03 G002.pdf
PDF 160 KB Posted
- Attached to
- J041--506-20-209 Replace Air Handler Bldg 31 - 1 and 2 Federal contract opportunity
- Solicitation number
- 36C25020B0055
About this file
This announcement is for an upcoming Invitation for Bid for a construction project at the Department of Veterans Affairs Medical Center in Ann Arbor, Michigan. The project involves removing and replacing internal components in Air Handler Units 1 and 2 in Building 31, including cooling coils, heating coils, heat recovery coils, humidifiers, supply fans, outside air control dampers, and addition of final filters. Access sections will also be relocated or removed. Additional work includes repairing interior and exterior casing rust, providing epoxy protection prior to new component installation, repairing door seals and air leaks, and converting all components to direct digital control. The project is to address issues with cooling coil leaks and draining as well as replace cracked steam headers. The bid solicitation will be issued on June 20, 2020 via beta.SAM.gov and bids are due by a date specified in the solicitation. The contract will be a firm fixed price award with an estimated value between $500,000 and $1 million. The contractor must complete all work within 120 days and follow VA privacy and security requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Covid Instructions.docx | DOCX document | |
| Sign In Sheet 506-20-209.pdf | ||
| 36C25020B0055 0004.docx | DOCX document | |
| 36 A103.pdf | ||
| 36C25020B0055 0002.docx | DOCX document | |
| 47 - M001 - GENERAL MECHANICAL INFORMATION.pdf | ||
| 48 - MH103 - MECHANICAL HVAC PENTHOUSE PLAN.pdf | ||
| 36 A320.pdf | ||
| 01 G001.pdf | ||
| 48 - MH100 - BASEMENT HVAC PLAN.pdf | ||
| 36C25020B0055 0003.docx | DOCX document | |
| RFI Form 506-20-209.docx | DOCX document | |
| 506-20-209 - VA AA AHU Replacement - Bid Drawings.pdf | ||
| WD- ML20200100 07-24-2020.pdf | ||
| Contractor EMR Certification Form 2020.docx | DOCX document | |
| 36C25020B0055_1.docx | DOCX document | |
| 506-20-209 AHU - Specifications.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A300
A320
A420
A500
ARCHITECTURAL SYMBOLS & PLAN INDICATORS ABBREVIATIONS
ROOMNAME
XXX
A
A
A
A
8'-0"
TOP OF STEEL
ELEV. 10'-0"
A200
TITLE
SCALE X" = 1'-0"
ELEVATION INDICATION
SHEET NO.
ELEVATION NUMBER
SECTION INDICATOR
ENLARGED PLAN OR
ELEVATION
PROPOSED SPOT
EXISTING SPOT
ELEVATION
100.57'
100.57'
STRUCTURAL SPAN
ROOF TRUSSES
FLOOR JOIST OR
RAMP
@ 16" O.C.
2 x 12
1" per 12"
SLOPE UP
REVISION TAG W/
REVISION NUMBER
KEYNOTE TAG
WINDOW TAG W/
WINDOW TYPE
INDICATOR
WALL SECTION CUT
COLUMN LINE
WALL TYPES
ELEVATION
BUILDING SECTION CUT
SHEET LOCATION
DETAIL NUMBER
TYPICAL
DIMENSIONING
SET-BACK LINE
PROPERTY LINE
EXISTING
CONTOUR
TOPOGRAPHY
CONTOUR
100'
100'
TOPOGRAPHY
PROPOSED
SECTIONS & DETAILS
TYPICAL TITLE FOR
DOOR NUMBER
DOOR TAG W/
ROOM NUMBER
ROOM NAME/
NORTH ARROW
60" DIAMETER CLEAR
WHEELCHAIR TURNING
SPACE - REFER TO PLAN
- REFER TO PLAN
AND GROUND SPACE
30" x 48" CLEAR FLOOR
CEILING HEIGHT TAG
4'-4"
XXXNORTH
@ AT
A/C AIR CONDITIONIN/AIR CONDITIONER
ACOUS ACOUSTICAL
AD AREA DRAIN, AUTOMATIC DAMPER
ADJ ADJUST, ADJUSTABLE
ALUM ALUMINUM
AP ACCESS PANEL
ACT ACOUSTICAL CEILING
