STRUCTURE SUMMARY STRUCTURE NO. 8800-002P

EL CAPITAN BRIDGE INSPECTION DATE: 7/12/18

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... STEEL NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... STRINGER/MULTI-BEAM or GIRDER NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 5 STRUCT. TOTAL LENGTH: .. 125.0 FT (38.1 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 45.0 FT (13.7 M)

WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 43.0 FT (13.1 M)

ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 27.0 FT (8.2 M)

PIER FOUNDATION(S): ........ SPREAD FOOTING ON PILES YEAR BUILT:

ABUTMENT / PIER MAT'L: ... MASONRY YEAR RECONSTRUCTED: .. N/A

PROJ./PLAN REF. NO: ......... 1B2 / RG367 SKEW ANGLE: ..................... 0 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 2009 - NEW ASPHALT OVERLAY. 2015 - ADDITIONAL SCOUR ANALYSIS PERFORMED.

LOCATION

YOSEMITE NATIONAL PARK MILE POINT: ..................... 0.28 (KM PT 0.45)

STATE: ................................. CALIFORNIA LOCATION: 10.3 miles east from El Portal boundary line on CA Route 140 (El Portal Road). Turn left (north),FACILITY CARRIED: ............ EL CAPITAN CROSSOVER then 1/4 mile toward El Capitan to bridge.

FEATURE INTERSECTED: .. MERCED RIVER

STRUCTURE EVALUATION SUMMARY

This steel multi-beam bridge is in fair structural condition, but has problems with scour and undermining, the extent of which is outlined below. Severe decay of the south timber fascia in the east span has caused the timber sidewalk above to be temporarily closed until repairs are complete. Other deficiencies include decay of the remaining fascia timber; deterioration of the mortar joints in the abutment breastwalls, bearing seats, and pier walls; and several locations of collision damage to the steel railing. Additional defects noted were missing rail sleeves; loose bolts at the rail posts; minor curb spalls; and a 14" drop-off at the west end of the south sidewalk.

It should also be noted that this structure has been deemed "scour critical", i.e. calculations from a 1998 scour study indicate the bridge foundations may be susceptible to undermining and instability during a major flood event. An additional scour evaluation was performed in 2015, and recommended installing additional engineered riprap in front of both abutments and around the piers, as well as monitoring the foundations for scour following major flood events.

It should be noted that the substructure footings are founded on timber piling. During this inspection, the abutment footings (pile caps) were exposed full length with up to 8" of undermining. Undermining of the northeast wingwall footing is present, and extends back for approximately 2'. Scour is present at the piers, with up to 5' of the footing (pile cap) exposed at the downstream end of the east pier. An underwater inspection performed in August 2018 further detailed the location and extent of the scour and its effects.

INSPECTION TEAM: J. ANDERSON, D. CHRISTENSEN

CONDITION ASSESSMENT:

JEFFREY ANDERSON, P.E., FIELD TEAM LEADER 720-963-3384

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 12/4/18

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

STRUCTURE SUMMARY STRUCTURE NO. 8800-002P

STRUCTURE EVALUATION SUMMARY CONTINUED

Corrective measures should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 8800-002P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

C226 PRIORITY OF IMPROVEMENT

ITEM

NO.

ROUTINE MAINTENANCE QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST

ESTIMATES

REHAB. RECONSTR.

S

S

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: It is recommended the south sidewalk be temporarily closed until repairs to sidewalk are complete

It is recommended that bridge foundations be monitored for scour following major flood events.

Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 8800-002P

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

N NOT APPLICABLE

9 EXCELLENT CONDITION

8 VERY GOOD CONDITION - no problems noted.

7 GOOD CONDITION - some minor problems.

6 SATISFACTORY CONDITION - structural elements show some minor deterioration.

5 FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

1 “IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

0 FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

58. DECK 6

1. DECK SLAB F

2. EXPANSION JOINTS N

3. WEARING SURFACE G

4. RIDEABILITY G

5. CURBS, SIDEWALKS, AND MEDIAN P

6. PARAPETS AND/OR RAILINGS P

7. DRAINS AND DRAINAGE P

8. UTILITIES N

9. DEFLECTION AND/OR VIBRATION G

10. OTHER N

59. SUPERSTRUCTURE 6

1. BEARING DEVICES

2. GIRDERS OR BEAMS

3. ARCH(ES) OR SLAB(S)

4. FLOOR BEAMS AND STRINGERS

5. TRUSSES

6. DIAPHRAGMS AND BRACING

7. PAINT

8. FASCIA(E)

9. DEFLECTION AND/OR VIBRATION

10. ALIGNMENT

11. OTHER

60. SUBSTRUCTURE

ABUTMENTS

1. BREASTWALLS OR COLUMNS

2. PILE BENTS

3. CAPS AND/OR BEARING SEATS

4. BACKWALLS AND/OR BULKHEADS

5. FOUNDATIONS (SPREAD FTG)

6. WINGWALLS

7. WEEP HOLES

8. EXPANSION JOINTS

9. EROSION AND/OR SCOUR

10. SETTLEMENT OR DEFLECTION

11. SLOPE PROTECTION

12. OTHER

PIER(S)

13. WALLS AND/OR COLUMNS

14. PILE BENTS

15. CAPS AND/OR BEARING SEATS

16. FOUNDATIONS

17. EROSION AND/OR SCOUR

18. SETTLEMENT OR DEFLECTION

19. OTHER

F F N N N G F P G G N

F N F G G F N P F G N N

F N F N F G N

58.1

58.2,3,7

58.5

58.6

ITEM REFERENCE AND REMARKS

MINOR TRANSVERSE CRACKING WITH EFFLORESCENCE ON DECK

UNDERSIDE, SPACED APPROXIMATELY 6' ON CENTER IN CENTER

SPAN AND AT ISOLATED LOCATIONS IN EAST AND WEST SPANS.

TRANSVERSE CRACKS WITH EFFLORESCENCE FROM CRACKS IN

OVERHANGS OF WEST SPAN. MINOR CRACKING OF DECK HAUNCH

AREAS OVER DIAPHRAGMS.

DECK EXPANSION JOINTS PAVED OVER; STEEL HEADERS NOT

VISIBLE. TOP OF DECK COVERED WITH ASPHALT WEARING

SURFACE; MINOR TRANSVERSE CRACKING OF WEARING SURFACE

AT DECK ENDS.

DECK DRAINS PAVED OVER; NO LONGER FUNCTIONING.

SIDEWALKS ARE PAVED WITH ASPHALT OVER TIMBER DECKING.

TIMBER DECKING IS IN GENERALLY GOOD CONDITION (EXCEPT AS

NOTED BELOW), BUT EXHIBITS MINOR WHITE SPOTS ON

UNDERSIDE. MODERATE TRANSVERSE CRACKING OF ASPHALT.

SOUTH SIDEWALK IN EAST SPAN IS SAGGING DUE TO SEVERE

DECAY OF SOUTHEAST FASCIA TIMBER LOG. SAGGED SECTION

WAS BARRICADED OFF DURING THIS INSPECTION.

SPALLING OF CURB ALONG NORTH SIDE. SEVERAL AREAS OF

MINOR COLLISION DAMAGE ALONG CURBS WITH SPALLING. MINOR

VERTICAL AND TRANSVERSE CRACKING OF CURBS.

LOOSE/MISSING ANCHOR NUTS ON SEVERAL RAIL POST PLATES.

RAIL POST ANCHOR BOLT NUTS MISSING AT EAST END OF SOUTH

RAILING. DEBRIS ACCUMULATED ON TOP OF RAIL ANCHORAGES

CAUSING CORROSION OF ANCHOR BOLTS. NUMEROUS GAPS EXIST

BETWEEN BRIDGE RAIL SECTIONS WHERE SPLICE SLEEVES HAVE

SLIPPED OR HAVE NOT BEEN INSTALLED.

ONE SECTION OF SOUTH RAIL IN EAST SPAN AND ONE SECTION IN

CENTER SPAN ARE BENT. NORTHWEST APPROACH RAIL IS

DAMAGED. MINOR VERTICAL AND TRANSVERSE CRACKS WITH

MINOR DELAMINATION OF GROUT PADS AT EAST END OF NORTH

RAILING; MINOR SPALLING AT EAST END OF SOUTH RAILING.

MINOR COLLISION DAMAGE ON TO WEST END OF SOUTH RAILING

AT TURNDOWN WITH WELD CRACKED AROUND BASE.

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION 3.

