On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rock Harbor Ferry Dock Inspection Report Isle Royale, Michigan
Submitted to:
Mr. Bob Pray Marine Services Corp.
70 Fargo Street Boston, Massachusetts 02210
Submitted by:
GEI Consultants of Michigan, P.C.
109 W. Baraga Street Marquette, Michigan 49855
September 23, 2016
GEI Project No. 1610430
George M. Meister, P.E.
Senior Project Engineer
Michael D. Carpenter, P.E.
Senior Project Engineer
Project #1610430 September 23, 2016
Table of Contents
1. Introduction
1.1 Background
1.2 Project Description
1.3 Purpose
2. Field Inspections
2.1 Substructure Inspection
2.2 Level I – Visual & Tactile Inspection
2.3 Level II – Up-Close & Detailed Inspection
2.4 Superstructure Inspection
2.5 Lake Bottom
3. Inspection Findings
3.1 Below Water
3.2 Above Water
3.3 Lake Bottom
Figures
Figure 1: Typical Crib Structure (in text) Figure 2: Plan and Elevation of Dock Figure 3: Map of Notable Areas Figure 4: Rock Harbor Dock Soundings
Appendices
Appendix A: Photo Log
GMM:aby:mdc W:\Marine Systems Corp (MSC)\1610430_Isle_Royale_Rock_Harbor_Inspection\Engineering\Rock Harbor Dock Report_FINAL.docx
GEI Consultants of Michigan, P.C. i
Project #1610430 September 23, 2016
1. Introduction
1.1 Background
The Rock Harbor Ferry Dock on Isle Royale provides access to National Park Service (NPS) employees and visitors via ferry and seaplane. The dock is 210 feet long by 31 feet wide and can become congested from visitors and cargo loading and offloading. The largest ship currently using the dock is the Ranger III operated by the NPS out of Houghton, Michigan. The draft of the Ranger III brings the hull of the ship to, or near, the lake bottom at the dock. Dredging has been performed in the past to accommodate the draft of the Ranger III. Widening of the dock has been proposed to provide the following benefits:
1. Additional dock platform space would relieve congestion around the ferry’s cargo operations area and improve safety of departing and/or boarding passengers.
2. The dock platform would be extended toward the deeper water.
1.2 Project Description
The Rock Harbor ferry dock consists of a five stone-filled timber crib structures with a concrete cap with approximate plan dimensions of 30 feet by 40 feet. The crib structures are framed with 12-inch by 12-inch, 8-foot by 12-foot timbers and 2-inch by 12-inch timber sheathing. The base and top of the crib structures have multiple rows of longitudinal 12-inch by 12-inch timbers stacked atop each other. The framing between the base and top alternates from longitudinal to transverse pieces and are secured by 7/8-inch diameter bolts with washers.
There is a 30-inch tall by ¼-inch thick steel plate at the water line on the east, west and south sides secured to the dock with lag bolts. The plate is presumably in place for ice protection.
The crib structures are capped by an 8-inch concrete cap bordered by 8-inch by 8-inch timbers. A sketch of the typically observed construction of one of the crib structures is included in Figure 1 above. The bottom of the south side of the dock appears to have had approximately two feet deep of 4-inch to 12-inch stone placed for scour protection. The north side of the dock has an additional walkway supported by metal
Figure 1 – Typical Crib Structure
GEI Consultants of Michigan, P.C. 1
Project #1610430 September 23, 2016 brackets just above the water line for access to small boats. A rendering of typical crib structure is shown in Figure 2.
1.3 Purpose
Widening of the dock has been proposed in order to reduce the congestion in the cargo operations area and increase the safety of the ferry passengers. GEI Consultants of Michigan, P.C. (GEI) has been retained to evaluate the current condition of the dock and provide depth soundings near the dock. The purposes of this assessment were to:
• Conduct a visual inspection of the wood cribbing, concrete deck and steel elements of the dock and lake bottom;
• Document the findings using photographs and video;
• Measure the current water depths 15 feet from the dock.
Photo 1 - Ranger III at dock in Rock Harbor
GEI Consultants of Michigan, P.C. 2
Project #1610430 September 23, 2016
2. Field Inspections GEI mobilized to the Rock Harbor ferry dock on Isle Royale via the Ranger III on Tuesday September 6, 2016. The three person professional engineer/diver team departed the ship along with a 16-foot aluminum boat at Mott Island and then proceeded to the Rock Harbor Dock. George M. Meister, P.E. conducted the substructure inspection with assistance from Alan Pepin, P.E. Michael D. Carpenter, P.E. conducted the inspection above the water surface. Photo and video documentation was conducted on the entire dock. A photo log and a CD containing the video from the inspection are included in Appendix A. The inspection approach for both the underwater and superstructure portions of the dock are summarized in the following sections.
2.1 Substructure Inspection
The dive inspection completed by GEI included checking accessible portions of the dock for misalignment and loss of section, as well as for evidence of decay or weathering. The dive inspection was documented on a sketch of the structure during the inspection, and through the use of underwater photography and video recordings. A description of each type of dive is included in the following sections.
2.2 Level I – Visual & Tactile Inspection
Longitudinally there are 5 crib structures along the dock. Divers accessed the crib structures on both sides of the dock. A portion of the crib structures are inaccessible due to the connection to the section of the dock that runs perpendicular to shore. This provided an appropriate and representative sample of the submerged portions of the dock.
2.3 Level II – Up-Close & Detailed Inspection
Accessible crib structures were inspected and measured by cleaning marine growth and utilizing picks or awls to determine the soundness of the timber. The timber framing elements and sheathing were inspected throughout the dock. In addition, the divers assessed the condition of the bolts that connect the elements of timber cribbing.
A visual and tactile inspection was completed on the substructure of the dock beginning at the east side progressing westerly along the south side and then back along the north side to the connection with the section of the dock perpendicular to shore. The dock section that is perpendicular to the shore was not included in the scope of this inspection. The inspection included up close visual inspection of the entire dock along with timber soundness testing by knife or hammer on selected areas of the dock. Selected bolts were cleaned of corrosion and marine growth to assess condition and level of corrosion.
Photo 2 - Dive inspector testing soundness of crib timber
GEI Consultants of Michigan, P.C. 3
Project #1610430 September 23, 2016
2.4 Superstructure Inspection
The superstructure of the crib structures and concrete cap were visually inspected. The timbers were checked for soundness. Bolts and metal connections were visually inspected for corrosion. The concrete cap was visually inspected for signs of wear and deterioration such as cracking, spalling, and delamination.
2.5 Lake Bottom
The lake bottom was assessed for types of material and depth. Signs of scour were also assessed. Soundings were taken by line and weight generally at 15 and 35 foot distances from the dock. A contour map based off of the soundings is included in Figure 4.
According to the National Oceanic and Atmospheric Administration (NOAA), the water surface elevation of Lake Superior was 602.69 feet during the inspection.
GEI Consultants of Michigan, P.C. 4
GEI Consultants of Michigan, P.C. 5
Isle Royale, Michigan Project #1610430 September 23, 2016
3. Inspection Findings
Overall, the dock was in good condition and is serviceable; however, specific elements are noted in the sections below.
3.1 Below Water
The timbers were found to be sound with degradation at the ice interface area of the dock. The top of the metal plates were at the current water line, and were loosening. Some bolts were able to be removed by hand or were missing, or have worked their way loose and fallen to the lake bottom. Notable timber degradation was observed immediately below the 1/4-inch thick steel plates, which were presumably installed to protect the timbers from ice damage as shown in Photo 3. Timbers were otherwise sound and did not show signs of rot. The 7/8-inch bolts securing the crib structures together appeared to be in good shape with minimal section loss due to corrosion. The sheathing within the crib structures was in good condition.
3.2 Above Water
The concrete cap shown in Photo 4 was in good condition with only minor spalling and cracking visible. The cement had been worn from much of the surface exposing the aggregate on the cap (less than 1 inch) and steel reinforcement was not visible.
The timber was in good condition and sound with minimal degradation or rot.
3.3 Lake Bottom
The lake bottom consists of a fine to medium sand with some cobbles. Stone scour protection from the dock has shifted away from the dock along the bottom. Some areas of the cribs were undermined approximately three feet under the dock and suspended approximately 8 to 18 inches; particularly the west end of the dock near the corners. Photo 5 shows typical undermining and differential elevations of crib joints. Bow thrusters from ferries using the dock appear to have shifted
Photo 5 - Crib joint misalignment and undermining of dock
Photo 3 - Timber degradation due to ice action
Photo 4 –Surface of dock
Project #1610430 September 23, 2016
GEI Consultants of Michigan, P.C. 6 some of the scour protection stone from the crib foundation leaving shallow depressions in the lake bottom where the ferries repeatedly activate the thrusters at the dock. Potentially, some of the stone material from within the cribs could have been lost due to the undermining shown in Photo 6; however, no voids were observed within the crib structures and inspectors were unable to determine if the stone fill within the cribs is contained by a base or grillage at the bottom of the crib structures. Referring to the cribs by number from west to east according to Figure 2, the crib structure joints between cribs 1 and 2 as well as 2 and 3 have experienced differential settlement of approximately 2 to 3 inches
Photo 6 - Typical scour protection along dock
Figures Figure 2: Plan and Elevation of Dock Figure 3: Section View Figure 4: Bathymetric Map of Soundings
GEI Consultants of Michigan, P.C.
3/16" = 1'-0"2 ELEVATION 2
3/16" = 1'-0"1 ELEVATION 1
ROCK HARBOR DOCK INSPECTION
MARINE SYSTEMS CORP.
BOSTON, MAW
:\M ar in e
Sy s t em s
C o r p (M
SC
) \1
_I sl e_
R oy al e_
R oc k _ H ar bo r_ In sp ec tio n\
C
AD
\R oc k H ar b o r.r vt
FIGURE 2
TYPICAL CRIB PLAN AND
ELEVATIONS
GEI NO. 1610430
NOTE:
SKETCHES PRESENTED IN THIS REPORT REPRESENT CONSTRUCTION
TYPICAL OF THE CRIB STRUCTURES LOCATED WITHIN THE ROCK
HARBOR DOCK. INTERNAL GEOMETRY OF THE STRUCTURE IS
ASSUMED BASED ON OBSERVATIONS MADE DURING THE INSPECTION.
LOWER
DOCK
LEVEL
ACCESS
DOCK
RAMP
RIPRAP SLOPE
WATERLINE DOCK
STRUCTURAL SLAB
SUPPORTED BY PIERS
CJ
CRIB 1
CRIB 2
CRIB 3 CRIB 4 CRIB 5
±42' TYP.
±3 1'
T Y
P
5 5
121212
---- W:\Marine Systems Corp (MSC)\1610430_Isle_Royale_Rock_Harbor_Inspection\CAD\Rock Harbor Dock Site Visit_CAS.dwg - 9/14/2016
Fig. 3
Rock Harbor Dock Inspection Rock Harbor, MI Isle Royale, MI
Marine Systems Corp Boston, MA
ROCK HARBOR DOCK
MAP OF NOTABLE AREAS
Sept. 2016Project 1610430
Consultants
LEGEND:
CLEAT
BOLLARD
DRAIN
SCALE:
20 40
1" = 20'
NOTES:
1. DETERIORATION AT CORNER ON WOOD AT PLASTIC
2. STEEL PLATE AT WATERLINE ~30" WIDE AND ~1/4" THICK WITH LAG BOLTS (MANY LOOSE OR MISSING)
3. SCOUR PROTECTION STONE. APPROXIMATELY 1' TO 3' THICK AND 10' TO 15' WIDE.
4. CONSTRUCTION JOINTS ON SURFACE ARE ASSOCIATED WITH SEPARATE CRIBS
5. SMALL BOAT ACCESS LEVEL
6. EAST SIDE IS LOWER ~2" THAN WEST SIDE
7. SAME AS #6
8. UNDERMINING WEST SIDE OF JOINT (ROCK LOSS)
9. STEEL PLATE COMPLETELY LOOSE AND NEARLY FALLING OFF
10. DOCK SUSPENDED DUE TO UNDERMINING OF MATERIAL FROM DOCK
11. BOTTOM OF CRIBBING SUSPENDED FROM BOTTOM DUE TO UNDERMINING UNTIL EAST END OF SECTION
12. CONCRETE CAP, 7"-8"
13. 2ND TIMBER BELOW WATER LINE IS DETERIORATED
14. LOTS OF DEBRIS IN CORNER WHERE RIPRAP SLOPE IS LOCATED
LAKE SUPERIOR
WATER ELEVATION 602.69' ON 9/6/2016
CONTOURS BASED ON SOUNDINGS SHOWN
ROCK HARBOR DOCK
TOP OF DOCK = ±607.5'
SOUNDING LOCATION AND DEPTH
---- W:\Marine Systems Corp (MSC)\1610430_Isle_Royale_Rock_Harbor_Inspection\CAD\1610430 Lake Bottom Soundings.dwg - 9/14/2016
Fig. #4
ROCK HARBOR DOCK INSPECTION
ROCK HARBOR DOCK
ISLE ROYALE, MICHIGAN
MARINE SERVICES CORP.
BOSTON, MASSACHUSETTS
ROCK HARBOR DOCK
SOUNDINGS
SEPTEMBER 2016Project 1610430
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
SOURCE:
1. PLAN BASED ON SOUNDINGS PERFORMED ON SEPTEMBER
6, 2016 AND NOAA WATER ELEVATION OF 602.69'
DRAFT
SCALE:
20 40
1" = 20'
Appendices Appendix A: Photo Log
GEI Consultants of Michigan, P.C.
Isle Royale Rock Harbor Inspection Photos Date: September 2016 GEI Project No.: 1610430 Client: Marine System Corp (MSC) i | P a g e
Photo No. 1 – Ranger III at the Dock _______________________________________________________________ 1
Photo No. 2 – Crib Section 2 Cap __________________________________________________________________ 1
Photo No. 3 – Crib Section 2 Cap __________________________________________________________________ 2
Photo No. 4 – Crib Section 3 Cap __________________________________________________________________ 2
Photo No. 5 – Crib Section 4 Cap __________________________________________________________________ 3
Photo No. 6 – Crib Section 5 Cap __________________________________________________________________ 3
Photo No. 7 – Dock Cap Crib 4 ____________________________________________________________________ 4
Photo No. 8 – 7” to 8” Concrete Cap on North Side of Dock _____________________________________________ 4
Photo No. 9 – Crib Joint Above Water Between Cribs 4 and 5 ___________________________________________ 5
Photo No. 10 – Crib Joint Above Water Between Cribs 1 and 2 __________________________________________ 5
Photo No. 11 – Differential Settlement and Undermining of Crib 2 and 3 Joint ______________________________ 6
Photo No. 12 – Differential Settlement of Crib 1 and 2 Joint ____________________________________________ 6
Photo No. 13 – Northwest Corner of Dock Looking Northeast ___________________________________________ 7
Photo No. 14 – North Face of Dock at Intersection with Riprap Slope of the Access Dock to Shore ______________ 7
Photo No. 15 – North Face of Dock; Note Walkway for Smaller Boats _____________________________________ 8
Photo No. 16 – Framing Beneath Walkway on North Side of Dock _______________________________________ 8
Photo No. 17 – Debris at North Face of Dock at the Intersection with the Dock Heading to Shore _______________ 9
Photo No. 18 – Typical 7/8” Bolt in Crib Structure ____________________________________________________ 9
Photo No. 19 – Typical Bolt Head Under Water _____________________________________________________ 10
Photo No. 20 – Typical Bolt Head Above Water _____________________________________________________ 10
Photo No. 21 – Crib Section 1 Cap ________________________________________________________________ 11
Photo No. 22 – Diver Testing Soundness of Timber with Blunt Tipped Dive Knife ___________________________ 11
Photo No. 23 – Diver Performing Close Up Inspection ________________________________________________ 12
Photo No. 24 – 8” x 8” Timber End _______________________________________________________________ 12
Photo No. 25 – 2” x 12” Sheathing _______________________________________________________________ 13
Photo No. 26 – Timber Degradation Below Water Line at Southeast Corner Due to Ice ______________________ 13
Photo No. 27 – Typical Degradation Below Metal Sheet ______________________________________________ 14
Photo No. 28 – East Face of Dock ________________________________________________________________ 14
Photo No. 29 – East End of Dock _________________________________________________________________ 15
Photo No. 30 – East End of Dock; Degradation at Ice Line _____________________________________________ 15
Photo No. 31 – East Side Dock Sheathing __________________________________________________________ 16
Photo No. 32 – Undermining of Dock at Southeast Corner _____________________________________________ 16
Photo No. 33 – Southeast Corner of Dock Showing Deterioration of Timbers Above Water Line _______________ 17
Photo No. 34 – South Face of Dock _______________________________________________________________ 17
Photo No. 35 – South Face of Dock _______________________________________________________________ 18
Photo No. 36 – South Face of Dock Base, Southeast Corner Looking West; Note Slight Undermining ___________ 18
Photo No. 37 – South Face of Dock, Southeast Corner Looking West _____________________________________ 19
Photo No. 38 – South Side Base of the Dock; Note Slight Undermining and Scour Protection __________________ 19
Photo No. 39 – South Side of Dock; Note Scour Protection Sloping Away From Dock ________________________ 20
Photo No. 40 – Undermining on South Side of Dock __________________________________________________ 20
Photo No. 41 – South Side of Dock, Southwest End Looking East ________________________________________ 21
Photo No. 42 – South Wall ______________________________________________________________________ 21
Photo No. 43 – Undermining of the Crib 1 at the South Side of the Dock __________________________________ 22
Photo No. 44 – South Face of Crib 1 ______________________________________________________________ 22
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430 ii | P a g e
Photo No. 45 – Undermining of Crib 1 _____________________________________________________________ 23
Photo No. 46 – Undermining of Southwest Corner of Dock Looking Southeast _____________________________ 23
Photo No. 47 – Undermining of Southwest Corner of Dock Looking Northwest _____________________________ 24
Photo No. 48 – Metal Plates at the Southwest Corner; Note Sheet Pulling Away from Dock __________________ 24
Photo No. 49 – Undermining of Northwest Corner of Dock Looking Northeast _____________________________ 25
Photo No. 50 – West Face of Riprap Slop of Access Dock to Shore _______________________________________ 25
Photo No. 51 – West Face of Dock ________________________________________________________________ 26
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
1 | P a g e
Photo No. 1 – Ranger III at the Dock
Photo No. 2 – Crib Section 2 Cap
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
2 | P a g e
Photo No. 3 – Crib Section 2 Cap
Photo No. 4 – Crib Section 3 Cap
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
3 | P a g e
Photo No. 5 – Crib Section 4 Cap
Photo No. 6 – Crib Section 5 Cap
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
4 | P a g e
Photo No. 7 – Dock Cap Crib 4
Photo No. 8 – 7” to 8” Concrete Cap on North Side of Dock
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
5 | P a g e
Photo No. 9 – Crib Joint Above Water Between Cribs 4 and 5
Photo No. 10 – Crib Joint Above Water Between Cribs 1 and 2
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
6 | P a g e
Photo No. 11 – Differential Settlement and Undermining of Crib 2 and 3 Joint
Photo No. 12 – Differential Settlement of Crib 1 and 2 Joint
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
7 | P a g e
Photo No. 13 – Northwest Corner of Dock Looking Northeast
Photo No. 14 – North Face of Dock at Intersection with Riprap Slope of the Access Dock to Shore
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
8 | P a g e
Photo No. 15 – North Face of Dock; Note Walkway for Smaller Boats
Photo No. 16 – Framing Beneath Walkway on North Side of Dock
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
9 | P a g e
Photo No. 17 – Debris at North Face of Dock at the Intersection with the Dock Heading to Shore
Photo No. 18 – Typical 7/8” Bolt in Crib Structure
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
10 | P a g e
Photo No. 19 – Typical Bolt Head Under Water
Photo No. 20 – Typical Bolt Head Above Water
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
11 | P a g e
Photo No. 21 – Crib Section 1 Cap
Photo No. 22 – Diver Testing Soundness of Timber with Blunt Tipped Dive Knife
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
12 | P a g e
Photo No. 23 – Diver Performing Close Up Inspection
Photo No. 24 – 8” x 8” Timber End
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
13 | P a g e
Photo No. 25 – 2” x 12” Sheathing
Photo No. 26 – Timber Degradation Below Water Line at Southeast Corner Due to Ice
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
14 | P a g e
Photo No. 27 – Typical Degradation Below Metal Sheet
Photo No. 28 – East Face of Dock
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
15 | P a g e
Photo No. 29 – East End of Dock
Photo No. 30 – East End of Dock; Degradation at Ice Line
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
16 | P a g e
Photo No. 31 – East Side Dock Sheathing
Photo No. 32 – Undermining of Dock at Southeast Corner
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
17 | P a g e
Photo No. 33 – Southeast Corner of Dock Showing Deterioration of Timbers Above Water Line
Photo No. 34 – South Face of Dock
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
18 | P a g e
Photo No. 35 – South Face of Dock
Photo No. 36 – South Face of Dock Base, Southeast Corner Looking West; Note Slight Undermining
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
19 | P a g e
Photo No. 37 – South Face of Dock, Southeast Corner Looking West
Photo No. 38 – South Side Base of the Dock; Note Slight Undermining and Scour Protection
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
20 | P a g e
Photo No. 39 – South Side of Dock; Note Scour Protection Sloping Away From Dock
Photo No. 40 – Undermining on South Side of Dock
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
21 | P a g e
Photo No. 41 – South Side of Dock, Southwest End Looking East
Photo No. 42 – South Wall
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
22 | P a g e
Photo No. 43 – Undermining of the Crib 1 at the South Side of the Dock
Photo No. 44 – South Face of Crib 1
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
23 | P a g e
Photo No. 45 – Undermining of Crib 1
Photo No. 46 – Undermining of Southwest Corner of Dock Looking Southeast
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
24 | P a g e
Photo No. 47 – Undermining of Southwest Corner of Dock Looking Northwest
Photo No. 48 – Metal Plates at the Southwest Corner; Note Sheet Pulling Away from Dock
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
25 | P a g e
Photo No. 49 – Undermining of Northwest Corner of Dock Looking Northeast
Photo No. 50 – West Face of Riprap Slop of Access Dock to Shore
Isle Royale Rock Harbor Inspection Photos
GEI Project No.: 1610430
26 | P a g e
Photo No. 51 – West Face of Dock
| Rock Harbor Ferry Dock Inspection Report |
| Table of Contents |
| 1. Introduction |
| 1.1 Background |
| 1.2 Project Description |
| 1.3 Purpose |
| 2. Field Inspections |
| 2.1 Substructure Inspection |
| 2.2 Level I – Visual & Tactile Inspection |
| 2.3 Level II – Up-Close & Detailed Inspection |
| 2.4 Superstructure Inspection |
| 2.5 Lake Bottom |
| 3. Inspection Findings |
| 3.1 Below Water |
| 3.2 Above Water |
| 3.3 Lake Bottom |
| Figures |
| Figure 2: Plan and Elevation of Dock |
| Figure 3: Section View |
| Figure 4: Bathymetric Map of Soundings |
Appendix A - Photo Log
File details come from the government source that posted it.