About this file
This is a geotechnical investigation report prepared by GEM Engineering, Inc. for Southwest Applied Technology College regarding subsurface conditions at a proposed commercial educational structure located at 757 West 800 South in Cedar City, Iron County, Utah. The investigation included one exploratory trench excavated to approximately 7 feet below existing grade, soil sampling, and laboratory testing to evaluate engineering properties and provide recommendations for site grading, foundation design, concrete slabs-on-grade, and asphaltic concrete pavements. The site is situated on a tiered, sloped parcel bordered by 800 South to the north, 555 West to the east, commercial structures to the south, and 860 West to the west. The subsurface soils encountered consisted of medium dense brown silty sand with pinhole voids throughout, with groundwater not encountered during exploration. Laboratory testing indicated the on-site soils exhibited relatively low solubility, low plasticity, and moderate collapse potential.
The report recommends that loose, soft, and collapsible soils be overexcavated and recompacted prior to structural fill placement, with a minimum 3-foot overexcavation depth below footing elevation or existing grade, whichever is greater. Conventional strip and/or spread footings can support the structure at an allowable net bearing pressure of 2,000 psf (increased by one-third for seismic or wind loads) following proper soil preparation. The site is classified as Seismic Design Category D1 per the 2021 International Residential Code due to proximity to the Hurricane Fault Zone and regional seismic activity. Critical recommendations include establishing positive drainage away from foundations at five percent slope in landscaped areas and two percent in pavement areas for a minimum 10-foot distance, utilizing Type 1L sulfate-resistant cement for concrete in contact with on-site soils, and implementing moisture protection measures to prevent foundation soil saturation. The report specifies structural fill requirements, asphaltic concrete pavement sections for light traffic/parking areas with 2.5 inches of asphalt over 6 inches of road base and 8 inches of compacted gravel, and mandatory observation and testing during site preparation, excavation, and construction phases.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GEM ENGINEERING, INC. ♦ 485 North Aviation Way ♦ Cedar City, UT 84721 Phone (435) 867-6478 ♦ www.gemengineeringinc.com gEM Engineering, Inc.
Geotechnical Investigation
Urban City Building 757 West 800 South
Cedar City, Iron, Utah
Prepared For:
Southwest Applied Technology College
Cedar City, Utah 84720
October 16, 2025
Report Number: 25-3109-RG4061
Copyright 2025 GEM Engineering, Inc.
All Rights Reserved http://www.gemengineeringinc.com
Gem ENGINEERING, INC.
485 North Aviation Way ♦ Cedar City, UT 84721
Phone (435) 867-6478 ♦ www.gemengineeringinc.com
25-3109-RG4061 GEM ENGINEERING, INC. i
October 16, 2025
Southwest Applied Technology College
Cedar City, Utah 84720
Subject: Urban City Building
Cedar City, Iron, Utah
Enclosed is our geotechnical investigation report for the subject proposed commercial educational structure to be constructed at the subject site in Cedar City, Utah.
The report details our field exploration and laboratory testing program and presents our analysis, opinions and recommendations for the proposed project.
Moderately collapsible/compressible soils were encountered which will need to be overexcavated and recompacted as outlined in this report.
We appreciate this opportunity to be of service on this phase of the project and look forward to being of service as the project progresses. If you have any questions, please contact this office at your convenience.
Sincerely, GEM Engineering, Inc.
Brennan L. Stucker, E.I.T. Robert W. Corry, P.E., S.E.
Field Engineer President
10/16/25 http://www.gemengineeringinc.com
25-3109-RG4061 GEM ENGINEERING, INC. ii
TABLE OF CONTENTS
Page No.
