506-20-209 - VA AA AHU Replacement - Bid Drawings.pdf
PDF 12 MB Posted
- Attached to
- J041--506-20-209 Replace Air Handler Bldg 31 - 1 and 2 Federal contract opportunity
- Solicitation number
- 36C25020B0055
About this file
This pre-solicitation notice announces an upcoming Invitation for Bid for a construction project to replace air handlers at the Ann Arbor VA Medical Center in Ann Arbor, Michigan. The project involves removing and replacing internal components in air handling units 1 and 2 located in Building 31, including cooling coils, heating coils, heat recovery coils, humidifiers, supply fans, outside air control dampers, and addition of final filters. Additional work includes interior and exterior casing rust repairs, door seal and air leak repairs, and conversion of all components to direct digital control including control valves. The contractor will be provided 120 days to complete the work. The solicitation will be available for download on or around June 30, 2020 from beta.SAM.gov with responses due on a date specified in the solicitation. The contract type will be firm fixed price with an award expected within 120 days of bid receipt. The North American Industry Classification code is 238220 for plumbing, heating and air conditioning contractors and the size standard of $16.5 million applies.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25020B0055 0004.docx | DOCX document | |
| Covid Instructions.docx | DOCX document | |
| Sign In Sheet 506-20-209.pdf | ||
| 36 A103.pdf | ||
| 36C25020B0055 0002.docx | DOCX document | |
| 03 G002.pdf | ||
| 48 - MH100 - BASEMENT HVAC PLAN.pdf | ||
| 47 - M001 - GENERAL MECHANICAL INFORMATION.pdf | ||
| 48 - MH103 - MECHANICAL HVAC PENTHOUSE PLAN.pdf | ||
| 36 A320.pdf | ||
| 01 G001.pdf | ||
| 36C25020B0055 0003.docx | DOCX document | |
| RFI Form 506-20-209.docx | DOCX document | |
| 506-20-209 AHU - Specifications.pdf | ||
| WD- ML20200100 07-24-2020.pdf | ||
| Contractor EMR Certification Form 2020.docx | DOCX document | |
| 36C25020B0055_1.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This is a PDF package created by Bluebeam Revu and may contain both PDF and non-PDF files. In order to fully utilize the PDF package interface for accessing files, download and install Bluebeam Revu.
Download now https://www.bluebeam.com/revu-update?src=2005
A300
A320
A420
A500
ARCHITECTURAL SYMBOLS & PLAN INDICATORS ABBREVIATIONS
ROOMNAME
XXX
A
8'-0"
TOP OF STEEL
ELEV. 10'-0"
A200
TITLE
SCALE X" = 1'-0"
ELEVATION INDICATION
SHEET NO.
ELEVATION NUMBER
SECTION INDICATOR
ENLARGED PLAN OR
ELEVATION
PROPOSED SPOT
EXISTING SPOT
100.57'
100.57'
STRUCTURAL SPAN
ROOF TRUSSES
FLOOR JOIST OR
RAMP
@ 16" O.C.
2 x 12
1" per 12"
SLOPE UP
REVISION TAG W/
REVISION NUMBER
KEYNOTE TAG
WINDOW TAG W/
WINDOW TYPE
INDICATOR
WALL SECTION CUT
COLUMN LINE
WALL TYPES
BUILDING SECTION CUT
SHEET LOCATION
DETAIL NUMBER
TYPICAL
DIMENSIONING
SET-BACK LINE
PROPERTY LINE
EXISTING
CONTOUR
TOPOGRAPHY
CONTOUR
100'
100'
TOPOGRAPHY
PROPOSED
SECTIONS & DETAILS
TYPICAL TITLE FOR
DOOR NUMBER
DOOR TAG W/
ROOM NUMBER
ROOM NAME/
NORTH ARROW
60" DIAMETER CLEAR
WHEELCHAIR TURNING
SPACE - REFER TO PLAN
- REFER TO PLAN
AND GROUND SPACE
30" x 48" CLEAR FLOOR
CEILING HEIGHT TAG
4'-4"
XXXNORTH
@ AT
A/C AIR CONDITIONIN/AIR CONDITIONER
ACOUS ACOUSTICAL
AD AREA DRAIN, AUTOMATIC DAMPER
ADJ ADJUST, ADJUSTABLE
ALUM ALUMINUM
AP ACCESS PANEL
ACT ACOUSTICAL CEILING
B BASE
BAR BARRIER
BD BOARD
BF BARRIER FREE
BKT BRACKET
BLDG BUILDING
BLKG BLOCKING
BOTT BOTTOM
C TO C CENTER TO CENTER
CAB CABINET
CE COLUMN ENCLOSURE
CIR CIRCLE
CIR CIRCUIT
CL CENTER LINE, CLEARANCES
CLG CEILING
CJ CONTROL JOINT
CLKG CAULKING
CLO CLOSET
CMT CERAMIC MOSAIC TILE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CORR CORRIDOR
CPT CARPET
CSS CLINICAL SERVICE SINK
CT CERAMIC TILE
CTR CENTER
CUH CABINET UNIT HEATER
DEMO DEMOLITION, DEMOLISH
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA, D DIAMETER
DIM DIMENSION
DN DOWN
DR DRAIN
DS DOWNSPOUT
ELECT ELECTRICAL
ELEV ELEVATION
ENTR ENTRANCE
EQ EQUAL
EP ELECTRICAL PANEL
EXH EXHAUST
EXP EXPOSED
EXIST EXISTING, EXSIST'G
EXT EXTERIOR
EW EACH WAY
FA FIRE ALARM
FD FIRE DAMPER OR FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FL, FLR FLOOR FINISH
FLG, FLRG FLOORING, FLOOR'G
FURN FURNITURE, FURNACE
FWC FABRIC WALL COVERING
FT FEET, FOOT
GALV GALVANIZE(D)
GL GLASS
GSB GYPSUM SHEATHING BOARD
GWB GYPSUM WALLBOARD
GYP. BD GYPSUM BOARD
ID INSIDE DIAMETER
INSUL INSULATION
IN INCH(ES)
JAN JANITOR'S CLOSET
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
HW HEADWALL
LAM LAMINATED
LF LINEAL FEET
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MANUF MANUFACTURED, MANUFACTURER
MIN MINIMUM
MLD'G MOLDING
MTL METAL
N NORTH
NAT NATURAL
NIC NOT IN CONTRACT
NORM NORMAL
NTS NOT TO SCALE
O.C. ON CENTER
OPN'G OPENING
O, O2 OXYGEN
PLAST PLASTIC
PNT PAINT
PREFAB PREFABRICATED
PLYWD PLYWOOD, PLYW'D
R RADIUS
RA RETURN AIR
REQ'D REQUIRED
RM ROOM
S SINK, SOUTH, SHINGLE
SA SUPPLY AIR
SAN SANITARY
SMKD SMOKE DAMPER
SECT SECTION
SHWR SHOWER
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SS SERVICE SINK, STAINLESS STEEL
STD STANDARD
STOR STORAGE
SUSP SUSPEND(ED)
SYM SYMBOL, SYMMETRICAL
TOIL TOILET
TYP TYPICAL
UNFIN UNFINISHED
UTIL UTILITY
VAC VACUUM
VAV VARIABLE AIR VOLUME
VCT VINYL COMPOSITION TILE
VD VOLUME DAMPER
VERT VERTICAL
V.I.F. VERIFY IN FIELD
VT VINYL TILE
VWC VINYL WALL COVERING
W/ WITH
WC WATER CLOSET
WD WOOD
WNDW WINDOW
W. HTR WATER HEATER
W/O WITHOUT
WP WALL PROTECTION
T500
WALK
CONC.
BLDG. 31
NOTE:
PROPOSED CRANE LOCATION/CONTRACTOR LAY-DOWN
SPACE; ALL MATERIALS TO BE LIFTED INTO PENTHOUSE ARE
TO ARRIVE ONSITE AT THE SAME TIME TO MINIMIZE IMPACTS
TO SURROUNDING VA BUILDINGS/PROJECTS; CONTRACTOR
TO COORDINATE FINAL LOCATION WITH VA COR
FULLER ROAD
FULLER CO
URT
1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com
616 361 2664 OFFICE 616 361 1493 FAX
600 E. Michigan Ave, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS
DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
ALLIANCE | 7GAE JV PROJECT NO.: 219008
Office of
Construction and Facilities
Management
VA FORM 08-6231
o n e ig h th i c q u a rt r in re s lf rs d
6 "
Department of Veterans Affairs17
G002
506-20-209
ANN ARBOR VAMC
JANUARY 10, 2020 JLK EMP
GENERAL INFORMATION &
SYMBOL LEGEND
REPLACE AHU 1 & 2 -
NORTH
SCALE: 1" = 100'-0"
CONTRACTOR STAGING AREA
REVISIONS DATE
Sheets
A103 - PENTHOUSE FLOOR PLAN
A320 - WALL SECTIONS
G001 - COVER SHEET
G002 - GENERAL INFORMATION & SYMBOL LEGEND
ELEV. 874'-3"
PENTHOUSE
ELEV. 857'-0"
CONTRACTOR TO REMOVE EXISTING
INSULATED METAL PANEL & EXISTING
HAT CHANNEL AS REQUIRED, TO CREATE
AN OPENING TO GET EXISTING AHU
EQUIPMENT OUT OF THE PENTHOUSE
AND STAGE REPLACEMENT EQUIPMENT
INSIDE THE PENTHOUSE
CONTRACTOR TO REMOVE EXISTING
METAL STUDS FROM SILLRUNNER TO
HEAD RUNNER TO CRATE OPENING IN
EXTERIOR WALL; DO NOT CUT
EXISTING STUDS TO REMOVE; PROTECT
STUDS FOR REINSTALLATION
EXISTING CMU WALL & METAL
RUNNER ARE EXISTING TO REMAIN;
DO NOT REMOVE
EXISTING INSULATED METAL PANEL &
METAL RUNNER ARE EXISTING TO
REMAIN; DO NOT REMOVE
EXISTING HAT CHANNEL TO REMAIN
CONTRACTOR SHALL PROVIDE
TEMPORARY SUPPORT FOR METAL
PANEL WHERE STUDS ARE REMOVED
FULL HEIGHT
CONTRACTOR TO COORDINATE ACTUAL
METAL PANEL REMOVAL HEIGHT WITH
MAXIMUM HEIGHT OF NEW EQUIPMENT;
HEIGHTS SHOWN ON WALL SECTIONS
INDICATE APPROXIMATE METAL PANEL
REMOVAL HEIGHT ONLY
CONTRACTOR TO REINSTALL INSULATED
METAL PANEL & HAT CHANNEL; PATCH
& REPAIR ADJACENT SURFACES AS
REQUIRED; PROVIDE NEW HAT
CHANNEL AS REQUIRED
CONTRACTOR TO REINSTALL METAL
STUDS; PATCH & REPAIR ADJACENT
SURFACES AS REQUIRED
CONTRACTOR TO PROVIDE NEW
SEALANT & BACKER ROD AT EACH
METAL PANEL JOINT AS REQUIRED
TO ENSURE AREA REMOVED IS
AIR/WATER TIGHT
CONTRACTOR TO COORDINATE ACTUAL
METAL PANEL REMOVAL HEIGHT WITH
MAXIMUM HEIGHT OF NEW EQUIPMENT;
HEIGHTS SHOWN ON WALL SECTIONS
INDICATE APPROXIMATE METAL PANEL
REMOVAL HEIGHT ONLY 03
CONTRACTOR TO REINSTALL METAL
STUDS; PATCH & REPAIR ADJACENT
SURFACES AS REQUIRED
SEALANT & BACKER ROD AT EACH
METAL PANEL JOINT AS REQUIRED
TO ENSURE AREA REMOVED IS
AIR/WATER TIGHT
EXISTING CMU WALL & METAL
RUNNER ARE EXISTING TO REMAIN;
DO NOT REMOVE
CONTRACTOR TO REINSTALL
INSULATED METAL PANEL & HAT
CHANNEL; PATCH & REPAIR
ADJACENT SURFACES AS
SEALANT & BACKER ROD AT
BOTTOM OF METAL PANEL AS
REQUIRED TO ENSURE AREA
REMOVED IS AIR/WATER TIGHT
EXISTING INSULATED METAL
PANEL & METAL RUNNER ARE
EXISTING TO REMAIN; DO NOT
REMOVE
METAL STUDS; PATCH & REPAIR
REQUIRED
INSULATED METAL PANEL & HAT
CHANNEL; PATCH & REPAIR
CONTRACTOR TO PROVIDE
NEW SEALANT & BACKER ROD
AT EACH METAL PANEL JOINT
AS REQUIRED TO ENSURE AREA
REMOVED IS AIR/WATER TIGHT
WALL SECTIONS REPLACE AHU 1 & 2 -
SCALE: 3/4" = 1'-0"A320
WALL SECTION - DEMO01
SCALE: 3/4" = 1'-0"A320
WALL SECTIONS - NEW02
SCALE: 1 1/2" = 1'-0"A320
WALL SILL DETAIL03
SCALE: 1 1/2" = 1'-0"A320
WALL PANEL CONNECTION DETAIL04
Sheets
A103 - PENTHOUSE FLOOR PLAN
A320 - WALL SECTIONS
01A34333231
30A
25 27
19 21
22 23
21A
26A 26B
11 07 05
S-1
S-2
P-1
0406080910
CB-3
CB-2
CB-1
121314
15A
15B
17A
17B
17C
30B
17D
CB-5
CB-4
CB-1A
29A
CB-G
UTILITY
TUNNEL
(EL. 810'-9")
UTILITY
TUNNEL
STAIR
#3
#1
#2
ELEV.
