STRUCTURE SUMMARY STRUCTURE NO. 8800-001P
POHONO BRIDGE INSPECTION DATE: 7/12/18
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... ARCH - DECK NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 80.0 FT (24.4 M)
DECK TYPE: ......................... NOT APPLICABLE MAX. SPAN LENGTH: .......... 80.0 FT (24.4 M)
WEARING SURFACE: .......... NOT APPLICABLE DECK WIDTH: ...................... 35.8 FT (10.9 M)
ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 26.4 FT (8.0 M)
PIER FOUNDATION(S): ........ N/A YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 1B2 / 00000 SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 2006-STRUCTURE AND SOUTH APPROACH REPAVED. 2008-STRUCTURE AND APPROACHES
REPAVED. 2015-ADDITIONAL SCOUR ANALYSIS PERFORMED.
LOCATION
YOSEMITE NATIONAL PARK MILE POINT: ..................... 0.02 (KM PT 0.03)
STATE: ................................. CALIFORNIA LOCATION: 7.9 miles east from El Portal boundary line on CA Route 140 (El Portal Road). Bridge is atFACILITY CARRIED: ............ VALLEY LOOP ROAD beginning of one way loop road.
FEATURE INTERSECTED: .. MERCED RIVER
STRUCTURE EVALUATION SUMMARY
This concrete arch bridge is in fair structural condition, but has some issues with scour and undermining, the extent of which is further described below. Other problems with the bridge include minor cracking of the arch underside, with efflorescence leaching from the cracks; and missing object markers at the north approach.
Please note that this structure had previously been assigned an Improvement Category of “B” (Major) due to concerns about scour and possible undermining of the north abutment footing. However, an underwater inspection performed in July 2018 confirmed that the undermining is limited to a protective concrete apron adjacent to the north abutment, and that the abutment footing itself is not undermined. As a result, this structure has been reassigned an Improvement Category of “C” (Moderate).
It should also be noted that this structure has been deemed "scour critical", i.e. calculations from a 1998 scour study indicate the bridge foundations may be susceptible to undermining and instability during a major flood event. An additional scour evaluation was performed in 2015, and further hydraulic analyses are in progress. Please be advised that the scour countermeasure recommendations in this report may be revised based on the results of these analyses.
INSPECTION TEAM: J. ANDERSON, D. CHRISTENSEN
CONDITION ASSESSMENT:
JEFFREY ANDERSON, P.E., FIELD TEAM LEADER 720-963-3384
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/4/18
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 8800-001P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
C226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
PRELIMINARY ESTIMATE TOTAL* : .
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: It is recommended that bridge foundations be monitored for scour following major flood events.
Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 8800-001P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
N
N N F N N N N G G
N G
G G G G G N
N
N
N
N
58.5 SURVEY MARKER ON SOUTHWEST CURB.
58.6 GAP IN TOP OF STONE PARAPET ON EAST SIDE NEAR SOUTH
ABUTMENT.
58.7 MINOR PONDING AT NORTHEAST CORNER OF BRIDGE (NOT VISIBLE
DUE TO DRY CONDITIONS AT TIME OF INSPECTION).
59.3 MINOR EFFLORESCENCE FROM MORTAR JOINTS THROUGHOUT
RING STONES AND SPANDREL WALLS. MODERATE
EFFLORESCENCE BETWEEN MASONRY RING STONES AND
CONCRETE ARCH ALONG BOTH SIDES.
MINOR TRANSVERSE CRACKING ON ARCH UNDERSIDE, ESPECIALLY
NEAR ABUTMENTS. SMALL VOIDS (UP TO 12" DEEP) IN BASE OF
ARCH ON BOTH SIDES, BOTH ENDS OF ARCH. MINOR DIAGONAL
CRACK WITH EFFLORESCENCE ON ARCH UNDERSIDE NEAR EAST
SIDE, APPROXIMATELY 1/3 OF SPAN FROM NORTH ABUTMENT.
MINOR EFFLORESCENCE ALONG COLD JOINTS. LOCAL HEAVY
EFFLORESCENCE 10' FROM NORTH ABUTMENT, EAST SIDE. 1. BREASTWALLS OR COLUMNS N
2. PILE BENTS N
3. CAPS AND/OR BEARING SEATS N
4. BACKWALLS AND/OR BULKHEADS N
5. FOUNDATIONS F
6. WINGWALLS G
7. WEEP HOLES N
8. EXPANSION JOINTS N
9. EROSION AND/OR SCOUR F
10. SETTLEMENT OR DEFLECTION G
11. SLOPE PROTECTION N
12. OTHER N
PIER(S)
13. WALLS AND/OR COLUMNS N
14. PILE BENTS N
15. CAPS AND/OR BEARING SEATS N
16. FOUNDATIONS N
17. EROSION AND/OR SCOUR N
18. SETTLEMENT OR DEFLECTION N
19. OTHER N
FIELD INSPECTION REPORT STRUCTURE NO. 8800-001P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL 6