1.0 INTRODUCTION
1.1 General
1.2 Project Description
2.0 FIELD EXPLORATION
3.0 LABORATORY TESTING
4.0 GEOLOGIC AND SEISMIC CONDITIONS
4.1 Geologic Setting
4.2 Faulting
4.3 Seismicity
5.0 SITE CONDITIONS
5.1 Surface Conditions
5.2 Subsurface Conditions
6.0 ENGINEERING ANALYSES AND RECOMMENDATIONS
6.1 General
6.2 Construction Considerations
6.2.1 Foundation Systems
6.3 Earthwork
6.3.1 Site Preparation and Grading
6.3.2 Excavations
6.3.3 Material Volume Changes
6.3.4 Structural Fill
6.4 Foundations
6.4.1 Conventional Foundations
6.5 Concrete Slabs-On-Grade
6.6 Soil Corrosion and Weathering Considerations
6.7 Moisture Protection and Drainage
6.8 Asphaltic Concrete Pavements
7.0 CLOSURE
7.1 Limitations
7.2 Additional Services
25-3109-RG4061 GEM ENGINEERING, INC. iii
APPENDICES
Appendix A
Site Plan ........................................................................................... Plate 1 Trench Log ...................................................................................... Plate 2 Laboratory Test Summary ............................................................. Plate 3 Consolidation Test Results ............................................................. Plate 4 Unified Soils Classification Chart .................................................. Plate 5 Overexcavation, Drainage and Moisture Protection Diagram .... Plate 6
25-3109-RG4061 GEM ENGINEERING, INC. Page 1
1.0 INTRODUCTION
1.1 General
This report presents the results of a geotechnical investigation performed for a proposed commercial educational structure at 757 West 800 South in Cedar City, Iron County, Utah.
The study was conducted in accordance with the client’s authorization.
The purposes of this investigation were to: (1) evaluate the general nature and engineering properties of the subsurface soils at the site; (2) identify the general site geologic conditions and (3) provide recommendations and opinions regarding general site grading and the design and construction of foundations, concrete slabs-on-grade and asphaltic concrete pavements. The investigation included a site reconnaissance, subsurface exploration, representative soil sampling, laboratory testing, engineering analyses, review of existing geologic studies performed in the area and preparation of this report.
The recommendations contained in this report are subject to the limitations presented in the "Limitations" section of the report. We recommend that all individuals reading this report read the limitations section of this document.
1.2 Project Description
We understand that a proposed commercial educational structure will be constructed at the location described in Cedar City, Utah. Structural loads are expected to be relatively low to moderate.
The site plan on Plate 1 shows the approximate trench location with respect to the approximate property lines and proposed structure location.
25-3109-RG4061 GEM ENGINEERING, INC. Page 2
2.0 FIELD EXPLORATION
The subsurface soil conditions were explored by excavating, 1 exploratory trench to a depth of approximately 7 feet below the existing site grade. The approximate location of this exploration is shown on Plate 1. Soils and subsurface conditions encountered in the exploration were classified, logged and recorded at the time of excavation by our field professional The results of the exploration are presented on the enclosed Plate 2. A key to soil symbols and terms is found on Plate 5.
25-3109-RG4061 GEM ENGINEERING, INC. Page 3
3.0 LABORATORY TESTING
Representative soil samples from the exploration were tested in the laboratory to verify the field classifications and to evaluate other pertinent engineering characteristics. The soil samples were tested for solubility, Atterberg limits, maximum density, and consolidation behavior. Results are presented on Plates 3 and 4.
25-3109-RG4061 GEM ENGINEERING, INC. Page 4
4.0 GEOLOGIC AND SEISMIC CONDITIONS
4.1 Geologic Setting
The Cedar Valley lies along the border between the Basin and Range and the Colorado
Plateau physiographic provinces. Structurally, parts of the valley and the eastern upland represent a zone of transition between the two provinces, with some structural features of both. A small area of thrust faults is present in the southwest, but the valley is characterized by normal fault-block structure common to the Basin and Range Province. The uplands east of the valley have been elevated by displacement along the Hurricane fault zone. The fault zone is several miles wide and includes several structural units separated by major normal faults trending northward to northeastward. East of the fault zone, rock strata dip gently eastward; gently inclined strata characterize much of the Colorado Plateau Province
(Geology of Eastern Iron County, Utah, Utah Geological and Mineralogical Survey, Bulletin No. 37, 1950). More locally the Fiddlers Canyon area lies upon alluvial fan deposits. The alluvial deposits consist of material ranging from Permian age Kaibab
Formation up through Tertiary age Claron Formation and basalt flow debris of Quaternary age (GEM Engineering, field investigation.).
The geologic units exposed in the area attain a maximum total thickness of more than
16,000 feet. The oldest formation exposed is the Kaibab Limestone of Permian age.
Formations overlying the Kaibab Limestone span geologic periods from Triassic through
Tertiary. Igneous laccoliths of Tertiary age intrude formations west of Cedar City Valley.
