- Rock Harbor Dock Improvement Project
- Solicitation number
- 6913G619R200040
About this file
Amendment 0002, Contracting Officer change and SOW update.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6913G619R200040,_0001.pdf | ||
| ISRO_Rock_Harbor_Drawing_sheets_1-6.pdf | ||
| RockHarbor_DockSketch_Updated.pdf | ||
| Rock_Harbor_Dock_Report_FINAL.pdf | ||
| RockHarbor_Pictures_Comments.pptx | PPTX presentation | |
| 6913G619R200040.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
6913G619R200040 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
6913G6
Cambridge MA 02142-1001 55 Broadway
VOLPE NAT'L TRANSPORTATION SYS CNTR
06/17/20190002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/17/2019
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Please see continuation sheet for changes.
IT Related Pur: NO
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
6913G619R200040
1. Paragraph 1.2 has changed :
From:
1.2. Design Drawings and Construction Specifications
The Contractor shall develop draft design drawings and construction specifications for the installation and upgrades of the Rock Harbor dock as specified above and submit to the Government for review.
The Government will conduct 30%, 60%, and 90% design reviews of the drawings and construction specifications. Government review comments will be provided with-in 10 days of receipt of deliverables. After delivery of Government (100% review) comments, final design drawings shall be stamped by a Professional Engineer (PE) registered in the State of Michigan, these are due 15 days after receipt of comments.
To:
1.2. Design Drawings and Construction Specifications
The Contractor shall develop draft design drawings and construction specifications for the installation and upgrades of the Rock Harbor dock as specified above and submit to the Government for review.
The Government will conduct 30%, 60%, and 90% design reviews of the drawings and construction specifications. Government review comments will be provided with-in 10 days of receipt of deliverables. After delivery of Government (100% review) comments, final design drawings shall be stamped, these are due 15 days after receipt of comments.
2. ADDENDA TO 52.212-1 INSTRUCTIONS TO OFFERORS has changed.
From:
ADDENDA TO 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (OCT
2018)
PROPOSAL SUBMISSION
Proposals must be submitted electronically in Adobe PDF format to the Contracting Officer Michael Griffin at michael.griffin@dot.gov by July 23, 2019 at 3:00 PM EST.
To:
ADDENDA TO 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (OCT
2018)
PROPOSAL SUBMISSION
Proposals must be submitted electronically in Adobe PDF format to the Contracting Officer Rachel Faiteau at Rachelle.Dorleans@dot.gov by July 23, 2019 at 3:00 PM EST.
No further changes have been made. All other terms and conditions remain.
mailto:michael.griffin@dot.gov mailto:Rachelle.Dorleans@dot.gov
| ADP54F7.tmp |
| 1. Paragraph 1.2 has changed : |
| To: |
| 2. ADDENDA TO 52.212-1 INSTRUCTIONS TO OFFERORS has changed. |
| From: |
| ADDENDA TO 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (OCT 2018) |
| PROPOSAL SUBMISSION |
| Proposals must be submitted electronically in Adobe PDF format to the Contracting Officer Michael Griffin at 30TUmichael.griffin@dot.govU30T by July 23, 2019 at 3:00 PM EST. |
| To: |
| ADDENDA TO 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (OCT 2018) |
| PROPOSAL SUBMISSION |
| Proposals must be submitted electronically in Adobe PDF format to the Contracting Officer Rachel Faiteau at 30TRachelle.Dorleans@dot.gov30T by July 23, 2019 at 3:00 PM EST. |
| No further changes have been made. All other terms and conditions remain. |