B BASE
BAR BARRIER
BD BOARD
BF BARRIER FREE
BKT BRACKET
BLDG BUILDING
BLKG BLOCKING
BOTT BOTTOM
C TO C CENTER TO CENTER
CAB CABINET
CE COLUMN ENCLOSURE
CIR CIRCLE
CIR CIRCUIT
CL CENTER LINE, CLEARANCES
CLG CEILING
CJ CONTROL JOINT
CLKG CAULKING
CLO CLOSET
CMT CERAMIC MOSAIC TILE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CORR CORRIDOR
CPT CARPET
CSS CLINICAL SERVICE SINK
CT CERAMIC TILE
CTR CENTER
CUH CABINET UNIT HEATER
DEMO DEMOLITION, DEMOLISH
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA, D DIAMETER
DIM DIMENSION
DN DOWN
DR DRAIN
DS DOWNSPOUT
ELECT ELECTRICAL
ELEV ELEVATION
ENTR ENTRANCE
EQ EQUAL
EP ELECTRICAL PANEL
EXH EXHAUST
EXP EXPOSED
EXIST EXISTING, EXSIST'G
EXT EXTERIOR
EW EACH WAY
FA FIRE ALARM
FD FIRE DAMPER OR FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FL, FLR FLOOR FINISH
FLG, FLRG FLOORING, FLOOR'G
FURN FURNITURE, FURNACE
FWC FABRIC WALL COVERING
FT FEET, FOOT
GALV GALVANIZE(D)
GL GLASS
GSB GYPSUM SHEATHING BOARD
GWB GYPSUM WALLBOARD
GYP. BD GYPSUM BOARD
ID INSIDE DIAMETER
INSUL INSULATION
IN INCH(ES)
JAN JANITOR'S CLOSET
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
HW HEADWALL
LAM LAMINATED
LF LINEAL FEET
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MANUF MANUFACTURED, MANUFACTURER
MIN MINIMUM
MLD'G MOLDING
MTL METAL
N NORTH
NAT NATURAL
NIC NOT IN CONTRACT
NORM NORMAL
NTS NOT TO SCALE
O.C. ON CENTER
OPN'G OPENING
O, O2 OXYGEN
PLAST PLASTIC
PNT PAINT
PREFAB PREFABRICATED
PLYWD PLYWOOD, PLYW'D
R RADIUS
RA RETURN AIR
REQ'D REQUIRED
RM ROOM
S SINK, SOUTH, SHINGLE
SA SUPPLY AIR
SAN SANITARY
SMKD SMOKE DAMPER
SECT SECTION
SHWR SHOWER
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SS SERVICE SINK, STAINLESS STEEL
STD STANDARD
STOR STORAGE
SUSP SUSPEND(ED)
SYM SYMBOL, SYMMETRICAL
TOIL TOILET
TYP TYPICAL
UNFIN UNFINISHED
UTIL UTILITY
VAC VACUUM
VAV VARIABLE AIR VOLUME
VCT VINYL COMPOSITION TILE
VD VOLUME DAMPER
VERT VERTICAL
V.I.F. VERIFY IN FIELD
VT VINYL TILE
VWC VINYL WALL COVERING
W/ WITH
WC WATER CLOSET
WD WOOD
WNDW WINDOW
W. HTR WATER HEATER
W/O WITHOUT
WP WALL PROTECTION
T500
WALK
CONC.
BLDG. 31
NOTE:
PROPOSED CRANE LOCATION/CONTRACTOR LAY-DOWN
SPACE; ALL MATERIALS TO BE LIFTED INTO PENTHOUSE ARE
TO ARRIVE ONSITE AT THE SAME TIME TO MINIMIZE IMPACTS
TO SURROUNDING VA BUILDINGS/PROJECTS; CONTRACTOR
TO COORDINATE FINAL LOCATION WITH VA COR
FULLER ROAD
FULLER CO
URT
1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com
616 361 2664 OFFICE 616 361 1493 FAX
600 E. Michigan Ave, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS
DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
ALLIANCE | 7GAE JV PROJECT NO.: 219008
Office of
Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o n e o e q u a rt e r in c h o th re e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o
6 "
Department of Veterans Affairs17
G002
506-20-209
ANN ARBOR VAMC
JANUARY 10, 2020 JLK EMP
GENERAL INFORMATION &
SYMBOL LEGEND
REPLACE AHU 1 & 2 -
BLDG. 31
NORTH
SCALE: 1" = 100'-0"
CONTRACTOR STAGING AREA
REVISIONS DATE
| Sheets |
| A103 - PENTHOUSE FLOOR PLAN |
| A320 - WALL SECTIONS |
| G001 - COVER SHEET |
| G002 - GENERAL INFORMATION & SYMBOL LEGEND |
File details come from the government source that posted it. Updated .