This is an evaluation score sheet for a Request for Statements of Qualifications (RFSQ) issued by the State of Utah Division of Purchasing in conjunction with Utah Charter Academies (UCA) for design professional services for the Eagle Mountain K-6 Campus project (Project ID: 26-EM-K6DES). The procurement seeks a design professional services provider to develop a K-6 campus design based on UCA's two-story elementary prototype, adapted for an 8-acre parcel in Eagle Mountain. The project scope includes site and civil engineering coordination with seller-performed horizontal improvements, with construction documents required to be completed by August 2027. Responses were due by Monday, August 24, 2026, at 5:00 PM MDT through the Bonfire platform. The award will be made to the highest-ranked firm following a qualifications-based selection process, with compensation to be negotiated at an amount determined to be fair and reasonable.

The evaluation process employs a committee of at least three evaluators, as required by Utah Code Ann. 63G-6a, Part 15, using a 100-point scoring rubric that assesses three primary criteria: capability to complete a quality project (30 points), capability and commitment to meet required milestone dates (40 points), and clear understanding of project vision, scope, and site (30 points). The scoring guide rates responses on a scale of 0 to 5, with no price or cost component evaluated. Pricing information must not be included in responses; any fee or rate information discovered during evaluation is referred to the Procurement Officer and excluded from scoring. The evaluation sheet includes a responsiveness checklist with 17 mandatory and preferred requirements, and a ranking summary mechanism for identifying the three highest-scoring firms for contract negotiation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Score Sheet- Evaluator

APA 2026-04 Eagle Mountain K-6 Campus – Design
Project ID: 26-EM-K6DES | RFSQ Evaluation Score Sheet
INDIVIDUAL EVALUATOR SCORE SHEET
One sheet per evaluator, per responding firm. Print or copy this tab as needed.
Firm Name:
Evaluator:
Date:
CriterionPossible PointsScore (0-5)WeightPoints EarnedComments
A. Demonstrates capability of effectively completing a quality project300.0
Experience – direct with similar K-6 and public charter school projects7.5x 1.50.0
Qualifications (firm & key individuals; Utah-licensed Architect of Record and Utah-licensed PE identified)5.0x 1.00.0
Financial strength5.0x 1.00.0
References7.5x 1.50.0
Reputation with subconsultants and reviewing agencies5.0x 1.00.0
B. Demonstrates capability and commitment to completing the design by the required milestone dates400.0
Staffing capacity and current workload relative to the schedule20.0x 4.00.0
Proposed design schedule and milestone plan (CDs complete August 2027)10.0x 2.00.0
Entitlement and permitting approach with Eagle Mountain City10.0x 2.00.0
C. Demonstrates a clear understanding of project vision, scope, and site300.0
Approach to adapting UCA's two-story elementary prototype to this site10.0x 2.00.0
Site and civil approach for the 8-acre parcel, coordinated with seller-performed horizontal improvements10.0x 2.00.0
Scale-up / phasing capability (1–3 classrooms per grade without core redesign)5.0x 1.00.0
Quality control and consultant coordination5.0x 1.00.0
TOTAL1000.0
HOW TO USE THIS SHEET
• Enter a whole-number score from 0 to 5 in the yellow "Score (0-5)" cells only. Points Earned and all totals calculate automatically.
• Scoring guide: 5 = Excellent | 4 = Above average | 3 = Acceptable | 2 = Below average | 1 = Poor | 0 = Not addressed.
• Example entry — Score: 4, Comments: "Three UT charter K-6 campuses delivered since 2019; two adapted from a client prototype."
• Leave a Score cell blank only if the criterion was not addressed; blank is treated as 0 points.
• NO PRICE OR COST COMPONENT is evaluated. If a response contains fee or rate information, note it in Comments and refer it to the Procurement Officer — do not score it.
• Utah Code Ann. § 63G-6a, Part 15 requires an evaluation committee of at least three members for design professional services.