G F N G N
HIGH
SUFF
9 FT.
SANDY, BOULDERS
222. APPROACHES 7
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER
N N N G G G F F N
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
60.5,9 UNDERWATER INSPECTION PERFORMED IN AUGUST 2018 NOTED
UNDERMINING OF PROTECTIVE CONCRETE APRON ADJACENT TO
NORTH ABUTMENT, HOWEVER NO UNDERMINING OF ABUTMENT
FOOTING ITSELF WAS OBSERVED.
MINOR HONEYCOMBING AND VOIDS IN ENDS OF NORTH ABUTMENT
CONCRETE AT JUNCTION WITH ROCK. GROUTED RIPRAP ON TOP
OF 6' DEEP X 7' HORIZONTAL CONCRETE APRON AT EAST SIDE OF
NORTH ABUTMENT IS UNDERMINED. OVERRUN OF GROUT POUR
ALSO PRESENT; CONCRETE APRON EXTENDS TO STREAM BED.
REMAINDER OF APRON CAST ON 3' DIAMETER OR LARGER
BOULDERS.
MODERATE SCOUR ALONG SOUTH ABUTMENT EXPOSING TIMBER
FORMING AT CENTER, NO UNDERMINING NOTED. HEAVY SCALING
AT WATERLINE WITH VOIDS; 3"L X 4"D VOID IN BOTTOM OF SOUTH
ABUTMENT AT WEST END. WATER ACTION HAS ALSO WASHED OUT
RING STONE MORTAR ALONG BOTTOM OF ARCH AT BOTH SIDES OF
SOUTH ABUTMENT.
SEE AUGUST 2018 UNDERWATER INSPECTION REPORT FOR
ADDITIONAL INFORMATION.
60.6 MINOR MORTAR JOINT DETERIORATION WITH EFFLORESCENCE
FROM MORTAR, AND MOSS GROWTH THROUGHOUT WINGWALLS;
MOSS GROWTH NOT NOTED DURING THIS INSPECTION.
61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.
61.4 MEDIUM SIZE TREE IN CHANNEL AT UPSTREAM END OF SOUTH
ABUTMENT, NOT NOTED DURING THIS INSPECTION.
222.5 FILL AND RIPRAP HAVE BEEN PLACED IN DITCH ON WEST SIDE OF
SOUTH APPROACH TO CORRECT EROSION, SETTLEMENT, AND
UNDERMINING OF TREES.
222.7 "POHONO BRIDGE" SIGNS ATTACHED TO ENDS OF NORTHWEST AND
SOUTHEAST PARAPET ENDS.
OBJECT MARKERS NOT PRESENT AT NORTH APPROACH.
222.8, 36.B,C,D
SIGHT DISTANCE IS FAIR. CURVES AT BOTH ENDS OF BRIDGE;
MINOR SPEED REDUCTION IS REQUIRED.
36.B,C,D NO APPROACH GUARDRAILS PRESENT.
STRUCTURE LOAD RATING STRUCTURE NO. 8800-001P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 30 27 50 45
HS 41 37 68 62
TYPE 3 34 31 57 52
TYPE 3S2 59 54 99 90
TYPE 3-3 70 64 117 106
DESIGN LOADING: UNKNOWN
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
X ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 5/16
LOAD RATING CONTROLLED BY: MOMENT
REMARKS: LOAD RATING HAS BEEN REVISED BASED ON FINDINGS FROM 8/19/18 UNDERWATER INSPECTION. SEE
BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 8800-001P
STRUCTURE IDENTIFICATION
(201) PARK: YOSEMITE NATIONAL PARK
(202) STRUCTURE NAME: .......... POHONO BRIDGE
(203) STRUCTURE KIND: ............1 - BRIDGE
(204) STRUCTURE NUMBER: ..... 8800-001P
(205) NPS REGION: .................... 6 - PACIFIC WEST
(206) ROUTE CODE NUMBER: ... 500
(207) ROAD SECTION NO: ..........001P
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD
(209) WITHIN NPS BNDRY?: .......YES
(210) OPERATING UNIT: ............. PARK
(211) PROJECT NO(S): ................1B2
(212) DRAWING NUMBERS:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY/PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR: ..
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORICAL DESIGNATION: ..