Deposits of alluvium, as valley fill, with some interbedded lava flows attain thicknesses of more than 1,000 feet in the Cedar City Valley (Bjorklund and others, 1977). Alluvial deposits, placed as valley fill derived from the adjacent hills and upland areas, range in size from clay to boulders. As the streams enter the valley and lose velocity with decreasing gradient, alluvial materials are deposited. Coarser material is deposited in the higher valley areas and progressively finer material is deposited toward the valley bottoms. Stream discharge and amounts are irregular and vary over a wide range. (Technical Publication
No. 60, State of Utah Department of Natural Resources, 1978).
25-3109-RG4061 GEM ENGINEERING, INC. Page 5
4.2 Faulting
The Cedar Valley lies within a zone of pronounced seismic activity. The Hurricane Fault
Zone, a prominent north-south trending fault zone with suspected Quaternary displacement, extends through the eastern portion of Cedar City. This zone of fracture is about 200 miles long within which the displacement of the sedimentary beds ranges from
1,500 feet to as much as 8,000 feet (Geological and Mineralogical Survey, Bulletin No. 37, 1950).
4.3 Seismicity
The Cedar City Valley lies near the southern end of a zone of pronounced earthquake activity that extends from southwestern Utah to northwestern Montana (Christenson and
Deen, 1983). A magnitude 5.9 earthquake occurred in 1992 approximately 5 miles southeast of Washington, Utah. An earthquake of at least that size could occur in this area.
The soil meets the 2021 International Building Code (IBC) requirements for a site class D.
Residential structures at the site shall be constructed in accordance with the requirements of Seismic Design Category D1 per the 2021 edition of the International Residential Code
(IRC).
25-3109-RG4061 GEM ENGINEERING, INC. Page 6
5.0 SITE CONDITIONS
5.1 Surface Conditions
As stated previously the site is located at 757 West 800 South in Cedar City, Iron County, Utah, as shown on Plate 1. At the time of our investigation of the proposed building site it was found to be a field that was now tiered to create 3 flat levels on the sloped site in the area of the proposed construction on the property of the existing Southwest Applied
Technology College campus. The site was bordered on the north by 800 South, on the eat cy 555 West and a few residential structures, on the south by existing commercial structures, and on the west by 860 West and an existing residential structure.
5.2 Subsurface Conditions
The on site soils encountered in the excavation generally consisted of medium dense brown silty sand which extended to the bottom of the exploratory trench approximately 7 feet below the existing site grade where refusal occurred on presumed highly cemented material or bedrock. Pinhole voids were observed throughout the depths explored.
Numerous factors contribute to fluctuations in groundwater levels and locations. The evaluation of these factors was beyond the scope of this study. However, groundwater was not encountered during the exploration. The soils were in a slightly moist condition throughout the depths explored.
The encountered subsurface conditions are described in detail on the enclosed trench log, Plate 2. Due to the nature and depositional characteristics of the native soils, care should be taken in extrapolating subsurface conditions beyond the exploration location.
The laboratory tests results indicated that the on-site soils exhibited a relatively low solubility, low plasticity and a moderate collapse potential.
25-3109-RG4061 GEM ENGINEERING, INC. Page 7
6.0 ENGINEERING ANALYSIS AND RECOMMENDATIONS
6.1 General
Based on our investigation there are loose, soft and/or collapsible soils located at the site which will require stabilization and/or overexcavation prior to the placement of structural fill. However, it is our opinion that the subject site is suitable for the proposed construction provided that the recommendations contained in this report are followed.
The following sections of this report present our recommendations to reduce the potential for structural damage. They contain specific opinions and recommendations concerning construction considerations, site preparation and grading, structural fill, foundation design, retaining walls, concrete slabs-on-grade, soil corrosion, moisture protection and structural pavement sections.
One of the most critical recommendations to follow in order to reduce potential for structural damage is to set the finished floor slab elevations high enough to facilitate proper drainage away from the structure.
6.2 Construction Considerations
6.2.1 Foundation Systems
After overexcavation and recompaction are completed, the structures can be supported by conventional strip and/or spread footings founded on properly placed and compacted structural fill.
6.3 Earthwork
6.3.1 Site Preparation and Grading
Within the areas to be graded, existing vegetation, loose soils, and debris, should be removed and hauled off the site. Any undocumented fill soils, and soft, loose, 25-3109-RG4061 GEM ENGINEERING, INC. Page 8 collapsible and/or disturbed native soils should be excavated to expose competent, dense or medium dense native soils.