EROSION AND/OR SCOUR 2.

ALIGNMENT 1.

61. CHANNEL 5

G F N F N

LOW

SUFF

14 FT.

SANDY

222. APPROACHES 7

1. APPROACH SLABS

2. RELIEF JOINTS

3. APPROACH GUARDRAIL

4. SURFACING

5. EROSION

6. SETTLEMENT

7. SIGNS

8. ALIGNMENT

9. OTHER

N N N G F G F G N

223. RETAINING WALL N

1. WALL

2. WEEP HOLES

3. FOUNDATION

4. EROSION AND/OR SCOUR

5. SETTLEMENT OR DEFLECTION

6. OTHER

36. TRAFFIC AND SAFETY FEATURES

A. BRIDGE RAILINGS

B. TRANSITIONS

C. APPROACH GUARDRAILS

D. APPROACH GUARDRAIL ENDS

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required.

59.1,2,6,7 MINOR SPOT RUSTING OF BEARING PLATES AT ISOLATED

LOCATIONS, NOT ACCESSED DURING THIS INSPECTION.

CORROSION ON BOTTOM FLANGES FOR FULL LENGTH OF

EXTERIOR GIRDERS. SPOT CORROSION ON FLANGES OF INTERIOR

GIRDERS.

HIGH WATER DEBRIS IN SUPERSTRUCTURE OF WEST SPAN.

59.8 SOUTHEAST FASCIA LOG HAS SEVERE DECAY IN TOP FACE FOR

FULL LENGTH. ALL FASCIA LOGS HAVE MINOR TO MODERATE

DECAY IN TOP 12". MINOR TO MODERATE CHECKING OF FASCIA

LOGS. MISSING TIE BOLT NUTS ON FASCIA LOG AT BOTH SIDES OF

WEST PIER. DECAY IN SIDEWALK SUPPORT LOG ON NORTH SIDE

OF CENTER SPAN. SEVERAL ANCHOR BOLT NUTS ARE LOOSE OR

MISSING FROM FASCIA LOGS WHICH SUPPORT SIDEWALKS.

DISCONNECTED CURB FASCIA BOARD ON SOUTH SIDE OVER

CENTER SPAN. TIMBER FASCIA HAS PULLED AWAY FROM DECK UP

TO 6" AT NORTHWEST AND SOUTHWEST CORNERS; MODERATE

DETERIORATION. SEVERE DECAY IN SOUTHEAST FASCIA HAS

CAUSED SIDEWALK TO SAG IN SPAN 1. NORTH (UPSTREAM)

FASCIA HAS IMPACT DAMAGE IN SEVERAL AREAS.

60.1,13 MINOR CRACKING AND DETERIORATION OF MORTAR THROUGHOUT

ABUTMENT BREASTWALLS AND PIER WALLS. HORIZONTAL

SEPARATION, UP TO 1/2" WIDE, OF MORTAR JOINTS AT CENTER/TOP

OF WEST ABUTMENT.

60.3,15 FLOOD DEBRIS ON PIER AND ABUTMENT CAPS. MODERATE

HORIZONTAL CRACK IN FIRST MORTAR JOINT DOWN FROM TOP AT

BEARING AREA OF BOTH ABUTMENTS. MODERATE CHECKING IN

ENDS OF TIMBER CAPS. MODERATE DECAY IN NORTH END OF

BOTH PIER TIMBER CAPS AND SOUTH END OF WEST PIER TIMBER

CAP.

NUTS MISSING FROM ANCHOR BOLTS CONNECTING TIMBER CAPS

TO PIER WALLS AT SOUTH END OF EAST PIER AND NORTH END OF

WEST PIER.

60.6,10 MINOR MOSS GROWTH AND SOME EFFLORESCENCE ON

WINGWALLS, MOSS GROWTH NOT PRESENT DURING THIS

INSPECTION.

MINOR SETTLEMENT OF NORTHEAST WINGWALL. LARGE TREE

GROWING ADJACENT TO SOUTHEAST WINGWALL.

60.8 SEVERE DETERIORATION OF VERTICAL JOINT FILLER AT

NORTHEAST RETAINING WALL/WINGWALL.

ADDITIONAL ITEM REFERENCE AND REMARKS

60.9,17 MODERATE SCOUR AND EROSION AT ABUTMENTS, WINGWALLS AND PIERS; ABUTMENTS AND PIERS ARE ON

FOUNDED ON TIMBER PILES, HOWEVER.

WEST ABUTMENT FOOTING EXPOSED AND UNDERMINED UP TO 8" FULL LENGTH; CONCRETE IS ABRADED. EAST ABUTMENT FOOTING EXPOSED FULL LENGTH AND UNDERMINED UP TO 8" ALONG UPSTREAM THIRD.

NORTHEAST WINGWALL FOOTING EXPOSED FULL HEIGHT X 8'L; UNDERMINING 5'L ON NORTH SIDE X 32"L ON

WEST SIDE X UP TO 1.5'D X 2' UNDER NEAR EAST END.

MODERATE SCOUR ALONG PIERS, MOST PRONOUNCED AT DOWNSTREAM END OF EAST PIER WHERE FOOTING

EXPOSED UP TO 5'.

SEE AUGUST 2018 UNDERWATER INSPECTION REPORT FOR ADDITIONAL INFORMATION.

61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.

61.2 SEVERE SLOUGHING ALONG EAST BANK, BOTH SIDES, WITH SEVERAL UNDERMINED TREES. PREVIOUSLY

REPORTED SANDBAR AT WEST UPSTREAM SIDE IS NO LONGER VISIBLE.

61.4 HEAVY ACCUMULATION OF LOGS AND DEBRIS IN CHANNEL AT UPSTREAM SIDE OF CENTER SPAN AND BOTH PIERS. PREVIOUSLY NOTED PILINGS PROTRUDING FROM STREAMBED IN CHANNEL UNDER EAST AND WEST SPANS NOT VISIBLE DURING THIS INSPECTION. MODERATE SILT BUILDUP IN WEST SPAN ALONG WEST PIER.

222.5,6 MODERATE EROSION AT END OF SOUTHWEST APPROACH SIDEWALK WITH 14" DROP-OFF.

222.7 NO TYPE 3 OBJECT MARKERS PRESENT AT BRIDGE CORNERS.

36.B,C,D NO APPROACH GUARDRAILS PRESENT.

STRUCTURE LOAD RATING STRUCTURE NO. 8800-002P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 22 20 37 34

HS 30 27 51 46

TYPE 3 27 24 46 42

TYPE 3S2 43 39 72 65

TYPE 3-3 53 48 89 81

DESIGN LOADING: H15 (M13.5)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

X ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 4/16

LOAD RATING CONTROLLED BY: MOMENT CAPACITY OF BEAMS

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 8800-002P

STRUCTURE IDENTIFICATION

(201) PARK: YOSEMITE NATIONAL PARK

(202) STRUCTURE NAME: .......... EL CAPITAN BRIDGE

(203) STRUCTURE KIND: ............1 - BRIDGE

(204) STRUCTURE NUMBER: ..... 8800-002P

(205) NPS REGION: .................... 6 - PACIFIC WEST

(206) ROUTE CODE NUMBER: ... 11

(207) ROAD SECTION NO: ..........002P

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?: .......YES

(210) OPERATING UNIT: ............. PARK

(211) PROJECT NO(S): ................1B2

(212) DRAWING NUMBERS: ....... RG367

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY/PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR: ..

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORICAL DESIGNATION: ..

069 - CALIFORNIA (CA)

043 - MARIPOSA

167000110

MERCED RIVER

EL CAPITAN CROSSOVER

8800002P0000000

10.3 miles east from El P

99.99 FT (99.99 M)

0.28 (KM PT 0.45)

N/A

3 - FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

3 - STEEL

02 - STRINGER/MULTI-BEAM or GIRDER

45.0 FT (13.7 M)

125.0 FT (38.1 M)

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 30.0 TONS (27.2 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 51.0 TONS (46.3 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 7/18 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 5 - SCOUR

(B) UNDERWATER: .............. YES

(221) SPECIAL STUDY DATE: 9/98 INSP. EVERY: 60 MONTHS - LAST INSP. : 8/18

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 8800-002P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 37°43'26.60"

(17) LONGITUDE: ......................... 119°37'53.50"

(19) DETOUR LENGTH: ............... 5 MI (8 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 00

(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN

(42B) SERVICE UNDER: .............. 5 - WATERWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... 0

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

(51) CURB TO CURB WIDTH:

