STRUCTURE SUMMARY STRUCTURE NO. 8800-009S
HAPPY ISLES BRIDGE INSPECTION DATE: 7/14/18
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... ARCH - DECK NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 125.5 FT (38.3 M)
DECK TYPE: ......................... NOT APPLICABLE MAX. SPAN LENGTH: .......... 75.0 FT (22.9 M)
WEARING SURFACE: .......... NOT APPLICABLE DECK WIDTH: ...................... 40.0 FT (12.2 M)
ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 27.0 FT (8.2 M)
PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 1B2 / NONE SKEW ANGLE: ..................... 30 °
NPS ROAD CLASS: .............. 3 - SPECIAL PURPOSE FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 2015 - ADDITIONAL SCOUR ANALYSIS PERFORMED.
LOCATION
YOSEMITE NATIONAL PARK MILE POINT: ..................... 0.55 (KM PT 0.89)
STATE: ................................. CALIFORNIA LOCATION: Approximately 500' downstream from Happy Isles Nature Center, on shuttle bus/service road. FACILITY CARRIED: ............ HAPPY ISLES LOOP
FEATURE INTERSECTED: .. MERCED RIVER
STRUCTURE EVALUATION SUMMARY
This concrete arch bridge is in fair condition overall, and is currently open only to service vehicles, shuttle buses, bicycles, and vehicles displaying a wheelchair emblem placard. The main problem is scour and undermining of the west pier footing, which should be repaired with engineered riprap. Undermining has increased at this location since the previous inspection.
It should also be noted that this structure has been deemed "scour critical", i.e. calculations from a 1998 scour study indicate the bridge foundations may be susceptible to undermining and instability during a major flood event. An additional scour evaluation was performed in 2015, and recommended installing engineered riprap in front of both piers, as well as monitoring the foundations for scour following major flood events.
Other problems include a moderate depression in asphalt of west approach; trees overhanging the northeast corner of the bridge; spalling with exposed rebar at the base of both abutments; and moderate sand and debris accumulation along the curblines.
Corrective measures should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: J. ANDERSON, , D. CHRISTENSEN
CONDITION ASSESSMENT:
JEFFREY ANDERSON, P.E., FIELD TEAM LEADER 720-963-3384
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/4/18
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 8800-009S
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
C226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: It is recommended that bridge foundations be monitored for scour following major flood events.
Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 8800-009S
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
OTHER
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
FOUNDATIONS
CAPS AND/OR BEARING SEATS
PILE BENTS
WALLS AND/OR COLUMNS
PIER(S)
OTHER
SLOPE PROTECTION
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
EXPANSION JOINTS
WEEP HOLES
WINGWALLS
FOUNDATIONS
BACKWALLS AND/OR BULKHEADS
CAPS AND/OR BEARING SEATS
PILE BENTS
BREASTWALLS OR COLUMNS
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
N
(TREES)
N N F N N N N F G
N G
F N N N G G G N G G N N
F N N N P G N
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
12.
13.
14.
15.
16.
17.
18.
19.
58.5 NORTH SIDEWALK USED AS BRIDLE PATH FOR HORSE TRAFFIC;
ASPHALT SURFACE IS ROUGH WITH MANY POTHOLES UP TO 2"
DEEP.
MODERATE DETERIORATION OF SIDEWALKS AT APPROACHES,
HAVE BEEN REPAIRED SINCE PREVIOUS INSPECTION; SEE ALSO
222.5.
58.6 MINOR CRACKING OF PARAPET MORTAR JOINTS.
58.7 MINOR ACCUMULATION OF SAND AND DEBRIS ALONG CURBLINES
AND BASE OF PARAPETS; MINOR VEGETATION GROWTH FROM
SAND.
58.10 TREE OVERHANGING NORTHEAST AND NORTHWEST BRIDGE
CORNERS.
59.3,8 SCALING OF CONCRETE WITH EFFLORESCENCE ALONG NORTH
SIDE OF WEST ARCH AT UPSTREAM END.
