47 - M001 - GENERAL MECHANICAL INFORMATION.pdf
PDF 629 KB Posted
- Attached to
- J041--506-20-209 Replace Air Handler Bldg 31 - 1 and 2 Federal contract opportunity
- Solicitation number
- 36C25020B0055
About this file
This solicitation announcement describes an upcoming Invitation for Bid for mechanical system replacement work at a Department of Veterans Affairs medical center. The solicitation will seek bids to remove and replace internal components in two air handling units, including cooling coils, heating coils, heat recovery coils, humidifiers, supply fans, outside air dampers, and access sections. Additional work includes interior and exterior casing repairs, epoxy protection, and conversion of all components to direct digital controls. Temporary heating, cooling, power, and other components must be installed to facilitate construction during planned shutdown periods. The North American Industry Classification Code for this project is 238220 and the estimated contract value is between $500,000 and $1,000,000. The solicitation will be available for download on or around June 30, 2020 via SAM.gov and bids will be due as specified within the solicitation. The contract type will be firm-fixed-price and the period of performance is estimated at 120 days.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Covid Instructions.docx | DOCX document | |
| Sign In Sheet 506-20-209.pdf | ||
| 36C25020B0055 0004.docx | DOCX document | |
| 36 A103.pdf | ||
| 36C25020B0055 0002.docx | DOCX document | |
| 48 - MH103 - MECHANICAL HVAC PENTHOUSE PLAN.pdf | ||
| 36 A320.pdf | ||
| 01 G001.pdf | ||
| 03 G002.pdf | ||
| 48 - MH100 - BASEMENT HVAC PLAN.pdf | ||
| 36C25020B0055 0003.docx | DOCX document | |
| RFI Form 506-20-209.docx | DOCX document | |
| 506-20-209 - VA AA AHU Replacement - Bid Drawings.pdf | ||
| WD- ML20200100 07-24-2020.pdf | ||
| Contractor EMR Certification Form 2020.docx | DOCX document | |
| 36C25020B0055_1.docx | DOCX document | |
| 506-20-209 AHU - Specifications.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEETMETAL NOTES
1. THE INSTALLATION OF ALL DUCTWORK SHALL BE CLOSELY COORDINATED WITH NEW
PLUMBING, ELECTRICAL, AND STRUCTURAL CONDITIONS. NOT ALL REQUIRED
OFFSETS AND FITTINGS ARE INDICATED ON DRAWINGS, BUT SHALL BE PROVIDED.
REFER TO ARCHITECTURAL AND STRUCTURAL PLANS FOR CLEARANCES. ALTERNATE
DUCT ROUTING SHALL BE APPROVED BY ARCHITECT/ENGINEER BEFORE
PROCEEDING IN ORDER TO ENSURE THAT THE AVAILABLE STATIC PRESSURE
REMAINS ADEQUATE. DUCTWORK LOCATION SHALL TAKE PRECEDENCE OVER HVAC
AND FIRE PROTECTION PIPING AND ELECTRICAL CONDUIT AND CABLE TRAY.
2. REFER TO DUCT TAKEOFF DETAILS. SPIN-IN TYPE WITH SCOOPS SHALL NOT BE
ACCEPTED. A MINIMUM OF 2 FEET SHALL BE PROVIDED BETWEEN RUNOUT
TAKEOFFS FROM TRUNK DUCTS.
3. THERMOSTAT AND SENSORS LOCATIONS WITHIN DUCTWORK SHALL BE VERIFIED
WITH ARCHITECT/ ENGINEER BEFORE ROUGH -IN.
4. RUNOUT BALANCING DAMPERS SHALL BE MOUNTED AS CLOSE TO MAIN DUCT AS
POSSIBLE.
5. DUCTWORK LAYOUT HAS BEEN DESIGNED TO ABSORB NOISE. ALL FITTINGS SHALL
BE PROVIDED AS INDICATED.
6. TERMINAL UNITS SHALL BE MOUNTED TO NOT IMPAIR ACCESS TO FILTERS, COILS
AND CONTROLS.
7. WATERTIGHT CONCRETE CURBS SHALL BE PROVIDED AROUND ELEVATED FLOOR
SLAB PENETRATIONS.
8. DUCTWORK AND ASSOCIATED COMPONENTS SHALL CLEAR DOORS AND WINDOWS.
9. UNLESS OTHERWISE NOTED, ALL DUCTWORK ABOVE CEILING OR EXPOSED IS
OVERHEAD AND AS HIGH AS POSSIBLE TO THE UNDERSIDE OF THE STRUCTURE,
WITH SPACE FOR INSULATION WHERE REQUIRED.