Based upon soil types and laboratory consolidation tests, the required depth of overexcavation is as follows: A minimum of 3 feet below the bottom of footing elevation or 3 feet below the existing site grade, whichever is greater.
Overexcavations should extend laterally beyond the edges of the footing, at each side, at least a distance equal to the depth of overexcavation. In no case shall the total width of excavation be less than the footing width plus 2 times the depth of overexcavation. (width of O.X. + ftg width + width of O.X.)
Slabs-on-grade, exterior concrete flatwork, and pavements should be supported by a zone of properly placed and compacted structural fill. Overexcavations on the order of 18 inches below the supportive gravel layer or 18 inches below the existing site grade, whichever is greater, are required. As an alternative to the above, 10 inches of Type 1 pit run gravel can be substituted for the 18 inches of recompacted native soils. Excavations shall extend laterally at least 2 feet beyond exterior flatwork and pavement areas.
If loose, soft or pumping soils are encountered at the bottom of the overexcavations, stabilization and/or additional overexcavation will be required prior to the placement of structural fill. Overexcavations may be terminated if competent, medium-dense granular soils are encountered. A GEM Engineering representative should observe excavation and determine if it is acceptable to terminate the excavation or reduce the overexcavation depth.
The majority of on-site soils, free of organics and debris, should be suitable for reuse as structural fill. If using on-site soils for backfill or structural fill a shrinkage factor of up to 20 percent can be expected.
25-3109-RG4061 GEM ENGINEERING, INC. Page 9
Following excavation of the unsuitable soils as described above, a representative of this office should observe the excavation bottoms prior to the continuance of grading to verify that unsuitable materials have been removed and that competent soils have been exposed. The native soils exposed after overexcavation should be scarified to a depth of 6 inches, brought to within 2 percent of the optimum moisture content for granular soils and slightly above optimum for fine-grained soils, and compacted to at least 90 percent of the maximum dry density for granular soils and
90 percent of the maximum dry density for fine grained soils as determined by
ASTM D1557. The site should then be brought to the proper grade with structural fill as described in the Structural Fill section.
Subgrade materials supporting slabs-on-grade, exterior concrete flatwork, and pavements should be kept moist and not be allowed to dry out and crack. If the subgrade has been disturbed or dried out prior to placement of aggregate base, the exposed soils should be moisture-conditioned and recompacted as outlined in the
Structural Fill section of this report.
We recommend that a GEM Engineering representative be allowed to review the grading plans when prepared to evaluate their compatibility with the recommendations of this report.
6.3.2 Excavations
The majority of the soils encountered in our explorations should be excavatable with conventional earthwork equipment. It is also possible that soft pumping soils may be encountered. Pumping soils will need to be stabilized prior to placing of structural fill. Safety of construction personnel is the responsibility of the
Contractor.
6.3.3 Material Volume Changes
There will be shrinkage losses when excavating and compacting the on-site soils.
An estimated average shrinkage factor of 20 percent is applicable for the loose to
25-3109-RG4061 GEM ENGINEERING, INC. Page 10 medium-dense near-surface native soils. A subsidence factor of 0.1 should be used in all areas where the surficial soils are scarified and recompacted to a depth of 6 inches.
6.3.4 Structural Fill
All fill placed for the support of slabs-on-grade, exterior concrete flatwork, and pavements should be structural fill. Structural fill may consist of approved excavated on-site or imported fill materials. Structural fill should have a swell potential less than 4 percent under a 60 psf surcharge, have a solubility of less than
3 percent, be free of organics, salts, or inert materials larger than 4 inches nominal size, and be similar in gradation to the on-site soils.
Structural fill should be placed in maximum eight-inch loose lifts and compacted on a horizontal plane, unless otherwise approved by the Geotechnical Engineer.
Soils in compacted fills should be compacted to at least 95 percent of the maximum dry density as determined by ASTM D1557 for fine grained soils and 95 percent for granular soils. The moisture content should be within 2 percent of optimum for granular soils and at least 2 percent above optimum for fine-grained soils. Any imported fill materials should be approved prior to importing. Also, prior to placing any fill, the excavations should be observed by a GEM Engineering representative to observe that unsuitable materials have been removed.
Structural fill shall be tested for minimum density compliance by means of a moisture-density gauge in accordance with ASTM D6938 or other approved methods. Moisture-density testing shall be performed at the bottom of overexcavation and every 12 inches vertically until the bottom of footing is reached.
