6-07. USP Physical Evaluation Score Sheet.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- UDOT RFP- Signal Pedestals
- Solicitation number
- UDOT260008MP
- Issued by
- Utah
About this file
The file "6-07. USP Physical Evaluation Score Sheet.xlsx" appears to be an evaluation scoresheet related to the Utah Department of Transportation (UDOT) Request for Proposal (RFP) for signal pedestals. The RFP seeks to establish a 5-year contract with a qualified vendor to provide single- and dual-metered traffic signal underground service pedestals for use in traffic signals, intersection lighting, and Intelligent Transportation Systems (ITS) throughout the state of Utah. The solicitation allows for innovative proposals and encourages offerors to expand upon the base specifications while addressing the core requirements outlined in the Scope of Work. UDOT anticipates making a single contract award at the conclusion of the procurement process.
The scoresheet likely contains evaluation criteria and scoring mechanisms for assessing vendor proposals, though the specific details are not visible in the provided file excerpt. The contract is valued for its comprehensive approach to infrastructure equipment procurement, with a focus on flexibility and vendor creativity in meeting the state's traffic infrastructure needs. The 5-year contract term with no renewal options suggests a strategic, long-term approach to standardizing traffic signal infrastructure equipment across Utah's transportation network.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-01. RFP Solicitation Information- Signal Pedestals.doc | DOC document | |
| 7-03. Submittal Form- Vendor Setup Form.pdf | ||
| 8-08. Submittal Form- USP Cost Sheet.xlsx | XLSX spreadsheet | |
| 5-04. Submittal Form- Business Confidentiality- check fields.doc | DOC document | |
| 4-06. Submittal Form- Pedestal Mandatory Requirements.xlsx | XLSX spreadsheet | |
| 2-02. 2025 Pedestal Requirements.docx | DOCX document | |
| 1-05. Submittal Form- Attachment A- Standard Terms and Conditions- with check fields.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Physical Evaluation Scoring Sheet
Vendor Name:
| Evaluator Name: | |||||
| No. | Description | Possible Points | Score (1-5) | Weighted Multiplier | Scored Points |
| 4.1 | How well do the cabinet doors open, close, and latch (stay closed) | 25 | 5 | 0 | |
| 4.2 | How easy is the pedestal to carry? | 20 | 4 | 0 | |
| 4.3 | How accessible are the ground and neutral terminations? | 25 | 5 | 0 | |
| 4.4 | How accessible is the lighting rotary test switch? See 3.2.7.4. | 10 | 2 | 0 | |
| 4.4.1 | How clearly labeled and intuitive is the lighting rotary test switch? | 25 | 5 | 0 | |
| 4.5 | Is there adequate space to remove the meter? | 5 | 1 | 0 | |
| 4.6 | How well are any openings permanently screened to prevent insect intrusion | 15 | 3 | 0 | |
| 4.7 | Mounting bracket quality, durability, and flexibility of mounting. | 25 | 5 | 0 | |
| 4.8 | Door latch quality. | 15 | 3 | 0 | |
| 4.9 | Overall housing quality. See 3.1. | 25 | 5 | 0 | |
| 4.10 | What is the typical lead time between order and delivery of 5 pedestals? | 20 | 4 | 0 | |
| 4.11 | Provide warranty length and details of the cabinet and electrical components. | 10 | 2 | 0 | |
| 4.12 | Is there a minimum quantity required per order? | 5 | 1 | 0 |
Total 225 0
File details come from the government source that posted it. Updated .