mt-d201801_DAR2018(1)_Plans_Signoff_2018-05-15.pdf
PDF 9 MB Posted
- Attached to
- MT DAR 2018(1), Defense Access Roads FY 2018
- Solicitation number
- 69056718B000015
About this file
Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary.pdf | ||
| Amendment_A003.pdf | ||
| Q&A_6-20-18.pdf | ||
| Amendment_A002.pdf | ||
| Q&A_6-19-18.pdf | ||
| Amendment_A001.pdf | ||
| Plan_Request_form.pdf | ||
| IFB_MT_DAR_2018(1).pdf | ||
| PROJECT_DESCRIPTION_DAR_2018.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Road Number
M-10 N-02 N-04 N-05 N-06 N-10 O-11 ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 90 420 30 260 60 30 890
A0140 15706-0200 SOIL EROSION CONTROL, CHECK
DAM EACH 132 132
A0160 15801-0000 WATERING FOR DUST CONTROL MGAL 205 644 1,251 572 912 197 344 4,125
A0180 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 (ENERGY DISSIPATOR) CUYD 4 3 3 10
A0200 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 (RIPRAP HEADWALL) CUYD 22 4 26
A0220 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 8 8
A0240 25101-2600 PLACED RIPRAP, METHOD B,
CLASS 6 CUYD 200 200
A0260 30202-2000 ROADWAY AGGREGATE, METHOD 2
(M ROADS) TON 30 30
A0280 30202-2000 ROADWAY AGGREGATE, METHOD 2
(N ROADS) TON 255 295 280 620 125 1,575
A0300 30202-2000 ROADWAY AGGREGATE, METHOD 2
(O ROADS) TON 400 400
A0320 30302-6000 ROADWAY RECONDITIONING Contract Quantity
(FOREST GROVE RD) LNFT 55,440 40,392 95,832
A0340 30302-6000 ROADWAY RECONDITIONING LNFT 13,094 29,198 25,344 8,712 36,274 112,622 Contract Quantity
A0360 31103-3000 STABILIZED AGGREGATE SURFACE
COURSE, CALCIUM CHLORIDE,
IMPORTED AGGREGATE (M ROADS) TON 3,669 3,669
A0380 31103-3000 STABILIZED AGGREGATE SURFACE
COURSE, CALCIUM CHLORIDE,
IMPORTED AGGREGATE (N ROADS) TON 16,697 33,011 15,091 24,051 5,187 94,037
A0400 31110-0000 CALCIUM CHLORIDE TON 122 298 589 269 429 92 1,799
A0420 60201-0800 24-INCH PIPE CULVERT LNFT 90 90
A0440 60201-1000 36-INCH PIPE CULVERT LNFT 52 52
A0460 60202-0200 18-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 40 34 74
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-M ay -2
3:
P M
F:
\h ig hw ay s\
FH
W
A\
_m t-d2
1_ D
A R
\E st im at e\
PS
E S ig no ff C om m en ts
4\ [m t-d2
1_ Es tim at e-
_S ig no ff-
Sc he du le
_A .x ls x]
Sh ee t
STATE PROJECT
B.1DAR 2018(1)MT
SHEET
NUMBER
M-10 N-02 N-04 N-05 N-06 N-10 O-11 ALLOWANCE Bid Schedule
A0480 60202-0500 30-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 40 40
A0500 60704-0000 CLEANING CULVERT IN PLACE EACH 1 18 4 10 1 1 35
A0520 60705-0000 REPAIRING DRAINAGE STRUCTURE EACH 2 6 2 4 1 15
A0540 61921-1000 REMOVE AND RESET FENCE LNFT 20 20
A0560 62201-0300 DUMP TRUCK, 12 CUBIC YARD
MINIMUM CAPACITY HOUR 65
A0580 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 65
A0600 62201-2050 ROLLER HOUR 20
A0620 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 40
A0640 62301-0000 GENERAL LABOR HOUR 40
A0660 62901-0500 ROLLED EROSION CONTROL
PRODUCT, TYPE 2.A SQYD 2,934 2,934
A0680 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
A0700 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 60 340 840 320 600 140 180 2,480
A0720 63511-0100 TEMPORARY TRAFFIC CONTROL,
RAILROAD FLAGGER CTSM 1 1
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-M ay -2
3:
P M
F:
\h ig hw ay s\
FH
W
A\
_m t-d2
1_ D
A R
\E st im at e\
PS
E S ig no ff C om m en ts
4\ [m t-d2
1_ Es tim at e-
_S ig no ff-
Sc he du le
_A .x ls x]
Sh ee t (2
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2DAR 2018(1)MT
M-10 N-02 N-04 N-05 N-06 N-10 N-11 O-11 ALLOWANCE Bid Schedule
B0020 15101-0000 MOBILIZATION LPSM ALL
B0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
B0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
B0080 15401-0000 CONTRACTOR TESTING LPSM ALL
B0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
B0120 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 90 420 30 260 60 150 30 1,040