069 - CALIFORNIA (CA)
043 - MARIPOSA
161005000
MERCED RIVER
VALLEY LOOP ROAD
8800001P0000000
7.9 miles east from El Po
99.99 FT (99.99 M)
0.02 (KM PT 0.03)
N/A
3 - FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
11 - ARCH - DECK
80.0 FT (24.4 M)
80.0 FT (24.4 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
6 - N/A
6 - N/A
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. N - NOT APPLICABLE
B) TYPE MEMBRANE: ................. N - NOT APPLICABLE
C) TYPE PROTECTION: .............. N - NOT APPLICABLE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - UNKNOWN (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 41.0 TONS (37.2 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 68.0 TONS (61.7 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 7/18 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 5 - SCOUR
(B) UNDERWATER: .............. YES
(221) SPECIAL STUDY DATE: 9/98 INSP. EVERY: 24 MONTHS - LAST INSP. : 8/18
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 8800-001P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 37°42'59.90"
(17) LONGITUDE: ......................... 119°39'58.50"
(19) DETOUR LENGTH: ............... 199 MI (199 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN
(42B) SERVICE UNDER: .............. 5 - WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
26.4 FT (8.0 M)
35.8 FT (10.9 M)
23.0 FT (7.0 M)
21.0 FT (6.4 M)
1.0 FT (0.3 M)
1.0 FT (0.3 M)
0 - NO MEDIAN
0 °
NO
26.4 FT (8.0 M)
0.0 FT (0.0 M)
5.1 FT (1.6 M)
3 - PARAPET ONLY
9 - OTHER
1 - CONTINUOUS RAIL
3.50 FT (1.07 M)
99.99 FT (99.99 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK: ................................. N
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1000
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
3 - Scour critical; foundations un
2 - REHAB/RECONSTRUCTION
C - MODERATE
$500
$390,000
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2006-STRUCTURE AND SOUTH APPROACH REPAVED. 2008-STRUCTURE AND APPROACHES REPAVED. 2015-ADDITIONAL SCOUR
ANALYSIS PERFORMED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
Span #1 - Length 80'; Type 111 (R/C Spandrel Filled Arch) https://119�39'58.50 https://37�42'59.90
APPENDIX STRUCTURE NO. 8800-001P
PHOTOGRAPHS STRUCTURE NO. 8800-001P
PHOTO #1 - LOOKING SOUTH TOWARD SOUTHSIDE DRIVE
FLOW
PHOTO #2 - WEST (DOWNSTREAM) SIDE
PHOTO #3 - LACK OF OBJECT MARKERS AT NORTH APPROACH
CORNERS, NORTHWEST CORNER SHOWN
PHOTO #4 - GENERAL TOPSIDE VIEW LOOKING SOUTH
PHOTO #5 - TYPICAL STONE MASONRY PARAPETS
PHOTO #6 - GAP IN TOP OF PARAPET ON EAST SIDE NEAR SOUTH
ABUTMENT
PHOTO #7 - GENERAL UNDERSIDE VIEW LOOKING TOWARD NORTH
ABUTMENT
PHOTO #8 - GENERAL UNDERSIDE VIEW LOOKING TOWARD SOUTH
PHOTO #9 - TRANSVERSE CRACK ALONG CONSTRUCTION JOINT AT
BOTTOM OF ARCH TOWARD NORTH ABUTMENT AT CENTER OF
STRUCTURE
PHOTO #10 - EFFLORESCENCE FROM MORTAR AT BOTTOM OF RING
STONES, EAST SIDE SHOWN
PHOTO #11 - LOSS OF MORTAR BETWEEN STONE RING AND
CONCRETE, WEST SIDE AT NORTH ABUTMENT SHOWN
PHOTO #12 - EFFLORESCENCE FROM MORTAR ON BOTTOM OF STONE
RING, BOTH SIDES
PHOTO #13 - 4"H X 20"W GAP IN MORTAR AT BOTTOM OF STONE RING
AT SOUTHEAST CORNER
PHOTO #14 - UNREPAIRED SCOUR HOLE IN FRONT OF NORTH
PHOTO #15 - ABRASION OF CONCRETE AT NORTH ABUTMENT WITH
VOIDS AT EAST END
PHOTO #16 - 18"L X 3"D VOID AT EAST END OF NORTH ABUTMENT
PHOTO #17 - 18"L X 6"D VOID AT EAST END OF NORTH ABUTMENT
PHOTO #18 - 16"L X 3"T X 11"D VOID IN WEST END OF NORTH
PHOTO #19 - EXPOSED TIMBER FORMING AT CENTER OF SOUTH
ABUTMENT
PHOTO #20 - EFFLORESCENCE FROM MORTAR JOINTS IN WINGWALLS,
SOUTHEAST WINGWALL SHOWN
PHOTO #21 - LOOKING UPSTREAM
PHOTO #22 - LOOKING DOWNSTREAM
File details come from the government source that posted it.