506-20-209 - VA AA AHU Replacement - Bid Drawings.pdf

PDF 12 MB Posted

Attached to
J041--506-20-209 Replace Air Handler Bldg 31 - 1 and 2 Federal contract opportunity
Solicitation number
36C25020B0055
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This pre-solicitation notice announces an upcoming Invitation for Bid for a construction project to replace air handlers at the Ann Arbor VA Medical Center in Ann Arbor, Michigan. The project involves removing and replacing internal components in air handling units 1 and 2 located in Building 31, including cooling coils, heating coils, heat recovery coils, humidifiers, supply fans, outside air control dampers, and addition of final filters. Additional work includes interior and exterior casing rust repairs, door seal and air leak repairs, and conversion of all components to direct digital control including control valves. The contractor will be provided 120 days to complete the work. The solicitation will be available for download on or around June 30, 2020 from beta.SAM.gov with responses due on a date specified in the solicitation. The contract type will be firm fixed price with an award expected within 120 days of bid receipt. The North American Industry Classification code is 238220 for plumbing, heating and air conditioning contractors and the size standard of $16.5 million applies.

View the file

Other files for this federal contract opportunity

Other files attached to J041--506-20-209 Replace Air Handler Bldg 31 - 1 and 2, newest first.
File Type Posted
36C25020B0055 0004.docx DOCX document
Covid Instructions.docx DOCX document
Sign In Sheet 506-20-209.pdf PDF
36 A103.pdf PDF
36C25020B0055 0002.docx DOCX document
03 G002.pdf PDF
48 - MH100 - BASEMENT HVAC PLAN.pdf PDF
47 - M001 - GENERAL MECHANICAL INFORMATION.pdf PDF
48 - MH103 - MECHANICAL HVAC PENTHOUSE PLAN.pdf PDF
36 A320.pdf PDF
01 G001.pdf PDF
36C25020B0055 0003.docx DOCX document
RFI Form 506-20-209.docx DOCX document
506-20-209 AHU - Specifications.pdf PDF
WD- ML20200100 07-24-2020.pdf PDF
Contractor EMR Certification Form 2020.docx DOCX document
36C25020B0055_1.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This is a PDF package created by Bluebeam Revu and may contain both PDF and non-PDF files. In order to fully utilize the PDF package interface for accessing files, download and install Bluebeam Revu.

Download now https://www.bluebeam.com/revu-update?src=2005

A300

A320

A420

A500

ARCHITECTURAL SYMBOLS & PLAN INDICATORS ABBREVIATIONS

ROOMNAME

XXX

A

8'-0"

TOP OF STEEL

ELEV. 10'-0"

A200

TITLE

SCALE X" = 1'-0"

ELEVATION INDICATION

SHEET NO.

ELEVATION NUMBER

SECTION INDICATOR

ENLARGED PLAN OR

ELEVATION

PROPOSED SPOT

EXISTING SPOT

100.57'

100.57'

STRUCTURAL SPAN

ROOF TRUSSES

FLOOR JOIST OR

RAMP

@ 16" O.C.

2 x 12

1" per 12"

SLOPE UP

REVISION TAG W/

REVISION NUMBER

KEYNOTE TAG

WINDOW TAG W/

WINDOW TYPE

INDICATOR

WALL SECTION CUT

COLUMN LINE

WALL TYPES

BUILDING SECTION CUT

SHEET LOCATION

DETAIL NUMBER

TYPICAL

DIMENSIONING

SET-BACK LINE

PROPERTY LINE

EXISTING

CONTOUR

TOPOGRAPHY

CONTOUR

100'

100'

TOPOGRAPHY

PROPOSED

SECTIONS & DETAILS

TYPICAL TITLE FOR

DOOR NUMBER

DOOR TAG W/

ROOM NUMBER

ROOM NAME/

NORTH ARROW

60" DIAMETER CLEAR

WHEELCHAIR TURNING

SPACE - REFER TO PLAN

- REFER TO PLAN

AND GROUND SPACE

30" x 48" CLEAR FLOOR

CEILING HEIGHT TAG

4'-4"

XXXNORTH

@ AT

A/C AIR CONDITIONIN/AIR CONDITIONER

ACOUS ACOUSTICAL

AD AREA DRAIN, AUTOMATIC DAMPER

ADJ ADJUST, ADJUSTABLE

ALUM ALUMINUM

AP ACCESS PANEL

ACT ACOUSTICAL CEILING

B BASE

BAR BARRIER

BD BOARD

BF BARRIER FREE

BKT BRACKET

BLDG BUILDING

BLKG BLOCKING

BOTT BOTTOM

C TO C CENTER TO CENTER

CAB CABINET

CE COLUMN ENCLOSURE

CIR CIRCLE

CIR CIRCUIT

CL CENTER LINE, CLEARANCES

CLG CEILING

CJ CONTROL JOINT

CLKG CAULKING

CLO CLOSET

CMT CERAMIC MOSAIC TILE

CMU CONCRETE MASONRY UNIT

CO CLEANOUT

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

CORR CORRIDOR

CPT CARPET

CSS CLINICAL SERVICE SINK

CT CERAMIC TILE

CTR CENTER

CUH CABINET UNIT HEATER

DEMO DEMOLITION, DEMOLISH

DEPT DEPARTMENT

DF DRINKING FOUNTAIN

DIA, D DIAMETER

DIM DIMENSION

DN DOWN

DR DRAIN

DS DOWNSPOUT

ELECT ELECTRICAL

ELEV ELEVATION

ENTR ENTRANCE

EQ EQUAL

EP ELECTRICAL PANEL

EXH EXHAUST

EXP EXPOSED

EXIST EXISTING, EXSIST'G

EXT EXTERIOR

EW EACH WAY

FA FIRE ALARM

FD FIRE DAMPER OR FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FIN FINISH

FL, FLR FLOOR FINISH

FLG, FLRG FLOORING, FLOOR'G

FURN FURNITURE, FURNACE

FWC FABRIC WALL COVERING

FT FEET, FOOT

GALV GALVANIZE(D)

GL GLASS

GSB GYPSUM SHEATHING BOARD

GWB GYPSUM WALLBOARD

GYP. BD GYPSUM BOARD

ID INSIDE DIAMETER

INSUL INSULATION

IN INCH(ES)

JAN JANITOR'S CLOSET

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HANDRAIL

HT HEIGHT

HW HEADWALL

LAM LAMINATED

LF LINEAL FEET

MAS MASONRY

MAT'L MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MANUF MANUFACTURED, MANUFACTURER

MIN MINIMUM

MLD'G MOLDING

MTL METAL

N NORTH

NAT NATURAL

NIC NOT IN CONTRACT

NORM NORMAL

NTS NOT TO SCALE

O.C. ON CENTER

OPN'G OPENING

O, O2 OXYGEN

PLAST PLASTIC

PNT PAINT

PREFAB PREFABRICATED

PLYWD PLYWOOD, PLYW'D

R RADIUS

RA RETURN AIR

REQ'D REQUIRED

RM ROOM

S SINK, SOUTH, SHINGLE

SA SUPPLY AIR

SAN SANITARY

SMKD SMOKE DAMPER

SECT SECTION

SHWR SHOWER

SIM SIMILAR

SPEC SPECIFICATION

SQ SQUARE

SS SERVICE SINK, STAINLESS STEEL

STD STANDARD

STOR STORAGE

SUSP SUSPEND(ED)

SYM SYMBOL, SYMMETRICAL

TOIL TOILET

TYP TYPICAL

UNFIN UNFINISHED

UTIL UTILITY

VAC VACUUM

VAV VARIABLE AIR VOLUME

VCT VINYL COMPOSITION TILE

VD VOLUME DAMPER

VERT VERTICAL

V.I.F. VERIFY IN FIELD

VT VINYL TILE

VWC VINYL WALL COVERING

W/ WITH

WC WATER CLOSET

WD WOOD

WNDW WINDOW

W. HTR WATER HEATER

W/O WITHOUT

WP WALL PROTECTION

T500

WALK

CONC.

BLDG. 31

NOTE:

PROPOSED CRANE LOCATION/CONTRACTOR LAY-DOWN

SPACE; ALL MATERIALS TO BE LIFTED INTO PENTHOUSE ARE

TO ARRIVE ONSITE AT THE SAME TIME TO MINIMIZE IMPACTS

TO SURROUNDING VA BUILDINGS/PROJECTS; CONTRACTOR

TO COORDINATE FINAL LOCATION WITH VA COR

FULLER ROAD

FULLER CO

URT

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

ALLIANCE | 7GAE JV PROJECT NO.: 219008

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e ig h th i c q u a rt r in re s lf rs d

6 "

Department of Veterans Affairs17

G002

506-20-209

ANN ARBOR VAMC

JANUARY 10, 2020 JLK EMP

GENERAL INFORMATION &

SYMBOL LEGEND

REPLACE AHU 1 & 2 -

NORTH

SCALE: 1" = 100'-0"

CONTRACTOR STAGING AREA

REVISIONS DATE

Sheets

A103 - PENTHOUSE FLOOR PLAN

A320 - WALL SECTIONS

G001 - COVER SHEET

G002 - GENERAL INFORMATION & SYMBOL LEGEND

ELEV. 874'-3"

PENTHOUSE

ELEV. 857'-0"

CONTRACTOR TO REMOVE EXISTING

INSULATED METAL PANEL & EXISTING

HAT CHANNEL AS REQUIRED, TO CREATE

AN OPENING TO GET EXISTING AHU

EQUIPMENT OUT OF THE PENTHOUSE

AND STAGE REPLACEMENT EQUIPMENT

INSIDE THE PENTHOUSE

CONTRACTOR TO REMOVE EXISTING

METAL STUDS FROM SILLRUNNER TO

HEAD RUNNER TO CRATE OPENING IN

EXTERIOR WALL; DO NOT CUT

EXISTING STUDS TO REMOVE; PROTECT

STUDS FOR REINSTALLATION

EXISTING CMU WALL & METAL

RUNNER ARE EXISTING TO REMAIN;

DO NOT REMOVE

EXISTING INSULATED METAL PANEL &

METAL RUNNER ARE EXISTING TO

REMAIN; DO NOT REMOVE

EXISTING HAT CHANNEL TO REMAIN

CONTRACTOR SHALL PROVIDE

TEMPORARY SUPPORT FOR METAL

PANEL WHERE STUDS ARE REMOVED

FULL HEIGHT

CONTRACTOR TO COORDINATE ACTUAL

METAL PANEL REMOVAL HEIGHT WITH

MAXIMUM HEIGHT OF NEW EQUIPMENT;

HEIGHTS SHOWN ON WALL SECTIONS

INDICATE APPROXIMATE METAL PANEL

REMOVAL HEIGHT ONLY

CONTRACTOR TO REINSTALL INSULATED

METAL PANEL & HAT CHANNEL; PATCH

& REPAIR ADJACENT SURFACES AS

REQUIRED; PROVIDE NEW HAT

CHANNEL AS REQUIRED

CONTRACTOR TO REINSTALL METAL

STUDS; PATCH & REPAIR ADJACENT

SURFACES AS REQUIRED

CONTRACTOR TO PROVIDE NEW

SEALANT & BACKER ROD AT EACH

METAL PANEL JOINT AS REQUIRED

TO ENSURE AREA REMOVED IS

AIR/WATER TIGHT

CONTRACTOR TO COORDINATE ACTUAL

METAL PANEL REMOVAL HEIGHT WITH

MAXIMUM HEIGHT OF NEW EQUIPMENT;

HEIGHTS SHOWN ON WALL SECTIONS

INDICATE APPROXIMATE METAL PANEL

REMOVAL HEIGHT ONLY 03

CONTRACTOR TO REINSTALL METAL

STUDS; PATCH & REPAIR ADJACENT

SURFACES AS REQUIRED

SEALANT & BACKER ROD AT EACH

METAL PANEL JOINT AS REQUIRED

TO ENSURE AREA REMOVED IS

AIR/WATER TIGHT

EXISTING CMU WALL & METAL

RUNNER ARE EXISTING TO REMAIN;

DO NOT REMOVE

CONTRACTOR TO REINSTALL

INSULATED METAL PANEL & HAT

CHANNEL; PATCH & REPAIR

ADJACENT SURFACES AS

SEALANT & BACKER ROD AT

BOTTOM OF METAL PANEL AS

REQUIRED TO ENSURE AREA

REMOVED IS AIR/WATER TIGHT

EXISTING INSULATED METAL

PANEL & METAL RUNNER ARE

EXISTING TO REMAIN; DO NOT

REMOVE

METAL STUDS; PATCH & REPAIR

REQUIRED

INSULATED METAL PANEL & HAT

CHANNEL; PATCH & REPAIR

CONTRACTOR TO PROVIDE

NEW SEALANT & BACKER ROD

AT EACH METAL PANEL JOINT

AS REQUIRED TO ENSURE AREA

REMOVED IS AIR/WATER TIGHT

WALL SECTIONS REPLACE AHU 1 & 2 -

SCALE: 3/4" = 1'-0"A320

WALL SECTION - DEMO01

SCALE: 3/4" = 1'-0"A320

WALL SECTIONS - NEW02

SCALE: 1 1/2" = 1'-0"A320

WALL SILL DETAIL03

SCALE: 1 1/2" = 1'-0"A320

WALL PANEL CONNECTION DETAIL04

Sheets

A103 - PENTHOUSE FLOOR PLAN

A320 - WALL SECTIONS

01A34333231

30A

25 27

19 21

22 23

21A

26A 26B

11 07 05

S-1

S-2

P-1

0406080910

CB-3

CB-2

CB-1

121314

15A

15B

17A

17B

17C

30B

17D

CB-5

CB-4

CB-1A

29A

CB-G

UTILITY

TUNNEL

(EL. 810'-9")

UTILITY

TUNNEL

STAIR

#3

#1

#2

ELEV.

(EL.

816.13)

#4

BLDG. NO.

22LOWER

LEVEL(EL. 816 '-1 1/2")

#5

AA A B C D D.6 E F G H J J.5 K L L.1 M

3.4

4.5

1.11

3 3

3 3

2 22 2

300 WATTS HTG

0.25 TONS CLG

225 WATTS HTG

0.15 TONS CLG

350 WATTS HTG

0.2 TONS CLG

400 WATTS HTG

1000 WATTS HTG

500 WATTS HTG

500 WATTS HTG

300 WATTS HTG 300 WATTS HTG 300 WATTS HTG 300 WATTS HTG

300 WATTS HTG 300 WATTS HTG 300 WATTS HTG 300 WATTS HTG

500 WATTS HTG 1000 WATTS HTG

VALUES SHOWN ARE MINIMUMS FOR HEATING AND COOLING.

HAVE AVAILABLE AN ADDITIONAL 10 KW OF HEATING CAPACITY AND 10 TONS OF COOLING

CAPACITY TO ADDRESS MISCELLANEOUS SPACES IN THE BASEMENT.

PROVIDE DATA LOGGERS TO RECORD TEMP AND HUMIDITY LEVELS IN SPACES IDENTIFIED IF BAS IS UNABLE TO RECORD AND TREND DUE TO CONSTRUCTION ACTIVITIES. TURN TREND DATA OVER

TO THE COR AFTER EACH SHUTDOWN.

MECHANICAL KEYNOTES - BASEMENT?

1. RADIOACTIVE ISOTOPE CONTAINMENT (NEGATIVE PRESSURE): MAINTAIN ROOM

AT 68°F TO 75°F, 45-60% RH, AND NEGATIVE PRESSURE DURING SHUTDOWNS OF

31-EX.AH-1. PROVIDE TEMPORARY HEATING OR COOLING DURING DURATION OF

SHUTDOWN. EXISTING EXHAUST AIR TERMINAL UNIT SHALL REMAIN OPEN

(MINIMUM POSITION WHERE POSSIBLE).

2. BIOSAFETY LEVEL I CONTAINMENT (POSITIVE PRESSURE): MAINTAIN ROOM AT 68°

F TO 75°F, 45-60% RH, AND POSITIVE PRESSURE DURING SHUTDOWNS OF 31-

EX.AH-1. PROVIDE TEMPORARY HEATING OR COOLING AS REQUIRED DURING

DURATION OF SHUTDOWN. EXISTING EXHAUST AIR TERMINAL UNIT SHALL BE

CLOSED DURING CONSTRUCTION SHUTDOWN.

3. BIOSAFETY LEVEL II CONTAINMENT (NEGATIVE PRESSURE): MAINTAIN ROOM AT

68°F TO 75°F, 45-60% RH, AND NEGATIVE PRESSURE DURING SHUTDOWNS OF 31-

EX.AH-1. PROVIDE TEMPORARY HEATING OR COOLING AS REQUIRED DURING

DURATION OF SHUTDOWN. EXISTING EXHAUST AIR TERMINAL UNIT SHALL REMAIN

OPEN (MINIMUM POSITION WHERE POSSIBLE).

4. EXISTING FUME HOOD 31-HD-8 SHALL BE CLOSED TO MINIMUM POSITION WHILE

MAINTAINING NEGATIVE PRESSURE.

Veterans Affairs17JANUARY 10, 2020

MH100

SMB MMK

BASEMENT HVAC PLAN REPLACE AHU 1 & 2 -

1/8" = 1'-0"

BASEMENT HVAC PLAN

ROOM LEGEND

1 CLEAN CAGE STORAGE

01A EQUIPMENT STORAGE

2 CAGE WASHING

4 ANIMAL WARD

5 PROCEDURE & TREATMENT ROOM

6 ANIMAL WARD

7 WOMENS LOCKERS

8 ANIMAL WARD

9 ANIMAL WARD

10 ANIMAL WARD

11 MENS LOCKERS

12 CUBICLE ROOM

13 CUBICLE ROOM

14 LARGE ANIMAL WARD / RABBITS

15 PROCEDURE LAB

15A ANIMAL WARD

15B HAZARDOUS WASTE

16 LARGE ANIMAL WARD / DOGS

17 AIR LOCK

17A INFECTIOUS PROCEDURE LAB

17B INFECTIOUS WARD

17C CHANGE & SHOWER ROOM

17D STERILIZER

18 ELECTRICAL

19 H.A.C.

20 LARGE ANIMAL WARD / DOGS

21 NECROPSY

21A COLD STORAGE

22 KITCHEN FEED & BEDDING

23 ANIMAL WARD / DOGS

24 PROCEDURE LAB

25 ELECTRICAL

26 VESTIBULE

26A ANIMAL WARD / PRIMATE

26B ANIMAL WARD / PRIMATE

27 COMMUNICATIONS

28 POST OPERATIVE WARD

29 SURGICAL SUPPLY

29A STERILIZER

30 SURGICAL PREP.

30A WASTE 03 SURVIVAL SURGERY

30B SCRUB & GOWN ROOM

31 TERMINAL SURGERY

32 OFFICE/ VETERINARIAN

33 OFFICE/ SUPERVISOR

34 LOUNGE

35 ANIMAL RECEIVING & EXAM WARD

36 DIAGNOSTIC LAB

37 LINK

37A UTILITY

CB-1 NEUTRAL CORRIDOR

CB-1A ELEVATOR LOBBY

CB-2 CLEAN CORRIDOR

CB-3 DIRTY CORRIDOR

CB-4 NEUTRAL CORRIDOR

CB-5 NEUTRAL CORRIDOR

kozelm

Stamp

Date

Sheets

E601 - ELECTRICAL ONE LINE DIAGRAM

ED103 - ELECTRICAL POWER PENTHOUSE DEMO. PLAN

ED601 - ELECTRICAL ONE LINE DIAGRAM DEMOLITION

EP102 - ELEC. POWER PLAN SECOND FLOOR - FOR REF. ONLY

EP103 - ELECTRICAL POWER PENTHOUSE PLAN

M001 - GENERAL MECHANICAL INFORMATION

M401 - MECHANICAL DETAILS

M501 - MECHANICAL SCHEDULES

M601 - 3D VIEWS - DEMOLITION

M602 - 3D VIEWS - DEMOLITION

MH100 - BASEMENT HVAC PLAN

MH103 - MECHANICAL HVAC PENTHOUSE PLAN

MI101 - MECHANICAL CONTROLS & INSTRUMENTATION

2020-01-06T09:24:48-0500

Maureen M. Kozel, PE

I have reviewed this document

1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHTLY.

2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.

3. SEE SMACNA 2005, FIGURE 9-15.

INSULATION

B B

ACCESS PANEL

ACCESS DOOR

SECTION A-A

SECTION B-B

GASKET

DUCT

INSULATION

CASING

GASKET

HANDLE INSIDE

INSULATION FLEXIBLE WASHER

FACTORY FABRICATED

LATCH

5 FT

6 8 10

9 1110 12

-1312 14 -16 -

1614 17 2219 23

2725 28 3230

20 241814 16128 1064 532 2 1/21 1/21 1 1/4THRU 3/4

7 7

7 98

SIDE VIEW TRAPEZE HANGER FOR UP TO

1000 LB. UNIFORM LOAD

ADJUSTABLE CLEVIS HANGER

TYPE 1 - SEE SPECIFICATIONS

ADJUSTABLE CLEVIS HANGER

TYPE 43 - SEE SPECIFICATIONS

PROVIDE INSULATION SHIELD

& INSERT FOR ALL PIPING

(8" MIN.)

BAND

1-5/8" 12 GAUGE

CHANNEL OR 2"x2"x1/4"

ANGLE

1/2" DIA.

HANGER RODS WITH

36" MAX. SPACING

ON EACH CHANNEL

WELD

SADDLE

INSULATION SHIELD

AT HANGER

PROVIDE HIGH

COMPRESSIVE STRENGTH

INSULATION (9 PSF MIN.

DENSITY) UNDER

INSULATION SHIELD

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR LOW

TEMPERATURE PIPE)

HANGER ROD

MAXIMUM PIPE/TUBING SUPPORT SPACING

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.

NOM. SIZE

PIPE

TUBING

NOTES:

SEE SPECIFER FOR DETAILED

HANGER REQUIREMENTS

1" M

X

IN.

FT.

FT.

STEAM TRAP ASSEMBLY

STEAM LINE DRIP POCKET

STEAM LINE

(TYPICAL)

6"

3/4" DRAIN

(ALTERNATE LOCATIONS)

(TYPICAL)

FROM DRIP

CONNECTION

3/4" MIN.

IN

2"

DRIP LEG (TYP.)

DRIP POCKET PIPE SIZE

SAME AS STEAM MAIN

UNLESS OTHERWISE NOTED.

3/8" TEST

CONNECTION

DRIP

RETURN

PIPE T0 STEAM

TRAP (TYPICAL)

CAP (TYPICAL)

2"

MV

OR

AV

TYPICAL MANUAL AIR VENT

TYPICAL CHILLED AND HOT WATER

PIPING DRAIN VALVE CONNECTIONS

THREADED PIPING

WELDED PIPING

TYPICAL WATER PIPING

REDUCER, IF REQUIRED

3/4" BALL VALVE

ADAPTER TO 3/4" HOSE

THREAD-PROVIDE HOSE CAP NUT

1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.

