48 - MH103 - MECHANICAL HVAC PENTHOUSE PLAN.pdf

PDF 2 MB Posted

Attached to
J041--506-20-209 Replace Air Handler Bldg 31 - 1 and 2 Federal contract opportunity
Solicitation number
36C25020B0055
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This pre-solicitation announcement describes a forthcoming invitation for bid for construction services. The Department of Veterans Affairs will seek a contractor to remove and replace internal components in two air handlers at building 31 of the Ann Arbor VA Medical Center in Ann Arbor, Michigan. Work will include replacing cooling coils, heating coils, heat recovery coils, humidifiers, supply fans, outside air dampers, and adding final filters across both air handling units. Additional repairs, component conversions to direct digital control, and coordination with facility operations are also required. The solicitation will be issued on or around June 20, 2020 via beta.SAM.gov with a bid due date to be specified therein. The contractor will have approximately 120 days to complete the work. The project value is estimated between $500,000 to $1,000,000, and the contract will be a firm fixed price awarded within 120 days of bid receipt.

View the file

Other files for this federal contract opportunity

Other files attached to J041--506-20-209 Replace Air Handler Bldg 31 - 1 and 2, newest first.
File Type Posted
Sign In Sheet 506-20-209.pdf PDF
36C25020B0055 0004.docx DOCX document
Covid Instructions.docx DOCX document
36 A103.pdf PDF
36C25020B0055 0002.docx DOCX document
01 G001.pdf PDF
03 G002.pdf PDF
48 - MH100 - BASEMENT HVAC PLAN.pdf PDF
47 - M001 - GENERAL MECHANICAL INFORMATION.pdf PDF
36 A320.pdf PDF
36C25020B0055 0003.docx DOCX document
RFI Form 506-20-209.docx DOCX document
Contractor EMR Certification Form 2020.docx DOCX document
36C25020B0055_1.docx DOCX document
506-20-209 AHU - Specifications.pdf PDF
506-20-209 - VA AA AHU Replacement - Bid Drawings.pdf PDF
WD- ML20200100 07-24-2020.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EX.26"øEA

EX.8"øEA

EX.24"x20"OA48"x30"ΦSA72"x36"ΦSA

31-EX.ACH 1

EX.6"CWR EX.6"CWS

EX.24"x20"OA

"x

"Φ

S A

"x

"Φ

S A

EX.32"x18"EA

EX.26"x16"SA

EX.16"x14"SA

EX.8"CWS

EX.8"CWR

EXISTING

INTAKE

PLENUM

EXISTING

INTAKE

PLENUM

EXISTING INTAKE

LOUVERS

E X

EX. EX.

E X

AA A B C D D.6 E F G H J J.5 K L L.1 M

3.4

4.5

1.11

31-EX.AHU1

MH103

3 MH103

31-EX.AHU2

31-EX.AHU3

EX.1"HS

EX.1"HR

EX.3"STM MP

EX.6"CWR

EX.6"CWR

EX.6"CWS

EX.6"CWS

EX.2"V

EX.2"V

C D

1.11

31-EX.AHU2

EX.3"STM MP

31-SF2

NEW INTERNAL

DIVIDER AROUND

FAN ARRAY INLET

UV LIGHT @

COOLING COILS

NEW 24" ACCESS DOOR

31-FF2

31-CWCC2

31-SH2 31-EX.PF2

EX.6"CWR

EX.6"CWS

EX.52"x38"SA

31-SHC2

G H J

1.11

31-SF1

31-FF1

UV LIGHT @

COOLING

COILS

31-ERC1 31-SHC1 31-CWCC1

31-EX.PF1

56"x30"ΦSA

EXISTING

INTAKE

PLENUM

1 2 5

31-SH1

EX31-CD1

NOTE:

1.

2.

3.

ACCESS DOORS SHALL BE GASKETED AND HINGED TO OPEN

AGAINST FAN OPERATING PRESSURE TO PREVENT AIR LEAKAGE.

MINIMUM ACCESS DOOR WIDTH SHALL BE 24" [600mm].

ACCESS DOOR HEIGHT SHALL BE DETERMINED BY UNIT

CASINGBUT NOT TO EXCEED 6'-0" [1800mm].

14 15131098765432

OUTSIDE AIR

INTAKE.

COIL PULL DISTANCE

AIR HANDLING UNIT ITEM

100% OUTSIDE AIR

THREE BEDS OF

FILTERS CV

PRE-FILTERS (SIDE ACCESS) 2 NO CHANGE

AFTER FILTER (SIDE ACCESS) 3

ACCESS SECTION 4

* HEAT RECOVERY COIL 5

* ACCESS SECTION 6

HEATING COIL 7 REPLACED

INSPECTION SECTION,SMALL 8 NEW

HUMIDIFIER 9 RELOCATE/REPLACED

COOLING COIL 11 REPLACED

FAN, WITH ACCESS 13

FINAL FILTER, SIDE ACCESS 16

HORIZONTAL DISCHARGE CONNECTION 17

*31-EX.AHU1 ONLY

NO CHANGE

NO CHANGE

REPLACED

NO CHANGE

ACCESS SECTION 1 NO CHANGE

ACCESS SECTION 10 NEW

ACCESS SECTION 12 NO CHANGE

REPLACED

NEW

NO CHANGE

MECHANICAL KEYNOTES?

1. REPLACE EXISTING ENERGY RECOVERY COIL (30% PROPYLENE GLYCOL).

REMOVE PIPING DOWNSTREAM OF ISOLATION OR MOTORIZED VALVES AS

SHOWN ON M601. RECONNECT AND REFILL SYSTEM AFTER INSTALLATION. RE-

INSULATE AND REPAIR INSULATION .

2. REPLACE EXISTING STEAM HEATING COIL AND FACE AND BYPASS DAMPER WITH

NEW. AS SHOWN ON M601 AND M602, REMOVE PIPING DOWNSTREAM OF

MOTORIZED CONTROL VALVE. RE-PIPE CONDENSATE PER DETAIL ON M401. RE-

INSULATE AND REPAIR INSULATION.

3. REPLACE EXISTING STEAM HUMIDIFIER AND RELOCATE FROM DOWNSTREAM OF

THE COOLING COIL TO UPSTREAM. DISCONNECT AS SHOWN ON M601 AND M602.

INSTALL IN EXISTING ACCESS SECTION AND REMOVE DOOR. REPLACE WITH NEW

DOUBLE WALL INSULATED PANEL WITH SITE GLASS. REPLACE EXISTING CONTROL

VALVE WITH NEW INCLUDING NEW DDC ACTUATOR. RE-INSULATE AND REPAIR

INSULATION.

4. REPLACE EXISTING CHILLED WATER COOLING COIL. AS SHOWN ON M601 AND

M602, REMOVE PIPING FROM DOWNSTREAM OF CONTROL VALVE AND ISOLATION

VALVES. RE-INSULATE AND REPAIR INSULATION . PROVIDE NEW ACCESS DOOR

DOWNSTREAM OF COILS. PROVIDE UV LIGHT WITH COOLING COILS AND

SEPARATE POWER CONNECTION. INTERLOCK UV LIGHT OPERATION TO

DEACTIVATE WHEN ACCESS DOORS ON EITHER SIDE ARE OPEN.

5. REPLACE EXISTING CENTRIFUGAL BLOWER WITH FAN ARRAY. PROVIDE (4) NEW

VFDS INSTALLED IN PLACE OF EXISTING VFD. PROVIDE NEW INTERNAL WALL TO

SEPARATE FAN SECTION FROM COOLING COIL SECTION. STUB FAN INLETS INTO

INTERIOR WALL.

6. ADD NEW FINAL FILTERS WITH SIDE ACCESS DOWNSTREAM OF FANS. INCLUDE

MOUNTING RACK AND INTERNAL BAFFLING TO PREVENT BYPASS OF FILTERS.

7. EXISTING MOTORIZED OUTSIDE AIR DAMPERS TO BE REPLACED. PROVIDE NEW

ACTUATOR (ONE FOR EACH SECTION). RELOCATE ACTUATOR LOCATION TO THE

SIDE OR CEILING OF THE INTAKE PLENUM (NOT FLOOR). ELIMINATE

JACKSHAFTING.

8. DURING CONSTRUCTION IN ORDER TO ACCESS THE 31-EX.AHU-2 STEAM HEATING

COIL, REMOVE EXISTING VENT TO ROOF AND REPLACE WITH AUTOMATIC AIR

VENT AT FLOOR (2 LOCATIONS). RE-INSTALL VENT TO ROOF ONCE

CONSTRUCTION IS COMPLETED AT THAT SECTION.

9. RELOCATE EXISTING THERMOSTAT FOR EXISTING UNIT HEATER FOR METAL

PANEL REMOVAL FOR EQUIPMENT ACCESS.

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

ALLIANCE | 7GAE JV PROJECT NO.: 219008

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o n e o e q u a rt e r in c h o th re e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs17JANUARY 10, 2020

MH103

506-20-209

ANN ARBOR VAMC

SMB MMK

MECHANICAL HVAC

PENTHOUSE PLAN

REPLACE AHU 1 & 2 -

BLDG. 31

1/8" = 1'-0"

PENTHOUSE HVAC PLAN

1/8" = 1'-0"

1 / MH103

AHU-2 REPLACEMENT PLAN

1/8" = 1'-0"

1 / MH103

AHU-1 REPLACEMENT PLAN

NOT TO SCALE

AHU SECTION & ACCESS SUMMARY

7REVISIONS DATE

kozelm Stamp kozelm Date

Sheets
E601 - ELECTRICAL ONE LINE DIAGRAM
ED103 - ELECTRICAL POWER PENTHOUSE DEMO. PLAN
ED601 - ELECTRICAL ONE LINE DIAGRAM DEMOLITION
EP102 - ELEC. POWER PLAN SECOND FLOOR - FOR REF. ONLY
EP103 - ELECTRICAL POWER PENTHOUSE PLAN
M001 - GENERAL MECHANICAL INFORMATION
M401 - MECHANICAL DETAILS
M501 - MECHANICAL SCHEDULES
M601 - 3D VIEWS - DEMOLITION
M602 - 3D VIEWS - DEMOLITION
MH100 - BASEMENT HVAC PLAN
MH103 - MECHANICAL HVAC PENTHOUSE PLAN
MI101 - MECHANICAL CONTROLS & INSTRUMENTATION
2020-01-06T09:24:20-0500
Maureen M. Kozel, PE
I have reviewed this document

File details come from the government source that posted it. Updated .