48 - MH100 - BASEMENT HVAC PLAN.pdf
PDF 769 KB Posted
- Attached to
- J041--506-20-209 Replace Air Handler Bldg 31 - 1 and 2 Federal contract opportunity
- Solicitation number
- 36C25020B0055
About this file
This pre-solicitation announcement and related federal contract opportunity document provide details for an upcoming Invitation for Bid to replace air handlers at the Ann Arbor VA Medical Center located in Ann Arbor, Michigan. The solicitation number is 36C25020B0055 and will require removal and replacement of existing internal components in Air Handler Units 1 and 2 located in Building 31, including cooling coils, heating coils, heat recovery coils, humidifiers, supply fans, outside air control dampers, and addition of final filters. Additional work includes interior and exterior casing repairs, door seal replacements, and conversion of all components to direct digital control. The contractor must furnish all labor, materials, equipment and supervision to complete the project, estimated at between $500,000 and $1,000,000. The North American Industry Classification System code is 238220 and size standard of $16.5 million applies. The solicitation will be issued on June 30, 2020 on beta.SAM.gov and bids are due on a date specified in that solicitation. The contract type will be firm fixed price with an award date within 120 days of bid receipt and a construction period of 120 days.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sign In Sheet 506-20-209.pdf | ||
| 36C25020B0055 0004.docx | DOCX document | |
| Covid Instructions.docx | DOCX document | |
| 36 A103.pdf | ||
| 36C25020B0055 0002.docx | DOCX document | |
| 01 G001.pdf | ||
| 03 G002.pdf | ||
| 47 - M001 - GENERAL MECHANICAL INFORMATION.pdf | ||
| 48 - MH103 - MECHANICAL HVAC PENTHOUSE PLAN.pdf | ||
| 36 A320.pdf | ||
| 36C25020B0055 0003.docx | DOCX document | |
| RFI Form 506-20-209.docx | DOCX document | |
| Contractor EMR Certification Form 2020.docx | DOCX document | |
| 36C25020B0055_1.docx | DOCX document | |
| 506-20-209 AHU - Specifications.pdf | ||
| 506-20-209 - VA AA AHU Replacement - Bid Drawings.pdf | ||
| WD- ML20200100 07-24-2020.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01A34333231
30A
25 27
19 21
22 23
21A
26A 26B
11 07 05
S-1
S-2
P-1
0406080910
CB-3
CB-2
CB-1
121314
15A
15B
17A
17B
17C
30B
17D
CB-5
CB-4
CB-1A
29A
CB-G
UTILITY
TUNNEL
(EL. 810'-9")
UTILITY
TUNNEL
STAIR
#3
STAIR
#1
STAIR
#2
ELEV.
ELEV.
ELEV.
(EL.
816.13)
STAIR
#4
BLDG. NO.
22LOWER
LEVEL(EL. 816 '-1 1/2")
STAIR
#5
AA A B C D D.6 E F G H J J.5 K L L.1 M
3.4
4.5
1.11
3 3
3 3
2 22 2
300 WATTS HTG
0.25 TONS CLG
225 WATTS HTG
0.15 TONS CLG
225 WATTS HTG
0.15 TONS CLG
225 WATTS HTG
0.15 TONS CLG
225 WATTS HTG
0.15 TONS CLG
300 WATTS HTG
0.25 TONS CLG
350 WATTS HTG
0.25 TONS CLG
350 WATTS HTG
0.25 TONS CLG
300 WATTS HTG
0.2 TONS CLG
300 WATTS HTG
0.2 TONS CLG
300 WATTS HTG
0.2 TONS CLG
300 WATTS HTG
0.25 TONS CLG
350 WATTS HTG
0.2 TONS CLG
400 WATTS HTG
0.2 TONS CLG
225 WATTS HTG
0.15 TONS CLG
1000 WATTS HTG
500 WATTS HTG
500 WATTS HTG
300 WATTS HTG
300 WATTS HTG
0.2 TONS CLG
350 WATTS HTG
0.25 TONS CLG
1000 WATTS HTG
300 WATTS HTG 300 WATTS HTG 300 WATTS HTG 300 WATTS HTG
300 WATTS HTG 300 WATTS HTG 300 WATTS HTG 300 WATTS HTG
1000 WATTS HTG
500 WATTS HTG 1000 WATTS HTG
VALUES SHOWN ARE MINIMUMS FOR HEATING AND COOLING.
HAVE AVAILABLE AN ADDITIONAL 10 KW OF HEATING CAPACITY AND 10 TONS OF COOLING
CAPACITY TO ADDRESS MISCELLANEOUS SPACES IN THE BASEMENT.
PROVIDE DATA LOGGERS TO RECORD TEMP AND HUMIDITY LEVELS IN SPACES IDENTIFIED IF BAS IS UNABLE TO RECORD AND TREND DUE TO CONSTRUCTION ACTIVITIES. TURN TREND DATA OVER
TO THE COR AFTER EACH SHUTDOWN.
MECHANICAL KEYNOTES - BASEMENT?
1. RADIOACTIVE ISOTOPE CONTAINMENT (NEGATIVE PRESSURE): MAINTAIN ROOM
AT 68°F TO 75°F, 45-60% RH, AND NEGATIVE PRESSURE DURING SHUTDOWNS OF
31-EX.AH-1. PROVIDE TEMPORARY HEATING OR COOLING DURING DURATION OF
SHUTDOWN. EXISTING EXHAUST AIR TERMINAL UNIT SHALL REMAIN OPEN
(MINIMUM POSITION WHERE POSSIBLE).
