10-2-CR27018-27110270 Approved Plans.pdf
PDF 21 MB Posted
- Attached to
- DFCM Construction - Prequalified General Stage II - General- New Storage Building - Project #27110270
- Solicitation number
- CR27018
- Issued by
- Utah
About this file
This document consists of approved construction plans for the State of Utah Division of Facilities Construction and Management (DFCM) Project #27110270, a pre-engineered metal storage building. The project scope includes construction of a storage building with two overhead doors and a heating-only mechanical system. The construction cost estimate is $337,481.00. This is a Stage II Invitation to Bid, meaning only contractors who have completed Stage I Prequalification and are currently listed on the DFCM Prequalified Contractors list as of the solicitation date are eligible to submit bids.
The approved plans document serves as the technical specification and design reference for bidders preparing their proposals. These plans establish the architectural and engineering standards that contractors must follow during construction. The document establishes the baseline design requirements and specifications that all qualified bidders must use to develop accurate cost estimates and construction schedules for their Stage II bids.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .