the bid?
Melton See Question #11 above.
Project PH21WR01H8, WR Boiler Replacement
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H701-23-R-00033
PROJECT: WR Boiler Replacement LOCATION: Whiteriver, AZ
PROJECT NO: PH21WR01H8
DOCUMENT
OWNER: Kelly Britton PHONE: 602-364-5081 DOCUMENTS:
DATE: 6/9/2023 DEPARTMENT: IHS/PAO/DFE
Item No.
Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response
14. Is there any equipment that the hospital will want to retain once it is removed from the space? Melton No equipment will be retained by IHS.
15.
There is an expansion tank directly above the doorway to the mechanical room. This tank will no longer be needed for the new system. Is this to be removed as well?
Melton/
AESUS
Yes, remove all items no longer piped/connected to the new system. As shown on construction document, a new Expansion Tank is provided.
16.
Only fuel is #2 oil. Condensing boilers require a minimum return temperature of 140°F when firing on oil. The schedule shows a return temp. of 120°F. Based on the 120°F return temp we cannot use the condensing boiler for the application if the only #2 fuel oil is available For gas/oil applications the return temp can be much lower when firing on gas, but when firing on oil the return would need to be 140°F. Would we require a mixing valve for the return water and temper the water for a condensing boiler to operate efficiently ?
Melton/ AESUS See Question #17 below.
Project PH21WR01H8, WR Boiler Replacement
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H701-23-R-00033
PROJECT: WR Boiler Replacement LOCATION: Whiteriver, AZ
PROJECT NO: PH21WR01H8
DOCUMENT
OWNER: Kelly Britton PHONE: 602-364-5081 DOCUMENTS:
DATE: 6/9/2023 DEPARTMENT: IHS/PAO/DFE
Item No.
Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response
17.
The following requires clarification/response from the project design engineer. There is a disparity between the boiler design requirements found on the equipment schedules, and how these specified boiler products can be safely operated according to current industry/code standards pertaining to boiler technology.
TECHNICAL BACKGROUND FOR THIS RFI
The boiler equipment schedules contained in the project plans indicate that the operating efficiency rating of the new boilers must be a minimum of 92% in order to meet the project requirements. This means the boiler must absolutely be a condensing type boiler, designed to operate with return water temperatures at or below 120F. The low return water temps cause the boiler exhaust gas temperature to drop significantly, reaching the dewpoint inside the combustion chamber and in the exhaust stack itself. This generates a significant amount of “condensate” which mixes with the byproducts of combustion yielding a highly acidic liquid that must be properly trapped, and neutralized before draining to a floor sink. As a current industry standard, ALL boilers designed and manufactured as CONDENSING boilers operate exclusively on either Natural Gas or Propane, or a dual fuel option of NG primary fuel source, with LPG secondary fuel source.
This is in conflict with the equipment schedules which indicate the new boilers must fire exclusively on #2 diesel oil. This is
AESUS
The AE expressed the same concerns with several of the boiler manufacturers during design. The list of manufacturers was narrowed down to Fulton and Riello, both of whom expressed that their boilers were designed with appropriate materials such that they could operate in condensing mode with ULS #2 fuel oil (as primary) at 92% efficiency with the 140/120-deg operating temperatures.
These manufacturers have also provided example projects (where ULS #2 fuel oil was primary) and recommendations on condensate disposal. The manufacturers also detailed the ongoing maintenance requirements where #2 fuel oil is primary.
As shown on the Construction Documents:
1. The boiler must operate at 92% efficiency with the operating temperatures indicated.
2. The manufacturer’s recommended acid neutralization kit must be provided.
3. Similar to what was detailed above, the chosen manufacturer must certify and warranty operation with ULS #2 fuel oil as primary. We also ask that they provide a list of example projects where this was performed.
Project PH21WR01H8, WR Boiler Replacement
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H701-23-R-00033
PROJECT: WR Boiler Replacement LOCATION: Whiteriver, AZ
PROJECT NO: PH21WR01H8
DOCUMENT
OWNER: Kelly Britton PHONE: 602-364-5081 DOCUMENTS:
DATE: 6/9/2023 DEPARTMENT: IHS/PAO/DFE
Item No.
Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response not possible with a condensing boiler that is designed to operate with 120F inlet water temperature, as the equipment schedules indicate. The reason being, is that the byproducts of combustion for #2 fuel oil when mixed with condensation in the flue gas creates a highly toxic substance known as sulfuric acid. There is currently no available means or methods in the industry for managing, collecting, or disposing of sulfuric acid to a floor sink or drain. It is not allowable by code, and is a highly dangerous substance. For this reason, all boiler manufacturers have standardized on Natural Gas and LPG gas options only for high efficiency boilers of this type.
There are a couple of boiler manufacturers that make a condensing boiler pressure vessel, and pair it with a burner that is capable of firing on #2 diesel oil. We do represent such a manufacturer. However the manufacturer’s OM documents warn the operator that the boiler setpoint temperature must be maintained at 180F while operating on #2 diesel oil, in order to eliminate the possibility of creating condensation inside the boiler. This reduces the boiler operating efficiency to approximately 80-85% (similar to any non-condensing boiler), and thereby would completely void the desired “Condensing Efficiency” of 92% or higher. In general, these types of boilers are intended for the #2 oil to be a backup/reserve fuel only so that the run time on the diesel oil would only be for emergency use. Under these circumstances, the primary operating fuel source would still need to be NG or LPG.
Project PH21WR01H8, WR Boiler Replacement
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H701-23-R-00033
PROJECT: WR Boiler Replacement LOCATION: Whiteriver, AZ
PROJECT NO: PH21WR01H8
DOCUMENT
OWNER: Kelly Britton PHONE: 602-364-5081 DOCUMENTS:
DATE: 6/9/2023 DEPARTMENT: IHS/PAO/DFE
Item No.
Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response
FORMAL RFI
Based on the above technical background information, please provide whether the priority for this boiler project is meeting the minimum efficiency standard of 92%, or if meeting the #2 fuel oil requirement takes precedence. If a 92% efficiency minimum is the priority, we formally request to be able to submit a bid for condensing boiler equipment that operates on LPG propane gas as the fuel source. This will allow the operator to safely run the boiler equipment as designed with 120F inlet temp and 140F outlet temp, while meeting the minimum efficiency standard.
If meeting the #2 fuel oil requirement takes precedence, and there is no other fuel option under consideration, then the boiler design requirement must certainly be modified to maintain an outlet temperature of 180F, and the minimum efficiency standard for the equipment must be reduced to non-condensing efficiencies of 80-85%.
Attachment J01d WR Pipe Insulation Limited Asbestos
6/9/23, 10:18 AM SAM.gov https://sam.gov/wage-determination/AZ20230027/2 1/6
"General Decision Number: AZ20230027 06/09/2023
Superseded General Decision Number: AZ20220027
State: Arizona
Construction Type: Building BUILDING CONSTRUCTION, Includes Building Construction on Treatment Plants and on Industrial Sites (Chemical/Processing/Manufacturing Plants, Power Plants, Refineries, Nuclear Plants, Etc.)
County: Navajo County in Arizona.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Attachment J02 WD AZ20230027 Mod 2 2023.06.09 https://sam.gov/wage-determination/AZ20230027/2 2/6
Modification Number Publication Date 0 01/06/2023 1 02/03/2023 2 06/09/2023
BRAZ0003-009 07/01/2022
Rates Fringes
BRICKLAYER.......................$ 31.53 6.05
ZONE PAY:
(Radius miles from the intersection of Central Ave. and Washington St., Phoenix, AZ)
Zone A: 0-60 miles- Base Rate Zone B: 61-75 miles- Base Rate plus $2.00 per hour Zone C: 75-100 miles- Base Rate plus $3.00 per hour Zone D: 101-200 miles- Base Rate plus $3.50 per hour Zone E: Over 200 miles- Base Rate plus $6.50 per hour
CARP0408-001 07/01/2022
Rates Fringes
CARPENTER........................$ 31.95 13.62
CARP1327-001 07/01/2019
Rates Fringes
CARPENTER (Drywall Hanging Only)............................$ 26.24 8.86
ELEC0518-011 02/01/2022
(South and East of boundary beginning at a point where clear Creek crosses the Coconino-Navajo County Line, extending North-easterly along Clear Creek and North-easterly to Cottonwood Wash, along Cottonwood Wash North-easterly to intersection with Navajo Reservation, East along Navajo Reservation Boundary line to intersection with Navajo/Apache County lines)
Rates Fringes
ELECTRICIAN (Includes Alarm Installation and Low Voltage Wiring)..........................$ 30.10 12.91
ELEC0640-010 01/01/2023
(Remaining Part)
Rates Fringes
ELECTRICIAN (Includes Alarm Installation and Low Voltage Wiring)..........................$ 33.10 13.58 https://sam.gov/wage-determination/AZ20230027/2 3/6
ENGI0428-003 06/01/2022
Rates Fringes
POWER EQUIPMENT OPERATOR
(CRANE)
(2) under 15 tons...........$ 33.41 12.57
(3) 15 tons to 100 tons, Tower Crane.................$ 34.49 12.57
(4) 100 tons and over.......$ 35.52 12.57
IRON0075-002 08/01/2022
Rates Fringes
IRONWORKER, REINFORCING AND
STRUCTURAL.......................$ 28.50 18.16
Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson Zone 2: 050 to 100 miles - Add $4.00 Zone 3: 100 to 150 miles - Add $5.00 Zone 4: 150 miles & over - Add $6.50
* LABO1184-010 06/01/2023
Rates Fringes
LABORER (MASON TENDER-BRICK).....$ 24.18 7.59
PAIN0086-006 06/30/2021
Rates Fringes
DRYWALL FINISHER/TAPER
ZONE A......................$ 23.55 7.49
ZONE B......................$ 27.05 7.49
ZONE PAY:
ZONE A: Free Zone: A distance of 0 to 100 miles from the old Phoenix courthouse.
ZONE B: A distance of 101 miles and over from the old Phoenix courthouse: $3.50 per hour over ZONE A
ROOF0135-002 07/01/2022
Rates Fringes
ROOFER (Includes Installation of Metal Roofs)..................$ 25.11 7.15
* SUAZ2012-016 05/30/2012
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 17.71 2.60
FLOOR LAYER: Hardwood and Resilient Flooring...............$ 17.98 6.50
GLAZIER..........................$ 15.98 ** 0.79
https://sam.gov/wage-determination/AZ20230027/2 4/6
LABORER: Common or General......$ 11.98 ** 3.13
LABORER: Landscape & Irrigation.......................$ 9.31 ** 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 16.05 ** 1.49
OPERATOR: Backhoe...............$ 14.00 ** 1.80
PAINTER: Brush, Roller and Spray............................$ 16.13 ** 0.00
PIPEFITTER.......................$ 22.21 6.12
PLUMBER..........................$ 19.63 2.83
SHEET METAL WORKER...............$ 18.68 4.91
SPRINKLER FITTER (Fire Sprinklers)......................$ 16.48 2.94
TILE SETTER......................$ 15.93 ** 0.45
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the https://sam.gov/wage-determination/AZ20230027/2 5/6 cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
https://sam.gov/wage-determination/AZ20230027/2 6/6
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISIO"
File details come from the government source that posted it. Updated .