Backfill material surrounding basement walls and stem walls moisture-density testing shall be performed beginning at the bottom of footing elevation and continue at intervals of 24 inches vertically until finished grade is reached.
25-3109-RG4061 GEM ENGINEERING, INC. Page 11
6.4 Foundations
6.4.1 Conventional Foundations
General: Conventional shallow foundations consisting of strip and/or spread footings can be utilized for the support of the proposed building provided that overexcavation is completed in accordance with the requirements and recommendations of this report as described in the Earthwork section.
For frost protection the bottom of exterior conventional spread and strip footings shall be at least 30 inches below the lowest adjacent final compacted subgrade.
Foundations for structures constructed on soils, prepared in accordance with the recommendations and requirements of this report, may be designed for an allowable net bearing pressure of 2000 psf. This bearing pressure may be increased by one-third for load combinations containing seismic or wind loads.
Prior to constructing the foundations, the footing excavations should be observed by a GEM Engineering representative to confirm that the soil preparation has been completed in accordance with the requirements and recommendations of this report.
Settlement: Foundations established in accordance with the recommendations and requirements of this report are estimated to subject to 1 ½” or less of settlement if the soils beneath the overexcavation or piering do not become moistened. Estimated differential settlement could be on the order of ½ the total settlement.
25-3109-RG4061 GEM ENGINEERING, INC. Page 12
Lateral Earth Pressures: The following lateral earth pressure equivalent fluid densities shall be used in the design of the structure.
Properly Compacted On-Site Soils
Active Pressure 32 pcf
At Rest Pressure 50 pcf
Passive Pressure 261 pcf
Equivalent fluid densities presented above assume that the backfill has a maximum slope of 10:1 and that there will be no build-up of hydrostatic pressure. Any surcharge from adjacent structures or traffic loads should be added to this pressure.
When passive pressure is used for resistance to lateral loads the top one foot of soil should be neglected. The maximum allowable passive pressure for lateral load resistance should not exceed 1,600 psf.
The seismic lateral earth pressure coefficient (kh) is 0.21.
Lateral Load Resistance: Horizontal loads acting on foundations will be resisted by friction acting at the base of foundations and/or passive earth pressures acting against the side of footings and concrete walls. If design makes use of passive earth pressures, it is important that a GEM Engineering representative be present during backfill placement.
The friction force acting along the base of footings founded on suitable foundation soils may be calculated using a coefficient of friction of 0.40.
Lateral loads acting on buried utility lines may be resisted by thrust blocks reacting against undisturbed native soil or properly placed and compacted structural fill. The passive lateral earth pressure equivalent fluid density and coefficient of friction, previously listed, may be used for thrust block design.
25-3109-RG4061 GEM ENGINEERING, INC. Page 13
6.5 Concrete Slabs-On-Grade
Satisfactory support for concrete slabs-on-grade and exterior concrete flatwork may be provided by a 6 inch layer of compacted gravel overlying properly placed and compacted structural fill as recommended in the Site Grading section of this report. The layer of compacted gravel may consist of road base or pit-run gravel with a 2-inch maximum particle size and not more than 12% fines passing the No. 200 sieve. The gravel layer should be compacted to at least 95% of the maximum dry density as determined by ASTM
D1557.
All concrete slabs should be designed to minimize cracking as a result of shrinkage.
Reinforcement requirements shall be provided by the Structural Engineer. Reinforcement should be installed at the mid-height of the slab unless directed otherwise by the Structural
Engineer.
Special precautions must be taken during the placement and curing of all concrete slabs.
Excessive slump (high water-cement ratio) of the concrete and/or improper curing procedures used during either hot or cold weather conditions could lead to excessive shrinkage, cracking or curling in the slabs. All concrete placement and curing operations shall be performed in accordance with the American Concrete Institute (ACI) Manual.
6.6 Soil Corrosion and Weathering Considerations
Based on similar studies performed in the area, the on-site soils contain salts in sufficient concentration to be considered corrosive to both concrete and metal. Therefore, all concrete in contact with the on-site soils and used in stem walls should contain Type 1L or equivalent sulfate-resistant cement, and should be placed with a maximum four inch slump.
Furthermore concrete shall meet requirements specified in Tables 19.3.1.1 & 19.3.2.1 of
ACI 318-14 for severe sulfate exposure. Special protection to buried metal pipes and water lines should be considered for long term performance of these underground utilities.
Consideration should be given to cathodic protection of buried metal pipes, or to the use of PVC pipe where permitted by local building codes.
25-3109-RG4061 GEM ENGINEERING, INC. Page 14
6.7 Moisture Protection and Drainage
It is imperative that precautions are taken during and after construction to eliminate, or at least minimize, wetting of foundation soils. Drainage and grading shall be constructed in accordance with the requirements of section 1804.4 of the 2021 International Building
Code (IBC). Positive drainage shall be established away from the exterior walls of the structure. The required minimum slope is five percent (5%) in landscape areas and two percent (2%) in pavement areas, for a minimum distance of 10 feet from the structure. Roof runoff and other sources of moisture should not be allowed to infiltrate the soils in the vicinity of, or upslope from, the structure. No roof moisture should infiltrate the soils beneath the foundations.
All utility trenches leading into the structures should be backfilled with compacted non-pervious fill. Special care should be taken during installation of sub floor sewer and water lines to reduce the possibility of future subsurface saturation.
Landscape watering adjacent to the structure should be eliminated. As an additional protection a concrete slab could be placed around the structure to facilitate drainage away from the structure as described above. Any planters adjacent to the structure should have sealed bottoms. It is recommended that desert landscaping techniques be utilized.
6.8 Asphaltic Concrete Pavements
Asphaltic concrete pavement sections were developed for non-dedicated areas. In developing our recommendations, we have assumed that: (1) the pavement section detailed below will contain 3 separate layers including asphalt, road base, and Pit Run gravel underlain by appropriately overexcavated and recompacted native soils; (2) a Traffic Index value of 5.5 for automobile traffic and parking areas is appropriate; and (3) an R-value of
25 is representative of recompacted native soils. The following table presents the minimum recommended structural pavement sections:
25-3109-RG4061 GEM ENGINEERING, INC. Page 15
Asphaltic Concrete Pavements
Traffic Condition
Assumed Traffic Index
(T.I.)
Asphalt Thickness
(in)
Road Base Thickness
(in)
Compacted Type 1 Gravel
(in)
Light Traffic/Parking
5.5 2.5 6 8
Asphalt and aggregate base material should conform to local requirements. All base material should be compacted to at least (95%) of the maximum dry density (ASTM
D1557). Asphalt should be compacted to minimum of (96%) of the Marshall maximum density. Asphaltic concrete and base materials should be tested prior to delivery to the site and during placement to determine conformance with the project specifications.
It is important that parking area grades be set to provide positive drainage to suitable drainage structures. A desirable slope for drainage in paved areas is two percent.
25-3109-RG4061 GEM ENGINEERING, INC. Page 16
7.0 CLOSURE
7.1 Limitations
The recommendations contained in this report are based on the field exploration, laboratory tests, and our understanding of the proposed construction. The subsurface data used in the preparation of this report were obtained from the exploration made during this investigation. It is possible that variations in the soil and groundwater conditions could exist elsewhere on the site. The nature and extent of variations may not be evident until construction occurs. If any conditions are encountered at the site which are different from those described in this report, GEM Engineering should be immediately notified so that we may make any necessary revisions to recommendations contained in this report. In addition, if the scope of the proposed construction changes from that described in this report, GEM Engineering should likewise be notified.
This report was prepared in accordance with the generally accepted standard of practice at the time the report was written. Although some potential geologic hazards may be identified in this Geotechnical Investigation Report, this is NOT a Geologic Hazards
Report and should not be regarded as such. No warranty, express or implied, is made. It is the Client's responsibility to see that all parties to the project, including the Designer, Contractor, Subcontractors, etc., are made aware of this report in its entirety. The use of information contained in this report for bidding purposes should be done at the Contractor's option and risk. GEM Engineering will not accept the responsibility for damage caused by the uncontrolled action of water at the site.
7.2 Additional Services
The recommendations made in this report are based on the assumption that an adequate program of tests and observations will be made during the construction to verify compliance with the recommendations. These tests and observations should include, but not necessarily be limited to, the following:
25-3109-RG4061 GEM ENGINEERING, INC. Page 17
Observations and testing during site preparation, earthwork and structural fill placement
Observations of footing excavations
Consultation as may be required during construction
We also recommend that project plans and specifications be reviewed by us to verify compatibility with our conclusions and recommendations. Additional information concerning the scope and cost of these services can be obtained from our office.
GEM ENGINEERING, INC.
Appendix A
Key:
SITE PLAN
Notes: PROJECT: Urban City Building
GEM Plate: Approximate Trench Location 757 West 800 South, Cedar City, Utah Plan: Not to Scale Client: Southwest Applied Technology College 1 Report No: 25-3109-RG4061 ENGINEERING, INC.
N
T-1
800 South
W es t 555 W est
Trench No. 1 Sheet 1 of 1 D ep th
(f t)
S am pl e
U
SC
S Sy m bo l 2
Sample: Drive Sample Bag Sample Bucket Sample
1)
2) 5
3)
5)
TRENCH LOG
Location: See Site Plan Elevation: Not Measured Date
Excavated:
10/2/2025
T es ts 1 Soil Description
(Additional comments below)
C ol or
R el at iv e
M oi st ur e
D en sit y
C em en ta tio n
M ax s ize
P ar tic le
Sol, C
B At, M - Pinhole Voids
- Silty Sand Brown SM MD --
P
Refusal @ 7'
None noted
At = Atterberg, M = Moisture, Sol = Solubility, E = Expansion, C = Consol, P = Proctor, CS =Coarse Sieve Notes:
See Plate for explanation of Unified Soil Classification System Groundwater:
D = Dry, SM = Slightly Moist, M = Moist, VM = Very Moist, W = Wet Not encountered
ENGINEERING, INC.
SM
Urban City Building PROJECT: GEM Plate:757 West 800 South, Cedar City, Utah Client: Southwest Applied Technology College 2 Report No: 25-3109-RG4061
6) B=Boulder, C= Cobble, CG=Coarse Gravel (3" - 3/4"), FG=Fine Gravel (3/4" - 1/4"), CS=Coarse Sand (#10-#4), MS=Medium Sand (#40 - #10), FS=Fine Sand (#200 - #40), F=Fines
4) Coarse Grain: VL = Very Loose, L = Loose, MD = Medium Dense, D = Dense, VD = Very Dense Fine Grain: VSF = Very Soft, SF = Soft, MS = Medium Stiff, S = Stiff, VS = Very Stiff, H = Hard Caving of side walls:
W = Weak cementation, M = Moderate cementation, S = Strong cementation
Key:
LABORATORY TESTS SUMMARY Sheet
T re nc h
B or in g No
S am pl e
D ep th (f t)
U
CS
C S ym bo l Soil Description
F ie ld
M oi st ur e
F ie ld D ry D en sit y (p cf
So lu bi lit y
) Fine Sieve
H lb
D ry
D en sit y
Op tim um M oi st ur e
#4 #10 #40 #200
Atterberg Limits Expansion Net Percent Consolidation
Modified Proctor
% Passing
L iq ui d
L im it
P la st ic
L im it
P la st ici ty In de x
L oa d
NPT-1 4' SM Silty Sand 4.7 104.4 lb
123.0 10.5NP NP -- -- 0.6 6.80.2 98.1 97.0 91.7 30.7
Southwest Applied Technology College 3 Report No: 25-3109-RG4061 ENGINEERING, INC.
Notes: Urban City Building PROJECT: GEM Plate:NP = Non Plastic, -- indicates no test performed 757 West 800 South, Cedar City, Utah Atterberg Limits are for classification of fine-grained and fine-grained fraction of coarse-grained soils
Client:
CONSOLIDATION TEST DATA
Sample Location - T-1 4' Water added at 1000 psf
Load (psf) Percent Consolidation
Net Percent Consolidation *
500 0.99 0.00
1000 1.56 0.57
1000 + H20 5.66 4.67
2000 7.79 6.80
4000 9.61 8.62
500 9.11 8.12
Net consolidation assumes that existing native pressure on soil is aproximately equal to 500 psf
Urban City Building
GEM Plate:757 West 800 South, Cedar City, Utah Client: Southwest Applied Technology College 4 Report No: 25-3109-RG4061 ENGINEERING, INC.
PROJECT:
0.00
2.00
4.00
6.00
8.00
10.00
12.00
100 1000 10000
Pe rc en t C on so lid at io n
Load (psf)
COARSE
GRAINED SOILS
50% or more is retained (larger than) the No. 200 sieve.
Gravels Clean Gravels GW
THE UNIFIED SOIL CLASSIFICATION SYSTEM (USCS)
Major Division Symbol Color Typical Group Names
Well graded gravels, gravel sand mixtures, little or no fines
More than 50 % of coarse part is larger than the No. 4 sieve.
Less than 5% fines GP Poorly graded gravels/gravel sand mixtures
Gravels with Fines GM Silty gravels, gravel-sand-silt mixtures
Sands Clean Sands SW Well graded sands, gravely sands, little or no fines
SM Silty sands, sand-silt mixtures
More than 12% fines
More than 12% fines GC Clayey gravels, gravel-clay-sand mixtures
SC Clayey sands, sand clay mixtures
FINE GRAINED
SOILS
50% or more passes (smaller than) the No.
200 sieve.
Silts and Clays Liquid Limit less than 50
ML Inorganic silts and very fine sands, rock flour, silty or clayey fine sands or clayey silts with low plasticity
CL-ML
More than 50 % of coarse part is smaller than the No. 4 sieve.
Less than 5% fines SP Poorly graded sands or gravely sands, little or no fines
Sands w/ Fines
Inorganic clay-silt mixture and very fine sand, silty or clayey fine sands or clayey silts with low plasticity.
CL Inorganic clays of low to medium plasticity, gravely clays, sandy clays, silty clays, lean clays
OL Organic silts and organic silty clays of low plasticity
Silts and Clays Liquid Limit 50 or more
MH Inorganic silts, micaceous or diatomaceous fine sandy or silty soils, elastic silts
CH Inorganic clays of high plasticity, fat clays
OH Organic clays or medium to high plasticity, organic silts
Highly Organic Soils PT Peat and other highly organic silts
PLASTICITY CHART
25-3109-RG4061 ENGINEERING, INC.
Urban City Building PROJECT: GEM Plate:757 West 800 South, Cedar City, Utah Client: Southwest Applied Technology College 5 Report No:
0 10 20 30 40 50 60 70 80 90 100 110
Pl as tic ity
I nd ex
PI
Liquid Limit (LL)
CL-ML
ML
ML or OL
MH or OH
CH
CL
"A" Line
The width of overexcavation is equal to 5ft past the edge of ftg or equal to the depth of overexcavtion which is
GREATER.
OVEREXCAVATION, DRAINAGE AND
MOISTURE PROTECTION DIAGRAM
Basement Foundation The depth of overexcavation shall extend from the bottom of the footing or existing site grade whichever is
GREATER.
In some casses GEM Engineering may approve a width of lateral overexcavation less than 5'-0" but it shall never be less than the required depth of overexcavation.
The total width of overexcavation is euqal to the width of the footing plus 2x the width of lateral overexcavation.
Drainage and gradation shall be constructed in accordance with the requirements of section R401.3 & R801.3 of the 2021 IRC or section 1804.4 of the 2021 IBC. Refer to geotechnical report for additional drainage & grading requirements & recommendations.
Slab-On-Grade Foundation Refer to section 6.3.4 for moisture-density testing requirements.
ENGINEERING, INC.
PROJECT: Urban City Building
GEM Plate:757 West 800 South, Cedar City, Utah Client: Southwest Applied Technology College 6 Report No: 25-3109-RG4061
Hardscaped areas: 4 2% slope for 10'-0" required
(2 1/2" of fall over 10')
Compacted Structural Fill
Exterior flat work or pavement
Direct roof drainage away from foundation in accordance with
R401.3 & R801.3 (2021 IRC) or
1804.4 (2021 IBC)
Final grading
Landscaped areas: 4 5% slope for 10'-0" required
(6" of fall over 10')
Depth of overexcavation under slab or flat work =
1.5 ft
3 ft
Width of overexcavation 2
3 ft
Width of overexcavation 2
Footing 3 ft
Depth of 1 overexcavation
Total width of Native soil
3 ft3 ft
Footing 3 ft
Depth of 1 overexcavation
Total width of overexcavation 3
Width of overexcavation 2
Width of overexcavation 2
Depth of overexcavation under slab or flat work =
1.5 ft
| 25-3109-RG4061 - Urban City Building |
| 25-3109-RG4061 Report Plates |
| 25-3109-RG4061 Report Plates |
| 25-3109-RG4061 Report Plates |
File details come from the government source that posted it. Updated .