SCALING WITH EFFLORESCENCE ALONG NORTH SIDE OF ARCH
WITH HEAVY EFFLORESCENCE BETWEEN STONE RING AND ARCH.
TRANSVERSE CRACKS IN BOTTOM OF ARCH WITH
EFFLORESCENCE FROM CRACKS AT SOUTHEAST AND NORTHWEST
CORNERS. MISSING GROUT AT BOTTOM OF STONE RING AT SOUTH
END OF WEST PIER. MINOR HONEYCOMBING ALONG NORTH ARCH
UNDERSIDE. MODERATE DETERIORATION OF MORTAR AT STONE
RING AND CONCRETE INTERFACE.
MINOR CRACKING OF MASONRY MORTAR JOINTS ON SPANDREL
WALLS WITH EFFLORESCENCE FROM MORTAR.
60.1 THREE MINOR SPALLS WITH EXPOSED REBAR ON WEST ABUTMENT
BREASTWALL; FOUR ON EAST ABUTMENT BREASTWALL AT
GROUNDLINE. MINOR VERTICAL CRACKING OF ABUTMENT
BREASTWALLS. SCALING OF CONCRETE WITH EFFLORESCENCE AT
ENDS OF BOTH ABUTMENTS.
CRACK IN STONE RING AT DOWNSTREAM END OF EAST ABUTMENT.
G P P G F N
F
N
N
N
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL 4
P P N G N
HIGH
SUFF
16 FT.
BOULDERS
222. APPROACHES 6
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER (SIDEWALK)
N N N F F G G G P
223. RETAINING WALL 6
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
G N N G F N
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
60.6 MINOR CRACKING OF WINGWALL MASONRY MORTAR JOINTS WITH
MINOR EFFLORESCENCE FROM MORTAR.
60.13 MODERATE TO HEAVY ABRASION OF PIER WALLS EXTENDING FROM
BOTTOMS TO 3' ABOVE EXISTING WATERLINE, ALONG FULL LENGTH
OF PIERS. MINOR VOIDS IN FACES OF BOTH PIERS. MINOR
VERTICAL AND DIAGONAL CRACKING OF WEST FACE OF WEST PIER
WALL AT CENTER. LIGHT SCALING WITH EFFLORESCENCE OF EAST
FACE OF EAST PIER AT BOTH ENDS.
60.17 SCOUR HAS EXPOSED ENTIRE LENGTH OF WEST PIER FOOTING UP
TO 7.5' WITH UP TO 2.5' OF UNDERMINING ALONG UPSTREAM FACE.
WATER WAS TOO DEEP TO DETERMINE FULL EXTENT OF
UNDERMINING DURING TIME OF THIS INSPECTION.
SCOUR HAS EXPOSED ENTIRE LENGTH OF EAST PIER FOOTING UP
TO 4', NO UNDERMINING NOTED. FORM BOARDS EXPOSED AT
UPSTREAM END OF EAST PIER.
61.1 STREAM DIRECTED TOWARD UPSTREAM CORNER OF WEST PIER
CAUSING SCOUR; SEE ALSO 60.17.
61.2 CHANNEL APPEARS TO HAVE DROPPED 3' TO 4' IN ELEVATION
SINCE ORIGINAL CONSTRUCTION DUE TO GENERAL SCOUR.
MODERATE TO SEVERE SLOUGHING OF UP AND DOWNSTREAM
CHANNEL BANKS WITH SEVERAL UNDERMINED TREES.
61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.
61.3 PREVIOUSLY NOTED RIPRAP ON EAST, DOWNSTREAM CHANNEL
BANK APPEARS TO BE NATURAL STONE EXPOSED BY SLOUGHING.
222.4 MODERATE SETTLEMENT (DIP) OF ASPHALT WEARING SURFACE AT
WEST APPROACH.