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

27.0 FT (8.2 M)

43.0 FT (13.1 M)

38.0 FT (11.6 M)

22.0 FT (6.7 M)

8.0 FT (2.4 M)

8.0 FT (2.4 M)

0 - NO MEDIAN

0 °

NO

27.0 FT (8.2 M)

5.7 FT (1.7 M)

5.7 FT (1.7 M)

1 - FULL HEIGHT (NO PARAPE

6 - ALUMINUM

1 - CONTINUOUS RAIL

3.83 FT (1.17 M)

99.99 FT (99.99 M)

0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ...........................N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1000

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

3 - Scour critical; foundations un

2 - REHAB/RECONSTRUCTION

C - MODERATE

$19,000

$273,000

$0

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

2009 - NEW ASPHALT OVERLAY. 2015 - ADDITIONAL SCOUR ANALYSIS PERFORMED.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

Span #1, #3 - 42', #2 - 45'; Type 302 (Steel Girder) 5-each https://119�37'53.50 https://37�43'26.60

APPENDIX STRUCTURE NO. 8800-002P

PHOTOGRAPHS STRUCTURE NO. 8800-002P

PHOTO #1 - LOOKING WEST

FLOW

PHOTO #2 - SOUTH (DOWNSTREAM) SIDE

PHOTO #3 - EROSION AT END OF APPROACH

SIDEWALK AT SOUTHWEST CORNER

PHOTO #4 - BROKEN END WELD AND SCRAPE

AT END OF SOUTHWEST APPROACH RAIL

PHOTO #5 - DAMAGED RAIL AT END OF NORTHWEST CORNER

PHOTO #6 - GENERAL TOPSIDE VIEW LOOKING WEST

PHOTO #7 - MISSING AND DISCONNECTED NUTS ON TOP OF BRIDGE

RAIL

PHOTO #8 - DISCONNECTED RAIL EXPANSION CONNECTION ON

NORTH SIDE NEAR WEST ABUTMENT

PHOTO #9 - DEBRIS ACCUMULATED ON TOP OF RAIL ANCHORAGES

WITH CORRODED ANCHOR BOLTS

PHOTO #10 - SPALLING OF CURB ALONG NORTH SIDE

PHOTO #11 - DISCONNECTED CURB FASCIA BOARD ON SOUTH SIDE

OVER CENTER SPAN

PHOTO #12 - MISSING TIE BOLT NUTS ON FASCIA LOG AT SOUTH SIDE

OF WEST PIER

PHOTO #13 - DECAY IN SIDEWALK SUPPORT LOG ON NORTH SIDE OF

CENTER SPAN

PHOTO #14 - GENERAL UNDERSIDE VIEW LOOKING TOWARD WEST

PIER

PHOTO #15 - GENERAL UNDERSIDE VIEW OF SIDEWALKS, SOUTH SIDE

SHOWN

PHOTO #16 - TRANSVERSE CRACKING OF DECK IN EAST SPAN, THREE

CRACKS IN TWO BAYS

PHOTO #17 - GENERAL VIEW OF EAST ABUTMENT

PHOTO #18 - GENERAL VIEW OF WEST ABUTMENT

PHOTO #19 - WEST ABUTMENT FOOTING UNDERMINED UP TO 8" FULL

LENGTH; CONCRETE IS ABRADED

PHOTO #20 - GENERAL VIEW OF EAST PIER

PHOTO #21 - GENERAL VIEW OF WEST PIER

PHOTO #22 - MISSING CAP NUT AT NORTH SIDE OF WEST PIER

PHOTO #23 - DECAY IN SOUTH SIDE OF WEST PIER CAP LOG

PHOTO #24 - HIGH WATER DEBRIS IN SUPERSTRUCTURE OF WEST

SPAN

PHOTO #25 - HEAVY CHANNEL DEBRIS IN CENTER SPAN

PHOTO #26 - EFFLORESCENCE FROM GROUT BETWEEN WINGWALL

STONES, SOUTHEAST CORNER SHOWN

PHOTO #27 - EXPOSED WINGWALL FOOTING

AT NORTHEAST CORNER

PHOTO #28 - EROSION OF UPSTREAM BANK

PHOTO #29 - LOOKING UPSTREAM

PHOTO #30 - LOOKING DOWNSTREAM