2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS

AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.

AIR VENT

1/2"

BALL VALVE

1/4"

COPPER TUBING

1/2" x 4" NIPPLE

CIRCULATING WATER PIPING

1. VENT ALL HIGH POINTS INDICATED ABOVE.

2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.

DRAIN LINE SHALL BE AT LEAST THE SAME SIZE AS THE NIPPLE ON

THE DRAIN PAN

PIPING SHALL BE RIGID COPPER TYPE L OR TYPE M UNLESS NOTE

BELOW IS MET

BLOW THRU 2X

WHERE X = STATIC PRESSURE IN PAN

NOTE: 1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA AND IS INDOORS AND DOES

NOT PASS THROUGH RATED BARRIERS.

2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS ARE TO BE CONNECTED.

DRAW THRU

UNIT TYPE

ROOF DRAIN

2" PLUS X

1" MINIMUM

PITCH DOWN TOWARD DRAIN

CLEAN OUT

DIELECTRIC

FITTING

DRAIN PAN

1"

FLOW

1" GATE

VALVE

SEE DRAWINGS FOR PIPE SIZES

SCHEDULE 80 STEEL PIPE

DRIP LEG OR EQUIPMENT CONNECTION.

MAKE THE SAME SIZE AS THE SUPPLY MAIN

OR EQUIPMENT CONNECTION. SEE NOTE 1

BYPASS-INSTALL IN HORIZONTAL PLANE LEVEL

WITH TRAP OR IN VERTICAL PLANE & BELOW

TRAP

PROVIDE BYPASS PIPING FOR ALL TRAPS 1" AND

LARGER.

SCHEDULE 80

STEEL PIPE

DIELECTRIC FITTING WHERE

RETURN IS COPPER PIPE

FLOAT AND THERMOSTATIC TRAP.

SEE PLANS, AND SCHEDULES

PIPE SIZE SHALL BE SAME SIZE AS TRAP

TO RETURN MAIN

ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12" MINIMUM HIGH DRIP LEG FROM BOTTOM OF STEAM MAIN TO

TRAP INLET. DRIP LEG SHALL HAVE 6" SCALE POCKET BELOW TRAP INLET.

1.

MPS

MPR

INTEGRAL FACE AND

BYPASS DAMPER

FLOAT AND THERMOSTATIC TRAP ASSEMBLY

SPRING LOADED VACUUM BREAKER

VENTED TO ATMOSPHERE TYPICAL

ON BOTH THE STEAM SUPPLY

AND THE CONDENSATE LINES.

(30PSIG)

VB

FLEXIBLE CONNECTOR INSTALLED PARALLEL

TO COIL HEADER AND AS CLOSE AS POSSIBLE

TO COIL CONDENSATE CONNECTION.

ON/OFF CONTROL

VB

WATER

COIL

AIR VENT

WHEN COIL

IS NOT

SELF-VENTING

TEST PLUG

(TYP.)

PIPE HANGER SHALL SUPPORT

PIPING INDEPENDENT OF COIL

WATER

COIL

REDUCER, IF

REQUIRED

FLOW ELEMENT

DRAIN WHEN COIL IS

NOT SELF-DRAINING

DRAIN

DOUBLE COIL

2.

3.

WHEN COIL IS INCLUDED IN CASING MOUNTED ON VIBRATION ISOLATORS THE

FIRST 2 HANGERS FOR EACH PIPE SHALL BE SPRING & NEOPRENE TYPE. TYPE

"H" FOR 4" [100mm]∅ PIPE & SMALLER. TYPE "H-P" FOR 5" [125mm]∅ PIPE

& LARGER.

PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE

SWING OR USE OF ACCESS DOORS OR PANELS; NEITHER SHALL IT BLOCK THE

SERVICING OF FILTERS, VALVES, OR EQUIPMENT.

THE FLOW ELEMENT MAY BE INSTALLED IN THE SUPPLY PIPING IF THE

REQUIRED MINIMUM UPSTREAM AND DOWNSTREAM DIMENSIONS CANNOT BE

OBTAINED IN THE RETURN

PIPING.

FE

TI

4.

5.

WHEN COIL IS INCLUDED IN CASING MOUNTED ON

VIBRATION ISOLATOR UNITS, THE RUNOUT PIPING

FOR CONNECTIONS TO COIL SHALL BE INSTALLED

WITH SWING JOINTS TO ALLOW FOR THE

VIBRATION.

PIPING SHALL BE INSTALLED IN SUCH MANNER

THAT IT WILL NOT BLOCK THE SWING OR USE OF

ACCESS DOORS OR PANELS; NEITHER SHALL IT

BLOCK THE SERVICING OF FILTERS, VALVES, OR

EQUIPMENT.

TRAP EACH COIL SEPARATELY WHEN INSTALLED IN

A BANK OF TWO OR MORE HIGH. ALSO PROVIDE

SEPARATE VACUUM BREAKER FOR EACH

COIL.

TWO TRAP ASSEMBLIES IN PARALLEL ARE SHOWN.

TWO TRAPS REQUIRED WHEN CONDENSATE LOAD

IS 5,000 LBS/HR [2400 KG/HR] OR GREATER.

SUPPLY & RETURN PIPES ARE SHOWN FROM

SAME END. REHEAT COIL MAY HAVE SUPPLY &

RETURN PIPES FROM OPPOSITE ENDS.

PIPE HANGER

SHALL SUPPORT

PIPING

INDEPENDENT OF

COIL (TYP.)

PITCH COIL

DOWN 1/4"

[8mm] PER

FOOT TO

CONDENSATE

OUTLET

FULL SIZE

TAPPING

PRESSURE

GAGE

SCALE

POCKET

SEE NOTE

NO. 4

STEAM

1/2" [1 5mm]

CHECK VALVE

VACUUM BREAKER

INCREASER,

IF REQUIRED

REDUCER,

IF REQUIRED

[1 m

[3

STEAM

SUPPLY

"M

DRIP LEG OR EQUIPMENT

CONNECTION. MAKE THE SAME

SIZE AS THE SUPPLY MAIN OR

EQUIPMENT CONNECTION. SEE

NOTE 1

ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12" MINIMUM HIGH

DRIP LEG FROM BOTTOM OF STEAM MAIN TO TRAP INLET. DRIP LEG SHALL HAVE 6"

SCALE POCKET BELOW TRAP INLET.

PROVIDE BYPASS PIPING.

SEE DRAWINGS FOR PIPE

SIZES

TO RETURN

MAIN

SCHEDULE 80 STEEL

PIPE

PIPE SIZE SHALL BE SAME SIZE

AS TRAP

INVERTED BUCKET

TRAP. SEE PLANS,

AND SCHEDULES

DIELECTRIC FITTING

WHERE RETURN IS

COPPER PIPE

SCHEDULE 80

STEEL PIPE

BYPASS-INSTALL IN HORIZONTAL

PLANE LEVEL WITH TRAP OR IN

VERTICAL PLANE & BELOW TRAP

DRIP LEG OR EQUIPMENT

CONNECTION. MAKE THE

SAME SIZE AS THE SUPPLY

MAIN OR EQUIPMENT

CONNECTION. SEE NOTE 1

1" GATE

FLOW

[3

[1

DRIVEN

EQUIPMENT

MOTORTYPICAL STRUCTURAL

STEEL MEMBER FOR

TYPE"B"

WELDED STEEL

BASE

TYPE "1"

CONCRETE INERTIA

BASE

NUMBER OF ISOLATION

UNITS AS REQUIRED

NUMBER OF ISOLATION

UNITS AS REQUIRED

TYPICAL

STRUCTURAL STEEL

MEMBER FOR

ALL WELDED

STEEL

FRAMEWORK

SECTION

A-A

STRUCTURAL

STEEL FRAME

SPRING

ISOLATOR

ANCHOR

BOLT

REINFORCING

BARS

SLEEVE

SHAFT

MOTORSHAFT

DRIVEN

MPR

FLOAT AND THERMOSTATIC TRAP ASSEMBLY

(30PSIG)

MODULATING

CONTROL

INSTALL STRAINER WITHIN 3'

OF HUMIDIFIER MANIFOLD

3/4" GRAVITY TO

DRAIN

W/ 1" GAP

M401

MECHANICAL DETAILS REPLACE AHU 1 & 2 -

NOT TO SCALE

ACCESS PANEL AND DOOR DETAIL

PIPE HANGERS

STEAM LINE DRIP POCKET/STEAM TRAP ASSEMBLY

DRAIN VALVE AND AIR VENT CONNECTIONS (HYDRONIC

SYSTEMS)

AIR HANDLING DRAIN TRAP DETAIL

FLOAT AND THERMOSTATIC STEAM TRAP ASSEMBLY

INTEGRAL FACE AND BYPASS STEAM COIL DETAIL

WATER COILS - PIPING CONNECTIONS

STEAM LINE DRIP POCKET/STEAM TRAP ASSEMBLY

INVERTED BUCKET STEAM TRAP ASSEMBLY

VIBRATION ISOLATION BASES

1/2" = 1'-0"

STEAM HUMIDIFIER PIPING DETAIL

Sheets

E601 - ELECTRICAL ONE LINE DIAGRAM

ED103 - ELECTRICAL POWER PENTHOUSE DEMO. PLAN

ED601 - ELECTRICAL ONE LINE DIAGRAM DEMOLITION

EP102 - ELEC. POWER PLAN SECOND FLOOR - FOR REF. ONLY

EP103 - ELECTRICAL POWER PENTHOUSE PLAN

M001 - GENERAL MECHANICAL INFORMATION

M401 - MECHANICAL DETAILS

M501 - MECHANICAL SCHEDULES

M601 - 3D VIEWS - DEMOLITION

M602 - 3D VIEWS - DEMOLITION

MH100 - BASEMENT HVAC PLAN

MH103 - MECHANICAL HVAC PENTHOUSE PLAN

MI101 - MECHANICAL CONTROLS & INSTRUMENTATION

2020-01-06T09:23:47-0500

Maureen M. Kozel, PE

I have reviewed this document

EX.6"CWS

EX.6"CWR

REMOVE EXISTING CHILLED

WATER PIPING BACK TO

ISOLATION VALVES FOR

COIL REPLACEMENT

31-EX.AHU-1

DISCONNECT

CONDENSATE LINE

FOR COIL REPLACEMENT

EX.1 1/2"COND

REMOVE EXISTING

GLYCOL PIPING FOR

EX.3"GYS

EX.3"GYR

31-EX.AHU1

EX.3"STM MP

STEAM PIPING BACK TO

ISOLATION VALVE FOR

HUMIDIFIER RELOCATION

EX.2"STM MP

EX.1 1/2"STM MP

EX.1 1/2"COND 2"COND

REMOVE TRAP, VALVES,

AND CONDENSATE PIPING

EX.8"CWR

EX.8"CWS

EX.6"C

WS

WR

REMOVE EXISTING CHILLED

WATER PIPING BACK TO

ISOLATION VALVES FOR

WR

WS

DISCONNECT

CONDENSATE LINE

EX.1 1/2"COND

GLYCOL PIPING FOR

ISOLATE GLYCOL

LOOP HERE

ON-OFF VALVE FOR

HUMIDIFIER RELOCATION

EX.1 1/2"STM MP

2"COND

REMOVE TRAP, VALVES,

KEY NOTES

1. DEMOLITION SCOPE SHOWN MAY BE REDUCED IN THE FIELD IF COMPONENT

REMOVAL AND INSTALL CAN BE ACCOMPLISHED WITHOUT FULL DEMOLITION.

PIPING AND TRIM MAY BE REINSTALLED IF IN GOOD CONDITION AS APPROVED BY

THE COR.

2. VALVES IDENTIFIED FOR WATER/STEAM/GLYCOL SHUTOFF. EXERCISE VALVES IN

ADVANCE OF SHUTDOWNS TO CONFIRM OPERATION. PROVIDE ALLOWANCE TO

REPLACE ISOLATION VALVES THAT FAIL TO CLOSE. COORDINATE ISOLATION VALVE

TESTING WITH COR.

INSTALL NEW PIPING TO NEW

HUMIDIFIER LOCATION

UPSTREAM OF COOLING COILS

2"COND

RE-INSTALL TRAP, VALVES,

AFTER COIL REPLACEMENT.

NEW CONTROL

VALVE AND

ACTUATOR

NEW STEAM TRAP

EXISTING V-3

1 1/2"STM MP

1"COND

M601

3D VIEWS - AHU-1 REPLACE AHU 1 & 2 -

NOT TO SCALE6

PARTIAL AHU-1 CHILLED WATER FRONT DEMOLITION

PLAN

NOT TO SCALE5

PARTIAL AHU-1 GLYCOL FRONT DEMOLITION PLAN

NOT TO SCALE3

PARTIAL AHU-1 STEAM FRONT DEMOLITION PLAN

NOT TO SCALE4

PARTIAL AHU-1 CHILLED WATER ISOMETRIC

DEMOLITION PLAN

NOT TO SCALE2

PARTIAL AHU-1 GLYCOL ISOMETRIC DEMOLITION PLAN

NOT TO SCALE1

PARTIAL AHU-1 STEAM ISOMETRIC DEMOLITION PLAN

1 2 1 2

1 21 2

1 2

NOT TO SCALE7

PARTIAL AHU-1 STEAM ISOMETRIC NEW PIPING PLAN

Sheets

M601 - 3D VIEWS - AHU-1

M602 - 3D VIEWS - AHU-2

2020-01-06T09:19:59-0500

Maureen M. Kozel, PE

I have reviewed this document

ZS

P

I/P

I

SD

T-2

H-2

T-1

S

H-1

T-4

T-5

OUTSIDE

AIR

DAMPER

END

SWITCH

OUTSIDE

PLENUM

N

R

G Y

O

V

IL

FROM DAMPER

SOLENOID

LI

ELECTRICAL

INTERLOCK

V-4 N.C.

HUMIDIFIER

CONTROL VA.

TEMP.

INPUT

DCP

OUTPUT

TO

OUTSIDE AIR

SUPPLY

SOLENOID

TRANSMITS DIFFERENTIAL PRESSURE

TO DCP TO INDICATE FILTER

CONDITIONS AND STATUS OF FANS.

CONTROLS OPERATION OF AIR

HANDLING UNIT IN ACCORDANCE

WITH THE SEQUENCE OF OPERATION.

OPENS WHEN SUPPLY FAN

STARTS AND CLOSES WHEN

SUPPLY FAN STOPS.

FACE & BY-PASS DAMPER

MODULATING

MODULATES AIRFLOW BETWEEN

THE COIL FACE AND THE COIL

BY-PASS IN RESPONSE TO DCP.

DUCT SMOKE DETECTORS

(FURNISHED AND WIRED TO

FIRE ALARM PANEL BY ELECTRICAL)

PRESSURE GAUGE

(SECTION 15880)

SENSES AND TRANSMITS SPACE

HUMIDITY TO DCP FOR

CONTROL AND INDICATION

SENSES AND TRANSMITS SUPPLY

AIR HUMIDITY TO DCP FOR

CONTROL AND INDICATION

CLOSES WHEN UNIT IS SHUT

OFF OR WHENEVER SMOKE

IS DETECTED BY F SD.

SUPPLY AIR TEMPERATURE

SENSOR

SENSES AND TRANSMITS SUPPLY

AIR DRY BULB TEMPERATURE TO

DCP FOR CONTROL AND INDICATION.

SENSES AND TRANSMITS OUTSIDE

AIR DRY BULB TEMPERATURE TO

DCP FOR CONTROL AND INDICATION.

SHUTS DOWN FAN SYSTEM AND ALARMS

DCP WHEN TEMP. LEAVING COIL IS BELOW

SETPOINT OF TEMP. SWITCH.

LEAVING PREHEAT COIL

AIR TEMPERATURE SWITCH

(FREEZE PROTECTION)

CHILLED WATER CONTROL VALVE

STRAIGHT THRU MODULATING

TYPE

PROPORTIONS FLOW OF

CHILLED WATER TO COOLING

COIL IN RESPONSE TO DCP.

CONTROLS STEAM FLOW

TO HUMIDIFIER

STEAM CONTROL VALVE

MODULATING TWO WAY

PROPORTIONS FLOW OF

STEAM TO HUMIDIFIER

IN RESPONSE TO DCP.

HUMIDIFIER

STEAM SHUT-OFF

OUTSIDE AIR TEMPERATURE

STARTS, STOPS SUPPLY FAN AND

CONTROLS SPEED IN RESPONSE TO DCP

CLOSES WHEN DAMPER IS OPEN

OPENS WHEN DAMPER BEGINS TO CLOSE

ADJUSTABLE

RESTRICTOR

-F

T

-F

LEAVING ENERGY RECOVERY COIL

AIR TEMPERATURE

SENSES AND TRANSMITS ENERGY

RECOVERY COIL DRY BULB

TEMPERATURE TO DCP.

31-ERC-3

(31-AH-1 ONLY)

EXHAUST

ENERGY

RECOVERY

COILS

EXHAUST

MAINTAIN 52F @ T-1 FOR AH-1

�MAINTAIN 53 F @ T-1 FOR AH-2

31-AH-1

SPACE

HUMIDITY

LOCATED

IN RM 20

31-AH-2

HUMIDITY

LOCATED

IN RM 110

DE-ENERGIZES SUPPLY FAN AND

PROVIDES SMOKE ALARM SIGNAL

TO DCP AND FIRE ALARM SYSTEM.

STEAM CONTROL VALVE,

TWO-WAY,

OPEN/CLOSE

STOPS AND STARTS FLOW OF

STEAM TO PREHEAT COIL

IN RESPONSE TO DCP.

N.C. 31-AH-1

N.O. 31-AH-2

STEAM CONTROL VALVE,

TWO-WAY,

OPEN/CLOSE

VARIABLE FREQUENCY

DRIVE

GLOBAL SENSOR

ONE PER BUILDING

CONTROL/

MONITORING

SYSTEM -

(31-AH-1ONLY)

PREHEAT COIL

(FACE &

BY-PASS)

TO FIRE

ALARM

SYSTEM

(BY FIRE

ALARM

CONTRACTOR)

POINT INPUT/OUTPUT APPLICABLE TO 31-AH-1 ONLY

(ALL OTHER POINTS APPLY TO BOTH 31-AH-1 & 31-AH-2)

(SMOKE DETECTOR/SUPPLY FAN INTERLOCK

BY FIRE ALARM CONTRACTOR)

31-SF-1

31-SF-2

GLYCOL TEMPERATURE SENSOR TO

ENERGY RECOVERY COILS 31-ERC-1

AND 31-ERC-2.

SENSES AND TRANSMITS GLYCOL

RETURN TEMP TO 31-ERC-1 AND 31-ERC-2

FOR DCP CONTROL OF MIXING VALVE V-5.

DEFROST VALVE,

TEMPERATURE CONTROL

VALVE (3-WAY MIXING)

MODULATES IN RESPONSE TO DCP IN

ORDER TO MAINTAIN GLYCOL RETURN

TEMPERATURE TO COILS TO PREVENT

FROST FROM BUILDING UP ON COIL FACE

LI

REVERSE ACTING CONTROL

FOR 31-AH-1

DIRECT ACTING CONTROL

FOR 31-AH-2

COOLING COIL FOR

UNIT 31-AH-2

31-CD1

31-CD2

N.O.

C.

DAMPER END SWITCH/SUPPLY FAN

D-2

V-2

N.O.N.C.

FREEZE STAT/SUPPLY FAN

H

V-3

N.O.

SH

SUPPLY FAN/SMOKE DAMPER

SD-1

C. N.O.

LEGEND

DIFFERENTIAL PRESSURE

DCP

DISTRIBUTED CONTROL

PANEL

31-CD1

31-CD2

OUTSIDE AIR DAMPER 2

POSITION

D-2

SD

FILTER CONDITION

INDICATOR

SPACE AIR HUMIDITY

H-2

SUPPLY AIR HUMIDITY

SD-1

SUPPLY AIR SMOKE

T-1

T-2

T-3

V-1

V-2

V-3

V-4

SUPPLY FAN/FACE & BY-PASS DAMPER

DAMPER END SWITCH/SUPPLY FAN

VFD

DAMPER END

31-ERC-1

31-EF-15

31-ERC-2

31-EF-16

31-P-5H

APPLIES TO 31-AH-1

ONLY

NC

NO

V-5

ALARM TO

ECC

31-AH-1 CONTROL

DIAGRAM

V-5

31-AH-2 SIMILAR EXCEPT WHERE

NOTED

T-5

CHR

CH

CH

N.C. N.O.

COMMON

31-AH-1

L

VFD

CR

AO

A B C D F G

1 2 3 4 5 6 7 8 9 10

MS

7 7

DI

SEQUENCE OF OPERATION

1. GENERAL

1.1 UNIT IS NORMALLY STARTED AND STOPPED BY THE DCP OR

REMOTELY AT THE ECC. H-O-A SWITCH SHALL BE KEPT IN THE "AUTO"

POSITION. "HAND" AND "OFF" SHALL BE USED ONLY FOR MAINTENANCE.

WHEN THE UNIT IS "OFF", 31-CD1, 31CD-2 AND SD-1 SHALL BE FULLY

CLOSED. WHEN THE UNIT IS "ON", D1 AND SD-1 SHALL BE FULLY OPEN.

SMOKE DAMPER END SWITCH (ZS) AND OUTSIDE AIR DAMPER END

SWITCH (ZS) SHALL PREVENT FAN OPERATION UNTIL BOTH DAMPERS

REACH THEIR FULL OPEN POSITION. D-2 SHALL MODULATE IN

ACCORDANCE WITH THE FOLLOWING SEQUENCE:

2. TEMPERATURE CONTROL (31-P-5H)

2.1 THE SUPPLY AIR TEMPERATURE SENSED BY T-1 SHALL BE

MAINTAINED AT SETPOINT BY THE DCP MODULATING/CONTROLLING

THE ENERGY RECOVERY SYSTEM, THE PRE-HEAT COIL VALVE AND THE

FACE AND BY-PASS DAMPERS AND THE COOLING COIL VALVE AS

FOLLOWS:

DURING THE HEATING SEASON WHEN THE OUTSIDE AIR TEMPERATURE

�IS BELOW 50 F, THE HEAT RECOVERY SYSTEM PUMP 31-P-5H SHALL BE

ENERGIZED BY THE DCP. THE DCP SHALL MONITOR THE UNIT

DISCHARGE AIR TEMPERATURE (T-1). IF THE DISCHARGE AIR

�TEMPERATURE IS SENSED TO DROP 1 F BELOW SETPOINT FOR 5

MINUTES, THE DCP SHALL OPEN PRE-HEAT COIL VALVE V-2. THE DCP

SHALL THEN BEGIN MODULATING THE PRE-HEAT COIL FACE AND BY-

PASS DAMPERS TO MAINTAIN THE DISCHARGE AIR TEMPERATURE. IF

�THE DISCHARGE AIR TEMPERATURE RISES 1 F ABOVE SET POINT FOR

5 MINUTES AND THE FACE AND BY-PASS DAMPERS ARE IN FULL BY-

PASS, THE DCP SHALL CLOSE THE PRE-HEAT COIL VALVE V-2.