222.5 MODERATE EROSION OF APPROACH ROADWAY SHOULDER
EMBANKMENT AT NORTH SIDE OF WEST APPROACH AND BOTH
SIDES OF EAST APPROACH; ENDS OF SIDEWALK BROKEN UP AT
THESE LOCATIONS, HAVE BEEN REPAIRED SINCE PREVIOUS
INSPECTION. SEE ALSO 58.5. NORTHWEST CORNER HAS 5"
DROP-OFF.
222.6 MINOR SETTLEMENT OF BOTH APPROACHES; SETTLEMENT
TRANSITIONED WITH ASPHALT AT WEST APPROACH. MINOR
DETERIORATION OF ASPHALT IN APPROACH SHOULDERS, NOT
NOTED DURING THIS INSPECTION.
222.7 "HAPPY ISLES BRIDGE" SIGNS POSTED ON NORTHEAST AND
SOUTHWEST PARAPET ENDS.
ADDITIONAL ITEM REFERENCE AND REMARKS
223.1,4,5 GROUTED ROCK WALL AT NORTHWEST WINGWALL END HAS DETACHED FROM WINGWALL AND PUSHED
OUTWARD UP TO 12" AT BASE.
DRY-STACKED RETAINING WALL AT NORTH SIDE OF EAST PIER IS IN GOOD CONDITION.
36.B,C,D NO APPROACH GUARDRAILS PRESENT.
STRUCTURE LOAD RATING STRUCTURE NO. 8800-009S
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 8 7 15 14
HS 21 19 36 33
TYPE 3 14 13 25 23
TYPE 3S2 21 19 36 33
TYPE 3-3 23 21 40 36
DESIGN LOADING: UNKNOWN
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: LOAD RATING IS BASED ON ENGINEERING JUDGEMENT IN ACCORDANCE WITH AASHTO MANUAL FOR
BRIDGE EVALUATION (MBE). SEE BRIDGE FILE FOR MORE INFORMATION.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 8800-009S
STRUCTURE IDENTIFICATION
(201) PARK: YOSEMITE NATIONAL PARK
(202) STRUCTURE NAME: .......... HAPPY ISLES BRIDGE
(203) STRUCTURE KIND: ............1 - BRIDGE
(204) STRUCTURE NUMBER: ..... 8800-009S
(205) NPS REGION: .................... 6 - PACIFIC WEST
(206) ROUTE CODE NUMBER: ... 408
(207) ROAD SECTION NO: ..........009S
(208) NPS ROAD CLASS: ............ 3 - SPECIAL PURPOSE
(209) WITHIN NPS BNDRY?: .......YES
(210) OPERATING UNIT: ............. PARK
(211) PROJECT NO(S): ................1B2
(212) DRAWING NUMBERS: ....... NONE
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY/PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR: ..
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORICAL DESIGNATION: ..
069 - CALIFORNIA (CA)
043 - MARIPOSA
168004080
MERCED RIVER
HAPPY ISLES LOOP
8800009S0000000
Approximately 500' downst
99.99 FT (99.99 M)
0.55 (KM PT 0.89)
N/A
3 - FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
11 - ARCH - DECK
75.0 FT (22.9 M)
125.5 FT (38.3 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 2
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. N - NOT APPLICABLE
B) TYPE MEMBRANE: ................. N - NOT APPLICABLE
C) TYPE PROTECTION: .............. N - NOT APPLICABLE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - UNKNOWN (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 21.0 TONS (19.1 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 36.0 TONS (32.7 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 7/18 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: Y - 3 - LOAD RATING CALCULATION (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 5 - SCOUR
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: 9/98 INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 8800-009S
