6-07. USP Physical Evaluation Score Sheet.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
UDOT RFP- Signal Pedestals
Solicitation number
UDOT260008MP
Issued by
Utah

About this file

The file "6-07. USP Physical Evaluation Score Sheet.xlsx" appears to be an evaluation scoresheet related to the Utah Department of Transportation (UDOT) Request for Proposal (RFP) for signal pedestals. The RFP seeks to establish a 5-year contract with a qualified vendor to provide single- and dual-metered traffic signal underground service pedestals for use in traffic signals, intersection lighting, and Intelligent Transportation Systems (ITS) throughout the state of Utah. The solicitation allows for innovative proposals and encourages offerors to expand upon the base specifications while addressing the core requirements outlined in the Scope of Work. UDOT anticipates making a single contract award at the conclusion of the procurement process.

The scoresheet likely contains evaluation criteria and scoring mechanisms for assessing vendor proposals, though the specific details are not visible in the provided file excerpt. The contract is valued for its comprehensive approach to infrastructure equipment procurement, with a focus on flexibility and vendor creativity in meeting the state's traffic infrastructure needs. The 5-year contract term with no renewal options suggests a strategic, long-term approach to standardizing traffic signal infrastructure equipment across Utah's transportation network.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Physical Evaluation Scoring Sheet

Vendor Name:

Evaluator Name:
No.DescriptionPossible PointsScore (1-5)Weighted MultiplierScored Points
4.1How well do the cabinet doors open, close, and latch (stay closed)2550
4.2How easy is the pedestal to carry?2040
4.3How accessible are the ground and neutral terminations?2550
4.4How accessible is the lighting rotary test switch? See 3.2.7.4.1020
4.4.1How clearly labeled and intuitive is the lighting rotary test switch?2550
4.5Is there adequate space to remove the meter?510
4.6How well are any openings permanently screened to prevent insect intrusion1530
4.7Mounting bracket quality, durability, and flexibility of mounting.2550
4.8Door latch quality.1530
4.9Overall housing quality. See 3.1.2550
4.10What is the typical lead time between order and delivery of 5 pedestals?2040
4.11Provide warranty length and details of the cabinet and electrical components.1020
4.12Is there a minimum quantity required per order?510

Total 225 0

File details come from the government source that posted it. Updated .