6-Interactive-Score-Sheet-NC27-116 - Informational Purposes Only.xls

XLS spreadsheet 82 KB Posted

Attached to
NC27-116 Non-Functional Turf Case Study (A)
Solicitation number
NC27-116
Issued by
Utah

About this file

Summary

This is an RFP evaluation scoresheet for Solicitation NC27-116, issued by the State of Utah Division of Purchasing through the Forestry, Fire, & State Lands department. The procurement seeks a vendor to conduct a study establishing a baseline framework for non-functional turf management in Utah and perform a detailed technical and economic case study on selected public or private institutions within the Great Salt Lake watershed. The contract term is 18 months, with the scope of work required to be completed within 12 months, followed by a 6-month administrative closeout period. Vendors must guarantee pricing for the 12-month performance period.

The evaluation scoresheet utilizes a 1,000-point total scoring system, comprising 800 technical points and 200 cost points. Technical evaluation is divided into four weighted criteria categories worth 200 points each: Statement of Qualifications (25%), Work Plan (25%), Timeline & Deliverables Schedule (25%), and References (25%), each scored on a 0–5 scale by multiple evaluators. Three mandatory pass/fail requirements address vendor experience in urban water management, turfgrass science, spatial analytics/GIS, or environmental policy; proven track record in technical research and policy report drafting; and strong understanding of Great Salt Lake watershed dynamics and Utah water law. The minimum technical threshold for contract award is 560 points (70% of 800 technical points). Cost points are calculated using a formula whereby the lowest-priced proposal receives 100% of the 200 available cost points, with other proposals receiving proportional points based on their price relative to the lowest bid.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Score Sheet

Non-Functional Turf Case Study (A)
SOLICITATION # NC27-116
RFP EVALUATION SCORESHEET
Evaluator:Score will be assigned as follows:
0 = Fail, the proposal fails to address the requirements or criteria described in the RFP or cannot be assessed due to missing information
Date:1 = Poor, the proposal inadequately addresses the requirements or criteria described in the RFP or cannot be assessed due to incomplete information
2 = Unsatisfactory, the proposal addresses the requirements or criteria described in the RFP in an unsatisfactory manner
3 = Satisfactory, the proposal addresses all requirements or criteria described in the RFP in a minimum satisfactory manner
4 = Good, the proposal addresses all requirements or criteria described in the RFP and in some respects exceeds them
5 = Excellent, the proposal addresses and exceeds all of the requirements or criteria described in the RFP
Vendor AVendor BVendor CVendor DVendor EVendor FVendor GVendor HVendor IVendor J
Minimum Mandatory RequirementsRFP SectionEvaluation (Pass/Fail)Evaluation (Pass/Fail)Evaluation (Pass/Fail)Evaluation (Pass/Fail)Evaluation (Pass/Fail)Evaluation (Pass/Fail)Evaluation (Pass/Fail)Evaluation (Pass/Fail)Evaluation (Pass/Fail)Evaluation (Pass/Fail)
1Vendor must have demonstrated experience in urban water management, turfgrass science, spatial analytics/GIS auditing, or environmental policy analysisU3P Proposal Data
2Vendor must have proven track record of conducting technical research and drafting public-facing policy reports or scientific syntheses.U3P Proposal Data
3Vendor must have a strong understanding of Great Salt Lake watershed dynamics, Utah water law, and municipal/institutional water conservation policies.U3P Proposal Data
0
Vendor AVendor BVendor CVendor DVendor EVendor FVendor GVendor HVendor IVendor J
Scoreable Technical CriteriaRFP SectionCriteria Weight% of Tech CriteriaPoints PossibleEvaluator Score (0-5)Points
EarnedEvaluator Score (0-5)Points
EarnedEvaluator Score (0-5)Points
EarnedEvaluator Score (0-5)Points
EarnedEvaluator Score (0-5)Points
EarnedEvaluator Score (0-5)Points
EarnedEvaluator Score (0-5)Points
EarnedEvaluator Score (0-5)Points
EarnedEvaluator Score (0-5)Points
EarnedEvaluator Score (0-5)Points