10. LOCATE MECHANICAL EQUIPMENT SUCH THAT THERE IS UNOBSTRUCTED ACCESS
TO UNIT ACCESS PANELS, CONTROLS AND VALVING.
11. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS CONNECTED TO
MECHANICAL EQUIPMENT THAT REQUIRE VIBRATION ISOLATION. FLEXIBLE
CONNECTIONS SHALL BE PROVIDED AT THE POINT OF CONNECTION TO THE
EQUIPMENT UNLESS OTHERWISE NOTED.
12. DUCTWORK SIZES ARE INSIDE CLEAR DIMENSIONS.
13. ALL ELBOWS IN DUCTWORK SHALL BE RADIUS ELBOWS UNLESS OTHERWISE NOTED.
RADIUS ELBOWS SHALL HAVE CENTERLINE RADIUS OF CURVATURE 1.5 TIMES THE
DUCT DIAMETER OR WIDTH IN THE PLANE OF TURN. WHERE SQUARE ELBOWS ARE
SHOWN, INSTALL TURNING VANES.
14. DUCTS CONNECTED TO EQUIPMENT SHALL EQUAL EQUIPMENT CONNECTION SIZE
UNLESS NOTED OTHERWISE.
15. MAXIMUM LENGTH ON FLEXIBLE DUCT SHALL BE 5'-0", UNLESS OTHERWISE NOTED
ON DETAILS OR SPECIFICATION.
16. REFER TO ARCH REFLECTED CEILING PLANS FOR EXACT DIFFUSER LOCATIONS IN
AREAS WITH A CEILING.
MECHANICAL GENERAL NOTES
1. COMPLY WITH ALL APPLICABLE LOCAL, STATE AND/OR REGULATORY AGENCIES,
CODES AND REGULATIONS FOR NEW WORK.
2. DO NOT INSTALL EQUIPMENT, PIPING OR DUCTWORK OVER ANY ELECTRICAL
EQUIPMENT OR COMMUNICATION ROOMS.
3. DO NOT RUN ANY PIPING OR DUCTWORK INTO THE ELECTRICAL ROOM UNLESS
DEDICATED TO SERVE THAT ROOM.
4. INSTALL MECHANICAL EQUIPMENT TO FACILITATE SERVICING, MAINTENANCE, AND
REPAIR OR REPLACEMENT OF EQUIPMENT COMPONENTS. AS MUCH AS
PRACTICAL, CONNECT EQUIPMENT FOR EASE OF DISCONNECTING, WITH A
MINIMUM OF INTERFERENCE WITH OTHER INSTALLATIONS.
5. LOCATE THERMOSTAT/TEMPERATURE SENSORS 48" ABOVE FINISHED FLOOR OR
AS NOTED ON THE PLANS.
6. WORK IDENTIFIED WITH MECHANICAL AND ELECTRICAL NOTES AND KEY NOTES
SHALL BE PERFORMED BY QUALIFIED MECHANICAL AND ELECTRICAL
CONTRACTORS RESPECTIVELY UNDER DIRECTION OF THE CONSTRUCTION
MANAGER. COORDINATE WITH OWNER'S REPRESENTATIVE OR CONSTRUCTION
MANAGER.
7. INSTALL SMOKE DETECTOR IN DUCTWORK AS SHOWN ON THE DRAWINGS AND IN
ACCORDANCE WITH THE MANUFACTURER'S PRINTED INSTRUCTIONS.
8. VERIFY ALL CONDITIONS IN FIELD BEFORE START OF CONSTRUCTION. NOTIFY
ARCHITECT/ENGINEER OF DISCREPANCIES BETWEEN DRAWINGS AND ACTUAL
FIELD CONDITIONS.
9. COORDINATE WORK WITH OTHER TRADES AND WITH THE CONSTRUCTION
MANAGER.
10. COORDINATE ANY REQUIRED SHUTDOWN OF SERVICES OR EQUIPMENT WITH
OWNER'S REPRESENTATIVE OR CONSTRUCTION MANAGER, MINIMIZE
INTERRUPTION OF EXISTING SERVICES.
11. PROVIDE ALL MISCELLANEOUS STEEL AND ITEMS REQUIRED FOR THE PROPER
INSTALLATION OF ALL PIPE, SHEET METAL AND EQUIPMENT.
