6-6-CR27018-27110270 Energy Envelope Complicance Certificate.pdf

PDF 414 KB Posted

Attached to
DFCM Construction - Prequalified General Stage II - General- New Storage Building - Project #27110270
Solicitation number
CR27018
Issued by
Utah

About this file

This is an Energy Envelope Compliance Certificate issued by the Division of Facilities Construction and Management (DFCM) for the State of Utah, certifying compliance with the 2024 International Energy Conservation Code (IECC) for a new pre-engineered metal storage building at Southwest Technical College in Cedar City, Utah. The project, numbered 131449 (Contract #27110270), involves construction of a single-story nonresidential storage/workshop building with a total floor area of 2,142 square feet located at 757 W 800 S, Cedar City, Utah 84720. The project is designed by Straightline Architecture, LLC under the direction of designer Nick Greenaway, RA NCARB, and is owned by Southwest Technical College with Ryan Fisher serving as the Owner/Agent. The envelope design exceeds code requirements by 9 percent and earned 62 proposed energy credits against a requirement of 36 credits, with improvements including reduced lighting power (20 credits), increased occupancy sensors (5 credits), and improved envelope performance per ASHRAE 90.1 Appendix C (37 credits). The building qualifies for renewable energy exceptions due to its effective floor area being less than 5,000 square feet.

The envelope assemblies include a metal standing seam roof with double insulation layers and thermal blocks (U-factor 0.043), an unheated slab-on-grade foundation, single-layer mineral fiber exterior walls on all four sides with thermal blocks at girts, one insulated metal swinging man door, and two insulated metal overhead garage doors with less than 14 percent glazing. The construction cost estimate is $337,481.00, and only contractors prequalified under DFCM's Stage I Prequalification for Contractors process and currently listed on the DFCM Prequalified Contractors list as of the solicitation date are eligible to bid on this Stage II Invitation to Bid. The compliance certificate was reviewed and approved by Jason Van Ausdal of DFCM on September 3, 2026, with the envelope compliance statement signed by designer Nick Greenaway on July 22, 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Report Title: Southwest Technical College Storage Building Report Date: Jul 21, 2026, 12:07 PM (PDT) 1 of 13

Compliance Certificate

Project Information

Energy Code:

Project Title:

Location:

Climate Zone:

Project Type:

Project No:

Project Sub Type:

All Electric:

Is Renewable:

Has Battery:

Has Charger:

Has Heat Pump

2024 IECC

Southwest Technical College Storage Building Cedar City, Utah 5b New Construction 131449 New Building/Complete false false false false false

Construction Site: Owner/Agent: Designer/Contractor:

757 W 800 S Cedar City , Utah 84720

Ryan Fisher Southwest Technical College 757 W 800 S Cedar City , Utah 84270

Nick Greenaway Straightline Architecture, LLC 1570 E. Westminster Ave Salt Lake City , Utah 84105 33037196925 ngreenaway@straightlinearch.com

Notes:

Energy Credits

Description Credit

L06 Reduced lighting power 20.0

L03 Increase occupancy sensor 5.0

E01 Improved envelope performance ASHRAE 90.1 Appendix C 37.0

Credits: 36.0 Required 62.0 Proposed

Renewable energy

Number of Floors:

Area of Three Largest Floors:

Proposed Capacity:

Required Capacity:

Proposed Off-site Energy:

Required Off-site Energy:

Exception:

42171 Building effective floor area is less than 5,000 ft2

Renewables Pass: Exception: Building effective floor area is less than 5,000 ft2

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

09/03/2026

REVIEWED FOR CODE

COMPLIANCE

Report Title: Southwest Technical College Storage Building Report Date: Jul 21, 2026, 12:07 PM (PDT) 2 of 13

Building Area

Description Floor Area

1-Storage (Workshop) : Nonresidential 2142

Report Title: Southwest Technical College Storage Building Report Date: Jul 21, 2026, 12:07 PM (PDT) 3 of 13

Envelope Compliance Certificate

Project Information

Energy Code:

Project Title:

Location:

Climate Zone:

Project Type:

Project Sub Type:

2024 IECC

Southwest Technical College Storage Building Cedar City, Utah 5b New Construction New Building/Complete

Construction Site: Owner/Agent: Designer/Contractor:

757 W 800 S Cedar City , Utah 84720

Ryan Fisher Southwest Technical College 757 W 800 S Cedar City , Utah 84270

Nick Greenaway Straightline Architecture, LLC 1570 E. Westminster Ave Salt Lake City , Utah 84105 33037196925 ngreenaway@straightlinearch.com

Envelope Assemblies

Assembly Gross Area or Perimeter

Cavity R- Value

Cont.

R- Value

Proposed U-Factor

Budget U- Factor

Roof:Roof, Metal Building, Standing Seam, Double Insulation Layer with Thermal Blocks (c), [Bldg. Use 1 - Storage]

2142 19.00 11.00 0.043 0.035

Floor:Floor, Unheated Slab-On-Grade, Vertical 2 ft., [Bldg. Use 1 - Storage] (b)

180 --- 15.00 0.520 0.520

NORTH

Ext Wall:North Wall, , Single Layer Mineral Fiber (in cavity, thermal block at girt), [Bldg. Use 1 - Storage]

2618 25.00 10.00 0.039 0.050

EAST

Ext Wall:East Wall, , Single Layer Mineral Fiber (in cavity, thermal block at girt), [Bldg. Use 1 - Storage]

3598 25.00 10.00 0.039 0.050

Door:Man Door, Insulated Metal, Swinging, [Bldg. Use 1 - Storage] 21 --- --- 0.083 0.370

Door:Overhead 1, Insulated Metal, Garage door < 14% glazing, [Bldg. Use 1 - Storage]

168 --- --- 0.083 0.310

Door:Overhead 2, Insulated Metal, Garage door < 14% glazing, [Bldg. Use 1 - Storage]

168 --- --- 0.083 0.310

SOUTH

Ext Wall:South Wall, , Single Layer Mineral Fiber (compressed at girt), [Bldg. Use 1 - Storage]

2618 25.00 10.00 0.060 0.050

WEST

Ext Wall:West Wall, , Single Layer Mineral Fiber (compressed at girt), [Bldg. Use 1 - Storage]

2880 25.00 10.00 0.060 0.050

(a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.

(b) Slab-On-Grade proposed and budget U-factors shown in table are F-factors.

(c) Thermal spacer block with minimum R-3.5 must be installed above the purlin/batt, and the roof deck secured to the purlins.

Envelope PASSES: Design 9% better than code

Envelope Compliance Statement

Report Title: Southwest Technical College Storage Building Report Date: Jul 21, 2026, 12:07 PM (PDT) 4 of 13

Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2024 IECC requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.

Name - Title Signature Date

Nick Greenaway, RA NCARB 07/22/2026