(EL.
816.13)
#4
BLDG. NO.
22LOWER
LEVEL(EL. 816 '-1 1/2")
#5
AA A B C D D.6 E F G H J J.5 K L L.1 M
3.4
4.5
1.11
3 3
3 3
2 22 2
300 WATTS HTG
0.25 TONS CLG
225 WATTS HTG
0.15 TONS CLG
350 WATTS HTG
0.2 TONS CLG
400 WATTS HTG
1000 WATTS HTG
500 WATTS HTG
500 WATTS HTG
300 WATTS HTG 300 WATTS HTG 300 WATTS HTG 300 WATTS HTG
300 WATTS HTG 300 WATTS HTG 300 WATTS HTG 300 WATTS HTG
500 WATTS HTG 1000 WATTS HTG
VALUES SHOWN ARE MINIMUMS FOR HEATING AND COOLING.
HAVE AVAILABLE AN ADDITIONAL 10 KW OF HEATING CAPACITY AND 10 TONS OF COOLING
CAPACITY TO ADDRESS MISCELLANEOUS SPACES IN THE BASEMENT.
PROVIDE DATA LOGGERS TO RECORD TEMP AND HUMIDITY LEVELS IN SPACES IDENTIFIED IF BAS IS UNABLE TO RECORD AND TREND DUE TO CONSTRUCTION ACTIVITIES. TURN TREND DATA OVER
TO THE COR AFTER EACH SHUTDOWN.
MECHANICAL KEYNOTES - BASEMENT?
1. RADIOACTIVE ISOTOPE CONTAINMENT (NEGATIVE PRESSURE): MAINTAIN ROOM
AT 68°F TO 75°F, 45-60% RH, AND NEGATIVE PRESSURE DURING SHUTDOWNS OF
31-EX.AH-1. PROVIDE TEMPORARY HEATING OR COOLING DURING DURATION OF
SHUTDOWN. EXISTING EXHAUST AIR TERMINAL UNIT SHALL REMAIN OPEN
(MINIMUM POSITION WHERE POSSIBLE).
2. BIOSAFETY LEVEL I CONTAINMENT (POSITIVE PRESSURE): MAINTAIN ROOM AT 68°
F TO 75°F, 45-60% RH, AND POSITIVE PRESSURE DURING SHUTDOWNS OF 31-
EX.AH-1. PROVIDE TEMPORARY HEATING OR COOLING AS REQUIRED DURING
DURATION OF SHUTDOWN. EXISTING EXHAUST AIR TERMINAL UNIT SHALL BE
CLOSED DURING CONSTRUCTION SHUTDOWN.
3. BIOSAFETY LEVEL II CONTAINMENT (NEGATIVE PRESSURE): MAINTAIN ROOM AT
68°F TO 75°F, 45-60% RH, AND NEGATIVE PRESSURE DURING SHUTDOWNS OF 31-
EX.AH-1. PROVIDE TEMPORARY HEATING OR COOLING AS REQUIRED DURING
DURATION OF SHUTDOWN. EXISTING EXHAUST AIR TERMINAL UNIT SHALL REMAIN
OPEN (MINIMUM POSITION WHERE POSSIBLE).
4. EXISTING FUME HOOD 31-HD-8 SHALL BE CLOSED TO MINIMUM POSITION WHILE
MAINTAINING NEGATIVE PRESSURE.
Veterans Affairs17JANUARY 10, 2020
MH100
SMB MMK
BASEMENT HVAC PLAN REPLACE AHU 1 & 2 -
1/8" = 1'-0"
BASEMENT HVAC PLAN
ROOM LEGEND
1 CLEAN CAGE STORAGE
01A EQUIPMENT STORAGE
2 CAGE WASHING
4 ANIMAL WARD
5 PROCEDURE & TREATMENT ROOM
6 ANIMAL WARD
7 WOMENS LOCKERS
8 ANIMAL WARD
9 ANIMAL WARD
10 ANIMAL WARD
11 MENS LOCKERS
12 CUBICLE ROOM
13 CUBICLE ROOM
14 LARGE ANIMAL WARD / RABBITS
15 PROCEDURE LAB
15A ANIMAL WARD
15B HAZARDOUS WASTE
16 LARGE ANIMAL WARD / DOGS
17 AIR LOCK
17A INFECTIOUS PROCEDURE LAB
17B INFECTIOUS WARD
17C CHANGE & SHOWER ROOM
17D STERILIZER
18 ELECTRICAL
19 H.A.C.
20 LARGE ANIMAL WARD / DOGS
21 NECROPSY
21A COLD STORAGE
22 KITCHEN FEED & BEDDING
23 ANIMAL WARD / DOGS
24 PROCEDURE LAB
25 ELECTRICAL
26 VESTIBULE
26A ANIMAL WARD / PRIMATE
26B ANIMAL WARD / PRIMATE
27 COMMUNICATIONS
28 POST OPERATIVE WARD
29 SURGICAL SUPPLY
29A STERILIZER
30 SURGICAL PREP.
30A WASTE 03 SURVIVAL SURGERY
30B SCRUB & GOWN ROOM
31 TERMINAL SURGERY
32 OFFICE/ VETERINARIAN
33 OFFICE/ SUPERVISOR
34 LOUNGE
35 ANIMAL RECEIVING & EXAM WARD
36 DIAGNOSTIC LAB
37 LINK
37A UTILITY
CB-1 NEUTRAL CORRIDOR
CB-1A ELEVATOR LOBBY
CB-2 CLEAN CORRIDOR
CB-3 DIRTY CORRIDOR
CB-4 NEUTRAL CORRIDOR
CB-5 NEUTRAL CORRIDOR
kozelm
Stamp
Date
Sheets
E601 - ELECTRICAL ONE LINE DIAGRAM
ED103 - ELECTRICAL POWER PENTHOUSE DEMO. PLAN
ED601 - ELECTRICAL ONE LINE DIAGRAM DEMOLITION
EP102 - ELEC. POWER PLAN SECOND FLOOR - FOR REF. ONLY
EP103 - ELECTRICAL POWER PENTHOUSE PLAN
M001 - GENERAL MECHANICAL INFORMATION
M401 - MECHANICAL DETAILS
M501 - MECHANICAL SCHEDULES
M601 - 3D VIEWS - DEMOLITION
M602 - 3D VIEWS - DEMOLITION
MH100 - BASEMENT HVAC PLAN
MH103 - MECHANICAL HVAC PENTHOUSE PLAN
MI101 - MECHANICAL CONTROLS & INSTRUMENTATION
2020-01-06T09:24:48-0500
Maureen M. Kozel, PE
I have reviewed this document
1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHTLY.
2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.
3. SEE SMACNA 2005, FIGURE 9-15.
INSULATION
B B
ACCESS PANEL
ACCESS DOOR
SECTION A-A
SECTION B-B
GASKET
DUCT
INSULATION
CASING
GASKET
HANDLE INSIDE
INSULATION FLEXIBLE WASHER
FACTORY FABRICATED
LATCH
5 FT
6 8 10
9 1110 12
-1312 14 -16 -
1614 17 2219 23
2725 28 3230
20 241814 16128 1064 532 2 1/21 1/21 1 1/4THRU 3/4
7 7
7 98
SIDE VIEW TRAPEZE HANGER FOR UP TO
1000 LB. UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER
TYPE 43 - SEE SPECIFICATIONS
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" MIN.)
BAND
1-5/8" 12 GAUGE
CHANNEL OR 2"x2"x1/4"
ANGLE
1/2" DIA.
HANGER RODS WITH
36" MAX. SPACING
ON EACH CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH
COMPRESSIVE STRENGTH
INSULATION (9 PSF MIN.
DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
NOTES:
SEE SPECIFER FOR DETAILED
HANGER REQUIREMENTS
1" M
X
IN.
FT.
FT.
STEAM TRAP ASSEMBLY
STEAM LINE DRIP POCKET
STEAM LINE
(TYPICAL)
6"
3/4" DRAIN
(ALTERNATE LOCATIONS)
(TYPICAL)
FROM DRIP
CONNECTION
3/4" MIN.
IN
2"
DRIP LEG (TYP.)
DRIP POCKET PIPE SIZE
SAME AS STEAM MAIN
UNLESS OTHERWISE NOTED.
3/8" TEST
CONNECTION
DRIP
RETURN
PIPE T0 STEAM
TRAP (TYPICAL)
CAP (TYPICAL)
2"
MV
OR
AV
TYPICAL MANUAL AIR VENT
TYPICAL CHILLED AND HOT WATER
PIPING DRAIN VALVE CONNECTIONS
THREADED PIPING
WELDED PIPING
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
3/4" BALL VALVE
ADAPTER TO 3/4" HOSE
THREAD-PROVIDE HOSE CAP NUT
1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.
2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS
AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.
AIR VENT
1/2"
BALL VALVE
1/4"
COPPER TUBING
1/2" x 4" NIPPLE
CIRCULATING WATER PIPING
1. VENT ALL HIGH POINTS INDICATED ABOVE.
2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.
DRAIN LINE SHALL BE AT LEAST THE SAME SIZE AS THE NIPPLE ON
THE DRAIN PAN
PIPING SHALL BE RIGID COPPER TYPE L OR TYPE M UNLESS NOTE
BELOW IS MET
BLOW THRU 2X
WHERE X = STATIC PRESSURE IN PAN
NOTE: 1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA AND IS INDOORS AND DOES
NOT PASS THROUGH RATED BARRIERS.
2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS ARE TO BE CONNECTED.
DRAW THRU
UNIT TYPE
ROOF DRAIN
2" PLUS X
1" MINIMUM
PITCH DOWN TOWARD DRAIN
CLEAN OUT
DIELECTRIC
FITTING
DRAIN PAN
1"
FLOW
1" GATE
VALVE
SEE DRAWINGS FOR PIPE SIZES
SCHEDULE 80 STEEL PIPE
DRIP LEG OR EQUIPMENT CONNECTION.
MAKE THE SAME SIZE AS THE SUPPLY MAIN
OR EQUIPMENT CONNECTION. SEE NOTE 1
BYPASS-INSTALL IN HORIZONTAL PLANE LEVEL
WITH TRAP OR IN VERTICAL PLANE & BELOW
TRAP
PROVIDE BYPASS PIPING FOR ALL TRAPS 1" AND
LARGER.
SCHEDULE 80
STEEL PIPE
DIELECTRIC FITTING WHERE
RETURN IS COPPER PIPE
FLOAT AND THERMOSTATIC TRAP.
SEE PLANS, AND SCHEDULES
PIPE SIZE SHALL BE SAME SIZE AS TRAP
TO RETURN MAIN
ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12" MINIMUM HIGH DRIP LEG FROM BOTTOM OF STEAM MAIN TO
TRAP INLET. DRIP LEG SHALL HAVE 6" SCALE POCKET BELOW TRAP INLET.
1.
MPS
MPR
INTEGRAL FACE AND
BYPASS DAMPER
FLOAT AND THERMOSTATIC TRAP ASSEMBLY
SPRING LOADED VACUUM BREAKER
VENTED TO ATMOSPHERE TYPICAL
ON BOTH THE STEAM SUPPLY
AND THE CONDENSATE LINES.
(30PSIG)
VB
FLEXIBLE CONNECTOR INSTALLED PARALLEL
TO COIL HEADER AND AS CLOSE AS POSSIBLE
TO COIL CONDENSATE CONNECTION.
ON/OFF CONTROL
VB
WATER
COIL
AIR VENT
WHEN COIL
IS NOT
SELF-VENTING
TEST PLUG
(TYP.)
PIPE HANGER SHALL SUPPORT
PIPING INDEPENDENT OF COIL
WATER
COIL
REDUCER, IF
REQUIRED
FLOW ELEMENT
DRAIN WHEN COIL IS
NOT SELF-DRAINING
DRAIN
DOUBLE COIL
2.
3.
WHEN COIL IS INCLUDED IN CASING MOUNTED ON VIBRATION ISOLATORS THE
FIRST 2 HANGERS FOR EACH PIPE SHALL BE SPRING & NEOPRENE TYPE. TYPE
"H" FOR 4" [100mm]∅ PIPE & SMALLER. TYPE "H-P" FOR 5" [125mm]∅ PIPE
& LARGER.
PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE
SWING OR USE OF ACCESS DOORS OR PANELS; NEITHER SHALL IT BLOCK THE
SERVICING OF FILTERS, VALVES, OR EQUIPMENT.
THE FLOW ELEMENT MAY BE INSTALLED IN THE SUPPLY PIPING IF THE
REQUIRED MINIMUM UPSTREAM AND DOWNSTREAM DIMENSIONS CANNOT BE
OBTAINED IN THE RETURN
PIPING.
FE
TI
4.
5.
WHEN COIL IS INCLUDED IN CASING MOUNTED ON
VIBRATION ISOLATOR UNITS, THE RUNOUT PIPING
FOR CONNECTIONS TO COIL SHALL BE INSTALLED
WITH SWING JOINTS TO ALLOW FOR THE
VIBRATION.
PIPING SHALL BE INSTALLED IN SUCH MANNER
THAT IT WILL NOT BLOCK THE SWING OR USE OF
ACCESS DOORS OR PANELS; NEITHER SHALL IT
BLOCK THE SERVICING OF FILTERS, VALVES, OR
EQUIPMENT.
TRAP EACH COIL SEPARATELY WHEN INSTALLED IN
A BANK OF TWO OR MORE HIGH. ALSO PROVIDE
SEPARATE VACUUM BREAKER FOR EACH
COIL.
TWO TRAP ASSEMBLIES IN PARALLEL ARE SHOWN.
TWO TRAPS REQUIRED WHEN CONDENSATE LOAD
IS 5,000 LBS/HR [2400 KG/HR] OR GREATER.
SUPPLY & RETURN PIPES ARE SHOWN FROM
SAME END. REHEAT COIL MAY HAVE SUPPLY &
RETURN PIPES FROM OPPOSITE ENDS.
PIPE HANGER
SHALL SUPPORT
PIPING
INDEPENDENT OF
COIL (TYP.)
PITCH COIL
DOWN 1/4"
[8mm] PER
FOOT TO
CONDENSATE
OUTLET
FULL SIZE
TAPPING
PRESSURE
GAGE
SCALE
SEE NOTE
NO. 4
STEAM
1/2" [1 5mm]
CHECK VALVE
VACUUM BREAKER
INCREASER,
IF REQUIRED
REDUCER,
IF REQUIRED
[1 m
[3
STEAM
SUPPLY
"M
DRIP LEG OR EQUIPMENT
CONNECTION. MAKE THE SAME
SIZE AS THE SUPPLY MAIN OR
EQUIPMENT CONNECTION. SEE
NOTE 1
ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12" MINIMUM HIGH
DRIP LEG FROM BOTTOM OF STEAM MAIN TO TRAP INLET. DRIP LEG SHALL HAVE 6"
SCALE POCKET BELOW TRAP INLET.
PROVIDE BYPASS PIPING.
SEE DRAWINGS FOR PIPE
SIZES
TO RETURN
MAIN
SCHEDULE 80 STEEL
PIPE
PIPE SIZE SHALL BE SAME SIZE
AS TRAP
INVERTED BUCKET
TRAP. SEE PLANS,
AND SCHEDULES
DIELECTRIC FITTING
WHERE RETURN IS
COPPER PIPE
SCHEDULE 80
STEEL PIPE
BYPASS-INSTALL IN HORIZONTAL
PLANE LEVEL WITH TRAP OR IN
VERTICAL PLANE & BELOW TRAP
DRIP LEG OR EQUIPMENT
CONNECTION. MAKE THE
SAME SIZE AS THE SUPPLY
MAIN OR EQUIPMENT
CONNECTION. SEE NOTE 1
1" GATE
FLOW
[3
[1
DRIVEN
EQUIPMENT
MOTORTYPICAL STRUCTURAL
STEEL MEMBER FOR
TYPE"B"
WELDED STEEL
BASE
TYPE "1"
CONCRETE INERTIA
BASE
NUMBER OF ISOLATION
UNITS AS REQUIRED
NUMBER OF ISOLATION
UNITS AS REQUIRED
TYPICAL
STRUCTURAL STEEL
MEMBER FOR
ALL WELDED
STEEL
FRAMEWORK
SECTION
A-A
STRUCTURAL
STEEL FRAME
SPRING
ISOLATOR
ANCHOR
BOLT
REINFORCING
BARS
SLEEVE
SHAFT
MOTORSHAFT
DRIVEN
MPR
FLOAT AND THERMOSTATIC TRAP ASSEMBLY
(30PSIG)
MODULATING
CONTROL
INSTALL STRAINER WITHIN 3'
OF HUMIDIFIER MANIFOLD
3/4" GRAVITY TO
DRAIN
W/ 1" GAP
M401
MECHANICAL DETAILS REPLACE AHU 1 & 2 -
NOT TO SCALE
ACCESS PANEL AND DOOR DETAIL
PIPE HANGERS
STEAM LINE DRIP POCKET/STEAM TRAP ASSEMBLY
DRAIN VALVE AND AIR VENT CONNECTIONS (HYDRONIC
SYSTEMS)
AIR HANDLING DRAIN TRAP DETAIL
FLOAT AND THERMOSTATIC STEAM TRAP ASSEMBLY
INTEGRAL FACE AND BYPASS STEAM COIL DETAIL
WATER COILS - PIPING CONNECTIONS
STEAM LINE DRIP POCKET/STEAM TRAP ASSEMBLY
INVERTED BUCKET STEAM TRAP ASSEMBLY
VIBRATION ISOLATION BASES
1/2" = 1'-0"
STEAM HUMIDIFIER PIPING DETAIL
Sheets
E601 - ELECTRICAL ONE LINE DIAGRAM
ED103 - ELECTRICAL POWER PENTHOUSE DEMO. PLAN
ED601 - ELECTRICAL ONE LINE DIAGRAM DEMOLITION
EP102 - ELEC. POWER PLAN SECOND FLOOR - FOR REF. ONLY
EP103 - ELECTRICAL POWER PENTHOUSE PLAN
M001 - GENERAL MECHANICAL INFORMATION
M401 - MECHANICAL DETAILS
M501 - MECHANICAL SCHEDULES
M601 - 3D VIEWS - DEMOLITION
M602 - 3D VIEWS - DEMOLITION
MH100 - BASEMENT HVAC PLAN
MH103 - MECHANICAL HVAC PENTHOUSE PLAN
MI101 - MECHANICAL CONTROLS & INSTRUMENTATION
2020-01-06T09:23:47-0500
Maureen M. Kozel, PE
I have reviewed this document
EX.6"CWS
EX.6"CWR
REMOVE EXISTING CHILLED
WATER PIPING BACK TO
ISOLATION VALVES FOR
COIL REPLACEMENT
31-EX.AHU-1
DISCONNECT
CONDENSATE LINE
FOR COIL REPLACEMENT
EX.1 1/2"COND
REMOVE EXISTING
GLYCOL PIPING FOR
EX.3"GYS
EX.3"GYR
31-EX.AHU1
EX.3"STM MP
STEAM PIPING BACK TO
ISOLATION VALVE FOR
HUMIDIFIER RELOCATION
EX.2"STM MP
EX.1 1/2"STM MP
EX.1 1/2"COND 2"COND
REMOVE TRAP, VALVES,
AND CONDENSATE PIPING
EX.8"CWR
EX.8"CWS
EX.6"C
WS
WR
REMOVE EXISTING CHILLED
WATER PIPING BACK TO
ISOLATION VALVES FOR
WR
WS
DISCONNECT
CONDENSATE LINE
EX.1 1/2"COND
GLYCOL PIPING FOR
ISOLATE GLYCOL
LOOP HERE
ON-OFF VALVE FOR
HUMIDIFIER RELOCATION
EX.1 1/2"STM MP
2"COND
REMOVE TRAP, VALVES,
KEY NOTES
1. DEMOLITION SCOPE SHOWN MAY BE REDUCED IN THE FIELD IF COMPONENT
REMOVAL AND INSTALL CAN BE ACCOMPLISHED WITHOUT FULL DEMOLITION.
PIPING AND TRIM MAY BE REINSTALLED IF IN GOOD CONDITION AS APPROVED BY
THE COR.
2. VALVES IDENTIFIED FOR WATER/STEAM/GLYCOL SHUTOFF. EXERCISE VALVES IN
ADVANCE OF SHUTDOWNS TO CONFIRM OPERATION. PROVIDE ALLOWANCE TO
REPLACE ISOLATION VALVES THAT FAIL TO CLOSE. COORDINATE ISOLATION VALVE
TESTING WITH COR.