B0140 15706-0200 SOIL EROSION CONTROL, CHECK
DAM EACH 132 132
B0160 15801-0000 WATERING FOR DUST CONTROL MGAL 205 644 1,251 572 912 197 1,068 344 5,193
B0180 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 (ENERGY DISSIPATOR) CUYD 4 3 3 10 20
B0200 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 (RIPRAP HEADWALL) CUYD 22 4 26
B0220 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 8 8
B0240 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 (ENERGY DISSIPATOR) CUYD 18 18
B0260 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 (RIPRAP HEADWALL) CUYD 26 26
B0280 25101-2600 PLACED RIPRAP, METHOD B,
CLASS 6 CUYD 200 200
B0300 30202-2000 ROADWAY AGGREGATE, METHOD 2
(M ROADS) TON 30 30
B0320 30202-2000 ROADWAY AGGREGATE, METHOD 2
(N ROADS) TON 255 295 280 620 125 390 1,965
B0340 30202-2000 ROADWAY AGGREGATE, METHOD 2
(O ROADS) TON 400 400
B0360 30302-6000 ROADWAY RECONDITIONING Contract Quantity
(FOREST GROVE RD) LNFT 55,440 40,392 95,832
B0380 30302-6000 ROADWAY RECONDITIONING LNFT 13,094 29,198 25,344 8,712 47,309 36,274 159,931 Contract Quantity
B0400 31103-3000 STABILIZED AGGREGATE SURFACE
COURSE, CALCIUM CHLORIDE,
IMPORTED AGGREGATE (M ROADS) TON 3,669 3,669
B0420 31103-3000 STABILIZED AGGREGATE SURFACE
COURSE, CALCIUM CHLORIDE,
IMPORTED AGGREGATE (N ROADS) TON 16,697 33,011 15,091 24,051 5,187 28,170 122,207
B0440 31110-0000 CALCIUM CHLORIDE TON 122 298 589 269 429 92 502 2,301
B0460 60201-0800 24-INCH PIPE CULVERT LNFT 90 90
-M ay -2
4:
P M
F:
\h ig hw ay s\
FH
W
A\
_m t-d2
1_ D
A R
\E st im at e\
PS
E S ig no ff C om m en ts
4\ [m t-d2
1_ Es tim at e-
_S ig no ff-
Sc he du le
_B .x ls x]
Sh ee t SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.3DAR 2018(1)MT
M-10 N-02 N-04 N-05 N-06 N-10 N-11 O-11 ALLOWANCE Bid Schedule
B0480 60201-1000 36-INCH PIPE CULVERT LNFT 52 52
B0500 60202-0200 18-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 40 34 74
B0520 60202-0500 30-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 40 124 164
B0540 60202-0800 48-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 50 50
B0560 60704-0000 CLEANING CULVERT IN PLACE EACH 1 18 4 10 1 3 1 38
B0580 60705-0000 REPAIRING DRAINAGE STRUCTURE EACH 2 6 2 4 5 1 20
B0600 61921-1000 REMOVE AND RESET FENCE LNFT 20 20
B0620 62201-0300 DUMP TRUCK, 12 CUBIC YARD
MINIMUM CAPACITY HOUR 65
B0640 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 65
B0660 62201-2050 ROLLER HOUR 20
B0680 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 40
B0700 62301-0000 GENERAL LABOR HOUR 40
B0720 62901-0500 ROLLED EROSION CONTROL
PRODUCT, TYPE 2.A SQYD 2,934 2,934
B0740 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
B0760 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 60 340 840 320 600 140 700 180 3,180
B0780 63511-0100 TEMPORARY TRAFFIC CONTROL,
RAILROAD FLAGGER CTSM 1 1
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-M ay -2
4:
P M
F:
\h ig hw ay s\
FH
W
A\
_m t-d2
1_ D
A R
\E st im at e\
PS
E S ig no ff C om m en ts
4\ [m t-d2
1_ Es tim at e-
_S ig no ff-
Sc he du le
_B .x ls x]
Sh ee t (2
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.4DAR 2018(1)MT
M-10 N-02 N-04 N-05 N-06 N-10 N-11 O-7 O-11 ALLOWANCE Bid Schedule
C0020 15101-0000 MOBILIZATION LPSM ALL
C0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
C0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
C0080 15401-0000 CONTRACTOR TESTING LPSM ALL
C0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
C0120 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 90 420 30 260 60 150 950 30 1,990
C0140 15706-0200 SOIL EROSION CONTROL, CHECK
DAM EACH 132 132
C0160 15801-0000 WATERING FOR DUST CONTROL MGAL 205 644 1,251 572 912 197 1,068 923 344 6,116
C0180 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 (ENERGY DISSIPATOR) CUYD 4 3 3 10 20
C0200 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 (RIPRAP HEADWALL) CUYD 22 4 26
C0220 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 8 8