12. COORDINATE FLOOR, WALL & ROOF PENETRATIONS ETC. WITH ARCHITECTURAL
TRADES.
13. FIRESTOP SHALL BE PROVIDED IN HOLES AND PENETRATIONS IN RATED
ASSEMBLIES.
14. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR
INDICATED.
15. DUCT SIZES ARE NET INSIDE DIMENSIONS.
16. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM,
TERMINAL UNITS, FILTERS, COILS, ETC.
17. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE
STANDARD EQUIPMENT DETAILS.
18. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE
TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
19. SEISMIC PROVISIONS NOT REQUIRED.
20. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.
MECHANICAL SYMBOLS
CABINET UNIT HEATER, TYPE 'CUH-#'
CONVECTOR, TYPE 'C-#'
SUPPLY DIFFUSER (4-WAY)
FT-##
SUPPLY DIFFUSER, SD#, ### CFM
ARROWS INDICATE DIRECTION OF THROW
SOUND ATTENUATOR
RG#
RETURN OR EXHAUST REGISTER
TYPE 'RG#' ### CFM
SIDEWALL SUPPLY, RETURN, OR EXHAUST REGISTER
TYPE ### , ### CFM
RETURN AIR/EXHAUST AIR BRANCH CONNECTION
WITH VOLUME DAMPER
FINNED TUBE RADIATION
(SEE DETAIL AND SCHEDULE)
SUPPLY DUCT UP
SUPPLY DUCT DOWN
PUMP(SCHEMATIC)
ATT-#
CUH-#
C-#
MECHANICAL EQUIPMENT (EXAMPLE ACV-##)
SEE SCHEDULE FOR ADDITIONAL
SD#
SD#
EG#
EXHAUST REGISTER
TYPE 'EG#' ### CFM
A
IR
F
LO
W
SUPPLY AIR BRANCH CONNECTION
WITH VOLUME DAMPER
A
IR
F
LO
W
S A
E A
/R A
RETURN DUCT UP
RETURN DUCT DOWN
EXHAUST DUCT UP
EXHAUST DUCT DOWN
HORIZONTAL FIRE DAMPER
VERTICAL FIRE DAMPER
COMBINATION FIRE/SMOKE HORIZONTAL FIRE DAMPER
COMBINATION FIRE/SMOKE VERTICAL FIRE DAMPER
FS
FS
#P-###
GPM RANGE PIPE SIZE
0.5 - 2.5 3/4"
2.6 - 6.0 1"
6.1 -10.0 1 1/4"
10.1 - 17.0 1 1/2"
17.1 - 35.0 2"
HYDRONIC PIPING NOTES
1. THE INSTALLATION OF ALL PIPING SHALL BE CLOSELY COORDINATED WITH SHEET
METAL, ELECTRICAL, AND STRUCTURAL CONDITIONS. NOT ALL REQUIRED OFFSETS
AND FITTINGS ARE INDICATED ON DRAWINGS, BUT SHALL BE PROVIDED. REFER TO
ARCHITECTURAL AND STRUCTURAL PLANS FOR CLEARANCES.
2. ALL PIPING SHALL BE INSTALLED TO FACILITATE COIL REMOVAL, FILTER
REPLACEMENT AND OPENING OF ACCESS PANELS.
3. INSTALL MAINS AS HIGH AS POSSIBLE. MANUAL AIR VENTS SHALL BE PROVIDED AT
ALL PIPING HIGH POINTS AND END OF PIPING LOOPS. PROVIDE REMOVABLE
INSULATION PLUG.
4. PIPE ANCHORS, EXPANSION LOOPS, AND GUIDES SHALL BE PROVIDED AS
REQUIRED. REFER TO SPECIFICATIONS.
5. SLEEVE AND SEAL EXTERIOR WALL AND ROOF PENETRATIONS TO A WEATHER
TIGHT CONDITION. SLEEVE AND SEAL INTERIOR FLOOR PENETRATIONS TO A
WATER TIGHT CONDITION.
6. PROVIDE MINIMUM OF 3/4" PIPE FOR ALL PIPING UNLESS SHOWN OTHERWISE.
7. ALL VALVES ARE TO BE FULL LINE SIZE EXCEPT CONTROL AND BALANCING
VALVES.