INSTALL NEW PIPING TO NEW
HUMIDIFIER LOCATION
UPSTREAM OF COOLING COILS
2"COND
RE-INSTALL TRAP, VALVES,
AFTER COIL REPLACEMENT.
NEW CONTROL
VALVE AND
ACTUATOR
NEW STEAM TRAP
EXISTING V-3
1 1/2"STM MP
1"COND
M601
3D VIEWS - AHU-1 REPLACE AHU 1 & 2 -
NOT TO SCALE6
PARTIAL AHU-1 CHILLED WATER FRONT DEMOLITION
PLAN
NOT TO SCALE5
PARTIAL AHU-1 GLYCOL FRONT DEMOLITION PLAN
NOT TO SCALE3
PARTIAL AHU-1 STEAM FRONT DEMOLITION PLAN
NOT TO SCALE4
PARTIAL AHU-1 CHILLED WATER ISOMETRIC
DEMOLITION PLAN
NOT TO SCALE2
PARTIAL AHU-1 GLYCOL ISOMETRIC DEMOLITION PLAN
NOT TO SCALE1
PARTIAL AHU-1 STEAM ISOMETRIC DEMOLITION PLAN
1 2 1 2
1 21 2
1 2
NOT TO SCALE7
PARTIAL AHU-1 STEAM ISOMETRIC NEW PIPING PLAN
Sheets
M601 - 3D VIEWS - AHU-1
M602 - 3D VIEWS - AHU-2
2020-01-06T09:19:59-0500
Maureen M. Kozel, PE
I have reviewed this document
ZS
P
I/P
I
SD
T-2
H-2
T-1
S
H-1
T-4
T-5
OUTSIDE
AIR
DAMPER
END
SWITCH
OUTSIDE
PLENUM
N
R
G Y
O
V
IL
FROM DAMPER
SOLENOID
LI
ELECTRICAL
INTERLOCK
V-4 N.C.
HUMIDIFIER
CONTROL VA.
TEMP.
INPUT
DCP
OUTPUT
TO
OUTSIDE AIR
SUPPLY
SOLENOID
TRANSMITS DIFFERENTIAL PRESSURE
TO DCP TO INDICATE FILTER
CONDITIONS AND STATUS OF FANS.
CONTROLS OPERATION OF AIR
HANDLING UNIT IN ACCORDANCE
WITH THE SEQUENCE OF OPERATION.
OPENS WHEN SUPPLY FAN
STARTS AND CLOSES WHEN
SUPPLY FAN STOPS.
FACE & BY-PASS DAMPER
MODULATING
MODULATES AIRFLOW BETWEEN
THE COIL FACE AND THE COIL
BY-PASS IN RESPONSE TO DCP.
DUCT SMOKE DETECTORS
(FURNISHED AND WIRED TO
FIRE ALARM PANEL BY ELECTRICAL)
PRESSURE GAUGE
(SECTION 15880)
SENSES AND TRANSMITS SPACE
HUMIDITY TO DCP FOR
CONTROL AND INDICATION
SENSES AND TRANSMITS SUPPLY
AIR HUMIDITY TO DCP FOR
CONTROL AND INDICATION
CLOSES WHEN UNIT IS SHUT
OFF OR WHENEVER SMOKE
IS DETECTED BY F SD.
SUPPLY AIR TEMPERATURE
SENSOR
SENSES AND TRANSMITS SUPPLY
AIR DRY BULB TEMPERATURE TO
DCP FOR CONTROL AND INDICATION.
SENSES AND TRANSMITS OUTSIDE
AIR DRY BULB TEMPERATURE TO
DCP FOR CONTROL AND INDICATION.
SHUTS DOWN FAN SYSTEM AND ALARMS
DCP WHEN TEMP. LEAVING COIL IS BELOW
SETPOINT OF TEMP. SWITCH.
LEAVING PREHEAT COIL
AIR TEMPERATURE SWITCH
(FREEZE PROTECTION)
CHILLED WATER CONTROL VALVE
STRAIGHT THRU MODULATING
TYPE
PROPORTIONS FLOW OF
CHILLED WATER TO COOLING
COIL IN RESPONSE TO DCP.
CONTROLS STEAM FLOW
TO HUMIDIFIER
STEAM CONTROL VALVE
MODULATING TWO WAY
PROPORTIONS FLOW OF
STEAM TO HUMIDIFIER
IN RESPONSE TO DCP.
HUMIDIFIER
STEAM SHUT-OFF
OUTSIDE AIR TEMPERATURE
STARTS, STOPS SUPPLY FAN AND
CONTROLS SPEED IN RESPONSE TO DCP
CLOSES WHEN DAMPER IS OPEN
OPENS WHEN DAMPER BEGINS TO CLOSE
ADJUSTABLE
RESTRICTOR
-F
T
-F
LEAVING ENERGY RECOVERY COIL
AIR TEMPERATURE
SENSES AND TRANSMITS ENERGY
RECOVERY COIL DRY BULB
TEMPERATURE TO DCP.
31-ERC-3
(31-AH-1 ONLY)
EXHAUST
ENERGY
RECOVERY
COILS
EXHAUST
MAINTAIN 52F @ T-1 FOR AH-1
�MAINTAIN 53 F @ T-1 FOR AH-2
31-AH-1
SPACE
HUMIDITY
LOCATED
IN RM 20
31-AH-2
HUMIDITY
LOCATED
IN RM 110
DE-ENERGIZES SUPPLY FAN AND
PROVIDES SMOKE ALARM SIGNAL
TO DCP AND FIRE ALARM SYSTEM.
STEAM CONTROL VALVE,
TWO-WAY,
OPEN/CLOSE
STOPS AND STARTS FLOW OF
STEAM TO PREHEAT COIL
IN RESPONSE TO DCP.
N.C. 31-AH-1
N.O. 31-AH-2
STEAM CONTROL VALVE,
TWO-WAY,
OPEN/CLOSE
VARIABLE FREQUENCY
DRIVE
GLOBAL SENSOR
ONE PER BUILDING
CONTROL/
MONITORING
SYSTEM -
(31-AH-1ONLY)
PREHEAT COIL
(FACE &
BY-PASS)
TO FIRE
ALARM
SYSTEM
(BY FIRE
ALARM
CONTRACTOR)
POINT INPUT/OUTPUT APPLICABLE TO 31-AH-1 ONLY
(ALL OTHER POINTS APPLY TO BOTH 31-AH-1 & 31-AH-2)
(SMOKE DETECTOR/SUPPLY FAN INTERLOCK
BY FIRE ALARM CONTRACTOR)
31-SF-1
31-SF-2
GLYCOL TEMPERATURE SENSOR TO
ENERGY RECOVERY COILS 31-ERC-1
AND 31-ERC-2.
SENSES AND TRANSMITS GLYCOL
RETURN TEMP TO 31-ERC-1 AND 31-ERC-2
FOR DCP CONTROL OF MIXING VALVE V-5.
DEFROST VALVE,
TEMPERATURE CONTROL
VALVE (3-WAY MIXING)
MODULATES IN RESPONSE TO DCP IN
ORDER TO MAINTAIN GLYCOL RETURN
TEMPERATURE TO COILS TO PREVENT
FROST FROM BUILDING UP ON COIL FACE
LI
REVERSE ACTING CONTROL
FOR 31-AH-1
DIRECT ACTING CONTROL
FOR 31-AH-2
COOLING COIL FOR
UNIT 31-AH-2
31-CD1
31-CD2
N.O.
C.
DAMPER END SWITCH/SUPPLY FAN
D-2
V-2
N.O.N.C.
FREEZE STAT/SUPPLY FAN
H
V-3
N.O.
SH
SUPPLY FAN/SMOKE DAMPER
SD-1
C. N.O.
LEGEND
DIFFERENTIAL PRESSURE
DCP
DISTRIBUTED CONTROL
PANEL
31-CD1
31-CD2
OUTSIDE AIR DAMPER 2
POSITION
D-2
SD
FILTER CONDITION
INDICATOR
SPACE AIR HUMIDITY
H-2
SUPPLY AIR HUMIDITY
SD-1
SUPPLY AIR SMOKE
T-1
T-2
T-3
V-1
V-2
V-3
V-4
SUPPLY FAN/FACE & BY-PASS DAMPER
DAMPER END SWITCH/SUPPLY FAN
VFD
DAMPER END
31-ERC-1
31-EF-15
31-ERC-2
31-EF-16
31-P-5H
APPLIES TO 31-AH-1
ONLY
NC
NO
V-5
ALARM TO
ECC
31-AH-1 CONTROL
DIAGRAM
V-5
31-AH-2 SIMILAR EXCEPT WHERE
NOTED
T-5
CHR
CH
CH
N.C. N.O.
COMMON
31-AH-1
L
VFD
CR
AO
A B C D F G
1 2 3 4 5 6 7 8 9 10
MS
7 7
DI
SEQUENCE OF OPERATION
1. GENERAL
1.1 UNIT IS NORMALLY STARTED AND STOPPED BY THE DCP OR
REMOTELY AT THE ECC. H-O-A SWITCH SHALL BE KEPT IN THE "AUTO"
POSITION. "HAND" AND "OFF" SHALL BE USED ONLY FOR MAINTENANCE.
WHEN THE UNIT IS "OFF", 31-CD1, 31CD-2 AND SD-1 SHALL BE FULLY
CLOSED. WHEN THE UNIT IS "ON", D1 AND SD-1 SHALL BE FULLY OPEN.
SMOKE DAMPER END SWITCH (ZS) AND OUTSIDE AIR DAMPER END
SWITCH (ZS) SHALL PREVENT FAN OPERATION UNTIL BOTH DAMPERS
REACH THEIR FULL OPEN POSITION. D-2 SHALL MODULATE IN
ACCORDANCE WITH THE FOLLOWING SEQUENCE:
2. TEMPERATURE CONTROL (31-P-5H)
2.1 THE SUPPLY AIR TEMPERATURE SENSED BY T-1 SHALL BE
MAINTAINED AT SETPOINT BY THE DCP MODULATING/CONTROLLING
THE ENERGY RECOVERY SYSTEM, THE PRE-HEAT COIL VALVE AND THE
FACE AND BY-PASS DAMPERS AND THE COOLING COIL VALVE AS
FOLLOWS:
DURING THE HEATING SEASON WHEN THE OUTSIDE AIR TEMPERATURE
�IS BELOW 50 F, THE HEAT RECOVERY SYSTEM PUMP 31-P-5H SHALL BE
ENERGIZED BY THE DCP. THE DCP SHALL MONITOR THE UNIT
DISCHARGE AIR TEMPERATURE (T-1). IF THE DISCHARGE AIR
�TEMPERATURE IS SENSED TO DROP 1 F BELOW SETPOINT FOR 5
MINUTES, THE DCP SHALL OPEN PRE-HEAT COIL VALVE V-2. THE DCP
SHALL THEN BEGIN MODULATING THE PRE-HEAT COIL FACE AND BY-
PASS DAMPERS TO MAINTAIN THE DISCHARGE AIR TEMPERATURE. IF
�THE DISCHARGE AIR TEMPERATURE RISES 1 F ABOVE SET POINT FOR
5 MINUTES AND THE FACE AND BY-PASS DAMPERS ARE IN FULL BY-
PASS, THE DCP SHALL CLOSE THE PRE-HEAT COIL VALVE V-2.