Score Sheet- Final

APA 2026-04 Eagle Mountain K-6 Campus – Design
Project ID: 26-EM-K6DES | RFSQ Evaluation Score Sheet
COMMITTEE SUMMARY – FINAL
Committee consensus score for the firm named below. Complete after individual evaluations are collected.
Firm Name:
Evaluator:
Date:
CriterionPossible PointsScore (0-5)WeightPoints EarnedComments
A. Demonstrates capability of effectively completing a quality project300.0
Experience – direct with similar K-6 and public charter school projects7.5x 1.50.0
Qualifications (firm & key individuals; Utah-licensed Architect of Record and Utah-licensed PE identified)5.0x 1.00.0
Financial strength5.0x 1.00.0
References7.5x 1.50.0
Reputation with subconsultants and reviewing agencies5.0x 1.00.0
B. Demonstrates capability and commitment to completing the design by the required milestone dates400.0
Staffing capacity and current workload relative to the schedule20.0x 4.00.0
Proposed design schedule and milestone plan (CDs complete August 2027)10.0x 2.00.0
Entitlement and permitting approach with Eagle Mountain City10.0x 2.00.0
C. Demonstrates a clear understanding of project vision, scope, and site300.0
Approach to adapting UCA's two-story elementary prototype to this site10.0x 2.00.0
Site and civil approach for the 8-acre parcel, coordinated with seller-performed horizontal improvements10.0x 2.00.0
Scale-up / phasing capability (1–3 classrooms per grade without core redesign)5.0x 1.00.0
Quality control and consultant coordination5.0x 1.00.0
TOTAL1000.0
HOW TO USE THIS SHEET
• Enter a whole-number score from 0 to 5 in the yellow "Score (0-5)" cells only. Points Earned and all totals calculate automatically.
• Scoring guide: 5 = Excellent | 4 = Above average | 3 = Acceptable | 2 = Below average | 1 = Poor | 0 = Not addressed.
• Example entry — Score: 4, Comments: "Three UT charter K-6 campuses delivered since 2019; two adapted from a client prototype."
• Leave a Score cell blank only if the criterion was not addressed; blank is treated as 0 points.
• NO PRICE OR COST COMPONENT is evaluated. If a response contains fee or rate information, note it in Comments and refer it to the Procurement Officer — do not score it.
• Utah Code Ann. § 63G-6a, Part 15 requires an evaluation committee of at least three members for design professional services.

Ranking Summary

APA 2026-04 Eagle Mountain K-6 Campus – Design
Project ID: 26-EM-K6DES | Committee Ranking Summary
Enter each evaluator's TOTAL score (from their individual score sheet) in the yellow cells. Average and Rank calculate automatically.
Responding FirmEvaluator 1Evaluator 2Evaluator 3Evaluator 4Evaluator 5AverageRank
SELECTION AND FEE NEGOTIATION
• Example row — Firm: "SPE Architects", Evaluator 1: 87.5, Evaluator 2: 84.0, Evaluator 3: 89.5 → Average 87.0.
• Utah Code Ann. § 63G-6a, Part 15: rank the three highest-scoring firms, then negotiate compensation with the highest-ranked firm at an amount determined in writing to be fair and reasonable.
• If negotiations with the highest-ranked firm fail, formally terminate them in writing before opening negotiations with the second-ranked firm. Terminated negotiations may not be reopened.
• Ties: the committee chair breaks a tie by documented consensus of the committee.

Eval Notes

APA 2026-04 Eagle Mountain K-6 Campus – Design
Responsiveness Checklist – complete before scoring
A response that fails a mandatory item should be referred to the Procurement Officer before the committee scores it.
#RequirementMet? (Y/N)Notes
1Response received through Bonfire on or before Monday, August 24, 2026, 5:00 PM MDT
2Letter of Introduction signed by a person authorized to bind the firm
3Executive Summary included (1–2 pages)
4Architect of Record identified, with current State of Utah architect license
5Utah-licensed professional engineer identified by name and license number, available to execute the Certificate of Consulting Engineer
6Subconsultants identified by discipline, with evidence of current Utah licensure
7Evidence of financial stability provided
8Evidence of insurance, including professional liability (errors and omissions), provided
9References provided
10Proposed design schedule provided, showing construction documents complete by August 2027
11Approach to adapting UCA's two-story elementary prototype addressed
12Scale-up / phasing approach addressed
13Eagle Mountain City entitlement and permitting approach addressed
14E-Verify statement provided (preferred)
15Signed certification statement included
16NO price, fee, rate or cost information included in the response
17Claim of Business Confidentiality and Redacted Version included, if any information is marked PROTECTED
Example — Item 16, Met?: "Y", Notes: "Confirmed — no fee data anywhere in the 42-page submittal."
Yellow cells are the only cells to fill in on this tab.