8. PROVIDE 1/2" DRAIN VALVES WITH HOSE-END CAPS AT ALL LOW POINTS IN PIPING.
PROVIDE MINIMUM PITCH SUFFICIENT TO INSURE ADEQUATE DRAINING. PROVIDE
REMOVABLE INSULATION PLUG.
9. ELEVATIONS AS SHOWN ON THE DRAWINGS ARE TO THE BOTTOM OF ALL
PRESSURE PIPING AND TO THE INVERT OF ALL GRAVITY PIPING UNLESS
OTHERWISE NOTED.
10. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD AND AS HIGH AS POSSIBLE
TO THE UNDERSIDE OF THE STRUCTURE OR SLAB, WITH SPACE FOR INSULATION
WHERE REQUIRED.
11. PIPING AND ASSOCIATED APPURTENANCES SHALL NOT INTERFERE WITH DOORS
AND WINDOWS.
12. INSTALL PIPING WITHOUT FORCING OR SPRINGING.
13. ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. PROVIDE
OFFSETS IN PIPING AROUND OBSTRUCTIONS ENCOUNTERED IN FIELD.
14. PROVIDE VIBRATION ISOLATORS FOR ALL PIPING SUPPORTS CONNECTED TO, AND
WITHIN 50 FEET OF ISOLATED EQUIPMENT (EXCEPT AT BASE ELBOW SUPPORTS
AND ANCHOR POINTS) THROUGHOUT MECHANICAL EQUIPMENT ROOMS.
15. FOR BALANCING 3-WAY VALVES, BALANCE BY-PASS WITH VALVE AT 50% POSITION
SUCH THAT TOTAL FLOW DOES NOT EXCEED 100%.
16. AIR CONDITIONING CONDENSATE DRAIN LINES FROM EACH UNIT'S DRAIN PAN
SHALL BE PIPED FULL SIZE OF THE UNIT DRAIN OUTLET WITH "P" TRAP.
CONDENSATE WATER PIPING SHALL BE A MINIMUM OF 3/4". SEE THE DETAILS
SHOWN IN THE DRAWINGS OR MANUFACTURER'S LITERATURE FOR THE DEPTH OF
THE AIR CONDITIONING CONDENSATE TRAP. PITCH DOWN IN DIRECTION OF FLOW,
MINIMUM 1 INCH PER 10 FEET.
17. INSTALL PIPING SO ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES AND
OTHER APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.
18. PROVIDE PRESSURE/TEMPERATURE (P/T) PLUGS, WITH CAPS UP AND
DOWNSTREAM OF ALL EQUIPMENT, AT THE SUPPLY AND RETURN TAPS OF ALL
PIPING BRANCHES AND/OR WHERE INDICATED. PROVIDE EXTENDED PLUGS AND
LABELS WHERE PIPING IS INSULATED.
19. WHERE SPACE PERMITS PROVIDE AUXILIARY DRAIN PANS UNDER COOLING
EQUIPMENT LOCATED ABOVE CEILINGS. WHERE SPACE DOES NOT PERMIT THE
USE OF AN AUXILIARY DRAIN PAN PROVIDE WATER LEVEL DETECTION DEVICE
(FLOAT SWITCH)CONFORMING TO UL 508 THAT WILL SHUT OFF THE EQUIPMENT
SERVED IN THE EVENT THAT THE PRIMARY DRAIN IS BLOCKED.
20. PROVIDE FLUSHING VALVES AND TEES AT BOTH ENDS OF ALL EQUIPMENT. TAPS
SHALL MATCH EQUIPMENT PIPING UP TO 1". FOR LARGER EQUIPMENT AND PIPE
LOOPS, PROVIDE 1-1/2" TAPS AND VALVES.
21. ALL HYDRONIC PIPING BRANCH TAKEOFFS FROM MAINS SHALL BE MADE WITH
SWING JOINTS.
22. USE THE FOLLOWING TABLE FOR PIPING RUNOUT SIZES TO HEATING AND
COOLING ELEMENTS. REFER TO SCHEDULE FOR SPECIFIED GPM.
HYDRONIC HEATING SUPPLY
HYDRONIC HEATING RETURN
STEAM (15 PSI)
STEAM CONDENSATE
SNOW MELT SUPPLY
SNOW MELT RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSER SUPPLY
HYDRONIC PIPING SYMBOLOGY
HS
HR
CWS
CWR
REF
STM(15#)
COND
CNS
CNR
GLR
GLS
SMS
HPR
HPS
GYS
GYR
PC
SMR
CTS
CTR
CONDENSER
RETURN
COOLING TOWER SUPPLY
COOLING TOWER RETURN
PUMPED CONDENSATE
GLYCOL SUPPLY
GLYCOL RETURN
REFRIGERANT PIPING (SINGLE
DX)
GROUND LOOP SUPPLY
GROUND LOOP RETURN
HEAT PUMP SUPPLY
HEAT PUMP RETURN
SA
RA
EA
OA
REL
MA
HDS
CDS
LHEA
GHEA
SUPPLY AIR
HOT DECK SUPPLY AIR
COLD DECK SUPPLY AIR
RETURN AIR
EXHAUST AIR
LAB HOOD EXHAUST AIR
GENERAL LAB HOOD EXHAUST AIR
OUTSIDE AIR
RELIEF AIR
SHEETMETAL SYMBOLOGY
MIXED AIR
EXISTING - TO REMAIN
EXISTING - FOR DEMOLITION
PHASING
EXTENT OF DEMOLITION
POINT OF CONNECTION BETWEEN PROPOSED AND EXISTING
MECHANICAL TAGS SYMBOLS
1W-EX.SF 3
BUILDING NUMBER WHERE EQUIPMENT IS LOCATED.
INDICATOR THAT COMPONENT IS EXISTING.
EQUIPMENT ABBREVIATION (SUPPLY FAN)
EXISTING SUPPLY FAN NO. 3 IN BUILDING NO. 1W
MECHANICAL EQUIPMENT/FIXTURE TAG (EXISTING)
1W-SF 4
BUILDING NUMBER WHERE EQUIPMENT IS LOCATED.
EQUIPMENT ABBREVIATION (SUPPLY FAN)
SUPPLY FAN NO. 3 IN BUILDING NO. 1W
MECHANICAL EQUIPMENT/FIXTURE TAG (NEW)
DEMOLITION NOTE TAG
PLAN NOTE TAG
A
PL105
SECTION LETTER
DRAWING NUMBER WHERE SHOWN
PL105
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
1W-TU-1-4
BUILDING NUMBER WHERE EQUIPMENT IS LOCATED.
ITEM (TERMINAL UNIT)
ITEM NUMBER (TERMINAL UNIT NO. 4)
TERMINAL UNIT TAG
SERVED BY AIR HANDLER UNIT NO. 1
MECHANICAL SCOPE OF WORK &
CONSTRUCTION PHASING NOTES
1. SCOPE OF WORK CONSISTS OF THE REPLACEMENT & REFURBISHMENT OF THE
FOLLOWING COMPONENTS FOR 31-EX.AHU1:
• REPLACE ENERGY RECOVERY COIL
• REPLACE STEAM HEATING COIL (INCREASE HEATING CAPACITY FOR -10°F)
• REPLACE STEAM HUMIDIFIER AND RELOCATE UPSTREAM OF COOLING COIL
• REPLACE COOLING COIL
• ADD UV LIGHT TO COOLING COIL
• REPLACE SUPPLY FAN WITH FAN ARRAY WITH NEW VFDS.
• ADD FINAL FILTERS DOWNSTREAM OF FAN
• REPLACE OUTSIDE AIR DAMPERS AND ACTUATOR
• EPOXY COAT THE INTERIOR OF THE CASING FLOOR (EXTEND EPOXY UP 6" ON
THE CASING WALL) AND PAINT THE REST OF THE CASING INTERIOR.
• PROVIDE NEW ACCESS DOORS AS SHOWN. PROVIDE NEW CASING WHERE
DOORS ARE TO BE REMOVED.
2. SCOPE OF WORK CONSISTS OF THE REPLACEMENT & REFURBISHMENT OF THE
FOLLOWING COMPONENTS FOR 31-EX.AHU2:
• REPLACE STEAM HEATING COIL (INCREASE HEATING CAPACITY FOR -10°F)
• REPLACE STEAM HUMIDIFIER AND RELOCATE UPSTREAM OF COOLING COIL
• REPLACE COOLING COIL
• ADD UV LIGHT TO COOLING COIL
• REPLACE SUPPLY FAN WITH FAN ARRAY.
• ADD FINAL FILTERS DOWNSTREAM OF FAN
• REPLACE OUTSIDE AIR DAMPERS AND ACTUATOR
• EPOXY COAT THE INTERIOR OF THE CASING (UP TO 6" ON THE WALL) AND
PAINT THE REST OF THE INTERIOR CASING.