Earned

1Statement of QualificationsResponse to Att. D4025.0%200.000.000.000.000.000.000.000.000.000.000.00
2Work PlanResponse to Att. D4025.0%200.000.000.000.000.000.000.000.000.000.000.00
3Timeline & Deliverables ScheduleResponse to Att. D4025.0%200.000.000.000.000.000.000.000.000.000.000.00
4ReferencesResponse to Att. D4025.0%200.000.000.000.000.000.000.000.000.000.000.00
130.0%0.000.000.000.000.000.000.000.000.000.00
140.0%0.000.000.000.000.000.000.000.000.000.00
150.0%0.000.000.000.000.000.000.000.000.000.00
160.0%0.000.000.000.000.000.000.000.000.000.00
170.0%0.000.000.000.000.000.000.000.000.000.00
180.0%0.000.000.000.000.000.000.000.000.000.00
190.0%0.000.000.000.000.000.000.000.000.000.00
200.0%0.000.000.000.000.000.000.000.000.000.00
210.0%0.000.000.000.000.000.000.000.000.000.00
220.0%0.000.000.000.000.000.000.000.000.000.00
230.0%0.000.000.000.000.000.000.000.000.000.00
800.000.000.000.000.000.000.000.000.000.000.00
Required Technical Point ThresholdRFP SectionMin PercentMin Points Required
70%560.0
* Purchasing will use the following cost formula: The points assigned to each offerors cost proposal will be based on the lowest proposal price. The offeror with the lowest Proposed Price will receive 100% of the price points. All other offerors will receive a portion of the total cost points based on what percentage higher their Proposed Price is than the Lowest Proposed Price. The formula to compute the points is: Cost Points x (Lowest Proposed Price/Proposed Price).
Total Evaluation PointsPoints Possible
Total Technical Evaluation Points800.0
Total Cost Evaluation Points200.0
Total Evaluation Points1,000.0

Scoresheet Summary

XX##### Solicitation Name Scoresheet Summary
Instructions:
Enter the solicitation number and name.
Enter each Offeror name.
Enter the Criteria name for each category.
Enter the Weight in column B that corresponds to the Criteria Weight on the Score Sheet tab column J for each criterion.
Enter the Total Possible Points for each Criterion, Cost Points, and Score Summary section.
Mandatory Minimum Requirements: Evaluate each offer and enter pass or fail
Ensure that the number of evaluator lines matches the number of evaluators.
Offers not meeting the Minimum Mandatory Requirements will not be evaluated further.
Ensure that the Total Average Score formula includes all of the evaluator line items.
Technical Scores: Enter each evaluator score for each offer.
Signatures:Date:
Evaluator 1__________________
Evaluator 2__________________
Evaluator 3__________________
Evaluator 4__________________
Evaluator 5__________________
Minimum Mandatory RequirementsVendor AVendor BVendor CVendor DVendor EVendor FVendor GVendor HOfferor IOfferor JOfferor KOfferor LOfferor MOfferor NOfferor OOfferor POfferor QOfferor ROfferor SOfferor T
1
2
3
WeightTechnical ScoresVendor AVendor BVendor CVendor DVendor EVendor FVendor GVendor HOfferor IOfferor JOfferor KOfferor LOfferor MOfferor NOfferor OOfferor POfferor QOfferor ROfferor SOfferor T
Criteria #1
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #1 - Total Points (Total Possible Points = XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #2
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #2 - Total Points (Total Possible Points = XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #3
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #3 - Total Points (Total Possible Points = XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #4
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #4 - Total Points (Total Possible Points = XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #5
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #5 - Total Points (Total Possible Points = XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #6
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #6 - Total Points (Total Possible XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #7
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #7 - Total Points (Total Possible Points = XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total Technical Points (Total Possible Points = XX) Minimum Threshold = XX0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total Cost PointsCost ScoresVendor AVendor BVendor CVendor DVendor EVendor FVendor GVendor HOfferor IOfferor JOfferor KOfferor LOfferor MOfferor NOfferor OOfferor POfferor QOfferor ROfferor SOfferor T
Cost
300.0Cost Points0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Score SummaryVendor AVendor BVendor CVendor DVendor EVendor FVendor GVendor HOfferor IOfferor JOfferor KOfferor LOfferor MOfferor NOfferor OOfferor POfferor QOfferor ROfferor SOfferor T
Total Technical Points (Total Possible = XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total Cost Points (Total Possible = XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Grand Total Points (Total Possible = XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

File details come from the government source that posted it. Updated .