WHEN VALVE V-2 IS CLOSED AND THE DCP SENSES A DISCHARGE AIR
�TEMPERATURE 2 F ABOVE SETPOINT FOR 15 MINUTES, THE DCP SHALL
DE-ENERGIZE THE ENERGY RECOVERY SYSTEM CIRCULATING PUMP
31-P-5H AND ENERGIZE THE CHILLED WATER PUMP 31-P-1H (OR 31-P-2H
AS PROGRAMMED.) WITH THE CHILLED WATER PUMP ENERGIZED, THE
DCP SHALL MAINTAIN DISCHARGE AIR TEMPERATURE SETPOINT BY
MODULATING THE COOLING COIL VALVE V-1.
�WHEN THE OUTSIDE AIR TEMPERATURE IS SENSED TO BE 80 F, THE
DCP SHALL ENERGIZE THE ENERGY RECOVERY CIRCULATING PUMP
31-P-5H. THE PUMP SHALL REMAIN ENERGIZED AS LONG AS THE DCP
�SENSES THE OUTSIDE AIR TEMPERATURE TO BE 80 F OR ABOVE.
DISCHARGE AIR TEMPERATURE WILL CONTINUE TO BE MAINTAINED BY
MODULATION OF THE COOLING COIL VALVE V-1.
�WHEN THE OUTSIDE AIR TEMPERATURE FALLS TO 78 F AND REMAINS
THERE FOR 30 MINUTES, THE DCP SHALL DE-ENERGIZE THE
CIRCULATING PUMP 31-P-5H.
WHEN THE COOLING COIL VALVE V-1 IS CLOSED AND THE UNIT
�DISCHARGE AIR TEMPERATURE IS SENSED TO BE 1 F BELOW
SETPOINT FOR 5 MINUTES, THE DCP SHALL DE-ENERGIZE THE CHILLED
WATER PUMP AND ENERGIZE THE HEAT RECOVERY SYSTEM PUMP
(REGARDLESS OF OUTDOOR TEMPERATURE).
2. TEMPERATURE CONTROL (31-AH-2)
2.1 THE SUPPLY AIR TEMPERATURE, SENSED BY T-1, SHALL BE
MAINTAINED AT SETPOINT BY THE DCP MODULATING/CONTROLLING
THE PRE-HEAT COIL VALVE AND THE FACE AND BY-PASS DAMPERS
AND THE COOLING COIL VALVE AS FOLLOWS:
THE DCP SHALL MONITOR THE UNIT DISCHARGE AIR TEMPERATURE
(T- �1). IF THE DISCHARGE AIR TEMPERATURE IS SENSED TO DROP 1 F
BELOW SETPOINT FOR 5 MINUTES, THE DCP SHALL OPEN PRE-HEAT
COIL VALVE V-2. THE DCP SHALL THEN BEGIN MODULATING THE PRE-
HEAT COIL FACE AND BY-PASS DAMPERS TO MAINTAIN THE
DISCHARGE AIR TEMPERATURE. IF THE DISCHARGE AIR TEMPERATURE
�RISES 1 F ABOVE SET POINT FOR 5 MINUTES AND THE FACE AND BY-
PASS DAMPERS ARE IN FULL BY-PASS, THE DCP SHALL CLOSE THE
PRE-HEAT COIL VALVE V-2.
WHEN VALVE V-2 IS CLOSED AND THE DCP SENSES A DISCHARGE AIR
�TEMPERATURE 1 F ABOVE SETPOINT FOR 5 MINUTES, THE DCP SHALL
BEGIN MODULATING THE COOLING COIL VALVE V-1 TO MAINTAIN THE
UNIT DISCHARGE AIR TEMPERATURE. THE REVERSE SEQUENCE
OCCURS ON A FALL IN DISCHARGE AIR TEMPERATURE.
3. AIRFLOW MONITORING
3.1 THE DCP SHALL MONITOR THE UNIT PRE-FILTER/AFTER FILTER, AND
FINAL FILTER AND SHALL ALARM WHEN THE DIFFERENTIAL PRESSURE
SWITCH REACHES ITS SETPOINT INDICATING THAT THE FILTER IS DIRTY
4. HUMIDITY CONTROL
4.1 WHEN THE DCP IS NOT CALLING FOR HUMIDITY, SENSED BY H-1, "ON-
OFF" TWO-WAY CONTROL VALVE V-3 SHALL REMAIN CLOSED. WHEN THE
DCP IS CALLING FOR HUMIDITY, V-3 SHALL REMAIN OPEN AND V-1
(COOLING COIL CONTROL VALVE) SHALL REMAIN CLOSED.
4.2 THE SPACE HUMIDITY, SENSED BY H-1, SHALL BE MAINTAINED AT
SETPOINT BY THE DCP MODULATING HUMIDITY CONTROL VALVE V-4 TO
MAINTAIN THE DESIRED RELATIVE HUMIDITY. THE DCP SHALL OVERRIDE
THIS CONTROL TO MAINTAIN HUMIDITY OF 80% AS SENSED BY H-2. DCP
SHALL CLOSE VALVE V-3 WHENEVER THE SUPPLY FAN IS OFF. VALVE V-4
SHALL BE INTERLOCKED WITH A TEMPERATURE SWITCH TO KEEP THE
HUMIDIFIER OFF UNTIL CONDENSATE TEMPERATURE APPROACHES STEAM
TEMPERATURE. VALVE V-4 SHALL ALSO BE INTERLOCKED WITH THE
SUPPLY FAN MOTOR STARTER SO THAT, WHEN THE FAN IS OFF, THE
CONTROL SIGNAL TO THE VALVE WILL BLEED TO ATMOSPHERE THROUGH
A SOLENOID VALVE ALLOWING VALVE V-4 TO GO FULLY CLOSED.
5. FREEZE PROTECTION
5.1 IF THE AIR TEMPERATURE, AS SENSED BY T- �3, FALLS BELOW 45 F, AN
ALARM SIGNAL SHALL BE INDICATED AT THE DCP AND ECC. 31-AHU-1
�ONLY: IF THIS TEMPERATURE FALLS BELOW 40 F, AS SENSED BY
FREEZESTAT T-4, THE UNIT SUPPLY FAN SHALL SHUT DOWN (THROUGH A
HARDWIRED INTERLOCK BETWEEN THE FREEZESTAT CONTROL RELAY
AND FAN MOTOR STARTER) AND A CRITICAL ALARM SHALL BE INDICATED
AT THE DCP AND ECC.
6. AUTOMATIC SHUTDOWN/RESTART
6.1 WHEN SMOKE IS DETECTED BY DUCT SMOKE DETECTOR F SD, THE
SUPPLY FAN SHALL SHUT "OFF" (THROUGH A HARDWIRED INTERLOCK
BETWEEN THE SMOKE DETECTOR AND FAN MOTOR STARTER) AND AN
ALARM SIGNAL SHALL BE TRANSMITTED TO THE ECC AND TO THE FIRE
ALARM SYSTEM. THE OUTSIDE AIR DAMPER AND SMOKE DAMPER IN THE
SUPPLY DUCT SHALL CLOSE. EXHAUST FANS SERVING THE SAME SPACE
AS THE SUPPLY FAN SHALL CONTINUE TO RUN. SUPPLY FAN SHALL
RESTART AND SMOKE DAMPER AND OUTSIDE AIR DAMPER SHALL OPEN
WHEN FIRE ALARM CIRCUIT IS MANUALLY RESET.
7. ENERGY RECOVERY COIL FROST PROTECTION
7.1 THE PNEUMATICALLY CONTROLLED, 3-WAY MIXING VALVE V-5 SHALL
BE MODULATED BY THE DCP, MIXING SUPPLY AND RETURN GLYCOL TO
�MAINTAIN A MINIMUM OF 35 F GLYCOL TEMPERATURE TO ENERGY
RECOVERY COILS 31-ERC-1 AND 31-ERC-2 AS SENSED BY THE DCP
THROUGH TEMPERATURE SENSOR T-5.
8 UV-C LIGHT OPERATION
8.1 PROVIDE THE FOLLOWING SAFETY FUNCTIONS. ALL SAFETIES SHALL
BE OPERATIONAL REGARDLESS OF FAN MODE (HAND, OFF, AUTO, OR
BYPASS): UV LAMPS ACCESS DOOR SHALL INCLUDE A SAFETY SWITCH
THAT DISCONNECTS UV LAMPS POWER WHENEVER THE DOOR IS OPEN.
8.2 UV LAMPS: ENABLE UV LAMPS ON SUPPLY FANS START. PROVIDE
INTERLOCK TO DISABLE UV LAMP WHEN AHU ACCESS DOOR IS OPEN.
DISABLE UV LAMPS ON FAN STOP. INCLUDE A SCHEDULE PROGRAM THAT
ALLOWS THE OPERATOR TO SCHEDULE RUNTIME OF UV LAMPS.
CONTROLS DIAGRAM SHOWN IN ITS ENTIRETY FOR REFERENCE ONLY. ITEMS CHANGING OR REPLACED ARE SHOWN IN BOLD. THE CONTROL SYSTEM INTEGRATOR IS SIEMENS DESIGO (CONTACT BILL MCCOY). UNDER THIS PROJECT REPLACE/MODIFY OR ADD THE FOLLOWING:
1. (31-AH-1 & 31-AH-2) HUMIDIFIER SHALL BE RELOCATED UPSTREAM OF COOLING COIL AND REPLACED WITH NEW INCLUDING CONTROL VALVE
AND ACTUATOR.
2. (31-AH-1 & 31-AH-2) SINGLE FAN SHALL BE REPLACED WITH FAN ARRAY (2x2 FAN CONFIGURATION) WITH A VFD FOR EACH FAN.
3. (31-AH-1 & 31-AH-2) NEW FINAL FILTER DOWNSTREAM OF SUPPLY FAN.
4. (31-AH-1 & 31-AH-2) NEW UV LAMPS FOR COOLING COILS.
5. (31-AH-1 & 31-AH-2) NEW STEAM COIL WITH NEW FACE AND BYPASS. .
U
LA
REPLACE WITH NEW INCLUDING
DDC ACTUATOR. MAINTAIN
EXISTING INTERLOCKS TO
SUPPLY FAN AND V-3.
REMOVE PNEUMATIC
CONTROLS
REMOVE TEMP SWITCH ON
TURNS ON WHEN SUPPLY FANS START.
INTERLOCKS WITH DOOR SWITCH TO TURN
OFF.
UV UV LAMPS
DO POWER FOR UV
ENABLE/DISABLE
FROM BAS
INTERLOCK W/ ACCESS DOOR CONTACT
NEW
VFD VFD VFD
CSR
CSR
DO
/S
APPLIES TO EACH VFD/FAN
COMM
REPLACE
HUMIDITY
REPLACE WITH NEW. LOCATE
UPSTREAM OF FINAL FILTERS.
U
HPL
8 UV-C LIGHT OPERATION
8.1 PROVIDE THE FOLLOWING SAFETY FUNCTIONS. ALL SAFETIES SHALL
BYPASS): UV LAMPS ACCESS DOOR SHALL INCLUDE A SAFETY SWITCH
THAT DISCONNECTS UV LAMPS POWER WHENEVER THE DOOR IS OPEN.
8.2 UV LAMPS: ENABLE UV LAMPS ON SUPPLY FANS START. PROVIDE
INTERLOCK TO DISABLE UV LAMP WHEN AHU ACCESS DOOR IS OPEN.
