AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A002 07/01/2019 N/A CA NPS BP 2017(1),

Bridge Preservation Yosemite

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X 69056718B000030

9B. DATED (SEE ITEM 11)

06/11/2019

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

CA NPS BP 2017(1), Bridge Preservation Yosemite Amendment A002 is issued to revise the following:

SPECIAL CONTRACT REQUIREMENTS

Page E-22, Subsection 108.01, Commencement, Prosecution, and Completion of Work. Adds allowable work during Winter Shutdown

ENCLOSURES: Page E-22

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

E-22 DIVISION 100

Special Contract Requirements Project: CA NPS BP 2017(1), Bridge Preservation Yosemite

Section 108. — PROSECUTION AND PROGRESS

12/17/18– FP-14

108.01 Commencement, Prosecution, and Completion of Work. Add the following:

Furnish at least a 48-hour advanced notice before changing the current work schedule. Work schedule changes that include additional shifts require a 14-day advanced notice.

Perform work under this contract according to the following:

(a) Limit work as provided for in Sections 105, 107, and 157.

(b) Limit work as provided for in Subsection 156.07.

(c) Do not perform construction operations between 12 noon Friday and 6:00 a.m. the following Tuesday of the Labor Day weekend.

(d) Notify the CO at least two weeks prior to any excavation to allow Yosemite National Park resource staff to complete preconstruction activities such as performing Native American and cultural site clearances, as well as monitoring the site during construction. This advance notification is necessary prior to each individual excavation exercise within this area until the entire area is cleared by the Park staff.

(e) Notify the CO at least two weeks prior to any clearing and grubbing to allow the Yosemite National Park plant resource staff to complete removing and transplanting of all rare plants.

This advance notification is necessary prior to each clearing and grubbing exercise within this area until the entire area is cleared by the Park staff.

(f) Complete all work for Pohono and Happy Isles Bridges by October 30, 2019.

(g) Do not perform work, except as indicated in (1) through (5) below, November 12, 2019 through March 16, 2020, both dates inclusive for Winter Shutdown. The following work is allowed during the Winter Shutdown:

(1) Mobilization to and from the project;

(2) Survey and staking;

(3) Production of material at Contractor-located sources;

(4) Installation of temporary traffic control; and

(5) Inspection and maintenance of erosion control devices.

(6) System Installation, Scour Monitoring System.

108.01A Labor. (Added Subsection).

Follow the requirements of FAR Clause 52.222-6 Construction Wage Rate Requirements.

Revised by Amendment A002