STRUCTURE SUMMARY STRUCTURE NO. 8800-013P
EAST FORK CASCADE CREEK BRIDGE INSPECTION DATE: 7/12/18
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE CONTINUOUS
MAIN SPAN TYPE: ............... SLAB
# OF BEAMS, MAIN SPAN: .. 1
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE
WEARING SURFACE: .......... NONE
ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES
PIER FOUNDATION(S): ........ SPREAD FOOTING ON PILES
ABUTMENT / PIER MAT'L: ... CONCRETE
PROJ./PLAN REF. NO: ......... UNKNOWN / RG2434
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD
STRUCTURE HISTORY: ...... 2011-APPROACHES RESURFACED.
NO. OF MAIN SPANS:
NO. OF APPR. SPANS:
STRUCT. TOTAL LENGTH: ..
MAX. SPAN LENGTH:
DECK WIDTH:
CURB TO CURB WIDTH:
YEAR BUILT:
YEAR RECONSTRUCTED: ..
SKEW ANGLE:
FRACTURE CRITICAL:
140.0 FT (42.7 M)
55.0 FT (16.8 M)
39.7 FT (12.1 M)
26.0 FT (7.9 M)
N/A
12 °
NO
LOCATION
YOSEMITE NATIONAL PARK MILE POINT: ..................... 1.70 (KM PT 2.74)
STATE: ................................. CALIFORNIA LOCATION: 5.1 miles east from El Portal boundary line on CA Route 140 (El Portal Road). FACILITY CARRIED: ............ EL PORTAL ROAD
FEATURE INTERSECTED: .. EAST FORK CASCADE CREEK
STRUCTURE EVALUATION SUMMARY
This concrete slab bridge is in fair condition overall. Problems include widespread abrasion and cracking in the concrete deck surface and underside; minor vertical cracking of the abutments and piers; and moderate to severe decay of the timber railing. Other problems include isolated minor undermining of the west abutment and undermining of the northeast retaining wall base below a corrugated metal pipe.
Corrective measures should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future. To help improve motorist safety, consideration should also be given to installing an approach guardrail system meeting current safety standards.
INSPECTION TEAM: J. ANDERSON, D. CHRISTENSEN
CONDITION ASSESSMENT:
JEFFREY ANDERSON, P.E., FIELD TEAM LEADER 720-963-3384
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/4/18
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 8800-013P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
C226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
S
S
$0
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 8800-013P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
OTHER
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
FOUNDATIONS
CAPS AND/OR BEARING SEATS
PILE BENTS
WALLS AND/OR COLUMNS
PIER(S)
OTHER
SLOPE PROTECTION
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
EXPANSION JOINTS
WEEP HOLES
WINGWALLS
FOUNDATIONS
BACKWALLS AND/OR BULKHEADS
CAPS AND/OR BEARING SEATS
PILE BENTS
BREASTWALLS OR COLUMNS
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
G N F N N N N N G
N G
G N N N N G G G F G N N
G N N N F G N
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
12.
13.
14.
15.
16.
17.
18.
19.
58.1, 59.3 EXPOSED AGGREGATE THROUGHOUT TOP OF SLAB. EXTENSIVE
TRANSVERSE AND MAP CRACKING OF TOP OF SLAB THROUGHOUT.
FULL LENGTH LONGITUDINAL CRACK IN BOTTOM OF SLAB IN
CENTER SPAN WITH EFFLORESCENCE FROM CRACK TOWARD
PIERS. LONGITUDINAL CRACK IN BOTTOM OF SLAB OF NORTH
SPAN WITH EFFLORESCENCE FROM CRACK IN WEST HALF OF
SPAN. LIGHT SURFACE CRACKING OF BOTTOM OF SLAB IN CENTER
SPAN NEXT TO EAST PIER ON NORTH SIDE. LIGHT SURFACE
CRACKING OF BOTTOM OF SLAB IN WEST SPAN ON SOUTH SIDE.
MINOR TRANSVERSE CRACKING WITH EFFLORESCENCE ON
UNDERSIDE OF OVERHANGS; HEAVIER AT PIERS.
MINOR STAINING AT DRAINS.
58.2 MINOR SURFACE RUST ON JOINT ARMOR AT BOTH ENDS OF SLAB.
58.5 EXTENSIVE MAP AND TRANSVERSE CRACKING ON SIDEWALKS.
MINOR SPALL ON SOUTHEAST APPROACH SIDEWALK AT JOINT.
MINOR IMPACT DAMAGE ALONG WEST APPROACH CURBS.
58.6 MINOR TO MODERATE CHECKING OF TIMBER RAILS WITH
MODERATE TO SEVERE DECAY, MORE PROMINENT AT SOUTH
RAILING. MINOR DETERIORATION OF VERTICAL JOINT FILLER IN
PARAPETS.
58.7 MINOR GRAVEL ACCUMULATION ALONG CURBLINES HAS BEEN
SIGNIFICANTLY REDUCED. MODERATE PONDING IN NORTH
SHOULDER OF WEST APPROACH (UNABLE TO VERIFY DURING THIS
INSPECTION).