• PROVIDE NEW ACCESS DOORS AS SHOWN. PROVIDE NEW CASING WHERE
DOORS ARE TO BE REMOVED.
3. SIEMENS DESIGO IS CONTROLS PROVIDER AND MASTER SYSTEM INTEGRATOR.
CONTROLS TO BE ADDED OR REPLACED SHALL BE DIRECT DIGITAL CONTROLS BY
SIEMENS DESIGO. (CONTACT CONTROLS INTEGRATOR: BILL MCCOY). SEQUENCE
OF OPERATION UNLESS NOTED OTHERWISE SHALL NOT BE CHANGED.
4. PHASING:
• WORK WITHIN THE AIR HANDLERS SHALL BE COMPLETED OVER SIX WEEKEND
SHUTDOWNS (FRIDAY 5:00 PM TO MONDAY 3:00 AM) WITH ONLY ONE UNIT
OFFLINE AT A TIME.
• EACH SHUTDOWN PERIOD SHALL BE COORDINATED WITH THE COR 6 WEEKS
IN ADVANCE AND SHALL BE CONFIRMED 1 WEEK IN ADVANCE. ALL MATERIALS
MUST BE ONSITE 3 DAYS PRIOR TO SHUTDOWN FOR IT TO COMMENCE.
• DURING SHUTDOWN, THE DOWNSTREAM DUCTWORK SHALL BE SEALED OFF
FROM CONSTRUCTION DEBRIS AND FUMES.
• AT THE END OF EACH SHUTDOWN, THE AHU OPERATION SHALL BE VERIFIED.
NEW TEST AND BALANCE SHALL BE PERFORMED ON EACH NEW OR AFFECTED
COMPONENT AND PROPER OPERATION SHALL BE WITNESSED AND SIGNED
OFF BY THE COR BEFORE THE AHU IS TURNED BACK OVER TO THE BUILDING.
• DURING THE SHUTDOWN OF AHU-1, THE CRITICAL AREAS NOTED ON M100
SHALL BE MONITORED FOR TEMPERATURE, HUMIDITY AND PRESSURIZATION
LEVELS. TEMPORARY COOLING AND HEATING SHALL BE PROVIDED DURING
THE ENTIRE SHUTDOWN PERIOD. PROVIDE DATA LOGGERS TO MONITOR AND
RECORD THE TEMPERATURE AND HUMIDITY DURING CONSTRUCTION AS THE
EXISTING BAS MAY BE AFFECTED BY CONSTRUCTION ACTIVITIES.
• DURING THE SHUTDOWN OF AHU-2, THE FIRST AND SECOND FLOOR SHALL BE
MONITORED FOR TEMPERATURE AND NEGATIVE PRESSURIZATION. PROVIDE
TEMPORARY HEATING AND COOLING FOR PERIMETER ROOMS. PROVIDE DATA
LOGGERS TO MONITOR AND RECORD THE TEMPERATURE AND HUMIDITY
DURING CONSTRUCTION AS THE EXISTING BAS MAY BE AFFECTED BY
CONSTRUCTION ACTIVITIES.
• PRIOR TO SHUTDOWN, EXHAUST FANS SHALL BE TURNED OFF OR SET TO
MINIMUM LEVELS. AFTER SHUTDOWN, THEY SHALL BE RETURNED TO NORMAL
OPERATION. COORDINATE WITH COR WHICH FANS MAY BE TURNED OFF.
• EPOXY COATING SHALL BE COMPLETED AT END OF THE REPLACEMENT WORK.
PROVIDE TWO 8-HOUR SHIFTS PER AHU FOR COMPLETION OF EPOXY WORK.
5. THE PROJECT SHALL COMPLETE FINAL TEST AND BALANCE AND COMMISSIONING
DURING AFTER HOURS. SHUTDOWN OF 31-EX.AHU1 TO COMPLETE TAB AND CX
MUST BE WITHIN THE 6 WEEKEND SHUTDOWNS. 31-EX.AHU2 MAY BE SHUTDOWN
AFTER HOURS WITH PERMISSION OF COR TO COMPLETE TESTING.
BID OPTIONS
• EPOXY COAT SHALL INCLUDE THE OUTSIDE AIR INTAKE PLENUMS FOR EX-31AHU.1
AND EX-31AHU.2.