DISABLE UV LAMPS ON FAN STOP. INCLUDE A SCHEDULE PROGRAM THAT
ALLOWS THE OPERATOR TO SCHEDULE RUNTIME OF UV LAMPS.
9 FAN ARRAY OPERATION
9.1 EACH FAN SHALL BE PROVIDED WITH THE FOLLOWING:
1. VARIABLE FREQUENCY DRIVE WITH STATIC PRESSURE CONTROL
2. ISOLATION DAMPER CONTROL
9.2 PROVIDE THE FOLLOWING SAFETY FUNCTIONS. ALL SAFETIES SHALL
BYPASS)
1. ANY DAMPER THAT CAN RESULT IN ISOLATION OF FAN:
ISOLATION DAMPERS TO CLOSE UPON UNIT SHUTDOWN AND OPEN
ON FAN START UP.
2. DAMPER END SWITCH FOR ISOLATION DAMPER PROOF: END
SWITCH SHALL BE ELECTRONICALLY INTERLOCKED TO PREVENT
THE FAN FROM RUNNING UNTIL THE DAMPER HAS BEEN PROVED
OPEN. END SWITCH SHALL ALSO PROVIDE STATUS TO THE BAS.
3. HIGH STATIC PRESSURE LIMIT: PROVIDE A SEPARATE HIGH STATIC
PRESSURE SWITCH (ADJ) TO STOP THE FAN WHEN STATIC PRESSURE
RISES TO [5] IN W.G. WITH MANUAL RESET.
9.3 PROVIDE THE FOLLOWING OPERATIONAL AND INTERLOCK FUNCTIONS
WHEN THE AIR HANDLING UNIT FAN IS STARTED or STOPPED, UNLESS
OTHERWISE NOTED. THESE SEQUENCES SHALL BE OPERATIONAL UPON
PROOF OF FAN STATUS REGARDLESS OF MODE
(HAND, OFF, AUTO, OR BYPASS)
1. ISOLATION DAMPER CONTROL: UPON INITIAL FAN START, OPEN
ISOLATION DAMPERS TO 100%. UPON PROOF THAT ALL DAMPERS
ARE OPEN (VIA END SWITCH) THE FAN SHALL BE ALLOWED TO RUN.
IF FAN FAILS TO START WITHIN 60 SEC (ADJ) INITIATE A FAN FAILURE
ALARM AT THE BAS. REMAINING FANS SHALL CONTINUE TO
OPERATE IN NORMAL MODE.
2. STATIC PRESSURE CONTROL LOOP: ENABLE STATIC PRESSURE
CONTROL LOOP UPON PROOF OF FAN START. DISABLE STATIC
PRESSURE CONTROL LOOP UPON PROOF OF FAN STOP.
WHEN THE UNIT IS PROVEN ON IN RESPONSE TO THE BAS OR A
MANUAL OVERRIDE, PROVIDE THE FOLLOWING.
FAN CONTROL LOOP: USE THE EXISTING REMOTE MOUNTED STATIC
PRESSURE SENSOR. CONTROL THE VARIABLE SPEED DRIVES TO
MAINTAIN THE CALCULATED REMOTE STATIC PRESSURE SET-POINT.
DRIVES SHALL BE PROVIDED THE SAME SPEED SIGNALS.
ADD PRESSURE GAUGE TO NEW
FINAL FILTERS
NEW INCLUDING ACTUATORS
T-3
PROVIDE NEW FREEZESTAT
BETWEEN HUMIDIFIER AND
COOLING COIL
NEW FREEZESTAT, INSTALL
DOWNSTREAM OF HUMIDIFIER AND
UPSTREAM OF COOLING COIL.
MI101
MECHANICAL CONTROLS &
INSTRUMENTATION
12REVISIONS DATE
Sheets
E601 - ELECTRICAL ONE LINE DIAGRAM
ED103 - ELECTRICAL POWER PENTHOUSE DEMO. PLAN
ED601 - ELECTRICAL ONE LINE DIAGRAM DEMOLITION
EP102 - ELEC. POWER PLAN SECOND FLOOR - FOR REF. ONLY
EP103 - ELECTRICAL POWER PENTHOUSE PLAN
M001 - GENERAL MECHANICAL INFORMATION
M401 - MECHANICAL DETAILS
M501 - MECHANICAL SCHEDULES
M601 - 3D VIEWS - DEMOLITION
M602 - 3D VIEWS - DEMOLITION
MH100 - BASEMENT HVAC PLAN
MH103 - MECHANICAL HVAC PENTHOUSE PLAN
MI101 - MECHANICAL CONTROLS & INSTRUMENTATION
2020-01-06T09:22:32-0500
Maureen M. Kozel, PE
I have reviewed this document
POWER DISTRIBUTION RISER
EMCC-P-01 RISER
EMCC-P-02 RISER
CB
E F
E F
E F
S F
E F
E F
E F
E F
E F
E F
.7
20A 3P
400A
90A
40A
110A
S F
S F
E F
E F
.7
E L E V A T
E F
.5
175A
100A
25A
80A
A C
(3
R F
C P
(2
V P
.5
A C C U
K W
1P
EMCC-P-01
800A, 480Y/277V, 3P, 4W + GRD
110A
EMCC-P-02
800A, 480Y/277V, 3P, 4W + GRD
VFD30A
400A
WP
IR
C O O L
N D E N S
IN
G
U
IT
L D
R M
C O O L
N D E N S
IN
G
U
L D
R M
C O O L
N D E N S
IN
G
U
L D
R M
P
E F
E F
P
E F
E F
E F
E F
E F
M A
S
IZ
A P
S P A
PROVISIONS
FOR FUTURE
SECTIONS
M A
S
IZ
A P
S P A
3PVFD
P
E F
E F
E F
E F
PROVISIONS
FOR FUTURE
SECTIONS
2P
P
E F
P
NEMA SIZE 1
30A, 3P C.B.
WIRE LENGTH FROM TRANSFORMER
LUGS TO PANEL LUGS SHALL NOT
EXCEED 10'-0"
INDICATES THE NUMBER
OF SECONDS FOR THE
TIMMING RELAY TO TIME
OUT (TYPICAL)
N
TR
LA
C C P
277- 120V
NEMA SIZE 1
30A, 3P, C.B. SPACE
DOES NOT OPERATE UNDER EMERGENCY
POWER. SHUT-OFF VIA CONTACT FROM
CONTROL RELAY EMCC-P-01 (TYPICAL)
E F
E F
A C
3 /
"C
"C
"C
"C
"C
"C
"C
"C
"C
"C
"C
"C
"C
"C
"C
"C
"C
"C
"C
"C
"C
"C
IZ
IZ
9 K
"C
"C
"C
"C
"C
1 / "C
"C
"C
"C
"C
"C
"C
"C
"C
K c m il
T T
60 90 60
"C
"C
"C
"C
"C
"C
"C
30 90 60 30
"C
"C
"C
K V A R 3 K V
K V
"C
K V
120120
120120120120120120120120
12012012012012012012012012012030
J
3/4" PVC
CONDUIT1#2 GRD. TO
ELECTL.RM. GROUND
BUS
120 120 120
ST
VOLT
120 120 120 120
R B
IS
B
P
3/4" PVC CONDUIT 1#8
GRD.TO ELEC. RM. GROUND
"C
"C
3 4
5 6
7 8
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
NAME OF PROJECT
PANEL DESIGNATION LOCATION VOLTAGE
BY
DATE
CHECKED
DATE
PROJECT NO.
SHT. OF
MAINS
TYPE CAPACITY
NO. DESCRIPTION
POLES
BKR
SIZE
BRANCH
CIRC.
WATTS
NO.
POLES
BKR
SIZE
BRANCH
CIRC.
WATTS
KW CONNECTED LIGHTING LOAD
KW BASED ON N.E.C. 220-3
KW CONNECTED RECEPTACLE LOAD
KW TOTAL CONNECTED LOAD
KW FOR SPARE POSITIONS @ 1.0KW
KW 25% OF LIGHTING LOAD
KW CONNECTED EQUIPMENT LOAD
KW FEEDER DESIGN LOADTOTAL
PLUS
PLUS
DESIGN
LOAD AMP
% VOLT
DROP208Y/
120V 225AMCBR2-03
506-027D
VAMC ANN
ARBOR
RESEARCH
BUILDING
RECEPTACLE PANEL
SCHEDULE
1P 20A
20A1P 1200
GEN RECEPTS (4)
(6)
(4)
20A1P 800
(5)
1.3
21.4
32.42
ROOM #217
EWC
(7)
GEN RECEPT (PH) (5)
32.09
20A1P 800
GEN RECEPTS (5)
(2)
20A1P 400
2P
25A
(3)
(2)
PROJ SCREEN
31-DWH-1 (PENTHSE)
AIR DRYER (PENTHSE)
AIR DRYER (PENTHSE)
TYPE "A" (PENTHSE)
RECEPTACLE
DESCRIPTION
DARK ROOM LTS & SIGN
100DRAIN VLVS (8) (PENTHSE)
9.39
STERLIZER
31-UH-11, 31-UH-13
SPARE
AHU-1 & 2 LTG 900 AHU-1 & 2 RECEPT 1800
0.325
SPACE SPACE
COMMUNICATION
CLOSET 218
CLOSET 117
CLOSET 27
1000KVA
TRANSF.
�480Y/277V-3
500KVA
TRANSF.
�208Y/120V-3
480V
EMERGENCY
480V
EMERGENCY
SWITCHBOARD.
31-PB-02
�208Y/120V,3 ,4W
SWITCHBOARD.
31-PB-01
�480Y/277V,3 ,4W
15-GEN-1
GENERATOR
CIRCUIT
BREAKER
GRADE
ROOM
SECOND
FLOOR
FIRST
FLOOR
BASEMENT
RA106 RA103RA105
RA205 RA206 RA203 RA202 RA201RA214RA209RA210RA213RA212RA211
RA111 RA112 RA113 RA110 RA109 EL1-04 ER1-05
LB-03 RB-04
D1-01 L1-02 R1-03
D2-01 L2-02 R2-03
ELECTRICAL ROOM
MAIN ELEC. ROOM
RB-05 RB-06PB-07
TT
15-PB-01
CP-1
31-ATS#231-ATS#1
15-ED-01
15-ER-02
ISRB-06 ISRB-07
ER1-05B
2-2"C., NO
ELECTRICAL DEMOLITION KEYNOTES?
1. REMOVE EXISTING CONDUCTORS, CONDUIT, AND VFD/DISCONNECT TO AHU-1 AND
AHU-2. REFER TO DRAWING E601 FOR NEW FEEDER SIZES AND CONSTRUCTION
PHASING.
2. DISCONNECT AND REFEED AHU-2 PRIOR TO DISCONNECTING AHU-1.
3. SALAVAGE 110A AHU-2 CIRCUIT BREAKER FOR USE WITH AHU-1. BYPASS/REMOVE
MOTOR CONTROL COMPONENT(S) IN MCC.
4. BYPASS/REMOVE MOTOR CONTROL COMPONENT(S) IN MCC.
5. UTLIZE SPACE LOCATIONS IN PANEL R2-03 FOR NEW BRANCH CIRCUITS AS
INDICATED
ED601
SDT AJC
ELECTRICAL ONE LINE
DIAGRAM DEMOLITION
GRAY TO INDICATE EXISTING
BLACK TO INDICATE NEW
HATCH TO INDICATE DEMOLITION
Sarah Gengelbach
Date Stamp
Sheets
E601 - ELECTRICAL ONE LINE DIAGRAM
ED103 - ELECTRICAL POWER PENTHOUSE DEMO. PLAN
ED601 - ELECTRICAL ONE LINE DIAGRAM DEMOLITION
EP102 - ELEC. POWER PLAN SECOND FLOOR - FOR REF. ONLY
EP103 - ELECTRICAL POWER PENTHOUSE PLAN
M001 - GENERAL MECHANICAL INFORMATION
M401 - MECHANICAL DETAILS
M501 - MECHANICAL SCHEDULES
M601 - 3D VIEWS - DEMOLITION
M602 - 3D VIEWS - DEMOLITION
MH100 - BASEMENT HVAC PLAN
MH103 - MECHANICAL HVAC PENTHOUSE PLAN
MI101 - MECHANICAL CONTROLS & INSTRUMENTATION
2020-01-06T09:02:24-0500
Sarah C. Gengelbach
I have reviewed this document
3"V
MCC MCC
AAA A.4 B C D E F G H J K L
D.6
J.5
J.4
4.8
1.13
3.7
K.9J.3 K.1
1.11.1
3.65
#1
#2
31-DWH-1
R2-29
31-P-3H
31-P-4H
31-P-6-P
HAND OFF
AUTO CONTROL
GFI, WP MOUNTED
TO UNIIT R2-25
ROOM 108
WP/GFI
R2-23
R2-27
R2-25
R2-28,30
R2-26 R2-24
R2-28,30A
R2-25
R2-25R2-23R2-25
31-ACCU-1
31-P-1H31-P-2H
31-EF-22
31-UH-13
R2-34
31-P-6H
ER1-05-36
31-RF-3EMCC-P-01
ON
ROOF
EF-23
21A
31-UH-11
R2-34
ON
ROOF
EF-21
31-UH-12
R2-34 R2-25
HEAT
TRACE
31-EF-19
C-2C-1T
AIR COMPRESSOR
CONTROL PANEL
FOR AIR COMP.
DRAIN VALVE
ER1-34
MOUNT RECEPTACLE HIGH AND
LOW FOR AUTOMATIC DRAIN
VALVES. TYPICAL FOR EACH
COMPRESSOR. COORDINATE
EXACT LOCATION IN FIELD
TO CKT R2-31
AIR COOLED
CONDENSING UNITS
FOR COLD ROOMS
AIR COOLED
CONDENSING UNITS
FOR COLD ROOMS
COMPRESSED
LAB
VACUUM
DRYER
AHU#3
AHU#1
EMCC-P-01 EMCC-P-02
31-EF-17
31-EF-18
31-EF-8
31-EF-9
31-EF-13
31-EF-15
31-EF-16
31-EF-3
31-SF-3
31-VP-1
31-EF-231-EF-6
31-EF-7
31-EF-1
31-EF-5
31-EF-10 31-EF-11 31-EF-12
31-EF-14
31-EF-4
31-EF-24
EF-20EF-25
31-AD1
31-AD2
31-AC-1
R2-31
CO
MONITOR
31-EF-27
03-35,36 31-P-5H
31-AC-2
03-36 (ALL RECEPTACLES FOR AHU-2)
03-35 (ALL LIGHTING FOR AHU-2) 03-35 (ALL LIGHTING FOR AHU-1)
03-36 (ALL RECEPTACLES FOR AHU-1)
TT
ra w g it le
ELECTRICAL KEYNOTES?
1. EXISTING 60HP AHU-2 MOTOR TO BE REPLACED WITH (4) NEW 25HP FANS. REFEED
AHU-2 WITH 3#2/0+#6G - 2"C, A NEW 200A CIRCUIT BREAKER, AND REUSE EXISTING
200A DISCONNECT SWITCH. SALVAGE 110A CIRCUIT BREAKER FOR USE WITH
AHU-1.
2. EXISTING 40HP AHU-1 MOTOR TO BE REPLACED BY (4) NEW 15HP FANS. REFEED
AHU-1 WITH 3#3+#6G - 1 1/4"C. REUSE EXISITNG 110A CIRCUIT BREAKER FROM
AHU-2 AND INSTALL NEW 200A DISCONNECT SWITCH.
3. VFD FOR EACH MOTOR IN FAN ARRAY PROVIDED WITH UNIT.
4. ELECTRICAL ROOM 217 AND PANEL R2-03 SHOWN PER EP102 FOR REFERENCE
AND NEW BRANCH CIRCUIT LOCATIONS.
EP103
SDT AJC
ELECTRICAL POWER
PENTHOUSE PLAN
PENTHOUSE FLOOR POWER PLAN
VFD VFD VFD VFD
31-SF-2
VFD VFD VFD VFD
31-SF-1
R2-03-38 (UV LIGHT) R2-03-37 (UV LIGHT)
3 2
GRAY TO INDICATE EXISTING
BLACK TO INDICATE NEW
Date Stamp
Sheets
E601 - ELECTRICAL ONE LINE DIAGRAM
ED103 - ELECTRICAL POWER PENTHOUSE DEMO. PLAN
ED601 - ELECTRICAL ONE LINE DIAGRAM DEMOLITION
EP102 - ELEC. POWER PLAN SECOND FLOOR - FOR REF. ONLY
EP103 - ELECTRICAL POWER PENTHOUSE PLAN
M001 - GENERAL MECHANICAL INFORMATION
M401 - MECHANICAL DETAILS
M501 - MECHANICAL SCHEDULES
M601 - 3D VIEWS - DEMOLITION
M602 - 3D VIEWS - DEMOLITION
MH100 - BASEMENT HVAC PLAN
MH103 - MECHANICAL HVAC PENTHOUSE PLAN
MI101 - MECHANICAL CONTROLS & INSTRUMENTATION
2020-01-06T09:05:01-0500
Sarah C. Gengelbach
I have reviewed this document
FULLER CO
URT
FULLER ROAD
LOCATION MAP
T500
WALKCONC.
G001
COVER SHEET REPLACE AHU 1 & 2 -
ANN ARBOR, MICHIGAN
PROJECT TEAM DRAWING SHEET INDEX
ENGINEERING:
ARCHITECTURE:
OWNER: DESCRIPTIONSHEET ISSUE DATE NOTES
PHONE: 269.927.0144
269.593.5933FAX:
SEVEN GENERATIONS A+E
KALAMAZOO, MI 49007
600 E. MICHIGAN AVENUE - SUITE B
WEB: WWW.7GENAE.COM
PHONE: 616.361.2664
616.361.1493FAX:
PROGRESSIVE AE
GRAND RAPIDS, MI 49525
1811 4 MILE RD. N.E.
OFFICE OF CONSTRUCTION AND
FACILITIES MANAGEMENT
DEPARTMENT OF VETERANS AFFAIRS
MEDICAL CENTER
ANN ARBOR, MI 48105
2215 FULLER ROAD
PROJECT NO. 506-20-209 REPLACE AIR HANDLER 1 AND 2 IN BUILDING 31
100% BID DOCUMENTS
VA ANN ARBOR HEALTHCARE SYSTEM
DEPT. of VETERANS AFFAIRS MEDICAL
CENTER- ANN ARBOR, MICHIGAN
G001 COVER SHEET JANUARY 10, 2020
G002 GENERAL INFORMATION & SYMBOL LEGEND JANUARY 10, 2020
A103 PENTHOUSE FLOOR PLAN JANUARY 10, 2020
A320 WALL SECTIONS JANUARY 10, 2020
M001 GENERAL MECHANICAL INFORMATION JANUARY 10, 2020
MH100 MECHANICAL HVAC BASEMENT PLAN JANUARY 10, 2020
MH103 MECHANICAL HVAC PENTHOUSE PLAN JANUARY 10, 2020
M401 MECHANICAL DETAILS JANUARY 10, 2020
M501 MECHANICAL SCHEDULES JANUARY 10, 2020
M601 3D VIEWS JANUARY 10, 2020
M602 3D VIEWS JANUARY 10, 2020
MI101 MECHANICAL CONTROLS & INSTRUMENTATION JANUARY 10, 2020
ED103 ELECTRICAL POWER PENTHOUSE DEMO. PLAN JANUARY 10, 2020
ED601 ELECTRICAL ONE LINE DIAGRAM DEMOLITION JANUARY 10, 2020
EP102 ELECTRICAL POWER PLAN SECOND FLOOR - FOR REF. ONLY JANUARY 10, 2020
EP103 ELECTRICAL POWER PENTHOUSE PLAN JANUARY 10, 2020
E601 ELECTRICAL ONE LINE DIAGRAM JANUARY 10, 2020
Sheets
A103 - PENTHOUSE FLOOR PLAN
A320 - WALL SECTIONS
G001 - COVER SHEET
G002 - GENERAL INFORMATION & SYMBOL LEGEND
AA A B C D D.6 E F G H J J.5 K L L.1
AREA OF WORK
AREA OF WORK
EXISTING AHU EXISTING AHU
CONTRACTOR TO USE THIS AREA AS
REPLACEMENT EQUIPMENT STAGING AREA;
REFER TO MECHANICAL SHEET M001 FOR
ADDITIONAL PHASING INFORMATION
AA A B C
CONTRACTOR TO REMOVE & SALVAGE EXISTING INSULATED
METAL PANELS & PORTION OF EXISTING METAL STUDS FROM
RUNNER TO RUNNER TO PROVIDE ACCESS TO PENTHOUSE.
PROTECT INSULATED METAL PANELS & METAL STUDS DURING
DEMOLITION FOR RE-INSTALLATION. PATCH & REPAIR ADJACENT
SURFACES AS REQUIRED. REFER TO MECHANICAL & ELECTRICAL
PLANS PRIOR TO STUD REMOVAL FOR DEVICE RELOCATION
COORDINATION.
CONTRACTOR TO ONLY REMOVE REQ. LENGTH FOR PENTHOUSE ENTRY
13' - 2" ± NOTE:
CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING
A TEMPORARY ENCLOSURE AROUND OPENING WHERE METAL
PANEL IS REMOVED. ONCE METAL PANEL IS RE-INSTALLED,
TEMPORARY ENCLOSURE CAN BE REMOVED.
EXISTING AHU
EXISTING COLD FORMED DOOR FRAMING TO REMAIN
AA A B C
EXISTING AHU
FLOOR PLAN LEGEND
EXISTING NON-FIRE RATED WALL
NEW NON-FIRE RATED WALL
EXISTING DOOR
NEW DOOR
2-HOUR FIRE RATED BARRIER - UL DES U419
1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO
MECHANICAL PHASING DESCRIPTION ON SHEET M001.
2. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY
WALK-OFF MATS ON INSIDE & OUTSIDE OF WORK SPACE.
3. REFER TO SHEETS A103 & A320 FOR ADDITIONAL INFORMATION
ON DEMOLITION INTENT & EXTENT.
4. CONTRACTOR TO COORDINATE ALL AHU SHUT DOWNS WITH VA
COR & BUILDING USERS AT LEAST 6 WEEKS IN ADVANCE, TO
ALLOW USERS TO PREPARE FOR AIR FLOW DISRUPTION.
5. ALL AHU COMPONENT REPLACEMENT TO TAKE PLACE AFTER
HOURS, ON WEEKENDS. AHU SHUT DOWN IS TO TAKE PLACE
BETWEEN 5:00 PM FRIDAY - 3:00 AM MONDAY. CONTRACTOR
TO COORDINATE FINAL SHUTDOWN TIMES WITH VA COR.
6. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO
ENSURE ALL BUILDING AND CONSTRUCTION CODES ARE MET
FOR EACH PHASE PRIOR TO THE PHASE BEING CONSIDERED
CLOSED.
7. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND
MAINTAINING A TEMPORARY ENCLOSURE AROUND OPENING
WHERE METAL PANEL IS REMOVED. ONCE METAL PANEL IS RE-
INSTALLED, TEMPORARY ENCLOSURE CAN BE REMOVED.
8. PARKING WILL BE ALLOWED ON NIGHTS/WEEKENDS IN
DESIGNATED LOCATIONS. PARKING DURING NORMAL BUSINESS
HOURS WILL BE LIMITED TO 2 SPACES. CONTRACTOR TO
COORDINATE PARKING LOCATIONS WITH VA COR.
GENERAL PHASING NOTES
A103
PENTHOUSE FLOOR PLAN REPLACE AHU 1 & 2 -
SCALE: 1/8" = 1'-0"
PENTHOUSE COMPOSITE PLAN
SCALE: 1/4" = 1'-0"A103
PENTHOUSE DEMOLITION PLAN01
SCALE: 1/4" = 1'-0"A103
PENTHOUSE FLOOR PLAN02
Sheets
A103 - PENTHOUSE FLOOR PLAN
A320 - WALL SECTIONS
SHEETMETAL NOTES
1. THE INSTALLATION OF ALL DUCTWORK SHALL BE CLOSELY COORDINATED WITH NEW
PLUMBING, ELECTRICAL, AND STRUCTURAL CONDITIONS. NOT ALL REQUIRED
OFFSETS AND FITTINGS ARE INDICATED ON DRAWINGS, BUT SHALL BE PROVIDED.
REFER TO ARCHITECTURAL AND STRUCTURAL PLANS FOR CLEARANCES. ALTERNATE
DUCT ROUTING SHALL BE APPROVED BY ARCHITECT/ENGINEER BEFORE
PROCEEDING IN ORDER TO ENSURE THAT THE AVAILABLE STATIC PRESSURE
REMAINS ADEQUATE. DUCTWORK LOCATION SHALL TAKE PRECEDENCE OVER HVAC
AND FIRE PROTECTION PIPING AND ELECTRICAL CONDUIT AND CABLE TRAY.
2. REFER TO DUCT TAKEOFF DETAILS. SPIN-IN TYPE WITH SCOOPS SHALL NOT BE
ACCEPTED. A MINIMUM OF 2 FEET SHALL BE PROVIDED BETWEEN RUNOUT
TAKEOFFS FROM TRUNK DUCTS.
3. THERMOSTAT AND SENSORS LOCATIONS WITHIN DUCTWORK SHALL BE VERIFIED
WITH ARCHITECT/ ENGINEER BEFORE ROUGH -IN.
4. RUNOUT BALANCING DAMPERS SHALL BE MOUNTED AS CLOSE TO MAIN DUCT AS
POSSIBLE.
5. DUCTWORK LAYOUT HAS BEEN DESIGNED TO ABSORB NOISE. ALL FITTINGS SHALL
BE PROVIDED AS INDICATED.
6. TERMINAL UNITS SHALL BE MOUNTED TO NOT IMPAIR ACCESS TO FILTERS, COILS
AND CONTROLS.
7. WATERTIGHT CONCRETE CURBS SHALL BE PROVIDED AROUND ELEVATED FLOOR
SLAB PENETRATIONS.
8. DUCTWORK AND ASSOCIATED COMPONENTS SHALL CLEAR DOORS AND WINDOWS.
9. UNLESS OTHERWISE NOTED, ALL DUCTWORK ABOVE CEILING OR EXPOSED IS
OVERHEAD AND AS HIGH AS POSSIBLE TO THE UNDERSIDE OF THE STRUCTURE,
WITH SPACE FOR INSULATION WHERE REQUIRED.
10. LOCATE MECHANICAL EQUIPMENT SUCH THAT THERE IS UNOBSTRUCTED ACCESS
TO UNIT ACCESS PANELS, CONTROLS AND VALVING.
11. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS CONNECTED TO
MECHANICAL EQUIPMENT THAT REQUIRE VIBRATION ISOLATION. FLEXIBLE
CONNECTIONS SHALL BE PROVIDED AT THE POINT OF CONNECTION TO THE
EQUIPMENT UNLESS OTHERWISE NOTED.
12. DUCTWORK SIZES ARE INSIDE CLEAR DIMENSIONS.
13. ALL ELBOWS IN DUCTWORK SHALL BE RADIUS ELBOWS UNLESS OTHERWISE NOTED.
RADIUS ELBOWS SHALL HAVE CENTERLINE RADIUS OF CURVATURE 1.5 TIMES THE
DUCT DIAMETER OR WIDTH IN THE PLANE OF TURN. WHERE SQUARE ELBOWS ARE
SHOWN, INSTALL TURNING VANES.
14. DUCTS CONNECTED TO EQUIPMENT SHALL EQUAL EQUIPMENT CONNECTION SIZE
UNLESS NOTED OTHERWISE.
15. MAXIMUM LENGTH ON FLEXIBLE DUCT SHALL BE 5'-0", UNLESS OTHERWISE NOTED
ON DETAILS OR SPECIFICATION.
16. REFER TO ARCH REFLECTED CEILING PLANS FOR EXACT DIFFUSER LOCATIONS IN
AREAS WITH A CEILING.
MECHANICAL GENERAL NOTES
1. COMPLY WITH ALL APPLICABLE LOCAL, STATE AND/OR REGULATORY AGENCIES,
CODES AND REGULATIONS FOR NEW WORK.
2. DO NOT INSTALL EQUIPMENT, PIPING OR DUCTWORK OVER ANY ELECTRICAL
EQUIPMENT OR COMMUNICATION ROOMS.
3. DO NOT RUN ANY PIPING OR DUCTWORK INTO THE ELECTRICAL ROOM UNLESS
DEDICATED TO SERVE THAT ROOM.
4. INSTALL MECHANICAL EQUIPMENT TO FACILITATE SERVICING, MAINTENANCE, AND
REPAIR OR REPLACEMENT OF EQUIPMENT COMPONENTS. AS MUCH AS
PRACTICAL, CONNECT EQUIPMENT FOR EASE OF DISCONNECTING, WITH A
MINIMUM OF INTERFERENCE WITH OTHER INSTALLATIONS.
5. LOCATE THERMOSTAT/TEMPERATURE SENSORS 48" ABOVE FINISHED FLOOR OR
AS NOTED ON THE PLANS.
6. WORK IDENTIFIED WITH MECHANICAL AND ELECTRICAL NOTES AND KEY NOTES
SHALL BE PERFORMED BY QUALIFIED MECHANICAL AND ELECTRICAL
CONTRACTORS RESPECTIVELY UNDER DIRECTION OF THE CONSTRUCTION
MANAGER. COORDINATE WITH OWNER'S REPRESENTATIVE OR CONSTRUCTION
MANAGER.
7. INSTALL SMOKE DETECTOR IN DUCTWORK AS SHOWN ON THE DRAWINGS AND IN
ACCORDANCE WITH THE MANUFACTURER'S PRINTED INSTRUCTIONS.
8. VERIFY ALL CONDITIONS IN FIELD BEFORE START OF CONSTRUCTION. NOTIFY
ARCHITECT/ENGINEER OF DISCREPANCIES BETWEEN DRAWINGS AND ACTUAL
FIELD CONDITIONS.
9. COORDINATE WORK WITH OTHER TRADES AND WITH THE CONSTRUCTION
MANAGER.
10. COORDINATE ANY REQUIRED SHUTDOWN OF SERVICES OR EQUIPMENT WITH
OWNER'S REPRESENTATIVE OR CONSTRUCTION MANAGER, MINIMIZE
INTERRUPTION OF EXISTING SERVICES.
11. PROVIDE ALL MISCELLANEOUS STEEL AND ITEMS REQUIRED FOR THE PROPER
INSTALLATION OF ALL PIPE, SHEET METAL AND EQUIPMENT.
12. COORDINATE FLOOR, WALL & ROOF PENETRATIONS ETC. WITH ARCHITECTURAL
TRADES.
13. FIRESTOP SHALL BE PROVIDED IN HOLES AND PENETRATIONS IN RATED
ASSEMBLIES.
14. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR
INDICATED.
15. DUCT SIZES ARE NET INSIDE DIMENSIONS.
16. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM,
TERMINAL UNITS, FILTERS, COILS, ETC.
17. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE
STANDARD EQUIPMENT DETAILS.
18. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE
TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
19. SEISMIC PROVISIONS NOT REQUIRED.
20. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.
MECHANICAL SYMBOLS
CABINET UNIT HEATER, TYPE 'CUH-#'
CONVECTOR, TYPE 'C-#'
SUPPLY DIFFUSER (4-WAY)
FT-##
SUPPLY DIFFUSER, SD#, ### CFM
ARROWS INDICATE DIRECTION OF THROW
SOUND ATTENUATOR
RG#
RETURN OR EXHAUST REGISTER
TYPE 'RG#' ### CFM
SIDEWALL SUPPLY, RETURN, OR EXHAUST REGISTER
TYPE ### , ### CFM
RETURN AIR/EXHAUST AIR BRANCH CONNECTION
WITH VOLUME DAMPER
FINNED TUBE RADIATION
(SEE DETAIL AND SCHEDULE)
SUPPLY DUCT UP
SUPPLY DUCT DOWN
PUMP(SCHEMATIC)
ATT-#
CUH-#
C-#
MECHANICAL EQUIPMENT (EXAMPLE ACV-##)
SEE SCHEDULE FOR ADDITIONAL
SD#
SD#
EG#
EXHAUST REGISTER
TYPE 'EG#' ### CFM
LO
SUPPLY AIR BRANCH CONNECTION
WITH VOLUME DAMPER
LO
/R
RETURN DUCT UP
RETURN DUCT DOWN
EXHAUST DUCT UP
EXHAUST DUCT DOWN
HORIZONTAL FIRE DAMPER
VERTICAL FIRE DAMPER
COMBINATION FIRE/SMOKE HORIZONTAL FIRE DAMPER
COMBINATION FIRE/SMOKE VERTICAL FIRE DAMPER
FS
FS
#P-###
GPM RANGE PIPE SIZE
0.5 - 2.5 3/4"
2.6 - 6.0 1"
6.1 -10.0 1 1/4"
10.1 - 17.0 1 1/2"
17.1 - 35.0 2"
HYDRONIC PIPING NOTES
1. THE INSTALLATION OF ALL PIPING SHALL BE CLOSELY COORDINATED WITH SHEET
METAL, ELECTRICAL, AND STRUCTURAL CONDITIONS. NOT ALL REQUIRED OFFSETS
AND FITTINGS ARE INDICATED ON DRAWINGS, BUT SHALL BE PROVIDED. REFER TO
ARCHITECTURAL AND STRUCTURAL PLANS FOR CLEARANCES.
2. ALL PIPING SHALL BE INSTALLED TO FACILITATE COIL REMOVAL, FILTER
REPLACEMENT AND OPENING OF ACCESS PANELS.
3. INSTALL MAINS AS HIGH AS POSSIBLE. MANUAL AIR VENTS SHALL BE PROVIDED AT
ALL PIPING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .