PROJECT_DESCRIPTION_DAR_2018.pdf

PDF 23 KB Posted

Attached to
MT DAR 2018(1), Defense Access Roads FY 2018
Solicitation number
69056718B000015
Issued by

View the file

Other files

File Type Posted
Bid_Opening_Summary.pdf PDF
Amendment_A003.pdf PDF
Q&A_6-20-18.pdf PDF
Amendment_A002.pdf PDF
Q&A_6-19-18.pdf PDF
Amendment_A001.pdf PDF
Plan_Request_form.pdf PDF
mt-d201801_DAR2018(1)_Plans_Signoff_2018-05-15.pdf PDF
IFB_MT_DAR_2018(1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT DAR 2018(1), Defense Access Roads FY 2018 in Lewiston and Judith Basin Counties.

The work consists of Roadway reconditioning, aggregate surfacing, aggregate stabilization, cattle guards, and drainage. and other small items of work.

Project length: 58 Miles

Tentative Fixed Completion Date: Fall 2019 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $3 million to $7 million

Location: Various Miles Northeast, East and West of Lewiston, MT

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

(rev 8/16) Page 3 Project No/Name: MT DAR 2018(1), Defense Access Roads FY 2018

A dd iti on al S ch

Sc h

N am e

A

A dd iti on al

N am e

_B iti on al

N am e

C

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes Yes Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes Yes Yes 154 Contractor Sampling & Testing (yes/no) Yes Yes Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes 157 Soil Erosion & Sediment Control (erosion control devices) Fiber Roll Check Dam

890 LNFT

132 EACH

1,040 LNFT

132 EACH

1,990 LNFT

132 EACH

158 Watering for Dust Control 4,220 MGAL 5,288 MGAL 6,211 MGAL DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Class 2 Class 3

44 CUYD

0 CUYD

54 CUYD

44 CUYD

54 CUYD

96 CUYD

DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 2,005 TON 2,395 TON 2,765 TON 303 Road Reconditioning 214,526 LNFT 261,835 LNFT 303,705 LNFT 311 Stabilized Aggregate Surface Course Calcium Chloride

99,408 TON

1,855 TON

127,578 TON

2,357 TON

141,522 TON

2,784 TON

Project No/Name: MT DAR 2018(1), Defense Access Roads FY 2018 iti on al

N am e

A

A dd iti on al

N am e

_B iti on al

N am e

C

DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both) 24-inch pipe 36-inch pipe 18-inch pipe 30-inch pipe 48-inch pipe

90 LNFT

52 LNFT

74 LNFT

40 LNFT

0 LNFT

90 LNFT

52 LNFT

74 LNFT

164 LNFT

0 LNFT

90 LNFT

52 LNFT

74 LNFT

202 LNFT

50 LNFT

607 Cleaning, Relaying, & Repairing Existing Drainage Structures Cleaning culverts in place Repair Drainage Structure

35 EACH

15 EACH

38 EACH

20 EACH

39 EACH

23 EACH

619 Fences, Gates, Cattle Guards & Bollard Posts Remove and reset fence 20 LNFT 20 LNFT 40 LNFT 622 Rental Equipment (yes/no) Yes Yes Yes 623 General Labor (yes/no) Yes Yes Yes 635 Temporary Traffic Control – Flagger 2,520 FXHR 3,220 FXHR 3,760 FXHR 635 Temporary Traffic Control LPSM LPSM LPSM

File details come from the government source that posted it.