• INCLUDE 10-YEAR EXTENDED WARRANTY FOR EPOXY COATING.
• REMOVE UV LIGHTS INCLUDING CONTROLS FROM COOLING COILS FOR EX-31AHU.1
AND EX-31AHU.2.
1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com
616 361 2664 OFFICE 616 361 1493 FAX
600 E. Michigan Ave, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS
DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
ALLIANCE | 7GAE JV PROJECT NO.: 219008
Office of
Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o n e o e q u a rt e r in c h o th re e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o
6 "
Department of Veterans Affairs17JANUARY 10, 2020
M001
506-20-209
ANN ARBOR VAMC
SMB MMK
GENERAL MECHANICAL
INFORMATION
REPLACE AHU 1 & 2 -
BLDG. 31
ABBREVIATIONS - HVAC
RC RE-HEAT COIL
RCP RADIANT CEILING PANEL
RG RETURN AIR GRILLE
RP RADIANT PANEL
RPBP REDUCED PRESSURE BACKFLOW
PREVENTER
RPM REVOLUTIONS PER MINUTE
RR RETURN AIR REGISTER
RR REST ROOM
RTU ROOFTOP UNIT
RV RELIEF VENT
S REFRIGERATION SUCTION
SA SUPPLY AIR
SAF SUPPLY AIR FAN
SAT SATURATED
SC STEAM COIL
SD SUPPLY AIR DIFFUSER
SG SUPPLY AIR GRILLE
SG SPECIFIC GRAVITY
SK SINK
SM SURFACE MOUNTED
SMM SNOW MELT MANIFOLD
SMR SNOW MELT RETURN
SMS SNOW MELT SUPPLY
SR SUPPLY AIR REGISTER
STL STEEL
STM STEAM
STOR STORAGE
TERM TERMINAL
TF TRANSFER FAN
TG TRANSFER AIR GRILLE
THERM 100 CUBIC FEET OF NATURAL GAS
TOC TOP OF CURB
TR TAMPER RESISTANT
TSE TOP OF STEEL ELEVATION
TU TERMINAL UNIT
U/V UNIT VENTILATOR
UH UNIT HEATER
V VOLTS
VAV VARIABLE AIR VOLUME
VCD VOLUME CONTROL DAMPER
VFD VARIABLE FREQUENCY DRIVE
VI VIBRATION ISOLATOR
VOL VOLUME
WB WET BULB
WHTR WATER HEATER
XFER TRANSFER
HTR HEATER
HUM HUMIDIFIER
HW HOT WATER
HWP HYDRONIC WATER PUMP
HX HEAT EXCHANGER
HZ HERTZ
INS INSULATE, INSULATION
IR INFRARED
KVAR KILOVOLT-AMPERES REACTIVE
L REFRIGERATION LIQUID
LAB LABORATORY
LAT LEAVING AIR TEMPERATURE
LEED LEADERSHIP IN ENERGY AND
ENVIRONMENTAL DESIGN
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
MA MIXED AIR
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MOP BASIN
MBH THOUSAND BRITISH THERMAL UNIT
MCA MINIMUM CIRCUIT AMPS
MD MOTORIZED DAMPER, MOTION
DETECTOR
MOP MAXIMUM OVERCURRENT PROTECTION
NC NORMALLY CLOSED
NF NONFUSED
NFDS NONFUSED DISCONNECT SWITCH
NG NATURAL GAS
NO NORMALLY OPEN
OA OUTSIDE AIR
OHD OVERHEAD DOOR
OPG OPENING
ORD OVERFLOW ROOF DRAIN
OV OUTLET VELOCITY
P PUMP
P/T PETE'S PLUG
PC PUMPED CONDENSATE
PCR PUMPED CONDENSATE RETURN
PD PRESSURE DROP
PF PUMP - FIRE PROTECTION
PH PHASE
PP PUMP - PLUMBING
PR PERIMETER RADIATION
PRV PRESSURE REDUCING VALVE
PRV POWER ROOF VENTILATOR
PSIG POUNDS PER SQUARE INCH GAUGE
R RISER
RA RETURN AIR
RAF RETURN AIR FAN
CWS CHILLED WATER SUPPLY
DB DRY BULB
DB DIALYSIS WASTE & SUPPLY BOX
DDC DIRECT DIGITAL CONTROLS
DDTU DUAL DUCT TERMINAL UNIT
DIFF DIFFUSER
DISC DISCONNECT
DPR DAMPER
DT DOUBLE THROW
EA EXHAUST AIR
EDB ENTERING DRY BULB
EF EXHAUST FAN
EG EXHAUST AIR GRILLE
EHC ELECTRIC HEATING COIL
EIH ELECTRIC INFARED HEATER
EM EMERGENCY
ENT ENTERING
ERC ENERGY RECOVERY COIL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EWB ENTERING WET BULB
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXP EXPLOSION PROOF
F&T FLOAT & THERMOSTATIC STEAM TRAP
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT
FD FIRE DAMPER
FDS FUSED DISCONNECT SWITCH
FM FORCEMAIN
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPM FEET PER MINUTE
FSEC FOOD EQUIPMENT SERVICE
CONTRACTOR
FT FIN TUBE
G GAS
GEN GENERATOR
GLR GROUND LOOP RETURN
GLS GROUND LOOP SUPPLY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GV GATE VALVE
HC HEATING COIL
HG REFRIGERATION HOT GAS
HP HORSEPOWER
HP STM HIGH PRESSURE STEAM
HPR HEAT PUMP WATER RETURN
HPS HEAT PUMP WATER SUPPLY
HR HEATING WATER RETURN, HOUR
HS HEATING WATER SUPPLY
HSKP HOUSEKEEPING PAD
HTG HEATING
HTP HEAT PUMP
Φ FLAT OVAL DUCT
AC AIR COMPRESSER
AC ARCHITECTURAL CONTRACTOR
ACL ACOUSTICALLY LINED
ACU AIR CONDITIONING UNIT
ACV AIR CONTROL VALVE
AD ACCESS DOOR
ADA AMERICANS WITH DISABILITIES ACT
AFS AIR FLOW SWITCH
AFT AIR FLOW TRANSMITTER
AHU AIR HANDLING UNIT
AP ACCESS PANEL
APD AIR PRESSURE DROP
APPROX APPROXIMATE
AQ-STAT AQUA STAT
AS AMP SWITCH
ATS AUTOMATIC TRANSFER SWITCH
ATT SOUND ATTENUATOR
AVS ACID VENT STACK
AW ACID WASTE
B BOILER
BAS BUILDING AUTOMATION SYSTEM
BBD BOILER BLOWDOWN
BC BOOSTER COIL
BDD BACKDRAFT DAMPER
BFP BOILER FEEDWATER PUMP
BHP BREAK HORSEPOWER
BMS BUILDING MANAGEMENT SYSTEM
BP BACKFLOW PREVENTER
C CONVECTOR
CAB CABINET
CAP CAPACITY
CC COOLING COIL
CD COLD DECK
CD CONDENSATE DRAIN
CF CEILING FAN
CF CUBIC FOOT
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CH CABINET HEATER
CLR CLEAR, CLEARANCE
CMP CORRUGATED METAL PIPE
CMPR COMPRESSOR
CNR CONDENSER WATER RETURN
CNS CONDENSER WATER SUPPLY
COMP COMPARTMENT
COND CONDENSATE
CONV CONVECTOR
COORD COORDINATE
CP CIRCULATING PUMP
CT COOLING TOWER
CTR COOLING TOWER RETURN
CTS COOLING TOWER SUPPLY
CU COPPER
CV CONTROL VALVE
CWR CHILLED WATER RETURN
5REVISIONS DATE
kozelm Stamp kozelm Date
| Sheets |
| E601 - ELECTRICAL ONE LINE DIAGRAM |
| ED103 - ELECTRICAL POWER PENTHOUSE DEMO. PLAN |
| ED601 - ELECTRICAL ONE LINE DIAGRAM DEMOLITION |
| EP102 - ELEC. POWER PLAN SECOND FLOOR - FOR REF. ONLY |
| EP103 - ELECTRICAL POWER PENTHOUSE PLAN |
| M001 - GENERAL MECHANICAL INFORMATION |
| M401 - MECHANICAL DETAILS |
| M501 - MECHANICAL SCHEDULES |
| M601 - 3D VIEWS - DEMOLITION |
| M602 - 3D VIEWS - DEMOLITION |
| MH100 - BASEMENT HVAC PLAN |
| MH103 - MECHANICAL HVAC PENTHOUSE PLAN |
| MI101 - MECHANICAL CONTROLS & INSTRUMENTATION |
| 2020-01-06T09:21:46-0500 | |
| Maureen M. Kozel, PE | |
| I have reviewed this document |