About this file

This pre-solicitation announcement and related federal contract opportunity describe an upcoming invitation for bid to replace air handlers at the Ann Arbor VA Medical Center in Ann Arbor, Michigan. The solicitation will be issued on or around June 20, 2020 on beta.SAM.gov seeking a contractor to remove and replace internal components in air handler units 1 and 2 located in Building 31. Work will include replacing cooling coils, heating coils, humidifiers, supply fans, outside air dampers and adding final filters. Additional repairs to casing rust and interior components are also required. The contract will utilize firm fixed pricing and have an estimated completion date of 120 days from award. The North American Industry Classification size standard of $16.5 million for NAICS code 238220 Plumbing, Heating, and Air Conditioning applies. The project value is estimated between $500,000 to $1 million. The Department of Veterans Affairs Veterans Health Administration is the contracting agency. Interested parties should monitor beta.SAM.gov for solicitation documents and amendments issued on or around June 30, 2020.

View the file

Other files for this federal contract opportunity

Other files attached to J041--506-20-209 Replace Air Handler Bldg 31 - 1 and 2, newest first.
File Type Posted
Sign In Sheet 506-20-209.pdf PDF
Covid Instructions.docx DOCX document
36C25020B0055 0004.docx DOCX document
36C25020B0055 0002.docx DOCX document
01 G001.pdf PDF
47 - M001 - GENERAL MECHANICAL INFORMATION.pdf PDF
48 - MH103 - MECHANICAL HVAC PENTHOUSE PLAN.pdf PDF
36 A320.pdf PDF
03 G002.pdf PDF
48 - MH100 - BASEMENT HVAC PLAN.pdf PDF
36C25020B0055 0003.docx DOCX document
RFI Form 506-20-209.docx DOCX document
Contractor EMR Certification Form 2020.docx DOCX document
36C25020B0055_1.docx DOCX document
506-20-209 - VA AA AHU Replacement - Bid Drawings.pdf PDF
WD- ML20200100 07-24-2020.pdf PDF
506-20-209 AHU - Specifications.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

AA A B C D D.6 E F G H J J.5 K L L.1

3.4

4.5

1.11

AREA OF WORK

AREA OF WORK

A R

E A

O F W

O R

K

A R

E A

O F W

O R

K

EXISTING AHU EXISTING AHU

NOTE:

CONTRACTOR TO USE THIS AREA AS

REPLACEMENT EQUIPMENT STAGING AREA;

REFER TO MECHANICAL SHEET M001 FOR

ADDITIONAL PHASING INFORMATION

AA A B C

1.11

A320

NOTE:

CONTRACTOR TO REMOVE & SALVAGE EXISTING INSULATED

METAL PANELS & PORTION OF EXISTING METAL STUDS FROM

RUNNER TO RUNNER TO PROVIDE ACCESS TO PENTHOUSE.

PROTECT INSULATED METAL PANELS & METAL STUDS DURING

DEMOLITION FOR RE-INSTALLATION. PATCH & REPAIR ADJACENT

SURFACES AS REQUIRED. REFER TO MECHANICAL & ELECTRICAL

PLANS PRIOR TO STUD REMOVAL FOR DEVICE RELOCATION

COORDINATION.

CONTRACTOR TO ONLY REMOVE REQ. LENGTH FOR PENTHOUSE ENTRY

13' - 2" ± NOTE:

CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING

A TEMPORARY ENCLOSURE AROUND OPENING WHERE METAL

PANEL IS REMOVED. ONCE METAL PANEL IS RE-INSTALLED,

TEMPORARY ENCLOSURE CAN BE REMOVED.

EXISTING AHU

NOTE:

EXISTING COLD FORMED DOOR FRAMING TO REMAIN

AA A B C

1.11

A320

EXISTING AHU

FLOOR PLAN LEGEND

EXISTING NON-FIRE RATED WALL

NEW NON-FIRE RATED WALL

EXISTING DOOR

NEW DOOR

2-HOUR FIRE RATED BARRIER - UL DES U419

1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO

MECHANICAL PHASING DESCRIPTION ON SHEET M001.

2. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY

WALK-OFF MATS ON INSIDE & OUTSIDE OF WORK SPACE.

3. REFER TO SHEETS A103 & A320 FOR ADDITIONAL INFORMATION

ON DEMOLITION INTENT & EXTENT.

4. CONTRACTOR TO COORDINATE ALL AHU SHUT DOWNS WITH VA

COR & BUILDING USERS AT LEAST 6 WEEKS IN ADVANCE, TO

ALLOW USERS TO PREPARE FOR AIR FLOW DISRUPTION.

5. ALL AHU COMPONENT REPLACEMENT TO TAKE PLACE AFTER

HOURS, ON WEEKENDS. AHU SHUT DOWN IS TO TAKE PLACE

BETWEEN 5:00 PM FRIDAY - 3:00 AM MONDAY. CONTRACTOR

TO COORDINATE FINAL SHUTDOWN TIMES WITH VA COR.

6. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO

ENSURE ALL BUILDING AND CONSTRUCTION CODES ARE MET

FOR EACH PHASE PRIOR TO THE PHASE BEING CONSIDERED

CLOSED.

7. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND

MAINTAINING A TEMPORARY ENCLOSURE AROUND OPENING

WHERE METAL PANEL IS REMOVED. ONCE METAL PANEL IS RE-

INSTALLED, TEMPORARY ENCLOSURE CAN BE REMOVED.

8. PARKING WILL BE ALLOWED ON NIGHTS/WEEKENDS IN

DESIGNATED LOCATIONS. PARKING DURING NORMAL BUSINESS

HOURS WILL BE LIMITED TO 2 SPACES. CONTRACTOR TO

COORDINATE PARKING LOCATIONS WITH VA COR.

GENERAL PHASING NOTES

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

ALLIANCE | 7GAE JV PROJECT NO.: 219008

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o n e o e q u a rt e r in c h o th re e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs17

A103

506-20-209

ANN ARBOR VAMC

JANUARY 10, 2020 JLK EMP

PENTHOUSE FLOOR PLAN REPLACE AHU 1 & 2 -

BLDG. 31

NORTH

SCALE: 1/8" = 1'-0"

PENTHOUSE COMPOSITE PLAN

SCALE: 1/4" = 1'-0"A103

PENTHOUSE DEMOLITION PLAN01

SCALE: 1/4" = 1'-0"A103

PENTHOUSE FLOOR PLAN02

REVISIONS DATE

Sheets
A103 - PENTHOUSE FLOOR PLAN
A320 - WALL SECTIONS

File details come from the government source that posted it. Updated .