C0240 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 (ENERGY DISSIPATOR) CUYD 18 18
C0260 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 (RIPRAP HEADWALL) CUYD 26 52 78
C0280 25101-2600 PLACED RIPRAP, METHOD B,
CLASS 6 CUYD 200 200
C0300 30202-2000 ROADWAY AGGREGATE, METHOD 2
(M ROADS) TON 30 30
C0320 30202-2000 ROADWAY AGGREGATE, METHOD 2
(N ROADS) TON 255 295 280 620 125 390 1,965
C0340 30202-2000 ROADWAY AGGREGATE, METHOD 2
(O ROADS) TON 370 400 770
C0360 30302-6000 ROADWAY RECONDITIONING Contract Quantity
(FOREST GROVE RD) LNFT 55,440 40,392 95,832
C0380 30302-6000 ROADWAY RECONDITIONING LNFT 13,094 29,198 25,344 8,712 47,309 41,870 36,274 201,801 Contract Quantity
C0400 31103-3000 STABILIZED AGGREGATE SURFACE
COURSE, CALCIUM CHLORIDE,
IMPORTED AGGREGATE (M ROADS) TON 3,669 3,669
C0420 31103-3000 STABILIZED AGGREGATE SURFACE
COURSE, CALCIUM CHLORIDE,
IMPORTED AGGREGATE (N ROADS) TON 16,697 33,011 15,091 24,051 5,187 28,170 122,207
-M ay -2
4:
P M
F:
\h ig hw ay s\
FH
W
A\
_m t-d2
1_ D
A R
\E st im at e\
PS
E S ig no ff C om m en ts
4\ [m t-d2
1_ Es tim at e-
_S ig no ff-
Sc he du le
_C .x ls x]
Sh ee t SUMMARY OF QUANTITIES - Schedule C
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.5DAR 2018(1)MT
M-10 N-02 N-04 N-05 N-06 N-10 N-11 O-7 O-11 ALLOWANCE Bid Schedule
C0440 31103-3000 STABILIZED AGGREGATE SURFACE
COURSE, CALCIUM CHLORIDE,
IMPORTED AGGREGATE (O ROADS) TON 23,944 23,944
C0460 31110-0000 CALCIUM CHLORIDE TON 122 298 589 269 429 92 502 427 2,728
C0480 60201-0800 24-INCH PIPE CULVERT LNFT 90 90
C0500 60201-1000 36-INCH PIPE CULVERT LNFT 52 52
C0520 60202-0200 18-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 40 34 74
C0540 60202-0500 30-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 40 124 38 202
C0560 60202-0800 48-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 50 50
C0580 60704-0000 CLEANING CULVERT IN PLACE EACH 1 18 4 10 1 3 1 1 39
C0600 60705-0000 REPAIRING DRAINAGE STRUCTURE EACH 2 6 2 4 5 3 1 23
C0620 61921-1000 REMOVE AND RESET FENCE LNFT 20 20 40
C0640 62201-0300 DUMP TRUCK, 12 CUBIC YARD
MINIMUM CAPACITY HOUR 65
C0660 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 65
C0680 62201-2050 ROLLER HOUR 20
C0700 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 40
C0720 62301-0000 GENERAL LABOR HOUR 40
C0740 62901-0500 ROLLED EROSION CONTROL
PRODUCT, TYPE 2.A SQYD 2,934 2,934
C0760 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
C0780 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 60 340 840 320 600 140 700 540 180 3,720
C0800 63511-0100 TEMPORARY TRAFFIC CONTROL,
RAILROAD FLAGGER CTSM 1 1
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-M ay -2
4:
P M
F:
\h ig hw ay s\
FH
W
A\
_m t-d2
1_ D
A R
\E st im at e\
PS
E S ig no ff C om m en ts
4\ [m t-d2
1_ Es tim at e-
_S ig no ff-
Sc he du le
_C .x ls x]
Sh ee t (2
SUMMARY OF QUANTITIES - Schedule C
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.6DAR 2018(1)MT
2 2.48 1 5.53 1 10.50 1 4.80 1 7.65 1 1.65 3 6.87
39.48 1 8.96
48.44 1 7.93
56.37
[1] Quantities are based on the following:
1. 50 MGAL/mile for roadway reconditioning and dust control.
2. 0.022 MGAL/TON for imported surface course aggregate.
[2] Quantities based on the following:
1. 15 TON/approach for private approaches.
2. 10 TON/approach for farm field approaches.
3. 40 TON/approach for public approaches.
4. 60 TON/approach for missile launch facility approaches.
5. 40 TON/turnout for public roadway turnouts.
[3] Quantities based on the following:
1. 30 TON/approach for missile launch facility
[4] Quantities are based on 1.93 TON/CUYD.
[5] Calcium chloride quantities based on 1.85% by dry weight of item 31103-3000 and 1.50% by unit weight of in-place aggregate for Typical Section No. 2.
[6] See Sheets C.2 - C.3.
[7] Place roadway aggregate on areas with insufficient existing aggregate surfacing, as directed.
MAINLINE TYPICAL SECTION QUANTITIES - MINUTEMAN MISSILE BASE ROADS
N-06
Schedule A Total
N-10
N-11 Schedule B Total
94,037 0 1,799
2,301
Schedule C Total O-07
Road Number
N-02 N-04 N-05
M-10
Item 30202-2000 Roadway aggregate, method 2
(N Roads) [2] [4]
0122,2075,193 3,669 28,170
41,870
FOOTNOTE:
4,125 112,622 95,832
122,207
Item 31103-3000 Stabilized aggregate surface course, calcium chloride, imported aggregate
(N Roads) [4]
(TON)
16,697
24,051
3,669
Item 31103-3000 Stabilized aggregate surface course, calcium chloride, imported aggregate (M Roads) [4]
1,965
201,801
1,965
Typical No. [6]
1,251
Miles
6,116
Item 15801-0000 Watering for dust control [1]
(MGAL)
Schedule B Total
Schedule A Total
(TON)
1,575
(TON)
3,669
36,274
1,068 47,309 159,931 95,832
Road Number
M-10 N-02 N-04
N-10
N-11
N-05 N-06
O-11
5,187
644 29,198
15,091 33,011
25,344 40,392
Item 31110-0000 Calcium chloride [5]
23,944 2,728 23,944
(TON)(TON)
(LNFT)
13,094
8,712
(TON)
3,669
55,440
Item 31103-3000 Stabilized aggregate surface course, calcium chloride, imported aggregate
(O Roads) [4]
(LNFT)
Item 30302-6000 Roadway reconditioning (Forest Grove Rd)
Item 30302-6000 Roadway reconditioning
Schedule C Total 95,832
ROADWAY AGGREGATE QUANTITIES
O-11 [7] 400
O-07
Item 30202-2000 Roadway aggregate, method 2
(M Roads) [3] [4]
(TON)
Item 30202-2000 Roadway aggregate, method 2
(O Roads) [4]
STATE PROJECT
DAR 2018(1) C.1MT
F:
\h ig hw ay s\
FH
W A\
_m t-d2
1_
D A R
\D es ig n\ Ty pi ca l S ec ti on s\ [m t-
-M ay
-2
4:
P
M S
M ar kw ar dt 3/
B
Th om ps on
3/
D es ig ne d by
C he ck ed b y:
NUMBER
TABULATION OF TYPICAL
SECTION QUANTITIES
0.69 LT
3.88 RT
Larry Phillips
302 South Dawes St., Lewistown, MT 59457
(406) 670-0884
Noah Davis
Bud Pederson
M-10 Central Montana Rail, Inc. 100 W. Railroad Ave., Denton, MT 59430 Carla Allen (406) 567-2223
1620 Airport Rd., Lewistown, MT 59457
Express Pipeline (Spectra Energy)
(406) 731-2459
(406) 394-2751
USAF - Malmstrom Cable Affairs
Scott Leeds Bruce Kudrna
(406) 394-2786
Matt Auger Ron Corkin
P.O. Box 1140, Havre, MT 59501Triangle Communications
NorthWestern Energy
M-10, N-04, N-06, N-10, N-11, & O-07 Fergus Electric Cooperative, Inc. 84423 US HWY 87, Lewistown, MT 59457
Mid-Rivers Telephone Cooperative 904 C Ave/PO Box 280, Circle, MT 59215
M-10, O-07, & O-11
Suite 352, 800 Werner Ct., Casper, WY 82601
N-04, N-05, N-06, N-10, & N-11
M-10
M-10, N-02, N-04, N-05, N-06, N-10, N-11, O-07, & O-11
M-10 N-02, N-04, N-05, N-06, N-10, N-11, O-07, & O-11
AddressCompany
1021 Chestnut St., Helena, MT 59601CenturyLink Communications, Inc.
6932 Goddard Dr., Bldg. 165, Rm. 153, Malmstrom AFB, MT 59402
Montana Department of Transportation
Brent Bushnell (406) 441-7649
(406) 538-3465Monte Obert Guy Johnson
UTILITY CONTACT INFORMATION
(406) 538-1201
Road Number
M-10, N-04, & N-06
Phone #Contact
Brian Tomlinson
(406) 535-7501
(406) 538-1301
Schedule C Total O-07
N-04
FENCE QUANTITIES
Item 61921-1000 Remove and reset fence
(LNFT)
Road Number
Schedules A & B Total
M.P.