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 37°43'57.40"
(17) LONGITUDE: ......................... 119°33'31.20"
(19) DETOUR LENGTH: ............... 2 MI (3 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN
(42B) SERVICE UNDER: .............. 5 - WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
27.0 FT (8.2 M)
40.0 FT (12.2 M)
25.0 FT (7.6 M)
21.0 FT (6.4 M)
2.0 FT (0.6 M)
2.0 FT (0.6 M)
0 - NO MEDIAN
30 °
NO
27.0 FT (8.2 M)
4.6 FT (1.4 M)
4.6 FT (1.4 M)
3 - PARAPET ONLY
9 - OTHER
1 - CONTINUOUS RAIL
3.83 FT (1.17 M)
99.99 FT (99.99 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK: ................................. N
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL:
(36) TRAFFIC SAFETY FEAT: ... 1000
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
3 - Scour critical; foundations un
2 - REHAB/RECONSTRUCTION
C - MODERATE
$3,000
$48,000
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2015 - ADDITIONAL SCOUR ANALYSIS PERFORMED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
Span #1 - Length 75'; Type 111 (R/C Spandrel Arch) https://119�33'31.20 https://37�43'57.40
APPENDIX STRUCTURE NO. 8800-009S
PHOTOGRAPHS STRUCTURE NO. 8800-009S
PHOTO #1 - LOOKING EAST
FLOW
PHOTO #2 - SOUTH (UPSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING EAST
PHOTO #4 - DEBRIS IN CURBLINES, SOUTH CURBLINE SHOWN
PHOTO #5 - POTHOLES IN ASPHALT ALONG
NORTH SIDEWALK
PHOTO #6 - POTHOLE IN SOUTH SIDEWALK
PHOTO #7 - SCALING OF CONCRETE WITH EFFLORESCENCE ALONG
NORTH SIDE OF WEST ARCH
PHOTO #8 - GENERAL UNDERSIDE VIEW OF CENTER SPAN
PHOTO #9 - SCALING WITH EFFLORESCENCE ALONG NORTH SIDE OF
ARCH
PHOTO #10 - TRANSVERSE CRACKS IN BOTTOM OF ARCH AT
SOUTHEAST CORNER; NOTE EFFLORESCENCE
PHOTO #11 - MISSING MORTAR AT BOTTOM OF RING STONES AT
SOUTH END OF WEST PIER
PHOTO #12 - GENERAL VIEW OF WEST ABUTMENT
PHOTO #13 - SPALLS IN BOTTOM OF WEST ABUTMENT WITH EXPOSED
REBAR
PHOTO #14 - SCALING OF WEST ABUTMENT CONCRETE AT BOTH
ENDS; NOTE EFFLORESCENCE
PHOTO #15 - GENERAL VIEW OF EAST ABUTMENT
PHOTO #16 - GENERAL VIEW OF WEST PIER, EAST FACE
PHOTO #17 - GENERAL VIEW OF WEST PIER, WEST FACE
PHOTO #18 - ABRASION ON WEST FACE OF WEST PIER ALONG
WATERLINE
PHOTO #19 - 30" OF UNDERMINING ALONG UPSTREAM FACE OF WEST
PIER
PHOTO #20 - ABRASION AND VOIDS (GOING BACK UP TO 4") IN
DOWNSTREAM FACE OF WEST PIER
PHOTO #21 - GENERAL VIEW OF EAST FACE OF EAST PIER
PHOTO #22 - ABRASION ON WEST FACE OF EAST PIER WALL
PHOTO #23 - VOIDS IN WEST FACE OF EAST PIER
PHOTO #24 - ABRASION ON EXPOSED FOOTING AT UPSTREAM END OF
EAST PIER; NOTE EXPOSED FORM BOARDS
PHOTO #25 - EFFLORESCENCE FROM STONE MASONRY MORTAR
JOINTS AT NORTH END OF EAST PIER
PHOTO #26 - UNDERMINED TREE AT SOUTH END OF WEST PIER
PHOTO #27 - EFFLORESCENCE FROM NORTHWEST WINGWALL
MORTAR JOINTS
PHOTO #28 - DETERIORATED MORTAR JOINTS AT UPSTREAM END OF
WEST PIER
PHOTO #29 - LOOKING UPSTREAM
PHOTO #30 - LOOKING DOWNSTREAM
File details come from the government source that posted it.