WHEN VALVE V-2 IS CLOSED AND THE DCP SENSES A DISCHARGE AIR

�TEMPERATURE 2 F ABOVE SETPOINT FOR 15 MINUTES, THE DCP SHALL

DE-ENERGIZE THE ENERGY RECOVERY SYSTEM CIRCULATING PUMP

31-P-5H AND ENERGIZE THE CHILLED WATER PUMP 31-P-1H (OR 31-P-2H

AS PROGRAMMED.) WITH THE CHILLED WATER PUMP ENERGIZED, THE

DCP SHALL MAINTAIN DISCHARGE AIR TEMPERATURE SETPOINT BY

MODULATING THE COOLING COIL VALVE V-1.

�WHEN THE OUTSIDE AIR TEMPERATURE IS SENSED TO BE 80 F, THE

DCP SHALL ENERGIZE THE ENERGY RECOVERY CIRCULATING PUMP

31-P-5H. THE PUMP SHALL REMAIN ENERGIZED AS LONG AS THE DCP

�SENSES THE OUTSIDE AIR TEMPERATURE TO BE 80 F OR ABOVE.

DISCHARGE AIR TEMPERATURE WILL CONTINUE TO BE MAINTAINED BY

MODULATION OF THE COOLING COIL VALVE V-1.

�WHEN THE OUTSIDE AIR TEMPERATURE FALLS TO 78 F AND REMAINS

THERE FOR 30 MINUTES, THE DCP SHALL DE-ENERGIZE THE

CIRCULATING PUMP 31-P-5H.

WHEN THE COOLING COIL VALVE V-1 IS CLOSED AND THE UNIT

�DISCHARGE AIR TEMPERATURE IS SENSED TO BE 1 F BELOW

SETPOINT FOR 5 MINUTES, THE DCP SHALL DE-ENERGIZE THE CHILLED

WATER PUMP AND ENERGIZE THE HEAT RECOVERY SYSTEM PUMP

(REGARDLESS OF OUTDOOR TEMPERATURE).

2. TEMPERATURE CONTROL (31-AH-2)

2.1 THE SUPPLY AIR TEMPERATURE, SENSED BY T-1, SHALL BE

MAINTAINED AT SETPOINT BY THE DCP MODULATING/CONTROLLING

THE PRE-HEAT COIL VALVE AND THE FACE AND BY-PASS DAMPERS

AND THE COOLING COIL VALVE AS FOLLOWS:

THE DCP SHALL MONITOR THE UNIT DISCHARGE AIR TEMPERATURE

(T- �1). IF THE DISCHARGE AIR TEMPERATURE IS SENSED TO DROP 1 F

BELOW SETPOINT FOR 5 MINUTES, THE DCP SHALL OPEN PRE-HEAT

COIL VALVE V-2. THE DCP SHALL THEN BEGIN MODULATING THE PRE-

HEAT COIL FACE AND BY-PASS DAMPERS TO MAINTAIN THE

DISCHARGE AIR TEMPERATURE. IF THE DISCHARGE AIR TEMPERATURE

�RISES 1 F ABOVE SET POINT FOR 5 MINUTES AND THE FACE AND BY-

PASS DAMPERS ARE IN FULL BY-PASS, THE DCP SHALL CLOSE THE

PRE-HEAT COIL VALVE V-2.

WHEN VALVE V-2 IS CLOSED AND THE DCP SENSES A DISCHARGE AIR

�TEMPERATURE 1 F ABOVE SETPOINT FOR 5 MINUTES, THE DCP SHALL

BEGIN MODULATING THE COOLING COIL VALVE V-1 TO MAINTAIN THE

UNIT DISCHARGE AIR TEMPERATURE. THE REVERSE SEQUENCE

OCCURS ON A FALL IN DISCHARGE AIR TEMPERATURE.

3. AIRFLOW MONITORING

3.1 THE DCP SHALL MONITOR THE UNIT PRE-FILTER/AFTER FILTER, AND

FINAL FILTER AND SHALL ALARM WHEN THE DIFFERENTIAL PRESSURE

SWITCH REACHES ITS SETPOINT INDICATING THAT THE FILTER IS DIRTY

4. HUMIDITY CONTROL

4.1 WHEN THE DCP IS NOT CALLING FOR HUMIDITY, SENSED BY H-1, "ON-

OFF" TWO-WAY CONTROL VALVE V-3 SHALL REMAIN CLOSED. WHEN THE

DCP IS CALLING FOR HUMIDITY, V-3 SHALL REMAIN OPEN AND V-1

(COOLING COIL CONTROL VALVE) SHALL REMAIN CLOSED.

4.2 THE SPACE HUMIDITY, SENSED BY H-1, SHALL BE MAINTAINED AT

SETPOINT BY THE DCP MODULATING HUMIDITY CONTROL VALVE V-4 TO

MAINTAIN THE DESIRED RELATIVE HUMIDITY. THE DCP SHALL OVERRIDE

THIS CONTROL TO MAINTAIN HUMIDITY OF 80% AS SENSED BY H-2. DCP

SHALL CLOSE VALVE V-3 WHENEVER THE SUPPLY FAN IS OFF. VALVE V-4

SHALL BE INTERLOCKED WITH A TEMPERATURE SWITCH TO KEEP THE

HUMIDIFIER OFF UNTIL CONDENSATE TEMPERATURE APPROACHES STEAM

TEMPERATURE. VALVE V-4 SHALL ALSO BE INTERLOCKED WITH THE

SUPPLY FAN MOTOR STARTER SO THAT, WHEN THE FAN IS OFF, THE

CONTROL SIGNAL TO THE VALVE WILL BLEED TO ATMOSPHERE THROUGH

A SOLENOID VALVE ALLOWING VALVE V-4 TO GO FULLY CLOSED.

5. FREEZE PROTECTION

5.1 IF THE AIR TEMPERATURE, AS SENSED BY T- �3, FALLS BELOW 45 F, AN

ALARM SIGNAL SHALL BE INDICATED AT THE DCP AND ECC. 31-AHU-1

�ONLY: IF THIS TEMPERATURE FALLS BELOW 40 F, AS SENSED BY

FREEZESTAT T-4, THE UNIT SUPPLY FAN SHALL SHUT DOWN (THROUGH A

HARDWIRED INTERLOCK BETWEEN THE FREEZESTAT CONTROL RELAY

AND FAN MOTOR STARTER) AND A CRITICAL ALARM SHALL BE INDICATED

AT THE DCP AND ECC.

6. AUTOMATIC SHUTDOWN/RESTART

6.1 WHEN SMOKE IS DETECTED BY DUCT SMOKE DETECTOR F SD, THE

SUPPLY FAN SHALL SHUT "OFF" (THROUGH A HARDWIRED INTERLOCK

BETWEEN THE SMOKE DETECTOR AND FAN MOTOR STARTER) AND AN

ALARM SIGNAL SHALL BE TRANSMITTED TO THE ECC AND TO THE FIRE

ALARM SYSTEM. THE OUTSIDE AIR DAMPER AND SMOKE DAMPER IN THE

SUPPLY DUCT SHALL CLOSE. EXHAUST FANS SERVING THE SAME SPACE

AS THE SUPPLY FAN SHALL CONTINUE TO RUN. SUPPLY FAN SHALL

RESTART AND SMOKE DAMPER AND OUTSIDE AIR DAMPER SHALL OPEN

WHEN FIRE ALARM CIRCUIT IS MANUALLY RESET.

7. ENERGY RECOVERY COIL FROST PROTECTION

7.1 THE PNEUMATICALLY CONTROLLED, 3-WAY MIXING VALVE V-5 SHALL

BE MODULATED BY THE DCP, MIXING SUPPLY AND RETURN GLYCOL TO

�MAINTAIN A MINIMUM OF 35 F GLYCOL TEMPERATURE TO ENERGY

RECOVERY COILS 31-ERC-1 AND 31-ERC-2 AS SENSED BY THE DCP

THROUGH TEMPERATURE SENSOR T-5.

8 UV-C LIGHT OPERATION

8.1 PROVIDE THE FOLLOWING SAFETY FUNCTIONS. ALL SAFETIES SHALL

BE OPERATIONAL REGARDLESS OF FAN MODE (HAND, OFF, AUTO, OR

BYPASS): UV LAMPS ACCESS DOOR SHALL INCLUDE A SAFETY SWITCH

THAT DISCONNECTS UV LAMPS POWER WHENEVER THE DOOR IS OPEN.

8.2 UV LAMPS: ENABLE UV LAMPS ON SUPPLY FANS START. PROVIDE

INTERLOCK TO DISABLE UV LAMP WHEN AHU ACCESS DOOR IS OPEN.

DISABLE UV LAMPS ON FAN STOP. INCLUDE A SCHEDULE PROGRAM THAT

ALLOWS THE OPERATOR TO SCHEDULE RUNTIME OF UV LAMPS.

CONTROLS DIAGRAM SHOWN IN ITS ENTIRETY FOR REFERENCE ONLY. ITEMS CHANGING OR REPLACED ARE SHOWN IN BOLD. THE CONTROL SYSTEM INTEGRATOR IS SIEMENS DESIGO (CONTACT BILL MCCOY). UNDER THIS PROJECT REPLACE/MODIFY OR ADD THE FOLLOWING:

1. (31-AH-1 & 31-AH-2) HUMIDIFIER SHALL BE RELOCATED UPSTREAM OF COOLING COIL AND REPLACED WITH NEW INCLUDING CONTROL VALVE

AND ACTUATOR.

2. (31-AH-1 & 31-AH-2) SINGLE FAN SHALL BE REPLACED WITH FAN ARRAY (2x2 FAN CONFIGURATION) WITH A VFD FOR EACH FAN.

3. (31-AH-1 & 31-AH-2) NEW FINAL FILTER DOWNSTREAM OF SUPPLY FAN.

4. (31-AH-1 & 31-AH-2) NEW UV LAMPS FOR COOLING COILS.

5. (31-AH-1 & 31-AH-2) NEW STEAM COIL WITH NEW FACE AND BYPASS. .

U

LA

REPLACE WITH NEW INCLUDING

DDC ACTUATOR. MAINTAIN

EXISTING INTERLOCKS TO

SUPPLY FAN AND V-3.

REMOVE PNEUMATIC

CONTROLS

REMOVE TEMP SWITCH ON

TURNS ON WHEN SUPPLY FANS START.

INTERLOCKS WITH DOOR SWITCH TO TURN

OFF.

UV UV LAMPS

DO POWER FOR UV

ENABLE/DISABLE

FROM BAS

INTERLOCK W/ ACCESS DOOR CONTACT

NEW

VFD VFD VFD

CSR

CSR

DO

/S

APPLIES TO EACH VFD/FAN

COMM

REPLACE

HUMIDITY

REPLACE WITH NEW. LOCATE

UPSTREAM OF FINAL FILTERS.

U

HPL

8 UV-C LIGHT OPERATION

8.1 PROVIDE THE FOLLOWING SAFETY FUNCTIONS. ALL SAFETIES SHALL

BYPASS): UV LAMPS ACCESS DOOR SHALL INCLUDE A SAFETY SWITCH

THAT DISCONNECTS UV LAMPS POWER WHENEVER THE DOOR IS OPEN.

8.2 UV LAMPS: ENABLE UV LAMPS ON SUPPLY FANS START. PROVIDE

INTERLOCK TO DISABLE UV LAMP WHEN AHU ACCESS DOOR IS OPEN.

DISABLE UV LAMPS ON FAN STOP. INCLUDE A SCHEDULE PROGRAM THAT

ALLOWS THE OPERATOR TO SCHEDULE RUNTIME OF UV LAMPS.

9 FAN ARRAY OPERATION

9.1 EACH FAN SHALL BE PROVIDED WITH THE FOLLOWING:

1. VARIABLE FREQUENCY DRIVE WITH STATIC PRESSURE CONTROL

2. ISOLATION DAMPER CONTROL

9.2 PROVIDE THE FOLLOWING SAFETY FUNCTIONS. ALL SAFETIES SHALL

BYPASS)

1. ANY DAMPER THAT CAN RESULT IN ISOLATION OF FAN:

ISOLATION DAMPERS TO CLOSE UPON UNIT SHUTDOWN AND OPEN

ON FAN START UP.

2. DAMPER END SWITCH FOR ISOLATION DAMPER PROOF: END

SWITCH SHALL BE ELECTRONICALLY INTERLOCKED TO PREVENT

THE FAN FROM RUNNING UNTIL THE DAMPER HAS BEEN PROVED

OPEN. END SWITCH SHALL ALSO PROVIDE STATUS TO THE BAS.

3. HIGH STATIC PRESSURE LIMIT: PROVIDE A SEPARATE HIGH STATIC

PRESSURE SWITCH (ADJ) TO STOP THE FAN WHEN STATIC PRESSURE

RISES TO [5] IN W.G. WITH MANUAL RESET.

9.3 PROVIDE THE FOLLOWING OPERATIONAL AND INTERLOCK FUNCTIONS

WHEN THE AIR HANDLING UNIT FAN IS STARTED or STOPPED, UNLESS

OTHERWISE NOTED. THESE SEQUENCES SHALL BE OPERATIONAL UPON

PROOF OF FAN STATUS REGARDLESS OF MODE

(HAND, OFF, AUTO, OR BYPASS)

1. ISOLATION DAMPER CONTROL: UPON INITIAL FAN START, OPEN

ISOLATION DAMPERS TO 100%. UPON PROOF THAT ALL DAMPERS

ARE OPEN (VIA END SWITCH) THE FAN SHALL BE ALLOWED TO RUN.

IF FAN FAILS TO START WITHIN 60 SEC (ADJ) INITIATE A FAN FAILURE

ALARM AT THE BAS. REMAINING FANS SHALL CONTINUE TO

OPERATE IN NORMAL MODE.

2. STATIC PRESSURE CONTROL LOOP: ENABLE STATIC PRESSURE

CONTROL LOOP UPON PROOF OF FAN START. DISABLE STATIC

PRESSURE CONTROL LOOP UPON PROOF OF FAN STOP.

WHEN THE UNIT IS PROVEN ON IN RESPONSE TO THE BAS OR A

MANUAL OVERRIDE, PROVIDE THE FOLLOWING.

FAN CONTROL LOOP: USE THE EXISTING REMOTE MOUNTED STATIC

PRESSURE SENSOR. CONTROL THE VARIABLE SPEED DRIVES TO

MAINTAIN THE CALCULATED REMOTE STATIC PRESSURE SET-POINT.

DRIVES SHALL BE PROVIDED THE SAME SPEED SIGNALS.

ADD PRESSURE GAUGE TO NEW

FINAL FILTERS

NEW INCLUDING ACTUATORS

T-3

PROVIDE NEW FREEZESTAT

BETWEEN HUMIDIFIER AND

COOLING COIL

NEW FREEZESTAT, INSTALL

DOWNSTREAM OF HUMIDIFIER AND

UPSTREAM OF COOLING COIL.

MI101

MECHANICAL CONTROLS &

INSTRUMENTATION

12REVISIONS DATE

Sheets

E601 - ELECTRICAL ONE LINE DIAGRAM

ED103 - ELECTRICAL POWER PENTHOUSE DEMO. PLAN

ED601 - ELECTRICAL ONE LINE DIAGRAM DEMOLITION

EP102 - ELEC. POWER PLAN SECOND FLOOR - FOR REF. ONLY

EP103 - ELECTRICAL POWER PENTHOUSE PLAN

M001 - GENERAL MECHANICAL INFORMATION

M401 - MECHANICAL DETAILS

M501 - MECHANICAL SCHEDULES

M601 - 3D VIEWS - DEMOLITION

M602 - 3D VIEWS - DEMOLITION

MH100 - BASEMENT HVAC PLAN

MH103 - MECHANICAL HVAC PENTHOUSE PLAN

MI101 - MECHANICAL CONTROLS & INSTRUMENTATION

2020-01-06T09:22:32-0500

Maureen M. Kozel, PE

I have reviewed this document

POWER DISTRIBUTION RISER

EMCC-P-01 RISER

EMCC-P-02 RISER

CB

E F

E F

E F

S F

E F

E F

E F

E F

E F

E F

.7

20A 3P

400A

90A

40A

110A

S F

S F

E F

E F

.7

E L E V A T

E F

.5

175A

100A

25A

80A

A C

(3

R F

C P

(2

V P

.5

A C C U

K W

1P

EMCC-P-01

800A, 480Y/277V, 3P, 4W + GRD

110A

EMCC-P-02

800A, 480Y/277V, 3P, 4W + GRD

VFD30A

400A

WP

IR

C O O L

N D E N S

IN

G

U

IT

L D

R M

C O O L

N D E N S

IN

G

U

L D

R M

C O O L

N D E N S

IN

G

U

L D

R M

P

E F

E F

P

E F

E F

E F

E F

E F

M A

S

IZ

A P

S P A

PROVISIONS

FOR FUTURE

SECTIONS

M A

S

IZ

A P

S P A

3PVFD

P

E F

E F

E F

E F

PROVISIONS

FOR FUTURE

SECTIONS

2P

P

E F

P

NEMA SIZE 1

30A, 3P C.B.

WIRE LENGTH FROM TRANSFORMER

LUGS TO PANEL LUGS SHALL NOT

EXCEED 10'-0"

INDICATES THE NUMBER

OF SECONDS FOR THE

TIMMING RELAY TO TIME

OUT (TYPICAL)

N

TR

LA

C C P

277- 120V

NEMA SIZE 1

30A, 3P, C.B. SPACE

DOES NOT OPERATE UNDER EMERGENCY

POWER. SHUT-OFF VIA CONTACT FROM

CONTROL RELAY EMCC-P-01 (TYPICAL)

E F

E F

A C

3 /

"C

"C

"C

"C

"C

"C

"C

"C

"C

"C

"C

"C

"C

"C

"C

"C

"C

"C

"C

"C

"C

"C

IZ

IZ

9 K

"C

"C

"C

"C

"C

1 / "C

"C

"C

"C

"C

"C

"C

"C

"C

K c m il

T T

60 90 60

"C

"C

"C

"C

"C

"C

"C

30 90 60 30

"C

"C

"C

K V A R 3 K V

K V

"C

K V

120120

120120120120120120120120

12012012012012012012012012012030

J

3/4" PVC

CONDUIT1#2 GRD. TO

ELECTL.RM. GROUND

BUS

120 120 120

ST

VOLT

120 120 120 120

R B

IS

B

P

3/4" PVC CONDUIT 1#8

GRD.TO ELEC. RM. GROUND

"C

"C

3 4

5 6

7 8

11 12

13 14

15 16

17 18

19 20

21 22

23 24

25 26

27 28

29 30

31 32

33 34

35 36

37 38

39 40

41 42

NAME OF PROJECT

PANEL DESIGNATION LOCATION VOLTAGE

BY

DATE

CHECKED

DATE

PROJECT NO.

SHT. OF

MAINS

TYPE CAPACITY

NO. DESCRIPTION

POLES

BKR

SIZE

BRANCH

CIRC.

WATTS

NO.

POLES

BKR

SIZE

BRANCH

CIRC.

WATTS

KW CONNECTED LIGHTING LOAD

KW BASED ON N.E.C. 220-3

KW CONNECTED RECEPTACLE LOAD

KW TOTAL CONNECTED LOAD

KW FOR SPARE POSITIONS @ 1.0KW

KW 25% OF LIGHTING LOAD

KW CONNECTED EQUIPMENT LOAD

KW FEEDER DESIGN LOADTOTAL

PLUS

PLUS

DESIGN

LOAD AMP

% VOLT

DROP208Y/

120V 225AMCBR2-03

506-027D

VAMC ANN

ARBOR

RESEARCH

BUILDING

RECEPTACLE PANEL

SCHEDULE

1P 20A

20A1P 1200

GEN RECEPTS (4)

(6)

(4)

20A1P 800

(5)

1.3

21.4

32.42

ROOM #217

EWC

(7)

GEN RECEPT (PH) (5)

32.09

20A1P 800

GEN RECEPTS (5)

(2)

20A1P 400

2P

25A

(3)

(2)

PROJ SCREEN

31-DWH-1 (PENTHSE)

AIR DRYER (PENTHSE)

AIR DRYER (PENTHSE)

TYPE "A" (PENTHSE)

RECEPTACLE

DESCRIPTION

DARK ROOM LTS & SIGN

100DRAIN VLVS (8) (PENTHSE)

9.39

STERLIZER

31-UH-11, 31-UH-13

SPARE

AHU-1 & 2 LTG 900 AHU-1 & 2 RECEPT 1800

0.325

SPACE SPACE

COMMUNICATION

CLOSET 218

CLOSET 117

CLOSET 27

1000KVA

TRANSF.

�480Y/277V-3

500KVA

TRANSF.

�208Y/120V-3

480V

EMERGENCY

480V

EMERGENCY

SWITCHBOARD.

31-PB-02

�208Y/120V,3 ,4W

SWITCHBOARD.

31-PB-01

�480Y/277V,3 ,4W

15-GEN-1

GENERATOR

CIRCUIT

BREAKER

GRADE

ROOM

SECOND

FLOOR

FIRST

FLOOR

BASEMENT

RA106 RA103RA105

RA205 RA206 RA203 RA202 RA201RA214RA209RA210RA213RA212RA211

RA111 RA112 RA113 RA110 RA109 EL1-04 ER1-05

LB-03 RB-04

D1-01 L1-02 R1-03

D2-01 L2-02 R2-03

ELECTRICAL ROOM

MAIN ELEC. ROOM

RB-05 RB-06PB-07

TT

15-PB-01

CP-1

31-ATS#231-ATS#1

15-ED-01

15-ER-02

ISRB-06 ISRB-07

ER1-05B

2-2"C., NO

ELECTRICAL DEMOLITION KEYNOTES?

1. REMOVE EXISTING CONDUCTORS, CONDUIT, AND VFD/DISCONNECT TO AHU-1 AND

AHU-2. REFER TO DRAWING E601 FOR NEW FEEDER SIZES AND CONSTRUCTION

PHASING.

2. DISCONNECT AND REFEED AHU-2 PRIOR TO DISCONNECTING AHU-1.

3. SALAVAGE 110A AHU-2 CIRCUIT BREAKER FOR USE WITH AHU-1. BYPASS/REMOVE

MOTOR CONTROL COMPONENT(S) IN MCC.

