RockHarbor_DockSketch_Updated.pdf

PDF 2 MB Posted

Attached to
Rock Harbor Dock Improvement Project
Solicitation number
6913G619R200040
Issued by

About this file

Rock Harbor Dock Sketch

View the file

Other files

File Type Posted
6913G619R200040,_0002.pdf PDF
6913G619R200040,_0001.pdf PDF
ISRO_Rock_Harbor_Drawing_sheets_1-6.pdf PDF
Rock_Harbor_Dock_Report_FINAL.pdf PDF
RockHarbor_Pictures_Comments.pptx PPTX presentation
6913G619R200040.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VISITOR CENTER

FUEL DOCK

REMOVE RAMP

CLEAN RIP RAP

REMOVE RAMP

REMOVE HANDRAILS

RELOCATE

NAVIGATION

MARKER

REMOVE OVERHEAD LIGHT REMOVE OVERHEAD LIGHT

REMOVE OVERHEAD LIGHT

REMOVE OVERHEAD

LIGHT

REMOVE BOLLARD

REMOVE CLEAT

REMOVE BOLLARDREMOVE BOLLARDREMOVE BOLLARD

REMOVE CLEAT

INSTALL STRUCTURE IN

LOWER BOAT ACCESS AREA

INSTALL STRUCTURE IN

LOWER BOAT ACCESS AREA

REMOVE SHORE POWER

CONNECTION

REMOVE TIMBER FACING, ICE PLATING,

AND HULL PROTECTION ALONG SOUTH SIDE OF DOCK

REMOVE HANDRAILS

REPLACE ICE PLATING

IF REQUIRED

REMOVE ICE PLATING

REMOVE HANDRAILS AND STAIRS IWO

LOWER BOAT ACCESS AREA

REMOVE HANDRAILS AND STAIRS IWO

LOWER BOAT ACCESS AREA

SMALL BOAT DOCK

SMALL BOAT DOCK

ROCK HARBOR DOCK REMOVALS

REMOVE DIESEL FUEL TRANSFER LINE

SEWAGE LIFT STATION

REMOVE CLEAT

REMOVE AND RETAIN

GASOLINE SPILL

CONTAINMENT

REMOVE AND RETAIN

DIESEL SPILL CONTAINMENT

GRIND

CONCRETE

CAP

GRIND

CONCRETE

CAP

GRIND

CONCRETE

CAP

GRIND

CONCRETE

CAP

GRIND

CONCRETE

CAP

REMOVE CLEAT

VISITOR CENTER

FUEL DOCK

INSTALL NEW TIMBER FACING, ICE PLATING,

AND HULL PROTECTION ALONG SOUTH SIDE OF DOCK

NEW RAMP TO BOAT DOCK

NEW RAMP TO BOAT DOCK

NEW PASSENGER PLATFORM

TO VISITOR CENTER

NEW HANDRAILS

NEW LOW PROFILE LIGHTING

POSSIBLE LOCATION

NEW LOW PROFILE LIGHTING

POSSIBLE LOCATION

NEW LOW PROFILE LIGHTING

POSSIBLE LOCATION

NEW LOW PROFILE LIGHTING

POSSIBLE LOCATION

INSTALL NEW BOLLARD

INSTALL NEW CLEAT

INSTALL NEW BOLLARD

INSTALL NEW BOLLARD

INSTALL NEW BOLLARD

INSTALL NEW CLEAT

NEW LOWER BOAT

ACCESS AREA

NEW LOWER BOAT

ACCESS AREA

NEW SHORE POWER CONNECTION

NEW DOCK CRIB STRUCTURES

NAVIGATION

MARKER

NEW REMOVABLE HANDRAILS FOR

PEDESTRIAN WALKING PATH

NEW REMOVABLE

HANDRAILS AND STAIRS IWO

LOWER BOAT ACCESS AREA

NEW REMOVABLE

HANDRAILS AND STAIRS IWO

LOWER BOAT ACCESS AREA

NEW SELF-CLOSING GATE

NEW SELF-CLOSING GATE

INSTALL ICE

PLATING IF

REQUIRED

INSTALL ICE PLATING

NEW SEWAGE PUMP-OUT STATION (OPTION)

15'

210'

~30'

ROCK HARBOR DOCK INSTALLS

SMALL BOAT DOCK

SMALL BOAT DOCK

PASSENGER WALKWAY

CARGO OPERATIONS AREA

15'-8"17'-6"18'-2"

21'-0"

21'-6"

20'-6"

LAKE SUPERIOR

SOUNDINGS BASED ON WATER

ELEVATION OF 602.69' ON 9/6/2016

NEW DOUBLE-WALL

DIESEL FUEL TRANSFER

LINE EMBEDDED

IN CONCRETE

NEW WHEELCHAIR

ACCESSIBLE RAMP

IN THIS AREA

SEWAGE LIFT STATION

POUR

CONCRETE

CAP

POUR

CONCRETE

CAP

POUR

CONCRETE

CAP

POUR

CONCRETE

CAP

POUR

CONCRETE

CAP

INSTALL NEW CLEATINSTALL NEW CLEAT

REINSTALL

GASOLINE SPILL

CONTAINMENT

REINSTALL DIESEL

SPILL CONTAINMENT

DockSketch-Layout1
Sheets and Views
Layout1
DockSketch-Layout1-2
Sheets and Views
Layout1-2

File details come from the government source that posted it.