2. BIOSAFETY LEVEL I CONTAINMENT (POSITIVE PRESSURE): MAINTAIN ROOM AT 68°
F TO 75°F, 45-60% RH, AND POSITIVE PRESSURE DURING SHUTDOWNS OF 31-
EX.AH-1. PROVIDE TEMPORARY HEATING OR COOLING AS REQUIRED DURING
DURATION OF SHUTDOWN. EXISTING EXHAUST AIR TERMINAL UNIT SHALL BE
CLOSED DURING CONSTRUCTION SHUTDOWN.
3. BIOSAFETY LEVEL II CONTAINMENT (NEGATIVE PRESSURE): MAINTAIN ROOM AT
68°F TO 75°F, 45-60% RH, AND NEGATIVE PRESSURE DURING SHUTDOWNS OF 31-
EX.AH-1. PROVIDE TEMPORARY HEATING OR COOLING AS REQUIRED DURING
DURATION OF SHUTDOWN. EXISTING EXHAUST AIR TERMINAL UNIT SHALL REMAIN
OPEN (MINIMUM POSITION WHERE POSSIBLE).
4. EXISTING FUME HOOD 31-HD-8 SHALL BE CLOSED TO MINIMUM POSITION WHILE
MAINTAINING NEGATIVE PRESSURE.
1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com
616 361 2664 OFFICE 616 361 1493 FAX
600 E. Michigan Ave, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS
DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
ALLIANCE | 7GAE JV PROJECT NO.: 219008
Office of
Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o n e o e q u a rt e r in c h o th re e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o
6 "
Department of Veterans Affairs17JANUARY 10, 2020
MH100
506-20-209
ANN ARBOR VAMC
SMB MMK
BASEMENT HVAC PLAN REPLACE AHU 1 & 2 -
BLDG. 31
1/8" = 1'-0"
BASEMENT HVAC PLAN
ROOM LEGEND
1 CLEAN CAGE STORAGE
01A EQUIPMENT STORAGE
2 CAGE WASHING
4 ANIMAL WARD
5 PROCEDURE & TREATMENT ROOM
6 ANIMAL WARD
7 WOMENS LOCKERS
8 ANIMAL WARD
9 ANIMAL WARD
10 ANIMAL WARD
11 MENS LOCKERS
12 CUBICLE ROOM
13 CUBICLE ROOM
14 LARGE ANIMAL WARD / RABBITS
15 PROCEDURE LAB
15A ANIMAL WARD
15B HAZARDOUS WASTE
16 LARGE ANIMAL WARD / DOGS
17 AIR LOCK
17A INFECTIOUS PROCEDURE LAB
17B INFECTIOUS WARD
17C CHANGE & SHOWER ROOM
17D STERILIZER
18 ELECTRICAL
19 H.A.C.
20 LARGE ANIMAL WARD / DOGS
21 NECROPSY
21A COLD STORAGE
22 KITCHEN FEED & BEDDING
23 ANIMAL WARD / DOGS
24 PROCEDURE LAB
25 ELECTRICAL
26 VESTIBULE
26A ANIMAL WARD / PRIMATE
26B ANIMAL WARD / PRIMATE
27 COMMUNICATIONS
28 POST OPERATIVE WARD
29 SURGICAL SUPPLY
29A STERILIZER
30 SURGICAL PREP.
30A WASTE 03 SURVIVAL SURGERY
30B SCRUB & GOWN ROOM
31 TERMINAL SURGERY
32 OFFICE/ VETERINARIAN
33 OFFICE/ SUPERVISOR
34 LOUNGE
35 ANIMAL RECEIVING & EXAM WARD
36 DIAGNOSTIC LAB
37 LINK
37A UTILITY
CB-1 NEUTRAL CORRIDOR
CB-1A ELEVATOR LOBBY
CB-2 CLEAN CORRIDOR
CB-3 DIRTY CORRIDOR
CB-4 NEUTRAL CORRIDOR
CB-5 NEUTRAL CORRIDOR
REVISIONS DATE
kozelm Stamp kozelm Date
| Sheets |
| E601 - ELECTRICAL ONE LINE DIAGRAM |
| ED103 - ELECTRICAL POWER PENTHOUSE DEMO. PLAN |
| ED601 - ELECTRICAL ONE LINE DIAGRAM DEMOLITION |
| EP102 - ELEC. POWER PLAN SECOND FLOOR - FOR REF. ONLY |
| EP103 - ELECTRICAL POWER PENTHOUSE PLAN |
| M001 - GENERAL MECHANICAL INFORMATION |
| M401 - MECHANICAL DETAILS |
| M501 - MECHANICAL SCHEDULES |
| M601 - 3D VIEWS - DEMOLITION |
| M602 - 3D VIEWS - DEMOLITION |
| MH100 - BASEMENT HVAC PLAN |
| MH103 - MECHANICAL HVAC PENTHOUSE PLAN |
| MI101 - MECHANICAL CONTROLS & INSTRUMENTATION |
| 2020-01-06T09:24:48-0500 | |
| Maureen M. Kozel, PE | |
| I have reviewed this document |