4. BYPASS/REMOVE MOTOR CONTROL COMPONENT(S) IN MCC.

5. UTLIZE SPACE LOCATIONS IN PANEL R2-03 FOR NEW BRANCH CIRCUITS AS

INDICATED

ED601

SDT AJC

ELECTRICAL ONE LINE

DIAGRAM DEMOLITION

GRAY TO INDICATE EXISTING

BLACK TO INDICATE NEW

HATCH TO INDICATE DEMOLITION

Sarah Gengelbach

Date Stamp

Sheets

E601 - ELECTRICAL ONE LINE DIAGRAM

ED103 - ELECTRICAL POWER PENTHOUSE DEMO. PLAN

ED601 - ELECTRICAL ONE LINE DIAGRAM DEMOLITION

EP102 - ELEC. POWER PLAN SECOND FLOOR - FOR REF. ONLY

EP103 - ELECTRICAL POWER PENTHOUSE PLAN

M001 - GENERAL MECHANICAL INFORMATION

M401 - MECHANICAL DETAILS

M501 - MECHANICAL SCHEDULES

M601 - 3D VIEWS - DEMOLITION

M602 - 3D VIEWS - DEMOLITION

MH100 - BASEMENT HVAC PLAN

MH103 - MECHANICAL HVAC PENTHOUSE PLAN

MI101 - MECHANICAL CONTROLS & INSTRUMENTATION

2020-01-06T09:02:24-0500

Sarah C. Gengelbach

I have reviewed this document

3"V

MCC MCC

AAA A.4 B C D E F G H J K L

D.6

J.5

J.4

4.8

1.13

3.7

K.9J.3 K.1

1.11.1

3.65

#1

#2

31-DWH-1

R2-29

31-P-3H

31-P-4H

31-P-6-P

HAND OFF

AUTO CONTROL

GFI, WP MOUNTED

TO UNIIT R2-25

ROOM 108

WP/GFI

R2-23

R2-27

R2-25

R2-28,30

R2-26 R2-24

R2-28,30A

R2-25

R2-25R2-23R2-25

31-ACCU-1

31-P-1H31-P-2H

31-EF-22

31-UH-13

R2-34

31-P-6H

ER1-05-36

31-RF-3EMCC-P-01

ON

ROOF

EF-23

21A

31-UH-11

R2-34

ON

ROOF

EF-21

31-UH-12

R2-34 R2-25

HEAT

TRACE

31-EF-19

C-2C-1T

AIR COMPRESSOR

CONTROL PANEL

FOR AIR COMP.

DRAIN VALVE

ER1-34

MOUNT RECEPTACLE HIGH AND

LOW FOR AUTOMATIC DRAIN

VALVES. TYPICAL FOR EACH

COMPRESSOR. COORDINATE

EXACT LOCATION IN FIELD

TO CKT R2-31

AIR COOLED

CONDENSING UNITS

FOR COLD ROOMS

AIR COOLED

CONDENSING UNITS

FOR COLD ROOMS

COMPRESSED

LAB

VACUUM

DRYER

AHU#3

AHU#1

EMCC-P-01 EMCC-P-02

31-EF-17

31-EF-18

31-EF-8

31-EF-9

31-EF-13

31-EF-15

31-EF-16

31-EF-3

31-SF-3

31-VP-1

31-EF-231-EF-6

31-EF-7

31-EF-1

31-EF-5

31-EF-10 31-EF-11 31-EF-12

31-EF-14

31-EF-4

31-EF-24

EF-20EF-25

31-AD1

31-AD2

31-AC-1

R2-31

CO

MONITOR

31-EF-27

03-35,36 31-P-5H

31-AC-2

03-36 (ALL RECEPTACLES FOR AHU-2)

03-35 (ALL LIGHTING FOR AHU-2) 03-35 (ALL LIGHTING FOR AHU-1)

03-36 (ALL RECEPTACLES FOR AHU-1)

TT

ra w g it le

ELECTRICAL KEYNOTES?

1. EXISTING 60HP AHU-2 MOTOR TO BE REPLACED WITH (4) NEW 25HP FANS. REFEED

AHU-2 WITH 3#2/0+#6G - 2"C, A NEW 200A CIRCUIT BREAKER, AND REUSE EXISTING

200A DISCONNECT SWITCH. SALVAGE 110A CIRCUIT BREAKER FOR USE WITH

AHU-1.

2. EXISTING 40HP AHU-1 MOTOR TO BE REPLACED BY (4) NEW 15HP FANS. REFEED

AHU-1 WITH 3#3+#6G - 1 1/4"C. REUSE EXISITNG 110A CIRCUIT BREAKER FROM

AHU-2 AND INSTALL NEW 200A DISCONNECT SWITCH.

3. VFD FOR EACH MOTOR IN FAN ARRAY PROVIDED WITH UNIT.

4. ELECTRICAL ROOM 217 AND PANEL R2-03 SHOWN PER EP102 FOR REFERENCE

AND NEW BRANCH CIRCUIT LOCATIONS.

EP103

SDT AJC

ELECTRICAL POWER

PENTHOUSE PLAN

PENTHOUSE FLOOR POWER PLAN

VFD VFD VFD VFD

31-SF-2

VFD VFD VFD VFD

31-SF-1

R2-03-38 (UV LIGHT) R2-03-37 (UV LIGHT)

3 2

GRAY TO INDICATE EXISTING

BLACK TO INDICATE NEW

Date Stamp

Sheets

E601 - ELECTRICAL ONE LINE DIAGRAM

ED103 - ELECTRICAL POWER PENTHOUSE DEMO. PLAN

ED601 - ELECTRICAL ONE LINE DIAGRAM DEMOLITION

EP102 - ELEC. POWER PLAN SECOND FLOOR - FOR REF. ONLY

EP103 - ELECTRICAL POWER PENTHOUSE PLAN

M001 - GENERAL MECHANICAL INFORMATION

M401 - MECHANICAL DETAILS

M501 - MECHANICAL SCHEDULES

M601 - 3D VIEWS - DEMOLITION

M602 - 3D VIEWS - DEMOLITION

MH100 - BASEMENT HVAC PLAN

MH103 - MECHANICAL HVAC PENTHOUSE PLAN

MI101 - MECHANICAL CONTROLS & INSTRUMENTATION

2020-01-06T09:05:01-0500

Sarah C. Gengelbach

I have reviewed this document

FULLER CO

URT

FULLER ROAD

LOCATION MAP

T500

WALKCONC.

G001

COVER SHEET REPLACE AHU 1 & 2 -

ANN ARBOR, MICHIGAN

PROJECT TEAM DRAWING SHEET INDEX

ENGINEERING:

ARCHITECTURE:

OWNER: DESCRIPTIONSHEET ISSUE DATE NOTES

PHONE: 269.927.0144

269.593.5933FAX:

SEVEN GENERATIONS A+E

KALAMAZOO, MI 49007

600 E. MICHIGAN AVENUE - SUITE B

WEB: WWW.7GENAE.COM

PHONE: 616.361.2664

616.361.1493FAX:

PROGRESSIVE AE

GRAND RAPIDS, MI 49525

1811 4 MILE RD. N.E.

OFFICE OF CONSTRUCTION AND

FACILITIES MANAGEMENT

DEPARTMENT OF VETERANS AFFAIRS

MEDICAL CENTER

ANN ARBOR, MI 48105

2215 FULLER ROAD

PROJECT NO. 506-20-209 REPLACE AIR HANDLER 1 AND 2 IN BUILDING 31

100% BID DOCUMENTS

VA ANN ARBOR HEALTHCARE SYSTEM

DEPT. of VETERANS AFFAIRS MEDICAL

CENTER- ANN ARBOR, MICHIGAN

G001 COVER SHEET JANUARY 10, 2020

G002 GENERAL INFORMATION & SYMBOL LEGEND JANUARY 10, 2020

A103 PENTHOUSE FLOOR PLAN JANUARY 10, 2020

A320 WALL SECTIONS JANUARY 10, 2020

M001 GENERAL MECHANICAL INFORMATION JANUARY 10, 2020

MH100 MECHANICAL HVAC BASEMENT PLAN JANUARY 10, 2020

MH103 MECHANICAL HVAC PENTHOUSE PLAN JANUARY 10, 2020

M401 MECHANICAL DETAILS JANUARY 10, 2020

M501 MECHANICAL SCHEDULES JANUARY 10, 2020

M601 3D VIEWS JANUARY 10, 2020

M602 3D VIEWS JANUARY 10, 2020

MI101 MECHANICAL CONTROLS & INSTRUMENTATION JANUARY 10, 2020

ED103 ELECTRICAL POWER PENTHOUSE DEMO. PLAN JANUARY 10, 2020

ED601 ELECTRICAL ONE LINE DIAGRAM DEMOLITION JANUARY 10, 2020

EP102 ELECTRICAL POWER PLAN SECOND FLOOR - FOR REF. ONLY JANUARY 10, 2020

EP103 ELECTRICAL POWER PENTHOUSE PLAN JANUARY 10, 2020

E601 ELECTRICAL ONE LINE DIAGRAM JANUARY 10, 2020

Sheets

A103 - PENTHOUSE FLOOR PLAN

A320 - WALL SECTIONS

G001 - COVER SHEET

G002 - GENERAL INFORMATION & SYMBOL LEGEND

AA A B C D D.6 E F G H J J.5 K L L.1

AREA OF WORK

AREA OF WORK

EXISTING AHU EXISTING AHU

CONTRACTOR TO USE THIS AREA AS

REPLACEMENT EQUIPMENT STAGING AREA;

REFER TO MECHANICAL SHEET M001 FOR

ADDITIONAL PHASING INFORMATION

AA A B C

CONTRACTOR TO REMOVE & SALVAGE EXISTING INSULATED

METAL PANELS & PORTION OF EXISTING METAL STUDS FROM

RUNNER TO RUNNER TO PROVIDE ACCESS TO PENTHOUSE.

PROTECT INSULATED METAL PANELS & METAL STUDS DURING

DEMOLITION FOR RE-INSTALLATION. PATCH & REPAIR ADJACENT

SURFACES AS REQUIRED. REFER TO MECHANICAL & ELECTRICAL

PLANS PRIOR TO STUD REMOVAL FOR DEVICE RELOCATION

COORDINATION.

CONTRACTOR TO ONLY REMOVE REQ. LENGTH FOR PENTHOUSE ENTRY

13' - 2" ± NOTE:

CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING

A TEMPORARY ENCLOSURE AROUND OPENING WHERE METAL

PANEL IS REMOVED. ONCE METAL PANEL IS RE-INSTALLED,

TEMPORARY ENCLOSURE CAN BE REMOVED.

EXISTING AHU

EXISTING COLD FORMED DOOR FRAMING TO REMAIN

AA A B C

EXISTING AHU

FLOOR PLAN LEGEND

EXISTING NON-FIRE RATED WALL

NEW NON-FIRE RATED WALL

EXISTING DOOR

NEW DOOR

2-HOUR FIRE RATED BARRIER - UL DES U419

1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO

MECHANICAL PHASING DESCRIPTION ON SHEET M001.

2. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY

WALK-OFF MATS ON INSIDE & OUTSIDE OF WORK SPACE.

3. REFER TO SHEETS A103 & A320 FOR ADDITIONAL INFORMATION

ON DEMOLITION INTENT & EXTENT.

4. CONTRACTOR TO COORDINATE ALL AHU SHUT DOWNS WITH VA

COR & BUILDING USERS AT LEAST 6 WEEKS IN ADVANCE, TO

ALLOW USERS TO PREPARE FOR AIR FLOW DISRUPTION.

5. ALL AHU COMPONENT REPLACEMENT TO TAKE PLACE AFTER

HOURS, ON WEEKENDS. AHU SHUT DOWN IS TO TAKE PLACE

BETWEEN 5:00 PM FRIDAY - 3:00 AM MONDAY. CONTRACTOR

TO COORDINATE FINAL SHUTDOWN TIMES WITH VA COR.

6. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO

ENSURE ALL BUILDING AND CONSTRUCTION CODES ARE MET

FOR EACH PHASE PRIOR TO THE PHASE BEING CONSIDERED

CLOSED.

7. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND

MAINTAINING A TEMPORARY ENCLOSURE AROUND OPENING

WHERE METAL PANEL IS REMOVED. ONCE METAL PANEL IS RE-

INSTALLED, TEMPORARY ENCLOSURE CAN BE REMOVED.

8. PARKING WILL BE ALLOWED ON NIGHTS/WEEKENDS IN

DESIGNATED LOCATIONS. PARKING DURING NORMAL BUSINESS

HOURS WILL BE LIMITED TO 2 SPACES. CONTRACTOR TO

COORDINATE PARKING LOCATIONS WITH VA COR.

GENERAL PHASING NOTES

A103

PENTHOUSE FLOOR PLAN REPLACE AHU 1 & 2 -

SCALE: 1/8" = 1'-0"

PENTHOUSE COMPOSITE PLAN

SCALE: 1/4" = 1'-0"A103

PENTHOUSE DEMOLITION PLAN01

SCALE: 1/4" = 1'-0"A103

PENTHOUSE FLOOR PLAN02

Sheets

A103 - PENTHOUSE FLOOR PLAN

A320 - WALL SECTIONS

SHEETMETAL NOTES

1. THE INSTALLATION OF ALL DUCTWORK SHALL BE CLOSELY COORDINATED WITH NEW

PLUMBING, ELECTRICAL, AND STRUCTURAL CONDITIONS. NOT ALL REQUIRED

OFFSETS AND FITTINGS ARE INDICATED ON DRAWINGS, BUT SHALL BE PROVIDED.

REFER TO ARCHITECTURAL AND STRUCTURAL PLANS FOR CLEARANCES. ALTERNATE

DUCT ROUTING SHALL BE APPROVED BY ARCHITECT/ENGINEER BEFORE

PROCEEDING IN ORDER TO ENSURE THAT THE AVAILABLE STATIC PRESSURE

REMAINS ADEQUATE. DUCTWORK LOCATION SHALL TAKE PRECEDENCE OVER HVAC

AND FIRE PROTECTION PIPING AND ELECTRICAL CONDUIT AND CABLE TRAY.

2. REFER TO DUCT TAKEOFF DETAILS. SPIN-IN TYPE WITH SCOOPS SHALL NOT BE

ACCEPTED. A MINIMUM OF 2 FEET SHALL BE PROVIDED BETWEEN RUNOUT

TAKEOFFS FROM TRUNK DUCTS.

3. THERMOSTAT AND SENSORS LOCATIONS WITHIN DUCTWORK SHALL BE VERIFIED

WITH ARCHITECT/ ENGINEER BEFORE ROUGH -IN.

4. RUNOUT BALANCING DAMPERS SHALL BE MOUNTED AS CLOSE TO MAIN DUCT AS

POSSIBLE.

5. DUCTWORK LAYOUT HAS BEEN DESIGNED TO ABSORB NOISE. ALL FITTINGS SHALL

BE PROVIDED AS INDICATED.

6. TERMINAL UNITS SHALL BE MOUNTED TO NOT IMPAIR ACCESS TO FILTERS, COILS

AND CONTROLS.

7. WATERTIGHT CONCRETE CURBS SHALL BE PROVIDED AROUND ELEVATED FLOOR

SLAB PENETRATIONS.

8. DUCTWORK AND ASSOCIATED COMPONENTS SHALL CLEAR DOORS AND WINDOWS.

9. UNLESS OTHERWISE NOTED, ALL DUCTWORK ABOVE CEILING OR EXPOSED IS

OVERHEAD AND AS HIGH AS POSSIBLE TO THE UNDERSIDE OF THE STRUCTURE,

WITH SPACE FOR INSULATION WHERE REQUIRED.

10. LOCATE MECHANICAL EQUIPMENT SUCH THAT THERE IS UNOBSTRUCTED ACCESS

TO UNIT ACCESS PANELS, CONTROLS AND VALVING.

11. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS CONNECTED TO

MECHANICAL EQUIPMENT THAT REQUIRE VIBRATION ISOLATION. FLEXIBLE

CONNECTIONS SHALL BE PROVIDED AT THE POINT OF CONNECTION TO THE

EQUIPMENT UNLESS OTHERWISE NOTED.

12. DUCTWORK SIZES ARE INSIDE CLEAR DIMENSIONS.

13. ALL ELBOWS IN DUCTWORK SHALL BE RADIUS ELBOWS UNLESS OTHERWISE NOTED.

RADIUS ELBOWS SHALL HAVE CENTERLINE RADIUS OF CURVATURE 1.5 TIMES THE

DUCT DIAMETER OR WIDTH IN THE PLANE OF TURN. WHERE SQUARE ELBOWS ARE

SHOWN, INSTALL TURNING VANES.

14. DUCTS CONNECTED TO EQUIPMENT SHALL EQUAL EQUIPMENT CONNECTION SIZE

UNLESS NOTED OTHERWISE.

15. MAXIMUM LENGTH ON FLEXIBLE DUCT SHALL BE 5'-0", UNLESS OTHERWISE NOTED

ON DETAILS OR SPECIFICATION.

16. REFER TO ARCH REFLECTED CEILING PLANS FOR EXACT DIFFUSER LOCATIONS IN

AREAS WITH A CEILING.

MECHANICAL GENERAL NOTES

1. COMPLY WITH ALL APPLICABLE LOCAL, STATE AND/OR REGULATORY AGENCIES,

CODES AND REGULATIONS FOR NEW WORK.

2. DO NOT INSTALL EQUIPMENT, PIPING OR DUCTWORK OVER ANY ELECTRICAL

EQUIPMENT OR COMMUNICATION ROOMS.

3. DO NOT RUN ANY PIPING OR DUCTWORK INTO THE ELECTRICAL ROOM UNLESS

DEDICATED TO SERVE THAT ROOM.

4. INSTALL MECHANICAL EQUIPMENT TO FACILITATE SERVICING, MAINTENANCE, AND

REPAIR OR REPLACEMENT OF EQUIPMENT COMPONENTS. AS MUCH AS

PRACTICAL, CONNECT EQUIPMENT FOR EASE OF DISCONNECTING, WITH A

MINIMUM OF INTERFERENCE WITH OTHER INSTALLATIONS.

5. LOCATE THERMOSTAT/TEMPERATURE SENSORS 48" ABOVE FINISHED FLOOR OR

AS NOTED ON THE PLANS.

6. WORK IDENTIFIED WITH MECHANICAL AND ELECTRICAL NOTES AND KEY NOTES

SHALL BE PERFORMED BY QUALIFIED MECHANICAL AND ELECTRICAL

CONTRACTORS RESPECTIVELY UNDER DIRECTION OF THE CONSTRUCTION

MANAGER. COORDINATE WITH OWNER'S REPRESENTATIVE OR CONSTRUCTION

MANAGER.

7. INSTALL SMOKE DETECTOR IN DUCTWORK AS SHOWN ON THE DRAWINGS AND IN

ACCORDANCE WITH THE MANUFACTURER'S PRINTED INSTRUCTIONS.

8. VERIFY ALL CONDITIONS IN FIELD BEFORE START OF CONSTRUCTION. NOTIFY

ARCHITECT/ENGINEER OF DISCREPANCIES BETWEEN DRAWINGS AND ACTUAL

FIELD CONDITIONS.

9. COORDINATE WORK WITH OTHER TRADES AND WITH THE CONSTRUCTION

MANAGER.

10. COORDINATE ANY REQUIRED SHUTDOWN OF SERVICES OR EQUIPMENT WITH

OWNER'S REPRESENTATIVE OR CONSTRUCTION MANAGER, MINIMIZE

INTERRUPTION OF EXISTING SERVICES.

11. PROVIDE ALL MISCELLANEOUS STEEL AND ITEMS REQUIRED FOR THE PROPER

INSTALLATION OF ALL PIPE, SHEET METAL AND EQUIPMENT.

12. COORDINATE FLOOR, WALL & ROOF PENETRATIONS ETC. WITH ARCHITECTURAL

TRADES.

13. FIRESTOP SHALL BE PROVIDED IN HOLES AND PENETRATIONS IN RATED

ASSEMBLIES.

14. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR

INDICATED.

15. DUCT SIZES ARE NET INSIDE DIMENSIONS.

16. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM,

TERMINAL UNITS, FILTERS, COILS, ETC.

17. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE

STANDARD EQUIPMENT DETAILS.

18. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE

TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.

19. SEISMIC PROVISIONS NOT REQUIRED.

20. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.

MECHANICAL SYMBOLS

CABINET UNIT HEATER, TYPE 'CUH-#'

CONVECTOR, TYPE 'C-#'

SUPPLY DIFFUSER (4-WAY)

FT-##

SUPPLY DIFFUSER, SD#, ### CFM

ARROWS INDICATE DIRECTION OF THROW

SOUND ATTENUATOR

RG#

RETURN OR EXHAUST REGISTER

TYPE 'RG#' ### CFM

SIDEWALL SUPPLY, RETURN, OR EXHAUST REGISTER

TYPE ### , ### CFM

RETURN AIR/EXHAUST AIR BRANCH CONNECTION

WITH VOLUME DAMPER

FINNED TUBE RADIATION

(SEE DETAIL AND SCHEDULE)

SUPPLY DUCT UP

SUPPLY DUCT DOWN

PUMP(SCHEMATIC)

ATT-#

CUH-#

C-#

MECHANICAL EQUIPMENT (EXAMPLE ACV-##)

SEE SCHEDULE FOR ADDITIONAL

SD#

SD#

EG#

EXHAUST REGISTER

TYPE 'EG#' ### CFM

LO

SUPPLY AIR BRANCH CONNECTION

WITH VOLUME DAMPER

LO

/R

RETURN DUCT UP

RETURN DUCT DOWN

EXHAUST DUCT UP

EXHAUST DUCT DOWN

HORIZONTAL FIRE DAMPER

VERTICAL FIRE DAMPER

COMBINATION FIRE/SMOKE HORIZONTAL FIRE DAMPER

COMBINATION FIRE/SMOKE VERTICAL FIRE DAMPER

FS

FS

#P-###

GPM RANGE PIPE SIZE

0.5 - 2.5 3/4"

2.6 - 6.0 1"

6.1 -10.0 1 1/4"

10.1 - 17.0 1 1/2"

17.1 - 35.0 2"

HYDRONIC PIPING NOTES

1. THE INSTALLATION OF ALL PIPING SHALL BE CLOSELY COORDINATED WITH SHEET

METAL, ELECTRICAL, AND STRUCTURAL CONDITIONS. NOT ALL REQUIRED OFFSETS

AND FITTINGS ARE INDICATED ON DRAWINGS, BUT SHALL BE PROVIDED. REFER TO

ARCHITECTURAL AND STRUCTURAL PLANS FOR CLEARANCES.

2. ALL PIPING SHALL BE INSTALLED TO FACILITATE COIL REMOVAL, FILTER

REPLACEMENT AND OPENING OF ACCESS PANELS.

3. INSTALL MAINS AS HIGH AS POSSIBLE. MANUAL AIR VENTS SHALL BE PROVIDED AT

ALL PIPING…