STATE PROJECT
DAR 2018(1) D.1MT
F:
\h ig hw ay s\
FH
W
A\
_m t-d2
1_ D
A R
\D es ig n\ Pl an a nd P ro fil e\ [m t-
-M ar
-2
1:
P
M S
M ar kw ar dt 3/
B
Th om ps on
3/
D es ig ne d by
C he ck ed b y:
NUMBER
TABULATION OF PLAN
QUANTITIES
10.4 x 16 25101 -0200
25101 -0200
25101 -0200
25101 -0300
25101 -0300
25101 -2600
60201 -0800
60201 -1000
60202 -0200
60202 -0500
60202 -0800
60704 -0000
60705 -0000
Mile Post
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
(F
O R I
N
FO
R M
A
TI
O N
O N
LY
S
TR
U C
TU
R A L
EX
C A V A
TI
N
R I
N
FO
R M
A
TI
O N
O N
LY
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
R
IP
R A P
H
EA
D W
A
LL
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
EN
ER
G
Y D
IS
S
IP
A
TO
R
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
R
IP
R A P
H
EA
D W
A
LL
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
EN
ER
G
Y D
IS
S
IP
A
TO
R
PL
A C
ED
R
IP
R A P, M
ET
H O
D B
C
LA
S S
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C H
E Q
U
IV
A
LE
N T
D
IA
M
ET
ER
A
R C H
O R E
LL
IP
TI
C A L
PI
PE
C U
LV
ER
T
-I N
C H
E Q
U
IV
A
LE
N T
D
IA
M
ET
ER
A
R C H
O R E
LL
IP
TI
C A L
PI
PE
C U
LV
ER
T
-I N
C H
E Q
U
IV
A
LE
N T
D
IA
M
ET
ER
A
R C H
O R E
LL
IP
TI
C A L
PI
PE
C U
LV
ER
T
C
LE
A N
IN
G
C U
LV
ER
T
IN
P
LA
C E
R
EP
A
IR
IN
G
D R A
IN
A G
E S
TR
U C
TU
R E
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered footnotes
FEET CUYD CUYD CUYD CUYD CUYD CUYD CUYD LNFT LNFT LNFT LNFT LNFT EACH EACH Lt Rt M-10
10.60 1
10.96 5 169 52 x/GS,C
M-10 Total 169 52 1
N-02
4.91 1
4.92 1
N-02 Total 2
N-04
0.15 1
0.44 1
0.69 1 10 40 x/C
0.98 1
2.67 1
3.58 1
4.34 1
4.44 1
4.51 1
5.16 1
5.67 1
5.83 3 23 40 x/C
5.90 1
6.14 1
6.24 1
6.36 1
6.93 1
7.45 1
7.64 1
7.85 1
8.31 4 4
CUMULATIVE TOTAL 202 0 0 4 0 0 0 40 52 40 0 0 15 6
Allowable Pipe Material
NOTE: FOOTNOTE: A Aluminum
1. Steel pipe, aluminized steel pipe, and aluminum pipe culvert 1. Twin pipe installation. 8. Class 2 Riprap ditch stabilization. AS Aluminized steel minimum wall thickness is the thickness required by the Std. 602-1 fill 2. Class 2 Riprap headwall at inlet. See Sheet F.5. See Sheet F.7. C Concrete height table, unless otherwise noted on plans. 3. Class 2 Riprap headwall at outlet. See Sheet F.5. 9. Approach pipe. GS Galvanized steel
2. Maintain cover per manufacturer's recommendations on all 4. Class 2 Energy dissipator at outlet. See Sheet F.5. 10. Install ditch berm at inlet based on (blank) Any appropriate material culverts under live loading during construction. 5. Class 3 Riprap headwall at inlet. See Sheet F.6. Std. 602-6 and as directed. See Sheet F.11. x/__ Any appropriate material
6. Class 3 Riprap headwall at outlet. See Sheet F.6. Estimated embankment quantity is 5 CUYD. except __
7. Class 3 Energy dissipator at outlet. See Sheet F.6. 11. Class 6 Riprap channel stabilization. See Sheet F.7.
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
F:
\h ig hw ay s\
FH
W A\
_m t-d2
1_
D A R
\D es ig n\ D ra in ag e\
[m t-
-M ay -2
5:
S
M ar kw ar dt 3/
B
Th om ps on
3/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
F.1
SHEET
NUMBER
DAR 2018(1)MT
Note: The quantities shown hereon are approximate and are subject to field adjustments.
-0200
25101 -0200
25101 -0200
25101 -0300
25101 -0300
25101 -2600
60201 -0800
60201 -1000
60202 -0200
60202 -0500
60202 -0800
60704 -0000
60705 -0000
Mile Post
ES
TI
M A
TE
D M
A X
IM
U M
C O
R I
N
FO
R M
A
TI
O N
O N
LY
S
TR
U C
TU
R A L
EX
C A V A
TI
R I
N
FO
R M
A
TI
O N
O N
LY
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
R
IP
R A P
H
EA
D W
A
LL
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
EN
ER
G
Y D
IS
S
IP
A
TO
R
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
R
IP
R A P
H
EA
D W
A
LL
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
EN
ER
G
Y D
IS
S
IP
A
TO
R
PL
A C
ED
R
IP
R A P, M
ET
H O
D B
C
LA
S S
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C H
E Q
U
IV
A
LE
N T
D
IA
M
ET
ER
A
R C H
O R E
LL
IP
TI
C A L
PI
PE
C U
LV
ER
T
-I N
C H
E Q
U
IV
A
LE
N T
D
IA
M
ET
ER
A
R C H
O R E
LL
IP
TI
C A L
PI
PE
C U
LV
ER
T
-I N
C H
E Q
U
IV
A
LE
N T
D
IA
M
ET
ER
A
R C H
O R E
LL
IP
TI
C A L
PI
PE
C U
LV
ER
T
C
LE
A N
IN
G
C U
LV
ER
T
IN
P
LA
C E
R
EP
A
IR
IN
G
D R A
IN
A G
E S
TR
U C
TU
R E
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered footnotes
FEET CUYD CUYD CUYD CUYD CUYD CUYD CUYD LNFT LNFT LNFT LNFT LNFT EACH EACH Lt Rt
PREVIOUS SHEET: 202 4 40 52 40 15 6
8.64 1
8.73 1
8.89 2 25 50 x/C
9.55 1
9.87 1
10.10 1
10.47 1
N-04 Total 58 4 90 40 18 6
N-05
0.81 1
1.47 1
1.58 1
2.23 1
2.35 1
2.65 3 4
3.91 1
N-05 Total 3 4 2
N-06
2.73 1
3.34 1
3.52 1
4.09 15 3 1 2, 3, 4
4.4 1
4.59 1
4.67 1
5.04 1
5.24 7 2
5.44 1
5.94 1 1
CUMULATIVE TOTAL 227 0 22 10 0 0 0 90 52 40 0 0 31 12
Allowable Pipe Material
NOTE: FOOTNOTE: A Aluminum
1. Steel pipe, aluminized steel pipe, and aluminum pipe culvert 1. Twin pipe installation. 8. Class 2 Riprap ditch stabilization. AS Aluminized steel minimum wall thickness is the thickness required by the Std. 602-1 fill 2. Class 2 Riprap headwall at inlet. See Sheet F.5. See Sheet F.7. C Concrete height table, unless otherwise noted on plans. 3. Class 2 Riprap headwall at outlet. See Sheet F.5. 9. Approach pipe. GS Galvanized steel
2. Maintain cover per manufacturer's recommendations on all 4. Class 2 Energy dissipator at outlet. See Sheet F.5. 10. Install ditch berm at inlet based on (blank) Any appropriate material culverts under live loading during construction. 5. Class 3 Riprap headwall at inlet. See Sheet F.6. Std. 602-6 and as directed. See Sheet F.11. x/__ Any appropriate material
6. Class 3 Riprap headwall at outlet. See Sheet F.6. Estimated embankment quantity is 5 CUYD. except __
7. Class 3 Energy dissipator at outlet. See Sheet F.6. 11. Class 6 Riprap channel stabilization. See Sheet F.7.
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
F:
\h ig hw ay s\
FH
W A\
_m t-d2
1_
D A R
\D es ig n\ D ra in ag e\
[m t-
-M ay -2
9:
M ar kw ar dt 3/
B
Th om ps on
3/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
F.2
SHEET
NUMBER
DAR 2018(1)MT
Note: The quantities shown
-0200
25101 -0200
25101 -0200
25101 -0300
25101 -0300
25101 -2600
60201 -0800
60201 -1000
60202 -0200
60202 -0500
60202 -0800
60704 -0000
60705 -0000
Mile Post
ES
TI
M A
TE
D M
A X
IM
U M
C O
R I
N
FO
R M
A
TI
O N
O N
LY
S
TR
U C
TU
R A L
EX
C A V A
TI
R I
N
FO
R M
A
TI
O N
O N
LY
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
R
IP
R A P
H
EA
D W
A
LL
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
EN
ER
G
Y D
IS
S
IP
A
TO
R
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
R
IP
R A P
H
EA
D W
A
LL
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
EN
ER
G
Y D
IS
S
IP
A
TO
R
PL
A C
ED
R
IP
R A P, M
ET
H O
D B
C
LA
S S
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C H
E Q
U
IV
A
LE
N T
D
IA
M
ET
ER
A
R C H
O R E
LL
IP
TI
C A L
PI
PE
C U
LV
ER
T
-I N
C H
E Q
U
IV
A
LE
N T
D
IA
M
ET
ER
A
R C H
O R E
LL
IP
TI
C A L
PI
PE
C U
LV
ER
T
-I N
C H
E Q
U
IV
A
LE
N T
D
IA
M
ET
ER
A
R C H
O R E
LL
IP
TI
C A L
PI
PE
C U
LV
ER
T
C
LE
A N
IN
G
C U
LV
ER
T
IN
P
LA
C E
R
EP
A
IR
IN
G
D R A
IN
A G
E S
TR
U C
TU
R E
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered footnotes
FEET CUYD CUYD CUYD CUYD CUYD CUYD CUYD LNFT LNFT LNFT LNFT LNFT EACH EACH Lt Rt
PREVIOUS SHEET: 227 22 10 90 52 40 31 12
6.10 1
6.91 8 1 8
7.22 1 9 34 x/C
7.34 1
7.39 1
N-06 Total 9 8 22 3 34 10 4
N-10
1.15 2 21 40 x/C
1.22 1
N-10 Total 21 40 1
O-11
4.22 4 2, 3
5.20 1
5.35 1
6.28 200 11
O-11 Total 4 200 1 1
Schedule A Total 257 8 26 10 200 90 52 74 40 35 15
CUMULATIVE TOTAL 257 8 26 10 0 0 200 90 52 74 40 0 35 15
Allowable Pipe Material
NOTE: FOOTNOTE: A Aluminum
1. Steel pipe, aluminized steel pipe, and aluminum pipe culvert 1. Twin pipe installation. 8. Class 2 Riprap ditch stabilization. AS Aluminized steel minimum wall thickness is the thickness required by the Std. 602-1 fill 2. Class 2 Riprap headwall at inlet. See Sheet F.5. See Sheet F.7. C Concrete height table, unless otherwise noted on plans. 3. Class 2 Riprap headwall at outlet. See Sheet F.5. 9. Approach pipe. GS Galvanized steel
2. Maintain cover per manufacturer's recommendations on all 4. Class 2 Energy dissipator at outlet. See Sheet F.5. 10. Install ditch berm at inlet based on (blank) Any appropriate material culverts under live loading during construction. 5. Class 3 Riprap headwall at inlet. See Sheet F.6. Std. 602-6 and as directed. See Sheet F.11. x/__ Any appropriate material
6. Class 3 Riprap headwall at outlet. See Sheet F.6. Estimated embankment quantity is 5 CUYD. except __
7. Class 3 Energy dissipator at outlet. See Sheet F.6. 11. Class 6 Riprap channel stabilization. See Sheet F.7.
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
F:
\h ig hw ay s\
FH
W A\
_m t-d2
1_
D A R
\D es ig n\ D ra in ag e\
[m t-
-M ay -2
M ar kw ar dt 3/
B
Th om ps on
3/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
F.3
SHEET
NUMBER
DAR 2018(1)MT
Note: The quantities shown
-0200
25101 -0200
25101 -0200
25101 -0300
25101 -0300
25101 -2600
60201 -0800
60201 -1000
60202 -0200
60202 -0500
60202 -0800
60704 -0000
60705 -0000
Mile Post
ES
TI
M A
TE
D M
A X
IM
U M
C O
R I
N
FO
R M
A
TI
O N
O N
LY
S
TR
U C
TU
R A L
EX
C A V A
TI
R I
N
FO
R M
A
TI
O N
O N
LY
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
R
IP
R A P
H
EA
D W
A
LL
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
EN
ER
G
Y D
IS
S
IP
A
TO
R
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
R
IP
R A P
H
EA
D W
A
LL
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
EN
ER
G
Y D
IS
S
IP
A
TO
R
PL
A C
ED
R
IP
R A P, M
ET
H O
D B
C
LA
S S
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C H
E Q
U
IV
A
LE
N T
D
IA
M
ET
ER
A
R C H
O R E
LL
IP
TI
C A L
PI
PE
C U
LV
ER
T
-I N
C H
E Q
U
IV
A
LE
N T
D
IA
M
ET
ER
A
R C H
O R E
LL
IP
TI
C A L
PI
PE
C U
LV
ER
T
-I N
C H
E Q
U
IV
A
LE
N T
D
IA
M
ET
ER
A
R C H
O R E
LL
IP
TI
C A L
PI
PE
C U
LV
ER
T
C
LE
A N
IN
G
C U
LV
ER
T
IN
P
LA
C E
R
EP
A
IR
IN
G
D R A
IN
A G
E S
TR
U C
TU
R E
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered footnotes
FEET CUYD CUYD CUYD CUYD CUYD CUYD CUYD LNFT LNFT LNFT LNFT LNFT EACH EACH Lt Rt
PREVIOUS SHEET: 257 8 26 10 200 90 52 74 40 35 15
N-11
0.01 4 4
0.59 1
1.00 1
1.54 1
1.76 1
2.08 1
4.58 6 1 4
5.12 1
5.78 1
8.28 3 33 42 x/GS,C
8.41 2 8 38 x/GS,C
8.76 3 32 44 x/GS,C 10
8.88 2 135 26 18 50 x/GS,C 5, 6, 7
N-11 Total 208 10 26 18 124 50 3 5
Schedule B Total 465 8 26 20 26 18 200 90 52 74 164 50 38 20
O-07
0.48 1
1.19 1
2.45 2 20 38 x/C
3.88 32 1, 5, 6
4.37 20 5, 6
5.12 1
6.77 1 9
O-07 Total 20 52 38 1 3
Schedule C Total 485 8 26 20 78 18 200 90 52 74 202 50 39 23
PROJECT TOTAL 485 8 26 20 78 18 200 90 52 74 202 50 39 23
Allowable Pipe Material
NOTE: FOOTNOTE: A Aluminum
1. Steel pipe, aluminized steel pipe, and aluminum pipe culvert 1. Twin pipe installation. 8. Class 2 Riprap ditch stabilization. AS Aluminized steel minimum wall thickness is the thickness required by the Std. 602-1 fill 2. Class 2 Riprap headwall at inlet. See Sheet F.5. See Sheet F.7. C Concrete height table, unless otherwise noted on plans. 3. Class 2 Riprap headwall at outlet. See Sheet F.5. 9. Approach pipe. GS Galvanized steel
2. Maintain cover per manufacturer's recommendations on all 4. Class 2 Energy dissipator at outlet. See Sheet F.5. 10. Install ditch berm at inlet based on (blank) Any appropriate material culverts under live loading during construction. 5. Class 3 Riprap headwall at inlet. See Sheet F.6. Std. 602-6 and as directed. See Sheet F.11. x/__ Any appropriate material
6. Class 3 Riprap headwall at outlet. See Sheet F.6. Estimated embankment quantity is 5 CUYD. except __
7. Class 3 Energy dissipator at outlet. See Sheet F.6. 11. Class 6 Riprap channel stabilization. See Sheet F.7.
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
F:
\h ig hw ay s\
FH
W A\
_m t-d2
1_
D A R
\D es ig n\ D ra in ag e\
[m t-
-M ay -2
M ar kw ar dt 3/
B
Th om ps on
3/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
F.4
SHEET
NUMBER
DAR 2018(1)MT
Note: The quantities shown
EACH 6 1 G20-1 36 x 18 6 27 EACH 40 2 G20-2 36 x 18 6 27 EACH 40 3 M4-8 24 x 18 1 3 EACH 12 4 M4-8a 24 x 18 2 6
5 M4-9R 30 x 24 1 5 6 M4-9L 30 x 24 1 5 7 M4-10R 48 x 18 1 6 8 R11-2 48 x 30 2 20
10 W3-4 36 x 36 6 54 11 W8-6 36 x 36 2 18 12 W13-1P 24 x 24 2 8 13 W20-1 36 x 36 12 108 14 W20-3 36 x 36 3 27 15 W20-3 36 x 36 3 27 16 W20-4 36 x 36 2 18 17 W20-7 36 x 36 6 54
1. Install all signs according to Standard 635-14 and Part 6 of the M.U.T.C.D.
2. Estimated temporary traffic control quantities based on three active work sites.
[1] For information only.
[2] Install signs 500 feet on either side of the material source entrance road.
[3] See Sheet G.3.
FOOTNOTE:
N-06 600 N-10 140
O-07 540
O-11 180 Schedule A Total 2,480
N-11 700
NOTE:
ROAD WORK AHEAD
TRUCK CROSSING [2]
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGNS [1]
ALL SCHEDULES
Sign Number
MUTCD
Number Description Sign size
(in x in) Number of signs
Quantity
(SQFT)
ROAD CLOSED 1000 FT
ROAD CLOSED 500 FT
ONE LANE ROAD AHEAD
1 12.5
BE PREPARED TO STOP
30ROAD CLOSED 1 MILE AHEAD
LOCAL TRAFFIC ONLY 60 x
TEMPORARY TRAFFIC CONTROL QUANTITIES,
CHANNELIZING DEVICES [1]
ALL SCHEDULES
Description Unit Quantity
DETOUR RIGHT
9 R11-3a
END ROAD WORK
END DETOUR
DETOUR LEFT
DETOUR RIGHT
ROAD CLOSED
DETOUR
Temporary traffic control, barricade type 3
25 MPH
ROAD WORK NEXT XX MILES
Temporary traffic control, cone, type 36-inch Temporary traffic control, drum Temporary traffic control, warning light type C
ITEM 63509-1000
TEMPORARY TRAFFIC
CONTROL, FLAGGER
FLAGGER (SYMBOL)
N-05 320
N-02 340 N-04 840
60M-10
N KOLIN ROAD CLOSED
XX MILES AHEAD
USE ALT ROUTE [3]
54 x
Road Number Quantity
(FX HR)
Total
2736 2
Schedule B Total 3,180
Schedule C Total 3,720
Ref-1
STATE PROJECT
DAR 2018(1) G.1MT
F:
\h ig hw ay s\
FH
W
A\
_m t-d2
1_ D
A R
\D es ig n\ Te m po ra ry
T ra ff ic
C on tr ol m t-
-M ay
-2
8:
M ar kw ar dt 3/
B
Th om ps on
3/
D es ig ne d by
C he ck ed b y:
NUMBER
TABULATION OF TEMPORARY
TRAFFIC CONTROL
QUANTITIES
| A.1 |
| A.3 |
| B.1-2 |
| B.3-4 |
| B.5-6 |
| C.1 |
| C.2 |
| D.2-11 |
| E.1 |
| E-2 |
| F.1-4 |
| G.2 |
| mt-d201801_DAR2018(1)_Plans_Signoff_2018-05-11 |
| mt-d201801_Section_C_Quantities |
| mt-d201801_Section_D_Quantities |
| mt-d201801_Section_G_Quantities |
| Schedule_A |
| Schedule_B |
| Schedule_C |
File details come from the government source that posted it.