PROJECT_DESCRIPTION_DAR_2018.pdf
PDF 23 KB Posted
- Attached to
- MT DAR 2018(1), Defense Access Roads FY 2018
- Solicitation number
- 69056718B000015
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary.pdf | ||
| Amendment_A003.pdf | ||
| Q&A_6-20-18.pdf | ||
| Amendment_A002.pdf | ||
| Q&A_6-19-18.pdf | ||
| Amendment_A001.pdf | ||
| Plan_Request_form.pdf | ||
| mt-d201801_DAR2018(1)_Plans_Signoff_2018-05-15.pdf | ||
| IFB_MT_DAR_2018(1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT DAR 2018(1), Defense Access Roads FY 2018 in Lewiston and Judith Basin Counties.
The work consists of Roadway reconditioning, aggregate surfacing, aggregate stabilization, cattle guards, and drainage. and other small items of work.
Project length: 58 Miles
Tentative Fixed Completion Date: Fall 2019 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $3 million to $7 million
Location: Various Miles Northeast, East and West of Lewiston, MT
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
(rev 8/16) Page 3 Project No/Name: MT DAR 2018(1), Defense Access Roads FY 2018
A dd iti on al S ch
Sc h
N am e
A
A dd iti on al
N am e
_B iti on al
N am e
C
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes Yes Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes Yes Yes 154 Contractor Sampling & Testing (yes/no) Yes Yes Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes 157 Soil Erosion & Sediment Control (erosion control devices) Fiber Roll Check Dam
890 LNFT
132 EACH
1,040 LNFT
132 EACH
1,990 LNFT
132 EACH
158 Watering for Dust Control 4,220 MGAL 5,288 MGAL 6,211 MGAL DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Class 2 Class 3
44 CUYD
0 CUYD
54 CUYD
44 CUYD
54 CUYD
96 CUYD
DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 2,005 TON 2,395 TON 2,765 TON 303 Road Reconditioning 214,526 LNFT 261,835 LNFT 303,705 LNFT 311 Stabilized Aggregate Surface Course Calcium Chloride
99,408 TON
1,855 TON
127,578 TON
2,357 TON
141,522 TON
2,784 TON
Project No/Name: MT DAR 2018(1), Defense Access Roads FY 2018 iti on al
N am e
A
A dd iti on al
N am e
_B iti on al
N am e
C
DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both) 24-inch pipe 36-inch pipe 18-inch pipe 30-inch pipe 48-inch pipe
90 LNFT
52 LNFT
74 LNFT
40 LNFT
0 LNFT
90 LNFT
52 LNFT
74 LNFT
164 LNFT
0 LNFT
90 LNFT
52 LNFT
74 LNFT
202 LNFT
50 LNFT
607 Cleaning, Relaying, & Repairing Existing Drainage Structures Cleaning culverts in place Repair Drainage Structure
35 EACH
15 EACH
38 EACH
20 EACH
39 EACH
23 EACH
619 Fences, Gates, Cattle Guards & Bollard Posts Remove and reset fence 20 LNFT 20 LNFT 40 LNFT 622 Rental Equipment (yes/no) Yes Yes Yes 623 General Labor (yes/no) Yes Yes Yes 635 Temporary Traffic Control – Flagger 2,520 FXHR 3,220 FXHR 3,760 FXHR 635 Temporary Traffic Control LPSM LPSM LPSM
File details come from the government source that posted it.