60.1,13 MINOR VERTICAL CRACKING OF ABUTMENT BREASTWALLS AND
PIER WALLS.
60.3 ELASTOMERIC BEARING MATERIAL AT NORTH END OF EAST
ABUTMENT IS DISPLACING AND SPLITTING.
N G G P G G
N
G
G
F
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL 6
F G G F N
MED
SUFF
8 FT.
BOULDERS, STONES, SAND
222. APPROACHES 6
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER
N N N F G F F G N
223. RETAINING WALL 5
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
F N N P P N
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
60.6 TREES GROWING ALONG BACK OF NORTHWEST WINGWALL.
60.8 MINOR DETERIORATION OF VERTICAL JOINT FILLER.
60.9,17 VOID AT BASE OF WEST ABUTMENT; UP TO 7" DEEP NEAR NORTH
END; ABUTMENT IS ON PILES. MINOR EROSION AT END OF
SOUTHWEST WINGWALL. MINOR VOID (28" DEEP) AT BASE OF EAST
PIER, EAST FACE NEAR SOUTH END, NOT NOTED DURING THIS
INSPECTION.
60.13 GALVANIZED STEEL ARMOR ON NORTH SIDE OF PIER WALLS.
61.1 STREAM FLOWS AGAINST EAST ABUTMENT (CENTER AND SOUTH
SPANS DRY AT TIME OF INSPECTION).
61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.
61.3, 223.1,4,5
RETAINING WALL RUNS NORTH OF EAST ABUTMENT AND HELPS TO
CHANNELIZE FLOW. UNDERMINING (UP TO 2.8') OF WALL NEAR
CORRUGATED PIPE OUTFALL. MINOR DETERIORATION OF MORTAR
JOINTS ABOVE AREA OF UNDERMINING WITH MULTIPLE VOIDS.
STONES SETTLED AND DISPLACED JUST NORTH OF PIPE.
61.4 ABANDONED UTILITIES COVERED WITH CONCRETE REMAIN UNDER
BRIDGE. VEGETATION BEGINNING TO CONSTRICT DOWNSTREAM
CHANNEL. SAND BAR WITH VEGETATION AND DEBRIS AT
DOWNSTREAM END OF WEST PIER. TREES GROWING AGAINST
BRIDGE ALONG BOTH SIDES; OVERHANGING RAILING IN CENTER
SPAN. FALLEN TREE AT UPSTREAM END OF WEST PIER; TREES
GROWING AGAINST BRIDGE AND OVERHANGING RAILING WAS NOT
NOTED DURING THIS INSPECTION.
222.4 1"W TRANSVERSE CRACK IN EASTBOUND LANE AND ALLIGATOR
CRACKING OF WESTBOUND LANE OF EAST APPROACH. MINOR
TRANSVERSE CRACKING OF APPROACH ASPHALT AT WEST END.
ALLIGATOR CRACKING OF ASPHALT ALONG JOINT AT EAST END.
222.6 UP TO 1.5" HEIGHT DIFFERENTIAL BETWEEN SIDEWALKS AND
APPROACH SIDEWALKS. MINOR SETTLEMENT OF WEST APPROACH
PAVEMENT AT EXPANSION JOINT IN EASTBOUND LANE.
222.7 TYPE 3 OBJECT MARKERS AT BOTH CORNERS OF EAST APPROACH
AND SOUTH CORNER OF WEST APPROACH; MINOR IMPACT
DAMAGE TO NORTHWEST OBJECT MARKER. OBJECT MARKER AT
SOUTHEAST CORNER IS LEANING.
ADDITIONAL ITEM REFERENCE AND REMARKS
36.B,C,D NO APPROACH GUARDRAILS PRESENT.
STRUCTURE LOAD RATING STRUCTURE NO. 8800-013P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 26 24
HS 21 19 35 32
TYPE 3 19 17 31 28
TYPE 3S2 29 26 49 44
TYPE 3-3 36 33 61 55
DESIGN LOADING: HS20 (MS18)
CAPACITY MEETS OR EXCEEDS DESIGN LOAD
X CAPACITY IS LESS THAN DESIGN LOAD
X ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 6/15
LOAD RATING CONTROLLED BY: POSITIVE MOMENT
REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 8800-013P
STRUCTURE IDENTIFICATION
(201) PARK: YOSEMITE NATIONAL PARK
(202) STRUCTURE NAME: .......... EAST FORK CASCADE CREEK BRIDGE
(203) STRUCTURE KIND: ............1 - BRIDGE
(204) STRUCTURE NUMBER: ..... 8800-013P
(205) NPS REGION: .................... 6 - PACIFIC WEST
(206) ROUTE CODE NUMBER: ... 16
(207) ROAD SECTION NO: ..........013P
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD
(209) WITHIN NPS BNDRY?: .......YES
(210) OPERATING UNIT: ............. PARK
(211) PROJECT NO(S): ................UNKNOWN
(212) DRAWING NUMBERS: ....... RG2434
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY/PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR: ..
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORICAL DESIGNATION: ..
069 - CALIFORNIA (CA)
043 - MARIPOSA
161000160
EAST FORK CASCADE CREE
EL PORTAL ROAD
8800013P0000000
5.1 miles east from El Po
99.99 FT (99.99 M)
1.70 (KM PT 2.74)
N/A
3 - FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
2 - CONCRETE CONTINUOUS
01 - SLAB
55.0 FT (16.8 M)
140.0 FT (42.7 M)
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 0 - NONE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 5 - HS20 (MS18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 21.0 TONS (19.1 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 35.0 TONS (31.8 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 7/18 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 5 - SCOUR
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: 9/98 INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 8800-013P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 37°43'25.90"
(17) LONGITUDE: ......................... 119°42'42.90"
(19) DETOUR LENGTH: ............... 50 MI (80 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN
(42B) SERVICE UNDER: .............. 5 - WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
26.0 FT (7.9 M)
39.7 FT (12.1 M)
34.0 FT (10.4 M)
26.0 FT (7.9 M)
4.0 FT (1.2 M)
4.0 FT (1.2 M)
0 - NO MEDIAN
12 °
NO
26.0 FT (7.9 M)
5.0 FT (1.5 M)
5.0 FT (1.5 M)
2 - MOUNTED ON PARAPET
8 - TIMBER/OTHER
1 - CONTINUOUS RAIL
4.92 FT (1.50 M)
99.99 FT (99.99 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL:
(36) TRAFFIC SAFETY FEAT: ... 1000
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
5 - Stable; scour within limits of
2 - REHAB/RECONSTRUCTION
C - MODERATE
$1,000
$567,000
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2011-APPROACHES RESURFACED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
SPAN #1 & #3 - LENGTH 42'-6", SPAN #2 - LENGTH 55'; TYPE 201 (R/C SLAB)
https://119�42'42.90 https://37�43'25.90
APPENDIX STRUCTURE NO. 8800-013P
PHOTOGRAPHS STRUCTURE NO. 8800-013P
PHOTO #1 - LOOKING WEST TOWARD ARCH ROCK ENTRANCE
FLOW
PHOTO #2 - NORTH (UPSTREAM) SIDE
PHOTO #3 - DAMAGED OBJECT MARKER AT NORTHWEST CORNER
PHOTO #4 - TIPPED OBJECT MARKER AT SOUTHEAST CORNER
PHOTO #5 - 1"W TRANSVERSE CRACK IN EASTBOUND LANE AND
ALLIGATOR CRACKING OF WESTBOUND LANE OF EAST APPROACH
PHOTO #6 - UP TO 1.5" VERTICAL OFFSET BETWEEN APPROACH
SIDEWALK AND BRIDGE SIDEWALK AT SOUTHEAST CORNER
PHOTO #7 - GENERAL TOPSIDE VIEW LOOKING EAST
PHOTO #8 - EXTENSIVE ROT IN TIMBER RAILING MEMBERS ON SOUTH
SIDE
PHOTO #9 - EXPOSED AGGREGATE AND EXTENSIVE TRANSVERSE AND
MAP CRACKING OF SLAB THROUGHOUT, CENTER SPAN SHOWN
PHOTO #10 - GENERAL UNDERSIDE VIEW OF SLAB IN CENTER SPAN
PHOTO #11 - FULL LENGTH LONGITUDINAL CRACK IN BOTTOM OF SLAB
IN CENTER SPAN WITH EFFLORESCENCE FROM CRACK TOWARD
PIERS
PHOTO #12 - LONGITUDINAL CRACK IN BOTTOM OF SLAB OF NORTH
SPAN WITH EFFLORESCENCE FROM CRACK IN WEST HALF OF SPAN
PHOTO #13 - TRANSVERSE CRACKING OF SLAB OVERHANGS, NORTH
SIDE OVER WEST PIER SHOWN
PHOTO #14 - GENERAL VIEW OF EAST ABUTMENT
PHOTO #15 - CRACKING OF EAST ABUTMENT BREASTWALL
PHOTO #16 - DISPLACEMENT OF BEARING MATERIAL AT NORTH END
OF EAST ABUTMENT
PHOTO #17 - UNDERMINING OF WEST ABUTMENT, 3'L X 6" BACK
PHOTO #18 - GENERAL VIEW OF EAST PIER
PHOTO #19 - UNDERMINING OF NORTHEAST CORNER RETAINING
WALL
PHOTO #20 - UNDERMINING OF NORTHEAST CORNER RETAINING
WALL, UP TO 33" BACK
PHOTO #21 - GAPS IN MORTAR OF NORTHEAST RETAINING WALL, UP
TO 50" BACK
PHOTO #22 - LOOKING UPSTREAM
PHOTO #23 - LOOKING DOWNSTREAM